Foundation Data

Foundation Numbers and sizes

             Length      Width        Depth                          Page
 Number        (ft)       (ft)         (ft)       Area (ft^3)
   10         137          3           3.5          1438.5             2
   11         131          3           2.5          982.5              5
   12          88          3           1.5           396               8
   13          87          3           1.5          391.5             10
   14          85          3           1.5          382.5             13
   15          86          3           1.5           387              16
   16          83          3           1.5          373.5             19
   21         125          3           1.5          562.5             22
   26         119          3           1.5          535.5             25
   27         233          3            2            1398             28
   29         175          3            5            2625             31
   30          60          3            5            900              34
   31         176          3            5            2640             36
   32         177          3            5            2655             39


All reinforcements used in the foundations are in the following pages. They are broken into sections by
the foundation number, followed by the top, bottom, and shear reinforcement data.
Foundation 10

Longitudinal Reinforcement – Top

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #5         5            0       8    1.38    1.55
    2        #6         6            8      38    2.51    2.64
    3        #5         6           38      58    1.82    1.86
    4        #6        10           58      88    4.21     4.4
    5        #6         9           88     104    3.88    3.96
    6        #6         5          104     128    1.88     2.2
    7        #5         5          128     137    0.25    1.55




Longitudinal Reinforcement – Bottom

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #6        10            0      24    4.33     4.4
    2        #6         9           24      48    3.73    3.96
    3        #6         8           48      72    3.39    3.52
    4        #6        14           72      96    5.76    6.16
    5        #5         5           96     115    0.69    1.55
    6        #4         7          115     137    1.36     1.4
Shear Reinforcement

  Size      Spc        Start    End     Req.    Prov.
            (in)        (ft)     (ft)   (in2)   (in2)
   #5        18          0      4.79    0.38    0.41
   #5        18       12.21      18     0.38    0.41
   #5        18         18       23     0.38    0.41
                        23       29       0       0
   #5        18         29     34.79    0.38    0.41
   #5        18       42.21      45     0.38    0.41
   #5        18         45       48     0.38    0.41
   #5        18         48       52     0.38    0.41
   #5        18         52     54.79    0.38    0.41
   #5        18       62.21      67     0.38    0.41
   #5        18         67       71     0.38    0.41
                        71       76       0       0
   #5        18         76       80     0.38    0.41
   #5        18         80     84.79    0.38    0.41
   #5        18       92.21      96     0.38    0.41
   #5        18         96       99     0.38    0.41
   #5        18         99     100.79   0.38    0.41
                      108.21    116       0       0
                       116     124.79     0       0
                      132.21    137       0       0
Foundation #11

Longitudinal Reinforcement – Top

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #3        12            0       5    1.23    1.32
    2        #4        16            5      35    3.15     3.2
    3        #4        16           35      55    3.15     3.2
    4        #4        16           55      85    3.15     3.2
    5        #4        16           85     101    3.15     3.2
    6        #4        13          101     125    2.55     2.6
    7        #3         8          125     131    0.86    0.88




Longitudinal Reinforcement – Bottom

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #7         5            0      20    2.79      3
    2        #6        10           20      45    4.35     4.4
    3        #7         7           45      70    4.09     4.2
    4        #8         5           70      93    3.91    3.95
    5        #7         6           93     113    3.12     3.6
    6        #6         6          113     131    2.48    2.64
Shear Reinforcement

  Size      Spc        Start    End     Req.    Prov.
            (in)        (ft)     (ft)   (in2)   (in2)
   #4        12          0      2.79    0.36     0.4
   #4        12        8.21      13     0.36     0.4
                        13       19       0       0
                        19       25       0       0
   #4        12         25     32.79    0.36     0.4
   #4        12       38.21    43.07    0.36     0.4
   #4        12       43.07      45     0.36     0.4
   #4        12         45     47.93    0.36     0.4
   #4        12       47.93    52.79    0.36     0.4
   #4        12       58.21      66     0.36     0.4
   #4        12         66       70     0.36     0.4
                        70       75       0       0
   #4        12         75     82.79    0.36     0.4
   #4        12       88.21      93     0.36     0.4
   #4        12         93     98.79    0.36     0.4
   #4        12       104.21    110     0.36     0.4
   #4        12        110      114     0.36     0.4
                       114      118       0       0
   #4        12        118     122.79   0.36     0.4
                      128.21    131       0       0
Foundation #12

Longitudinal Reinforcement – Top

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #4         5            0       4    0.42      1
    2        #5         5            4      34    1.48    1.55
    3        #6         5           34      54    2.13     2.2
    4        #5         5           54      84    1.49    1.55
    5        #4         5           84      88    0.46      1




Longitudinal Reinforcement – Bottom

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #6         6            0      17    2.42    2.64
    2        #7         9           17      44    5.11     5.4
    3        #7         9           44      73    5.12     5.4
    4        #6         6           73      88    2.51    2.64
Shear Reinforcement

  Size      Spc       Start    End    Req.    Prov.
            (in)       (ft)    (ft)   (in2)   (in2)
   #3         6         0     2.28    0.35    0.44
   #3         6       5.72      11    0.35    0.44
                       11       18      0       0
                       18       25      0       0
   #3        3         25     32.28   0.66    0.88
   #3        3        35.72     44    0.82    0.88
   #3        3         44     52.28   0.82    0.88
   #3        3        55.72     63    0.65    0.88
                       63       70      0       0
                       70       77      0       0
   #3        6         77     82.28   0.35    0.44
   #3        6        85.72     88    0.35    0.44
Foundation #13

Longitudinal Reinforcement – Top

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #3         5            0       3    0.32    0.55
    2        #4         7            3      33    1.33     1.4
    3        #4        10           33      53     1.9      2
    4        #4         7           53      83    1.34     1.4
    5        #3         5           83      87     0.3    0.55




Longitudinal Reinforcement – Bottom

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #4        10            0      17    1.87      2
    2        #5        15           17      43    4.63    4.65
    3        #6        11           43      69    4.65    4.84
    4        #5         6           69      87    1.84    1.86
Shear Reinforcement

  Size      Spc       Start    End    Req.    Prov.
            (in)       (ft)    (ft)   (in2)   (in2)
   #3         6         0     1.78    0.35    0.44
   #3         6       5.22      10    0.35    0.44
                       10       17      0       0
                       17       25      0       0
   #3        3         25     31.78    0.5    0.88
   #3        3        35.22     43    0.65    0.88
   #3        3         43     51.78   0.66    0.88
   #3        3        55.22     62    0.49    0.88
                       62       69      0       0
                       69       77      0       0
   #3        6         77     81.78   0.35    0.44
   #3        6        85.22     87    0.35    0.44
Foundation #14

Longitudinal Reinforcement – Top

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #3         5            0       2    0.07    0.55
    2        #4         6            2      32    1.13     1.2
    3        #4         7           32      52    1.38     1.4
    4        #4         6           52      82    1.11     1.2
    5        #3         7           82      85     0.7    0.77




Longitudinal Reinforcement – Bottom

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #4         6            0      16    1.18     1.2
    2        #5        11           16      42    3.31    3.41
    3        #5        11           42      68    3.32    3.41
    4        #4         6           68      85    1.16     1.2
Shear Reinforcement

  Size      Spc       Start    End    Req.    Prov.
            (in)       (ft)    (ft)   (in2)   (in2)
                      4.23       6      0       0
                        6       15      0       0
                       15       25      0       0
   #3        6         25     30.77   0.35    0.44
   #3        6        34.23     37    0.35    0.44
   #3        6         37     39.74   0.35    0.44
                      39.74     42      0       0
                       42     45.26     0       0
   #3        6        45.26     48    0.35    0.44
   #3        6         48     50.77   0.35    0.44
   #3        6        54.23     60    0.35    0.44
                       60       69      0       0
                       69       78      0       0
                       78     80.77     0       0
Foundation #15

Longitudinal Reinforcement – Top

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #3         5            0       3    0.15    0.55
    2        #3        10            3      33    1.07     1.1
    3        #3        13           33      53    1.43    1.43
    4        #3        10           53      83    1.09     1.1
    5        #3         5           83      86    0.15    0.55




Longitudinal Reinforcement – Bottom

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #4         7            0      17    1.39     1.4
    2        #5        11           17      43    3.33    3.41
    3        #6         8           43      69    3.33    3.52
    4        #5         5           69      86    1.37    1.55
Shear Reinforcement

  Size      Spc       Start    End    Req.    Prov.
            (in)       (ft)    (ft)   (in2)   (in2)
                        0     1.27      0       0
                      4.73       8      0       0
                        8       17      0       0
                       17       26      0       0
   #3        6         26     31.27   0.35    0.44
   #3        6        34.73     38    0.35    0.44
                       38       41      0       0
                       41       45      0       0
   #3        6         45       48    0.35    0.44
   #3        6         48     51.27   0.35    0.44
   #3        6        54.73     60    0.35    0.44
                       60       69      0       0
                       69       78      0       0
                       78     81.27     0       0
                      84.73     86      0       0
Foundation #16

Longitudinal Reinforcement – Top

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #3         5            0       1    0.01    0.55
    2        #4         8            1      31    1.44     1.6
    3        #3        10           31      51    1.03     1.1
    4        #4         7           51      81    1.37     1.4
    5        #3        10           81      83    1.02     1.1




Longitudinal Reinforcement – Bottom

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #3        10            0      20    1.05     1.1
    2        #4        13           20      43    2.46     2.6
    3        #4        13           43      64    2.49     2.6
    4        #3        10           64      83    1.02     1.1
Shear Reinforcement

  Size      Spc       Start    End    Req.    Prov.
            (in)       (ft)    (ft)   (in2)   (in2)
                      3.24       5      0       0
                        5       15      0       0
                       15       25      0       0
                       25     29.76     0       0
   #3        6        33.24     36    0.35    0.44
                       36       39      0       0
                       39       44      0       0
                       44       47      0       0
   #3        6         47     49.76   0.35    0.44
                      53.24     58      0       0
                       58       68      0       0
                       68       78      0       0
                       78     79.76     0       0
Foundation #21

Longitudinal Reinforcement – Top

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #3         5            0       2    0.13    0.55
    2        #4         7            2      32    1.39     1.4
    3        #5         5           32      52    1.43    1.55
    4        #4         7           52      82    1.38     1.4
    5        #4         5           82      98    0.98      1
    6        #5         5           98     122    1.48    1.55
    7        #4         5          122     125    0.97      1




Longitudinal Reinforcement – Bottom

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #5         6            0      21     1.8    1.86
    2        #6        10           21      42    4.14     4.4
    3        #5        12           42      68    3.68    3.72
    4        #4        16           68      90    3.17     3.2
    5        #5        11           90     108    3.24    3.41
    6        #5         5          108     125    1.53    1.55
Shear Reinforcement

  Size      Spc        Start    End     Req.    Prov.
            (in)        (ft)     (ft)   (in2)   (in2)
                       4.23       7       0       0
                         7       15       0       0
                        15       24       0       0
   #3        6          24     30.77    0.35    0.44
   #3        6        34.23      37     0.36    0.44
   #3        6          37     39.74    0.35    0.44
                      39.74      42       0       0
                        42     45.26      0       0
   #3        6        45.26      48     0.35    0.44
   #3        6          48     50.77    0.35    0.44
   #3        6        54.23      60     0.35    0.44
                        60       67       0       0
                        67       75       0       0
   #3        6          75     80.77    0.35    0.44
   #3        6        84.23      90     0.35    0.44
   #3        6          90     96.77    0.35    0.44
   #3        6        100.23    106     0.35    0.44
                       106      112       0       0
                       112      118       0       0
                       118     120.77     0       0
Foundation #26

Longitudinal Reinforcement – Top

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #3         5            0       2    0.09    0.55
    2        #4         8            2      20    1.55     1.6
    3        #4         8           20      47    1.49     1.6
    4        #4         8           47      82    1.54     1.6
    5        #3        10           82     117    1.05     1.1
    6        #3         5          117     119     0.1    0.55




Longitudinal Reinforcement – Bottom

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #3         7            0      12    0.67    0.77
    2        #3        15           12      34    1.61    1.65
    3        #4        17           34      63    3.28     3.4
    4        #3         8           63     100    0.79    0.88
    5        #3         6          100     119    0.65    0.66
Shear Reinforcement

  Size      Spc       Start    End     Req.    Prov.
            (in)       (ft)     (ft)   (in2)   (in2)
                      3.74       5       0       0
                        5        9       0       0
                        9       14       0       0
                       14     18.26      0       0
                      21.74     23       0       0
                       23       31       0       0
                       31       40       0       0
   #3        6         40     45.26    0.35    0.44
   #3        6        48.74     54     0.35    0.44
                       54       67       0       0
                       67     80.26      0       0
                      83.74     99       0       0
                       99      114       0       0
                       114    115.26     0       0
Foundation #27

Longitudinal Reinforcement – Top

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #5         5            0       8    1.38    1.55
    2        #6         6            8      38    2.51    2.64
    3        #5         6           38      58    1.82    1.86
    4        #6        10           58      88    4.21     4.4
    5        #6         9           88     104    3.88    3.96
    6        #6         5          104     128    1.88     2.2
    7        #5         5          128     137    0.25    1.55




Longitudinal Reinforcement – Bottom

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #6        10            0      24    4.33     4.4
    2        #6         9           24      48    3.73    3.96
    3        #6         8           48      72    3.39    3.52
    4        #6        14           72      96    5.76    6.16
    5        #5         5           96     115    0.69    1.55
    6        #4         7          115     137    1.36     1.4
Shear Reinforcement

  Size      Spc        Start    End     Req.    Prov.
            (in)        (ft)     (ft)   (in2)   (in2)
   #5        18          0      4.79    0.38    0.41
   #5        18       12.21      18     0.38    0.41
   #5        18         18       23     0.38    0.41
                        23       29       0       0
   #5        18         29     34.79    0.38    0.41
   #5        18       42.21      45     0.38    0.41
   #5        18         45       48     0.38    0.41
   #5        18         48       52     0.38    0.41
   #5        18         52     54.79    0.38    0.41
   #5        18       62.21      67     0.38    0.41
   #5        18         67       71     0.38    0.41
                        71       76       0       0
   #5        18         76       80     0.38    0.41
   #5        18         80     84.79    0.38    0.41
   #5        18       92.21      96     0.38    0.41
   #5        18         96       99     0.38    0.41
   #5        18         99     100.79   0.38    0.41
                      108.21    116       0       0
                       116     124.79     0       0
                      132.21    137       0       0
Foundation #29

Longitudinal Reinforcement – Top

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #4         5            0       4    0.42      1
    2        #5         5            4      34    1.48    1.55
    3        #6         5           34      54    2.13     2.2
    4        #5         5           54      84    1.49    1.55
    5        #4         5           84      88    0.46      1




Longitudinal Reinforcement – Bottom

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #6         6            0      17    2.42    2.64
    2        #7         9           17      44    5.11     5.4
    3        #7         9           44      73    5.12     5.4
    4        #6         6           73      88    2.51    2.64
Shear Reinforcement

  Size      Spc       Start    End    Req.    Prov.
            (in)       (ft)    (ft)   (in2)   (in2)
   #3         6         0     2.28    0.35    0.44
   #3         6       5.72      11    0.35    0.44
                       11       18      0       0
                       18       25      0       0
   #3        3         25     32.28   0.66    0.88
   #3        3        35.72     44    0.82    0.88
   #3        3         44     52.28   0.82    0.88
   #3        3        55.72     63    0.65    0.88
                       63       70      0       0
                       70       77      0       0
   #3        6         77     82.28   0.35    0.44
   #3        6        85.72     88    0.35    0.44
Foundation #30

Longitudinal Reinforcement – Top

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #3         5            0       7    0.03    0.55
    2        #3         5            7      25    0.32    0.55
    3        #4         8           25      52    1.59     1.6
    4        #3        13           52      60    1.42    1.43




Longitudinal Reinforcement – Bottom

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #3         5            0      18    0.26    0.55
    2        #3         5           18      38    0.15    0.55
    3        #4        12           38      60    2.21     2.4
Shear Reinforcement

  Seg.      Size      Spc    Start    End    Req.    Prov.
                      (in)    (ft)    (ft)   (in2)   (in2)
    1                          0     2.23      0             0
    2                        12.77     16      0             0
    3                         16     20.23     0             0
    4                        30.77     39      0             0
    5                         39     47.23     0             0
    6                        57.77     60      0             0
Foundation #31

Longitudinal Reinforcement – Top

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #3         5            0       8    0.26    0.55
    2        #3         8            8      33    0.87    0.88
    3        #3         6           33      43    0.63    0.66
    4        #4         6           43      68    1.18     1.2
    5        #4         5           68      93    0.92      1
    6        #4         9           93     123    1.76     1.8
    7        #4         9          123     148    1.78     1.8
    8        #3        17          148     168    1.82    1.87
    9        #3        17          168     176    1.84    1.87




Longitudinal Reinforcement – Bottom

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #4         5            0      21    0.98      1
    2        #5         7           21      38    2.16    2.17
    3        #4        10           38      56      2       2
    4        #5         6           56      81    1.72    1.86
    5        #4        11           81     105     2.2     2.2
    6        #5        11          105     136    3.41    3.41
    7        #4         5          136     158      0       1
    8        #5        10          158     176    2.87     3.1
Shear Reinforcement

  Size      Spc        Start    End     Req.    Prov.
            (in)        (ft)     (ft)   (in2)   (in2)
                         0      2.79      0       0
                      13.21      20       0       0
                        20     27.79      0       0
                      48.21      55       0       0
                        55     62.79      0       0
                      73.21      80       0       0
                        80     87.79      0       0
                      98.21     107       0       0
                       107     116.79     0       0
   #5        18       116.79   117.79   0.35    0.41
   #5        18       128.21   129.21   0.35    0.41
   #5        18       129.21    136     0.35    0.41
                       136     142.79     0       0
                      153.21    157       0       0
                       157     161.79     0       0
   #5        18       161.79   162.79   0.35    0.41
                      173.21    176       0       0
Foundation #32

Longitudinal Reinforcement – Top

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #3         5            0       8    0.22    0.55
    2        #4         5            8      33    0.97      1
    3        #3         6           33      43    0.61    0.66
    4        #4         6           43      68    1.16     1.2
    5        #4         5           68      93    0.89      1
    6        #5         6           93     123    1.78    1.86
    7        #5         6          123     148    1.76    1.86
    8        #4        10          148     168    1.99      2
    9        #5         7          168     177    2.01    2.17




Longitudinal Reinforcement – Bottom

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #4         5            0      22    0.91      1
    2        #5         7           22      38    2.12    2.17
    3        #4        10           38      57    1.98      2
    4        #5         6           57      82    1.72    1.86
    5        #4        11           82     107    2.19     2.2
    6        #5        12          107     137    3.42    3.72
    7        #4         5          137     158      0       1
    8        #4        16          158     177    3.15     3.2
Shear Reinforcement

  Size      Spc        Start    End     Req.    Prov.
            (in)        (ft)     (ft)   (in2)   (in2)
                         0      3.29      0       0
                      13.71      21       0       0
                        21     28.29      0       0
                      48.71      56       0       0
                        56     63.29      0       0
                      73.71      81       0       0
                        81     88.29      0       0
                      98.71     108       0       0
                       108     117.29     0       0
   #5        18       117.29   118.29   0.35    0.41
   #5        18       128.71    130     0.35    0.41
                       130      137       0       0
                       137     143.29     0       0
                      153.71    158       0       0
                       158     162.29     0       0
   #5        18       162.29   163.29   0.35    0.41
                      173.71    177       0       0
Foundation Analysis

Más contenido relacionado

La actualidad más candente

Massey ferguson mf 398 tractor, b18008 parts catalogue manual
Massey ferguson mf 398 tractor,   b18008 parts catalogue manualMassey ferguson mf 398 tractor,   b18008 parts catalogue manual
Massey ferguson mf 398 tractor, b18008 parts catalogue manual
fjsjjekdkme
 
Lintech ball screw_option_specsheet
Lintech ball screw_option_specsheetLintech ball screw_option_specsheet
Lintech ball screw_option_specsheet
Electromate
 
Massey ferguson mf 387 tractor service parts catalogue manual (part number 3...
Massey ferguson mf 387 tractor service parts catalogue manual (part number  3...Massey ferguson mf 387 tractor service parts catalogue manual (part number  3...
Massey ferguson mf 387 tractor service parts catalogue manual (part number 3...
fhsjejfsekkkm
 
Massey ferguson mf 362 n tractor (japan only) parts catalogue manual
Massey ferguson mf 362 n tractor (japan only) parts catalogue manualMassey ferguson mf 362 n tractor (japan only) parts catalogue manual
Massey ferguson mf 362 n tractor (japan only) parts catalogue manual
fjsjjekdkme
 
Webcast: 4th quarter 2006
Webcast: 4th quarter 2006Webcast: 4th quarter 2006
Webcast: 4th quarter 2006
Petrobras
 
Massey ferguson mf 24 combine engines (perkins) parts catalogue manual
Massey ferguson mf 24 combine engines (perkins) parts catalogue manualMassey ferguson mf 24 combine engines (perkins) parts catalogue manual
Massey ferguson mf 24 combine engines (perkins) parts catalogue manual
fjsjjekdkme
 
Dijet draaibeitels-cnmg
Dijet draaibeitels-cnmgDijet draaibeitels-cnmg
Dijet draaibeitels-cnmg
Mx Sanook
 
Massey ferguson mf 690 tractor 1984 (fr) tractor parts catalogue manual
Massey ferguson mf 690 tractor   1984 (fr) tractor parts catalogue manualMassey ferguson mf 690 tractor   1984 (fr) tractor parts catalogue manual
Massey ferguson mf 690 tractor 1984 (fr) tractor parts catalogue manual
fjskemdme
 
Massey ferguson mf 265 tractor, 193552 (gb) parts catalogue manual
Massey ferguson mf 265 tractor,   193552 (gb) parts catalogue manualMassey ferguson mf 265 tractor,   193552 (gb) parts catalogue manual
Massey ferguson mf 265 tractor, 193552 (gb) parts catalogue manual
fjsjjekdkme
 
Hyundai hlf202530(c) 5 forklift truck service repair manual
Hyundai hlf202530(c) 5 forklift truck service repair manualHyundai hlf202530(c) 5 forklift truck service repair manual
Hyundai hlf202530(c) 5 forklift truck service repair manual
fjskemdme
 

La actualidad más candente (17)

Massey ferguson mf 398 tractor, b18008 parts catalogue manual
Massey ferguson mf 398 tractor,   b18008 parts catalogue manualMassey ferguson mf 398 tractor,   b18008 parts catalogue manual
Massey ferguson mf 398 tractor, b18008 parts catalogue manual
 
Lintech ball screw_option_specsheet
Lintech ball screw_option_specsheetLintech ball screw_option_specsheet
Lintech ball screw_option_specsheet
 
Massey ferguson mf 387 tractor service parts catalogue manual (part number 3...
Massey ferguson mf 387 tractor service parts catalogue manual (part number  3...Massey ferguson mf 387 tractor service parts catalogue manual (part number  3...
Massey ferguson mf 387 tractor service parts catalogue manual (part number 3...
 
FM 753
FM 753FM 753
FM 753
 
Massey ferguson mf 20 combine parts catalogue manual
Massey ferguson mf 20 combine parts catalogue manualMassey ferguson mf 20 combine parts catalogue manual
Massey ferguson mf 20 combine parts catalogue manual
 
Massey ferguson mf 362 n tractor (japan only) parts catalogue manual
Massey ferguson mf 362 n tractor (japan only) parts catalogue manualMassey ferguson mf 362 n tractor (japan only) parts catalogue manual
Massey ferguson mf 362 n tractor (japan only) parts catalogue manual
 
Webcast: 4th quarter 2006
Webcast: 4th quarter 2006Webcast: 4th quarter 2006
Webcast: 4th quarter 2006
 
Massey ferguson mf 24 combine engines (perkins) parts catalogue manual
Massey ferguson mf 24 combine engines (perkins) parts catalogue manualMassey ferguson mf 24 combine engines (perkins) parts catalogue manual
Massey ferguson mf 24 combine engines (perkins) parts catalogue manual
 
Hyundai hdf35 3 forklift truck service repair manual
Hyundai hdf35 3 forklift truck service repair manualHyundai hdf35 3 forklift truck service repair manual
Hyundai hdf35 3 forklift truck service repair manual
 
Dijet draaibeitels-cnmg
Dijet draaibeitels-cnmgDijet draaibeitels-cnmg
Dijet draaibeitels-cnmg
 
1 d%20engine%20mechanical%2045 73
1 d%20engine%20mechanical%2045 731 d%20engine%20mechanical%2045 73
1 d%20engine%20mechanical%2045 73
 
Massey ferguson mf 690 tractor 1984 (fr) tractor parts catalogue manual
Massey ferguson mf 690 tractor   1984 (fr) tractor parts catalogue manualMassey ferguson mf 690 tractor   1984 (fr) tractor parts catalogue manual
Massey ferguson mf 690 tractor 1984 (fr) tractor parts catalogue manual
 
Assignment model problems
Assignment model problemsAssignment model problems
Assignment model problems
 
Nuts bolts-screws-washers
Nuts bolts-screws-washersNuts bolts-screws-washers
Nuts bolts-screws-washers
 
Massey ferguson mf 265 tractor, 193552 (gb) parts catalogue manual
Massey ferguson mf 265 tractor,   193552 (gb) parts catalogue manualMassey ferguson mf 265 tractor,   193552 (gb) parts catalogue manual
Massey ferguson mf 265 tractor, 193552 (gb) parts catalogue manual
 
Massey ferguson mf290 tractor ( 387021 (gb)) parts catalogue manual
Massey ferguson mf290 tractor (  387021 (gb)) parts catalogue manualMassey ferguson mf290 tractor (  387021 (gb)) parts catalogue manual
Massey ferguson mf290 tractor ( 387021 (gb)) parts catalogue manual
 
Hyundai hlf202530(c) 5 forklift truck service repair manual
Hyundai hlf202530(c) 5 forklift truck service repair manualHyundai hlf202530(c) 5 forklift truck service repair manual
Hyundai hlf202530(c) 5 forklift truck service repair manual
 

Destacado

Destacado (8)

Making it Matter: Supporting education in the developing world through open a...
Making it Matter: Supporting education in the developing world through open a...Making it Matter: Supporting education in the developing world through open a...
Making it Matter: Supporting education in the developing world through open a...
 
ARC Media Group 2010 Overview
ARC Media Group 2010 OverviewARC Media Group 2010 Overview
ARC Media Group 2010 Overview
 
Wheel Tracks April 2014
Wheel Tracks April 2014Wheel Tracks April 2014
Wheel Tracks April 2014
 
CTD Wi14 Weekly Workshop: How People Learn
CTD Wi14 Weekly Workshop: How People LearnCTD Wi14 Weekly Workshop: How People Learn
CTD Wi14 Weekly Workshop: How People Learn
 
CTD Fa14 Weekly Workshop: How People Learn
CTD Fa14 Weekly Workshop: How People LearnCTD Fa14 Weekly Workshop: How People Learn
CTD Fa14 Weekly Workshop: How People Learn
 
CIRTL Class Meeting 1: How People Learn
CIRTL Class Meeting 1: How People LearnCIRTL Class Meeting 1: How People Learn
CIRTL Class Meeting 1: How People Learn
 
2009 Tech Columbus Annual Report
2009 Tech Columbus Annual Report2009 Tech Columbus Annual Report
2009 Tech Columbus Annual Report
 
DFidoCV15
DFidoCV15DFidoCV15
DFidoCV15
 

Similar a Foundation Analysis

Foundation data
Foundation dataFoundation data
Foundation data
J C
 
Vpectrl3 ram foundation - continuous foundation design
Vpectrl3   ram foundation - continuous foundation designVpectrl3   ram foundation - continuous foundation design
Vpectrl3 ram foundation - continuous foundation design
cathexis123
 
Saint Francis & Purple Vision NAHF Presentation 24/3/12
Saint Francis & Purple Vision NAHF Presentation 24/3/12Saint Francis & Purple Vision NAHF Presentation 24/3/12
Saint Francis & Purple Vision NAHF Presentation 24/3/12
Purple Vision
 
Saint Francis & Purple Vision NAHF Presentation 24/3/12
Saint Francis & Purple Vision NAHF Presentation 24/3/12Saint Francis & Purple Vision NAHF Presentation 24/3/12
Saint Francis & Purple Vision NAHF Presentation 24/3/12
Purple Vision
 
Triangulation Sample
Triangulation  SampleTriangulation  Sample
Triangulation Sample
Chattichai
 
Stocks price
Stocks priceStocks price
Stocks price
iipmff2
 
คะแนนสอบคณิตศาสตร์ม.3 5 ปี53
คะแนนสอบคณิตศาสตร์ม.3 5 ปี53คะแนนสอบคณิตศาสตร์ม.3 5 ปี53
คะแนนสอบคณิตศาสตร์ม.3 5 ปี53
Aj Yawwalak
 
Iwsm2014 extracting dependencies from software changes (thomas wetzlmaier -...
Iwsm2014   extracting dependencies from software changes (thomas wetzlmaier -...Iwsm2014   extracting dependencies from software changes (thomas wetzlmaier -...
Iwsm2014 extracting dependencies from software changes (thomas wetzlmaier -...
Nesma
 
Portaria sit 319
Portaria sit 319Portaria sit 319
Portaria sit 319
Nestor Neto
 
คะแนนม.3 ปี53 3 5
คะแนนม.3 ปี53 3 5คะแนนม.3 ปี53 3 5
คะแนนม.3 ปี53 3 5
Aj Yawwalak
 
Structural Concrete Presentation
Structural Concrete PresentationStructural Concrete Presentation
Structural Concrete Presentation
Josue Campos
 

Similar a Foundation Analysis (20)

Foundation data
Foundation dataFoundation data
Foundation data
 
Vpectrl3 ram foundation - continuous foundation design
Vpectrl3   ram foundation - continuous foundation designVpectrl3   ram foundation - continuous foundation design
Vpectrl3 ram foundation - continuous foundation design
 
Saint Francis & Purple Vision NAHF Presentation 24/3/12
Saint Francis & Purple Vision NAHF Presentation 24/3/12Saint Francis & Purple Vision NAHF Presentation 24/3/12
Saint Francis & Purple Vision NAHF Presentation 24/3/12
 
Saint Francis & Purple Vision NAHF Presentation 24/3/12
Saint Francis & Purple Vision NAHF Presentation 24/3/12Saint Francis & Purple Vision NAHF Presentation 24/3/12
Saint Francis & Purple Vision NAHF Presentation 24/3/12
 
Triangulation Sample
Triangulation  SampleTriangulation  Sample
Triangulation Sample
 
Stocks price
Stocks priceStocks price
Stocks price
 
10
1010
10
 
คะแนนสอบคณิตศาสตร์ม.3 5 ปี53
คะแนนสอบคณิตศาสตร์ม.3 5 ปี53คะแนนสอบคณิตศาสตร์ม.3 5 ปี53
คะแนนสอบคณิตศาสตร์ม.3 5 ปี53
 
Dynaboltinstall
DynaboltinstallDynaboltinstall
Dynaboltinstall
 
The Science and Practice of Cartographic Interaction
The Science and Practice of Cartographic InteractionThe Science and Practice of Cartographic Interaction
The Science and Practice of Cartographic Interaction
 
Iwsm2014 extracting dependencies from software changes (thomas wetzlmaier -...
Iwsm2014   extracting dependencies from software changes (thomas wetzlmaier -...Iwsm2014   extracting dependencies from software changes (thomas wetzlmaier -...
Iwsm2014 extracting dependencies from software changes (thomas wetzlmaier -...
 
Portaria sit 319
Portaria sit 319Portaria sit 319
Portaria sit 319
 
Writing Readable Code with Pipes
Writing Readable Code with PipesWriting Readable Code with Pipes
Writing Readable Code with Pipes
 
Bolt details
Bolt detailsBolt details
Bolt details
 
คะแนนม.3 ปี53 3 5
คะแนนม.3 ปี53 3 5คะแนนม.3 ปี53 3 5
คะแนนม.3 ปี53 3 5
 
mansoane
mansoanemansoane
mansoane
 
Statistics.docx
Statistics.docxStatistics.docx
Statistics.docx
 
Production forecast and fuel 2020 rev00.pdf
Production forecast and fuel 2020 rev00.pdfProduction forecast and fuel 2020 rev00.pdf
Production forecast and fuel 2020 rev00.pdf
 
Structural Concrete Presentation
Structural Concrete PresentationStructural Concrete Presentation
Structural Concrete Presentation
 
508202
508202508202
508202
 

Más de J C

Structural calculations (conections and slab)
Structural calculations (conections and slab)Structural calculations (conections and slab)
Structural calculations (conections and slab)
J C
 
Summary of costs
Summary of costsSummary of costs
Summary of costs
J C
 
Summary of loan and payments
Summary of loan and paymentsSummary of loan and payments
Summary of loan and payments
J C
 
Gutter sizing data
Gutter sizing dataGutter sizing data
Gutter sizing data
J C
 
Irrigation savings
Irrigation savingsIrrigation savings
Irrigation savings
J C
 
Water storage data
Water storage dataWater storage data
Water storage data
J C
 
Leed 2009 checklist
Leed 2009 checklistLeed 2009 checklist
Leed 2009 checklist
J C
 
Leed consultant review
Leed consultant reviewLeed consultant review
Leed consultant review
J C
 
Leed 2009 checklist
Leed 2009 checklistLeed 2009 checklist
Leed 2009 checklist
J C
 
Loan analysis
Loan analysisLoan analysis
Loan analysis
J C
 
Costs
CostsCosts
Costs
J C
 
Schedule
ScheduleSchedule
Schedule
J C
 
Final pv system
Final pv systemFinal pv system
Final pv system
J C
 
Pv system analysis
Pv system analysisPv system analysis
Pv system analysis
J C
 
Pv system sizing
Pv system sizingPv system sizing
Pv system sizing
J C
 
Structural costs
Structural costsStructural costs
Structural costs
J C
 
Irrigation Plan
Irrigation PlanIrrigation Plan
Irrigation Plan
J C
 
Irrigation demand
Irrigation demandIrrigation demand
Irrigation demand
J C
 
Storage capacity
Storage capacityStorage capacity
Storage capacity
J C
 
Water Collected On Roof
Water Collected On RoofWater Collected On Roof
Water Collected On Roof
J C
 

Más de J C (20)

Structural calculations (conections and slab)
Structural calculations (conections and slab)Structural calculations (conections and slab)
Structural calculations (conections and slab)
 
Summary of costs
Summary of costsSummary of costs
Summary of costs
 
Summary of loan and payments
Summary of loan and paymentsSummary of loan and payments
Summary of loan and payments
 
Gutter sizing data
Gutter sizing dataGutter sizing data
Gutter sizing data
 
Irrigation savings
Irrigation savingsIrrigation savings
Irrigation savings
 
Water storage data
Water storage dataWater storage data
Water storage data
 
Leed 2009 checklist
Leed 2009 checklistLeed 2009 checklist
Leed 2009 checklist
 
Leed consultant review
Leed consultant reviewLeed consultant review
Leed consultant review
 
Leed 2009 checklist
Leed 2009 checklistLeed 2009 checklist
Leed 2009 checklist
 
Loan analysis
Loan analysisLoan analysis
Loan analysis
 
Costs
CostsCosts
Costs
 
Schedule
ScheduleSchedule
Schedule
 
Final pv system
Final pv systemFinal pv system
Final pv system
 
Pv system analysis
Pv system analysisPv system analysis
Pv system analysis
 
Pv system sizing
Pv system sizingPv system sizing
Pv system sizing
 
Structural costs
Structural costsStructural costs
Structural costs
 
Irrigation Plan
Irrigation PlanIrrigation Plan
Irrigation Plan
 
Irrigation demand
Irrigation demandIrrigation demand
Irrigation demand
 
Storage capacity
Storage capacityStorage capacity
Storage capacity
 
Water Collected On Roof
Water Collected On RoofWater Collected On Roof
Water Collected On Roof
 

Último

Vip Models Escorts in Lahore 03068178123
Vip Models Escorts in Lahore 03068178123Vip Models Escorts in Lahore 03068178123
Vip Models Escorts in Lahore 03068178123
Escorts in Lahore 03068178123
 
Models in Deira 0567006274 Deira Call girl Service
Models in Deira 0567006274 Deira Call girl ServiceModels in Deira 0567006274 Deira Call girl Service
Models in Deira 0567006274 Deira Call girl Service
Monica Sydney
 
Abortion pills in Saudi RIYADH (+919707899604 } Get Cytotec
Abortion pills in Saudi RIYADH (+919707899604 } Get CytotecAbortion pills in Saudi RIYADH (+919707899604 } Get Cytotec
Abortion pills in Saudi RIYADH (+919707899604 } Get Cytotec
Abortion pills in Riyadh +966572737505 get cytotec
 

Último (20)

Vip Models Escorts in Lahore 03068178123
Vip Models Escorts in Lahore 03068178123Vip Models Escorts in Lahore 03068178123
Vip Models Escorts in Lahore 03068178123
 
Call Girls Bijnor Just Call 8617370543 Top Class Call Girl Service Available
Call Girls Bijnor  Just Call 8617370543 Top Class Call Girl Service AvailableCall Girls Bijnor  Just Call 8617370543 Top Class Call Girl Service Available
Call Girls Bijnor Just Call 8617370543 Top Class Call Girl Service Available
 
VIP Bhiwandi Phone 8250092165 Escorts Service +Call +Girls Along With Ac Room
VIP Bhiwandi Phone 8250092165 Escorts Service +Call +Girls Along With Ac RoomVIP Bhiwandi Phone 8250092165 Escorts Service +Call +Girls Along With Ac Room
VIP Bhiwandi Phone 8250092165 Escorts Service +Call +Girls Along With Ac Room
 
Call Girls In Gorakhpur Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...
Call Girls In Gorakhpur Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...Call Girls In Gorakhpur Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...
Call Girls In Gorakhpur Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...
 
Bhubaneswar🌹Patia ❤CALL GIRLS 9777949614 💟 CALL GIRLS IN bhubaneswar ESCORT S...
Bhubaneswar🌹Patia ❤CALL GIRLS 9777949614 💟 CALL GIRLS IN bhubaneswar ESCORT S...Bhubaneswar🌹Patia ❤CALL GIRLS 9777949614 💟 CALL GIRLS IN bhubaneswar ESCORT S...
Bhubaneswar🌹Patia ❤CALL GIRLS 9777949614 💟 CALL GIRLS IN bhubaneswar ESCORT S...
 
Hire 💕 8617370543 Mirzapur Call Girls Service Call Girls Agency
Hire 💕 8617370543 Mirzapur Call Girls Service Call Girls AgencyHire 💕 8617370543 Mirzapur Call Girls Service Call Girls Agency
Hire 💕 8617370543 Mirzapur Call Girls Service Call Girls Agency
 
Satara call girl 8617370543♥️ call girls in satara escort service
Satara call girl 8617370543♥️ call girls in satara escort serviceSatara call girl 8617370543♥️ call girls in satara escort service
Satara call girl 8617370543♥️ call girls in satara escort service
 
Call Girls Kozhikode - 9332606886 Our call girls are sure to provide you with...
Call Girls Kozhikode - 9332606886 Our call girls are sure to provide you with...Call Girls Kozhikode - 9332606886 Our call girls are sure to provide you with...
Call Girls Kozhikode - 9332606886 Our call girls are sure to provide you with...
 
Models in Deira 0567006274 Deira Call girl Service
Models in Deira 0567006274 Deira Call girl ServiceModels in Deira 0567006274 Deira Call girl Service
Models in Deira 0567006274 Deira Call girl Service
 
Call Girls in Perumbavoor / 9332606886 Genuine Call girls with real Photos an...
Call Girls in Perumbavoor / 9332606886 Genuine Call girls with real Photos an...Call Girls in Perumbavoor / 9332606886 Genuine Call girls with real Photos an...
Call Girls in Perumbavoor / 9332606886 Genuine Call girls with real Photos an...
 
Deira Call girls Service 0507330913 Call girls in Deira
Deira Call girls Service 0507330913  Call girls in DeiraDeira Call girls Service 0507330913  Call girls in Deira
Deira Call girls Service 0507330913 Call girls in Deira
 
Vip Call Girls Bhubaneswar 🐱‍🏍 9777949614 Independent Escorts Service Bhubane...
Vip Call Girls Bhubaneswar 🐱‍🏍 9777949614 Independent Escorts Service Bhubane...Vip Call Girls Bhubaneswar 🐱‍🏍 9777949614 Independent Escorts Service Bhubane...
Vip Call Girls Bhubaneswar 🐱‍🏍 9777949614 Independent Escorts Service Bhubane...
 
Call Girls Rajnandgaon / 9332606886 Genuine Call girls with real Photos and N...
Call Girls Rajnandgaon / 9332606886 Genuine Call girls with real Photos and N...Call Girls Rajnandgaon / 9332606886 Genuine Call girls with real Photos and N...
Call Girls Rajnandgaon / 9332606886 Genuine Call girls with real Photos and N...
 
Abortion pills in Saudi RIYADH (+919707899604 } Get Cytotec
Abortion pills in Saudi RIYADH (+919707899604 } Get CytotecAbortion pills in Saudi RIYADH (+919707899604 } Get Cytotec
Abortion pills in Saudi RIYADH (+919707899604 } Get Cytotec
 
Turbhe Female Escorts 09167354423 Turbhe Escorts,Call Girls In Turbhe
Turbhe Female Escorts 09167354423  Turbhe Escorts,Call Girls In TurbheTurbhe Female Escorts 09167354423  Turbhe Escorts,Call Girls In Turbhe
Turbhe Female Escorts 09167354423 Turbhe Escorts,Call Girls In Turbhe
 
Dubai Call Girls 0556255850 Call girls in Dubai
Dubai Call Girls 0556255850 Call girls in DubaiDubai Call Girls 0556255850 Call girls in Dubai
Dubai Call Girls 0556255850 Call girls in Dubai
 
High Profile Escort in Dubai 0524076003 Dubai Escorts
High Profile Escort in Dubai 0524076003 Dubai EscortsHigh Profile Escort in Dubai 0524076003 Dubai Escorts
High Profile Escort in Dubai 0524076003 Dubai Escorts
 
Call Girls Bhubaneswar 9777949614 call me Independent Escort Service Bhubaneswar
Call Girls Bhubaneswar 9777949614 call me Independent Escort Service BhubaneswarCall Girls Bhubaneswar 9777949614 call me Independent Escort Service Bhubaneswar
Call Girls Bhubaneswar 9777949614 call me Independent Escort Service Bhubaneswar
 
Prayagraj College Girls Escorts 8250092165 Short 1500 Night 6000 Best call g...
Prayagraj College Girls Escorts  8250092165 Short 1500 Night 6000 Best call g...Prayagraj College Girls Escorts  8250092165 Short 1500 Night 6000 Best call g...
Prayagraj College Girls Escorts 8250092165 Short 1500 Night 6000 Best call g...
 
Bhubaneswar🌹Call Girls Kalpana Mesuem ❤Komal 9777949614 💟 Full Trusted CALL ...
Bhubaneswar🌹Call Girls Kalpana Mesuem  ❤Komal 9777949614 💟 Full Trusted CALL ...Bhubaneswar🌹Call Girls Kalpana Mesuem  ❤Komal 9777949614 💟 Full Trusted CALL ...
Bhubaneswar🌹Call Girls Kalpana Mesuem ❤Komal 9777949614 💟 Full Trusted CALL ...
 

Foundation Analysis

  • 1. Foundation Data Foundation Numbers and sizes Length Width Depth Page Number (ft) (ft) (ft) Area (ft^3) 10 137 3 3.5 1438.5 2 11 131 3 2.5 982.5 5 12 88 3 1.5 396 8 13 87 3 1.5 391.5 10 14 85 3 1.5 382.5 13 15 86 3 1.5 387 16 16 83 3 1.5 373.5 19 21 125 3 1.5 562.5 22 26 119 3 1.5 535.5 25 27 233 3 2 1398 28 29 175 3 5 2625 31 30 60 3 5 900 34 31 176 3 5 2640 36 32 177 3 5 2655 39 All reinforcements used in the foundations are in the following pages. They are broken into sections by the foundation number, followed by the top, bottom, and shear reinforcement data.
  • 2. Foundation 10 Longitudinal Reinforcement – Top Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #5 5 0 8 1.38 1.55 2 #6 6 8 38 2.51 2.64 3 #5 6 38 58 1.82 1.86 4 #6 10 58 88 4.21 4.4 5 #6 9 88 104 3.88 3.96 6 #6 5 104 128 1.88 2.2 7 #5 5 128 137 0.25 1.55 Longitudinal Reinforcement – Bottom Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #6 10 0 24 4.33 4.4 2 #6 9 24 48 3.73 3.96 3 #6 8 48 72 3.39 3.52 4 #6 14 72 96 5.76 6.16 5 #5 5 96 115 0.69 1.55 6 #4 7 115 137 1.36 1.4
  • 3. Shear Reinforcement Size Spc Start End Req. Prov. (in) (ft) (ft) (in2) (in2) #5 18 0 4.79 0.38 0.41 #5 18 12.21 18 0.38 0.41 #5 18 18 23 0.38 0.41 23 29 0 0 #5 18 29 34.79 0.38 0.41 #5 18 42.21 45 0.38 0.41 #5 18 45 48 0.38 0.41 #5 18 48 52 0.38 0.41 #5 18 52 54.79 0.38 0.41 #5 18 62.21 67 0.38 0.41 #5 18 67 71 0.38 0.41 71 76 0 0 #5 18 76 80 0.38 0.41 #5 18 80 84.79 0.38 0.41 #5 18 92.21 96 0.38 0.41 #5 18 96 99 0.38 0.41 #5 18 99 100.79 0.38 0.41 108.21 116 0 0 116 124.79 0 0 132.21 137 0 0
  • 4.
  • 5. Foundation #11 Longitudinal Reinforcement – Top Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #3 12 0 5 1.23 1.32 2 #4 16 5 35 3.15 3.2 3 #4 16 35 55 3.15 3.2 4 #4 16 55 85 3.15 3.2 5 #4 16 85 101 3.15 3.2 6 #4 13 101 125 2.55 2.6 7 #3 8 125 131 0.86 0.88 Longitudinal Reinforcement – Bottom Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #7 5 0 20 2.79 3 2 #6 10 20 45 4.35 4.4 3 #7 7 45 70 4.09 4.2 4 #8 5 70 93 3.91 3.95 5 #7 6 93 113 3.12 3.6 6 #6 6 113 131 2.48 2.64
  • 6. Shear Reinforcement Size Spc Start End Req. Prov. (in) (ft) (ft) (in2) (in2) #4 12 0 2.79 0.36 0.4 #4 12 8.21 13 0.36 0.4 13 19 0 0 19 25 0 0 #4 12 25 32.79 0.36 0.4 #4 12 38.21 43.07 0.36 0.4 #4 12 43.07 45 0.36 0.4 #4 12 45 47.93 0.36 0.4 #4 12 47.93 52.79 0.36 0.4 #4 12 58.21 66 0.36 0.4 #4 12 66 70 0.36 0.4 70 75 0 0 #4 12 75 82.79 0.36 0.4 #4 12 88.21 93 0.36 0.4 #4 12 93 98.79 0.36 0.4 #4 12 104.21 110 0.36 0.4 #4 12 110 114 0.36 0.4 114 118 0 0 #4 12 118 122.79 0.36 0.4 128.21 131 0 0
  • 7.
  • 8. Foundation #12 Longitudinal Reinforcement – Top Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #4 5 0 4 0.42 1 2 #5 5 4 34 1.48 1.55 3 #6 5 34 54 2.13 2.2 4 #5 5 54 84 1.49 1.55 5 #4 5 84 88 0.46 1 Longitudinal Reinforcement – Bottom Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #6 6 0 17 2.42 2.64 2 #7 9 17 44 5.11 5.4 3 #7 9 44 73 5.12 5.4 4 #6 6 73 88 2.51 2.64
  • 9. Shear Reinforcement Size Spc Start End Req. Prov. (in) (ft) (ft) (in2) (in2) #3 6 0 2.28 0.35 0.44 #3 6 5.72 11 0.35 0.44 11 18 0 0 18 25 0 0 #3 3 25 32.28 0.66 0.88 #3 3 35.72 44 0.82 0.88 #3 3 44 52.28 0.82 0.88 #3 3 55.72 63 0.65 0.88 63 70 0 0 70 77 0 0 #3 6 77 82.28 0.35 0.44 #3 6 85.72 88 0.35 0.44
  • 10. Foundation #13 Longitudinal Reinforcement – Top Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #3 5 0 3 0.32 0.55 2 #4 7 3 33 1.33 1.4 3 #4 10 33 53 1.9 2 4 #4 7 53 83 1.34 1.4 5 #3 5 83 87 0.3 0.55 Longitudinal Reinforcement – Bottom Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #4 10 0 17 1.87 2 2 #5 15 17 43 4.63 4.65 3 #6 11 43 69 4.65 4.84 4 #5 6 69 87 1.84 1.86
  • 11. Shear Reinforcement Size Spc Start End Req. Prov. (in) (ft) (ft) (in2) (in2) #3 6 0 1.78 0.35 0.44 #3 6 5.22 10 0.35 0.44 10 17 0 0 17 25 0 0 #3 3 25 31.78 0.5 0.88 #3 3 35.22 43 0.65 0.88 #3 3 43 51.78 0.66 0.88 #3 3 55.22 62 0.49 0.88 62 69 0 0 69 77 0 0 #3 6 77 81.78 0.35 0.44 #3 6 85.22 87 0.35 0.44
  • 12.
  • 13. Foundation #14 Longitudinal Reinforcement – Top Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #3 5 0 2 0.07 0.55 2 #4 6 2 32 1.13 1.2 3 #4 7 32 52 1.38 1.4 4 #4 6 52 82 1.11 1.2 5 #3 7 82 85 0.7 0.77 Longitudinal Reinforcement – Bottom Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #4 6 0 16 1.18 1.2 2 #5 11 16 42 3.31 3.41 3 #5 11 42 68 3.32 3.41 4 #4 6 68 85 1.16 1.2
  • 14. Shear Reinforcement Size Spc Start End Req. Prov. (in) (ft) (ft) (in2) (in2) 4.23 6 0 0 6 15 0 0 15 25 0 0 #3 6 25 30.77 0.35 0.44 #3 6 34.23 37 0.35 0.44 #3 6 37 39.74 0.35 0.44 39.74 42 0 0 42 45.26 0 0 #3 6 45.26 48 0.35 0.44 #3 6 48 50.77 0.35 0.44 #3 6 54.23 60 0.35 0.44 60 69 0 0 69 78 0 0 78 80.77 0 0
  • 15.
  • 16. Foundation #15 Longitudinal Reinforcement – Top Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #3 5 0 3 0.15 0.55 2 #3 10 3 33 1.07 1.1 3 #3 13 33 53 1.43 1.43 4 #3 10 53 83 1.09 1.1 5 #3 5 83 86 0.15 0.55 Longitudinal Reinforcement – Bottom Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #4 7 0 17 1.39 1.4 2 #5 11 17 43 3.33 3.41 3 #6 8 43 69 3.33 3.52 4 #5 5 69 86 1.37 1.55
  • 17. Shear Reinforcement Size Spc Start End Req. Prov. (in) (ft) (ft) (in2) (in2) 0 1.27 0 0 4.73 8 0 0 8 17 0 0 17 26 0 0 #3 6 26 31.27 0.35 0.44 #3 6 34.73 38 0.35 0.44 38 41 0 0 41 45 0 0 #3 6 45 48 0.35 0.44 #3 6 48 51.27 0.35 0.44 #3 6 54.73 60 0.35 0.44 60 69 0 0 69 78 0 0 78 81.27 0 0 84.73 86 0 0
  • 18.
  • 19. Foundation #16 Longitudinal Reinforcement – Top Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #3 5 0 1 0.01 0.55 2 #4 8 1 31 1.44 1.6 3 #3 10 31 51 1.03 1.1 4 #4 7 51 81 1.37 1.4 5 #3 10 81 83 1.02 1.1 Longitudinal Reinforcement – Bottom Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #3 10 0 20 1.05 1.1 2 #4 13 20 43 2.46 2.6 3 #4 13 43 64 2.49 2.6 4 #3 10 64 83 1.02 1.1
  • 20. Shear Reinforcement Size Spc Start End Req. Prov. (in) (ft) (ft) (in2) (in2) 3.24 5 0 0 5 15 0 0 15 25 0 0 25 29.76 0 0 #3 6 33.24 36 0.35 0.44 36 39 0 0 39 44 0 0 44 47 0 0 #3 6 47 49.76 0.35 0.44 53.24 58 0 0 58 68 0 0 68 78 0 0 78 79.76 0 0
  • 21.
  • 22. Foundation #21 Longitudinal Reinforcement – Top Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #3 5 0 2 0.13 0.55 2 #4 7 2 32 1.39 1.4 3 #5 5 32 52 1.43 1.55 4 #4 7 52 82 1.38 1.4 5 #4 5 82 98 0.98 1 6 #5 5 98 122 1.48 1.55 7 #4 5 122 125 0.97 1 Longitudinal Reinforcement – Bottom Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #5 6 0 21 1.8 1.86 2 #6 10 21 42 4.14 4.4 3 #5 12 42 68 3.68 3.72 4 #4 16 68 90 3.17 3.2 5 #5 11 90 108 3.24 3.41 6 #5 5 108 125 1.53 1.55
  • 23. Shear Reinforcement Size Spc Start End Req. Prov. (in) (ft) (ft) (in2) (in2) 4.23 7 0 0 7 15 0 0 15 24 0 0 #3 6 24 30.77 0.35 0.44 #3 6 34.23 37 0.36 0.44 #3 6 37 39.74 0.35 0.44 39.74 42 0 0 42 45.26 0 0 #3 6 45.26 48 0.35 0.44 #3 6 48 50.77 0.35 0.44 #3 6 54.23 60 0.35 0.44 60 67 0 0 67 75 0 0 #3 6 75 80.77 0.35 0.44 #3 6 84.23 90 0.35 0.44 #3 6 90 96.77 0.35 0.44 #3 6 100.23 106 0.35 0.44 106 112 0 0 112 118 0 0 118 120.77 0 0
  • 24.
  • 25. Foundation #26 Longitudinal Reinforcement – Top Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #3 5 0 2 0.09 0.55 2 #4 8 2 20 1.55 1.6 3 #4 8 20 47 1.49 1.6 4 #4 8 47 82 1.54 1.6 5 #3 10 82 117 1.05 1.1 6 #3 5 117 119 0.1 0.55 Longitudinal Reinforcement – Bottom Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #3 7 0 12 0.67 0.77 2 #3 15 12 34 1.61 1.65 3 #4 17 34 63 3.28 3.4 4 #3 8 63 100 0.79 0.88 5 #3 6 100 119 0.65 0.66
  • 26. Shear Reinforcement Size Spc Start End Req. Prov. (in) (ft) (ft) (in2) (in2) 3.74 5 0 0 5 9 0 0 9 14 0 0 14 18.26 0 0 21.74 23 0 0 23 31 0 0 31 40 0 0 #3 6 40 45.26 0.35 0.44 #3 6 48.74 54 0.35 0.44 54 67 0 0 67 80.26 0 0 83.74 99 0 0 99 114 0 0 114 115.26 0 0
  • 27.
  • 28. Foundation #27 Longitudinal Reinforcement – Top Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #5 5 0 8 1.38 1.55 2 #6 6 8 38 2.51 2.64 3 #5 6 38 58 1.82 1.86 4 #6 10 58 88 4.21 4.4 5 #6 9 88 104 3.88 3.96 6 #6 5 104 128 1.88 2.2 7 #5 5 128 137 0.25 1.55 Longitudinal Reinforcement – Bottom Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #6 10 0 24 4.33 4.4 2 #6 9 24 48 3.73 3.96 3 #6 8 48 72 3.39 3.52 4 #6 14 72 96 5.76 6.16 5 #5 5 96 115 0.69 1.55 6 #4 7 115 137 1.36 1.4
  • 29. Shear Reinforcement Size Spc Start End Req. Prov. (in) (ft) (ft) (in2) (in2) #5 18 0 4.79 0.38 0.41 #5 18 12.21 18 0.38 0.41 #5 18 18 23 0.38 0.41 23 29 0 0 #5 18 29 34.79 0.38 0.41 #5 18 42.21 45 0.38 0.41 #5 18 45 48 0.38 0.41 #5 18 48 52 0.38 0.41 #5 18 52 54.79 0.38 0.41 #5 18 62.21 67 0.38 0.41 #5 18 67 71 0.38 0.41 71 76 0 0 #5 18 76 80 0.38 0.41 #5 18 80 84.79 0.38 0.41 #5 18 92.21 96 0.38 0.41 #5 18 96 99 0.38 0.41 #5 18 99 100.79 0.38 0.41 108.21 116 0 0 116 124.79 0 0 132.21 137 0 0
  • 30.
  • 31. Foundation #29 Longitudinal Reinforcement – Top Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #4 5 0 4 0.42 1 2 #5 5 4 34 1.48 1.55 3 #6 5 34 54 2.13 2.2 4 #5 5 54 84 1.49 1.55 5 #4 5 84 88 0.46 1 Longitudinal Reinforcement – Bottom Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #6 6 0 17 2.42 2.64 2 #7 9 17 44 5.11 5.4 3 #7 9 44 73 5.12 5.4 4 #6 6 73 88 2.51 2.64
  • 32. Shear Reinforcement Size Spc Start End Req. Prov. (in) (ft) (ft) (in2) (in2) #3 6 0 2.28 0.35 0.44 #3 6 5.72 11 0.35 0.44 11 18 0 0 18 25 0 0 #3 3 25 32.28 0.66 0.88 #3 3 35.72 44 0.82 0.88 #3 3 44 52.28 0.82 0.88 #3 3 55.72 63 0.65 0.88 63 70 0 0 70 77 0 0 #3 6 77 82.28 0.35 0.44 #3 6 85.72 88 0.35 0.44
  • 33.
  • 34. Foundation #30 Longitudinal Reinforcement – Top Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #3 5 0 7 0.03 0.55 2 #3 5 7 25 0.32 0.55 3 #4 8 25 52 1.59 1.6 4 #3 13 52 60 1.42 1.43 Longitudinal Reinforcement – Bottom Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #3 5 0 18 0.26 0.55 2 #3 5 18 38 0.15 0.55 3 #4 12 38 60 2.21 2.4
  • 35. Shear Reinforcement Seg. Size Spc Start End Req. Prov. (in) (ft) (ft) (in2) (in2) 1 0 2.23 0 0 2 12.77 16 0 0 3 16 20.23 0 0 4 30.77 39 0 0 5 39 47.23 0 0 6 57.77 60 0 0
  • 36. Foundation #31 Longitudinal Reinforcement – Top Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #3 5 0 8 0.26 0.55 2 #3 8 8 33 0.87 0.88 3 #3 6 33 43 0.63 0.66 4 #4 6 43 68 1.18 1.2 5 #4 5 68 93 0.92 1 6 #4 9 93 123 1.76 1.8 7 #4 9 123 148 1.78 1.8 8 #3 17 148 168 1.82 1.87 9 #3 17 168 176 1.84 1.87 Longitudinal Reinforcement – Bottom Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #4 5 0 21 0.98 1 2 #5 7 21 38 2.16 2.17 3 #4 10 38 56 2 2 4 #5 6 56 81 1.72 1.86 5 #4 11 81 105 2.2 2.2 6 #5 11 105 136 3.41 3.41 7 #4 5 136 158 0 1 8 #5 10 158 176 2.87 3.1
  • 37. Shear Reinforcement Size Spc Start End Req. Prov. (in) (ft) (ft) (in2) (in2) 0 2.79 0 0 13.21 20 0 0 20 27.79 0 0 48.21 55 0 0 55 62.79 0 0 73.21 80 0 0 80 87.79 0 0 98.21 107 0 0 107 116.79 0 0 #5 18 116.79 117.79 0.35 0.41 #5 18 128.21 129.21 0.35 0.41 #5 18 129.21 136 0.35 0.41 136 142.79 0 0 153.21 157 0 0 157 161.79 0 0 #5 18 161.79 162.79 0.35 0.41 173.21 176 0 0
  • 38.
  • 39. Foundation #32 Longitudinal Reinforcement – Top Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #3 5 0 8 0.22 0.55 2 #4 5 8 33 0.97 1 3 #3 6 33 43 0.61 0.66 4 #4 6 43 68 1.16 1.2 5 #4 5 68 93 0.89 1 6 #5 6 93 123 1.78 1.86 7 #5 6 123 148 1.76 1.86 8 #4 10 148 168 1.99 2 9 #5 7 168 177 2.01 2.17 Longitudinal Reinforcement – Bottom Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #4 5 0 22 0.91 1 2 #5 7 22 38 2.12 2.17 3 #4 10 38 57 1.98 2 4 #5 6 57 82 1.72 1.86 5 #4 11 82 107 2.19 2.2 6 #5 12 107 137 3.42 3.72 7 #4 5 137 158 0 1 8 #4 16 158 177 3.15 3.2
  • 40. Shear Reinforcement Size Spc Start End Req. Prov. (in) (ft) (ft) (in2) (in2) 0 3.29 0 0 13.71 21 0 0 21 28.29 0 0 48.71 56 0 0 56 63.29 0 0 73.71 81 0 0 81 88.29 0 0 98.71 108 0 0 108 117.29 0 0 #5 18 117.29 118.29 0.35 0.41 #5 18 128.71 130 0.35 0.41 130 137 0 0 137 143.29 0 0 153.71 158 0 0 158 162.29 0 0 #5 18 162.29 163.29 0.35 0.41 173.71 177 0 0