SB-10 – THE ENVELOPE ULTIMATUM




Green Building Festival
12 October 2012
Energy Efficient
Enclosures & SB-10




            SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
Why does it matter?
 • Codes demand it
 • Substantial portion of construction budget – 20% range
 • Integration with HVAC requires that the building envelope
   perform
 • Sustainable buildings often incorporate innovative assemblies
   and materials
 • Envelope failure can require costly repairs to re-establish the
   design intent
 • Envelopes are complex systems with shared responsibilities
   and are not typically commissioned




                                          SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
Why does it matter?


12


10
                     Performance
                     Gap
 8


 6                         Mechanical
                           Envelope
                                                  Extract from NCBC 2010 Seminar “Successful
                                                       Exterior Enclosure Commissioning”
 4


 2


 0
         1       2




                                      SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
Why does it matter?

$90,000.00

$80,000.00

$70,000.00

$60,000.00

$50,000.00

$40,000.00

$30,000.00

$20,000.00

$10,000.00

       $-
             1    2    3      4   5   6      7     8     9   10


                 Code Building        based on 3%
                                      annual inflation
                 25% Better           over 10 years




                                                                  SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
Enclosure Failure
Energy & Durability




                      SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
Enclosure Failure
Indoor Environmental Quality




                               SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
Energy Code Trends




                     SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
Achieving SB-10




           SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
OBC and SB-10
Design Considerations

       • Meet ASHRAE 90.1-2010 + SB-10 Envelope
         Values (i.e. ASHRAE 189)
            Prescriptive
       • Exceed ASHRAE 90.1-2010 by minimum 5%
            Modeled
       • Exceed MNECB (1997) by minimum 25%
            Modeled
       • 40% maximum fenestration-to-wall ratio


      LEED NC 2009 prerequisite equivalent
                                      SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
SB-10 Envelope Values
    Zone Comparison

                                                                    Zone
                                   5                                  6                                 7
                    Max U-value        Min. R-Value     Max U-value     Min. R-Value     Max U-value        Min. R-Value
                          2                                   2                                2
Assembly             (w/m K)                             (w/m K)                          (w/m K)
Roof                        0.22       R-25 ci                  0.18    R-30 ci                  0.16       R-35 ci
Mass Walls                  0.45       R-13.3 ci                0.40    R-15.2 ci                0.34       R-20 ci
Metal Building              0.30       R-13 + R-13 ci           0.30    R-13 + R-13 ci           0.30       R-13 + R-13 ci
Steel Framed                0.31       R-13 + R-10 ci           0.31    R-13 + R-13 ci           0.31       R-13 + R-10 ci
Metal framed                1.99       0.35 SHGC                1.99    0.40 SHGC                1.70       0.45 SHGC
fenestration (max
40%)




                                                                        SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
Achieving SB-10
Solid Opaque Walls




                     SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
Achieving SB-10
Fenestration




                  SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
OBC and SB-10
Design Considerations

       • Meet ASHRAE 90.1-2010 + SB-10 Envelope
         Values (i.e. ASHRAE 189)
            Prescriptive
       • Exceed ASHRAE 90.1-2010 by minimum 5%
            Modeled
       • Exceed MNECB (1997) by minimum 25%
            Modeled
       • 40% maximum fenestration-to-wall ratio


      LEED NC 2009 prerequisite equivalent
                                      SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
Accurate Performance
     Prediction
 (Energy Modeling that Works)




                     SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
Energy Modeling That Works




                   SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
Energy Modeling That Works




                   SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
High Performance
   Enclosures




           SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
High-Performance Enclosures
Building-Integrated PV




                         SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
High-Performance Enclosures
External Shading




                   SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
High-Performance Enclosures
Vegetated Green Walls




                        SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
Analyzing Systems
Fenestration




                                               © Kawneer.com




                    SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
Delivering Quality
Enclosure Commissioning




                          SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
Verifying Performance
Enclosure Commissioning




                          SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
Scott R Armstrong         Dipl. Arch. Tech., A.Sc.T., LEED AP BD+C


Manager, Building Science & Sustainability
Associate
MMM Group Limited
100 Commerce Valley Drive West
Thornhill ON L3T 0A1

ArmstrongS@mmm.ca | m: 647.923.9053 | t: 905.882.4211 xt. 6864 | www.mmm.ca


                                                          SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
Communities
                                                             Transportation
                                                             Buildings
                                                             Infrastructure


PROJECT EXPERTISE
& RESOURCES




               Green Buildings &
                    LEED


               Building Science
                 Consulting




                                   SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012

Más contenido relacionado

La actualidad más candente

Masonry Veneer Support Details: Thermal Bridging
Masonry Veneer Support Details: Thermal BridgingMasonry Veneer Support Details: Thermal Bridging
Masonry Veneer Support Details: Thermal BridgingRDH Building Science
 
NBEC 2014 - Balcony Thermal Bridging
NBEC 2014 -  Balcony Thermal BridgingNBEC 2014 -  Balcony Thermal Bridging
NBEC 2014 - Balcony Thermal BridgingRDH Building Science
 
Deterioration Model for Optimal Mix of TbM v CbM
Deterioration Model for Optimal Mix of TbM v CbMDeterioration Model for Optimal Mix of TbM v CbM
Deterioration Model for Optimal Mix of TbM v CbMRDH Building Science
 
Tall Wood Building Enclosures - A Race To the Top
Tall Wood Building Enclosures - A Race To the TopTall Wood Building Enclosures - A Race To the Top
Tall Wood Building Enclosures - A Race To the TopRDH Building Science
 
Ashrae 90.1 2004 appendix g - performance rating method
Ashrae 90.1   2004 appendix g - performance rating methodAshrae 90.1   2004 appendix g - performance rating method
Ashrae 90.1 2004 appendix g - performance rating methodEduardo Miranda Cáceres
 
Ashrae standards for energy efficiency in buildings
Ashrae standards for energy efficiency in buildingsAshrae standards for energy efficiency in buildings
Ashrae standards for energy efficiency in buildingsUNEP OzonAction
 
ASHRAE 90 1 The Big Picture
ASHRAE 90 1 The Big PictureASHRAE 90 1 The Big Picture
ASHRAE 90 1 The Big PictureASHRAE Region VI
 
Thermal Bridging of Masonry Veneer Claddings and Energy Code Compliance
Thermal Bridging of Masonry Veneer Claddings and Energy Code ComplianceThermal Bridging of Masonry Veneer Claddings and Energy Code Compliance
Thermal Bridging of Masonry Veneer Claddings and Energy Code ComplianceRDH Building Science
 
Guideline for the Two-Dimensional Simulation of Spandrel Panel Thermal Perfor...
Guideline for the Two-Dimensional Simulation of Spandrel Panel Thermal Perfor...Guideline for the Two-Dimensional Simulation of Spandrel Panel Thermal Perfor...
Guideline for the Two-Dimensional Simulation of Spandrel Panel Thermal Perfor...RDH Building Science
 
Ahart resume
Ahart resumeAhart resume
Ahart resumeAndy Hart
 
ahart resume
ahart resumeahart resume
ahart resumeAndy Hart
 
Advancements cathodic protection for on grade storage tanks
Advancements cathodic protection for on grade storage tanksAdvancements cathodic protection for on grade storage tanks
Advancements cathodic protection for on grade storage tanksAudubon Engineering Company
 
PRESTIGE LTST 2O16 - Copy
PRESTIGE LTST 2O16 - CopyPRESTIGE LTST 2O16 - Copy
PRESTIGE LTST 2O16 - Copyanil prashanth
 
Benchmark cCstomer Day 22nd September 2010 - Building Regs Presentation
Benchmark cCstomer Day 22nd September 2010 - Building Regs Presentation Benchmark cCstomer Day 22nd September 2010 - Building Regs Presentation
Benchmark cCstomer Day 22nd September 2010 - Building Regs Presentation Benchmark
 
In-Place Pipe Support Load Testing and Hanger Surveys_Part of a Best in Class...
In-Place Pipe Support Load Testing and Hanger Surveys_Part of a Best in Class...In-Place Pipe Support Load Testing and Hanger Surveys_Part of a Best in Class...
In-Place Pipe Support Load Testing and Hanger Surveys_Part of a Best in Class...Britt Bettell
 
ASPE CEU Pipe Hangers and Supports
ASPE CEU Pipe Hangers and SupportsASPE CEU Pipe Hangers and Supports
ASPE CEU Pipe Hangers and SupportsJim LeStage
 

La actualidad más candente (20)

Masonry Veneer Support Details: Thermal Bridging
Masonry Veneer Support Details: Thermal BridgingMasonry Veneer Support Details: Thermal Bridging
Masonry Veneer Support Details: Thermal Bridging
 
NBEC 2014 - Balcony Thermal Bridging
NBEC 2014 -  Balcony Thermal BridgingNBEC 2014 -  Balcony Thermal Bridging
NBEC 2014 - Balcony Thermal Bridging
 
Deterioration Model for Optimal Mix of TbM v CbM
Deterioration Model for Optimal Mix of TbM v CbMDeterioration Model for Optimal Mix of TbM v CbM
Deterioration Model for Optimal Mix of TbM v CbM
 
Re-glazing of an All Glass Tower
Re-glazing of an All Glass TowerRe-glazing of an All Glass Tower
Re-glazing of an All Glass Tower
 
Tall Wood Building Enclosures - A Race To the Top
Tall Wood Building Enclosures - A Race To the TopTall Wood Building Enclosures - A Race To the Top
Tall Wood Building Enclosures - A Race To the Top
 
Ashrae 90.1 2004 appendix g - performance rating method
Ashrae 90.1   2004 appendix g - performance rating methodAshrae 90.1   2004 appendix g - performance rating method
Ashrae 90.1 2004 appendix g - performance rating method
 
Ashrae standards for energy efficiency in buildings
Ashrae standards for energy efficiency in buildingsAshrae standards for energy efficiency in buildings
Ashrae standards for energy efficiency in buildings
 
ASHRAE 90 1 The Big Picture
ASHRAE 90 1 The Big PictureASHRAE 90 1 The Big Picture
ASHRAE 90 1 The Big Picture
 
Thermal Bridging of Masonry Veneer Claddings and Energy Code Compliance
Thermal Bridging of Masonry Veneer Claddings and Energy Code ComplianceThermal Bridging of Masonry Veneer Claddings and Energy Code Compliance
Thermal Bridging of Masonry Veneer Claddings and Energy Code Compliance
 
Guideline for the Two-Dimensional Simulation of Spandrel Panel Thermal Perfor...
Guideline for the Two-Dimensional Simulation of Spandrel Panel Thermal Perfor...Guideline for the Two-Dimensional Simulation of Spandrel Panel Thermal Perfor...
Guideline for the Two-Dimensional Simulation of Spandrel Panel Thermal Perfor...
 
Presentation
PresentationPresentation
Presentation
 
ASHRAE Standard 189.1
ASHRAE Standard 189.1ASHRAE Standard 189.1
ASHRAE Standard 189.1
 
Resume' history
Resume' historyResume' history
Resume' history
 
Ahart resume
Ahart resumeAhart resume
Ahart resume
 
ahart resume
ahart resumeahart resume
ahart resume
 
Advancements cathodic protection for on grade storage tanks
Advancements cathodic protection for on grade storage tanksAdvancements cathodic protection for on grade storage tanks
Advancements cathodic protection for on grade storage tanks
 
PRESTIGE LTST 2O16 - Copy
PRESTIGE LTST 2O16 - CopyPRESTIGE LTST 2O16 - Copy
PRESTIGE LTST 2O16 - Copy
 
Benchmark cCstomer Day 22nd September 2010 - Building Regs Presentation
Benchmark cCstomer Day 22nd September 2010 - Building Regs Presentation Benchmark cCstomer Day 22nd September 2010 - Building Regs Presentation
Benchmark cCstomer Day 22nd September 2010 - Building Regs Presentation
 
In-Place Pipe Support Load Testing and Hanger Surveys_Part of a Best in Class...
In-Place Pipe Support Load Testing and Hanger Surveys_Part of a Best in Class...In-Place Pipe Support Load Testing and Hanger Surveys_Part of a Best in Class...
In-Place Pipe Support Load Testing and Hanger Surveys_Part of a Best in Class...
 
ASPE CEU Pipe Hangers and Supports
ASPE CEU Pipe Hangers and SupportsASPE CEU Pipe Hangers and Supports
ASPE CEU Pipe Hangers and Supports
 

Similar a SB-10: The Envelope Ultimatum

Building Enclosures of the Future - Building Tomorrow's Buildings Today
Building Enclosures of the Future - Building Tomorrow's Buildings TodayBuilding Enclosures of the Future - Building Tomorrow's Buildings Today
Building Enclosures of the Future - Building Tomorrow's Buildings TodayRDH Building Science
 
Case study of ms1525 energy efficiency and renewable energy code of practice.
Case study of ms1525   energy efficiency and renewable energy code of practice.Case study of ms1525   energy efficiency and renewable energy code of practice.
Case study of ms1525 energy efficiency and renewable energy code of practice.Steve Lojuntin
 
2013-03-06_Rian_Burger_Net Zero Energy and Sustainability
2013-03-06_Rian_Burger_Net Zero Energy and Sustainability2013-03-06_Rian_Burger_Net Zero Energy and Sustainability
2013-03-06_Rian_Burger_Net Zero Energy and SustainabilityRian Burger
 
Brayton Energy SunShot Poster 2016-04-07
Brayton Energy SunShot Poster 2016-04-07Brayton Energy SunShot Poster 2016-04-07
Brayton Energy SunShot Poster 2016-04-07Shaun Sullivan
 
2nd Generation Lead Free Alloys: Is SAC the Best We Can Do?
2nd Generation Lead Free Alloys: Is SAC the Best We Can Do?2nd Generation Lead Free Alloys: Is SAC the Best We Can Do?
2nd Generation Lead Free Alloys: Is SAC the Best We Can Do?Cheryl Tulkoff
 
AIA Sustainabilty Metal Roofing
AIA Sustainabilty Metal RoofingAIA Sustainabilty Metal Roofing
AIA Sustainabilty Metal Roofingdrexelmetals
 
Energy Efficiency Ontario Building Code - Bob Bach - 2012
Energy Efficiency Ontario Building Code - Bob Bach - 2012Energy Efficiency Ontario Building Code - Bob Bach - 2012
Energy Efficiency Ontario Building Code - Bob Bach - 2012SBCBreakfastSessions
 
Bob Bach: Energy Efficiency in the Ontario Building Code
Bob Bach: Energy Efficiency in the Ontario Building CodeBob Bach: Energy Efficiency in the Ontario Building Code
Bob Bach: Energy Efficiency in the Ontario Building CodeToronto 2030 District
 
Moving Towards More Energy Efficient Wood Frame Building Enclosures
Moving Towards More Energy Efficient Wood Frame Building EnclosuresMoving Towards More Energy Efficient Wood Frame Building Enclosures
Moving Towards More Energy Efficient Wood Frame Building EnclosuresRDH Building Science
 
Sustainable Energy Low Carbon Building Assessment GreenPASS by SEDA
Sustainable Energy Low Carbon Building Assessment GreenPASS by SEDASustainable Energy Low Carbon Building Assessment GreenPASS by SEDA
Sustainable Energy Low Carbon Building Assessment GreenPASS by SEDASteve Lojuntin
 
Insulated metal panels edc1
Insulated metal panels edc1Insulated metal panels edc1
Insulated metal panels edc1Derrick Teal
 
Industrial Perspectives on Large-Area TCOs
Industrial Perspectives on Large-Area TCOsIndustrial Perspectives on Large-Area TCOs
Industrial Perspectives on Large-Area TCOscdtpv
 
Gas insulated substation
Gas insulated substationGas insulated substation
Gas insulated substationsharique_64
 
2011 Q2 Green Viewpoint
2011 Q2 Green Viewpoint2011 Q2 Green Viewpoint
2011 Q2 Green Viewpointjj_di
 
2011 Q2 Green Viewpoint
2011 Q2 Green Viewpoint2011 Q2 Green Viewpoint
2011 Q2 Green Viewpointscottbrooker
 
Green building materials laney
Green building materials laneyGreen building materials laney
Green building materials laneylaneycollege
 
Conformal optical coatings on complex 3D-macrostructures using atomic layer d...
Conformal optical coatings on complex 3D-macrostructures using atomic layer d...Conformal optical coatings on complex 3D-macrostructures using atomic layer d...
Conformal optical coatings on complex 3D-macrostructures using atomic layer d...Beneq
 

Similar a SB-10: The Envelope Ultimatum (20)

Building Enclosures of the Future - Building Tomorrow's Buildings Today
Building Enclosures of the Future - Building Tomorrow's Buildings TodayBuilding Enclosures of the Future - Building Tomorrow's Buildings Today
Building Enclosures of the Future - Building Tomorrow's Buildings Today
 
Case study of ms1525 energy efficiency and renewable energy code of practice.
Case study of ms1525   energy efficiency and renewable energy code of practice.Case study of ms1525   energy efficiency and renewable energy code of practice.
Case study of ms1525 energy efficiency and renewable energy code of practice.
 
2013-03-06_Rian_Burger_Net Zero Energy and Sustainability
2013-03-06_Rian_Burger_Net Zero Energy and Sustainability2013-03-06_Rian_Burger_Net Zero Energy and Sustainability
2013-03-06_Rian_Burger_Net Zero Energy and Sustainability
 
Brayton Energy SunShot Poster 2016-04-07
Brayton Energy SunShot Poster 2016-04-07Brayton Energy SunShot Poster 2016-04-07
Brayton Energy SunShot Poster 2016-04-07
 
2016 OAWWA TANKS
2016 OAWWA TANKS2016 OAWWA TANKS
2016 OAWWA TANKS
 
2nd Generation Lead Free Alloys: Is SAC the Best We Can Do?
2nd Generation Lead Free Alloys: Is SAC the Best We Can Do?2nd Generation Lead Free Alloys: Is SAC the Best We Can Do?
2nd Generation Lead Free Alloys: Is SAC the Best We Can Do?
 
AIA Sustainabilty Metal Roofing
AIA Sustainabilty Metal RoofingAIA Sustainabilty Metal Roofing
AIA Sustainabilty Metal Roofing
 
Energy Efficiency Ontario Building Code - Bob Bach - 2012
Energy Efficiency Ontario Building Code - Bob Bach - 2012Energy Efficiency Ontario Building Code - Bob Bach - 2012
Energy Efficiency Ontario Building Code - Bob Bach - 2012
 
Bob Bach: Energy Efficiency in the Ontario Building Code
Bob Bach: Energy Efficiency in the Ontario Building CodeBob Bach: Energy Efficiency in the Ontario Building Code
Bob Bach: Energy Efficiency in the Ontario Building Code
 
CKS LED Solutions
CKS LED SolutionsCKS LED Solutions
CKS LED Solutions
 
Karel Spee
Karel SpeeKarel Spee
Karel Spee
 
Moving Towards More Energy Efficient Wood Frame Building Enclosures
Moving Towards More Energy Efficient Wood Frame Building EnclosuresMoving Towards More Energy Efficient Wood Frame Building Enclosures
Moving Towards More Energy Efficient Wood Frame Building Enclosures
 
Sustainable Energy Low Carbon Building Assessment GreenPASS by SEDA
Sustainable Energy Low Carbon Building Assessment GreenPASS by SEDASustainable Energy Low Carbon Building Assessment GreenPASS by SEDA
Sustainable Energy Low Carbon Building Assessment GreenPASS by SEDA
 
Insulated metal panels edc1
Insulated metal panels edc1Insulated metal panels edc1
Insulated metal panels edc1
 
Industrial Perspectives on Large-Area TCOs
Industrial Perspectives on Large-Area TCOsIndustrial Perspectives on Large-Area TCOs
Industrial Perspectives on Large-Area TCOs
 
Gas insulated substation
Gas insulated substationGas insulated substation
Gas insulated substation
 
2011 Q2 Green Viewpoint
2011 Q2 Green Viewpoint2011 Q2 Green Viewpoint
2011 Q2 Green Viewpoint
 
2011 Q2 Green Viewpoint
2011 Q2 Green Viewpoint2011 Q2 Green Viewpoint
2011 Q2 Green Viewpoint
 
Green building materials laney
Green building materials laneyGreen building materials laney
Green building materials laney
 
Conformal optical coatings on complex 3D-macrostructures using atomic layer d...
Conformal optical coatings on complex 3D-macrostructures using atomic layer d...Conformal optical coatings on complex 3D-macrostructures using atomic layer d...
Conformal optical coatings on complex 3D-macrostructures using atomic layer d...
 

Más de Toronto 2030 District

GBF2014 - Rob Thornton - Flexible, Local, Resilient Energy Generation
GBF2014 - Rob Thornton - Flexible, Local, Resilient Energy GenerationGBF2014 - Rob Thornton - Flexible, Local, Resilient Energy Generation
GBF2014 - Rob Thornton - Flexible, Local, Resilient Energy GenerationToronto 2030 District
 
GBF2014 - James Voogt - Climate Change & Cities
GBF2014 - James Voogt - Climate Change & CitiesGBF2014 - James Voogt - Climate Change & Cities
GBF2014 - James Voogt - Climate Change & CitiesToronto 2030 District
 
GBF2014 - Glenn McGillivray - Cities in the Crosshairs
GBF2014 - Glenn McGillivray - Cities in the CrosshairsGBF2014 - Glenn McGillivray - Cities in the Crosshairs
GBF2014 - Glenn McGillivray - Cities in the CrosshairsToronto 2030 District
 
GBF2014 - Paul Dowsett - Resilient Design
GBF2014 - Paul Dowsett - Resilient DesignGBF2014 - Paul Dowsett - Resilient Design
GBF2014 - Paul Dowsett - Resilient DesignToronto 2030 District
 
GBF2014 - Alec Hay - Planning Climate Resilient Cities
GBF2014 - Alec Hay - Planning Climate Resilient CitiesGBF2014 - Alec Hay - Planning Climate Resilient Cities
GBF2014 - Alec Hay - Planning Climate Resilient CitiesToronto 2030 District
 
Closing The Loops in Malmö, Sweden - Daniel Skog
Closing The Loops in Malmö, Sweden - Daniel SkogClosing The Loops in Malmö, Sweden - Daniel Skog
Closing The Loops in Malmö, Sweden - Daniel SkogToronto 2030 District
 
Re-Energizing Our Cities: From District to Specific - Integral Group
Re-Energizing Our Cities:  From District to Specific - Integral GroupRe-Energizing Our Cities:  From District to Specific - Integral Group
Re-Energizing Our Cities: From District to Specific - Integral GroupToronto 2030 District
 
Sustainable Cities through an Integrated Approach - Agneta Persson
Sustainable Cities through an Integrated Approach - Agneta PerssonSustainable Cities through an Integrated Approach - Agneta Persson
Sustainable Cities through an Integrated Approach - Agneta PerssonToronto 2030 District
 
Ampersand: A Sustainable Community - Robert Smith
Ampersand:  A Sustainable Community - Robert SmithAmpersand:  A Sustainable Community - Robert Smith
Ampersand: A Sustainable Community - Robert SmithToronto 2030 District
 
An Emerging Water Management Paradigm - Dr. Khosrow Farabakhsh
An Emerging Water Management Paradigm - Dr. Khosrow FarabakhshAn Emerging Water Management Paradigm - Dr. Khosrow Farabakhsh
An Emerging Water Management Paradigm - Dr. Khosrow FarabakhshToronto 2030 District
 
What is "Model" Sustainability? UniverCity's Journey Toward Sustainability T...
What is "Model" Sustainability?  UniverCity's Journey Toward Sustainability T...What is "Model" Sustainability?  UniverCity's Journey Toward Sustainability T...
What is "Model" Sustainability? UniverCity's Journey Toward Sustainability T...Toronto 2030 District
 
Update on the Enbridge Savings By Design Program
Update on the Enbridge Savings By Design ProgramUpdate on the Enbridge Savings By Design Program
Update on the Enbridge Savings By Design ProgramToronto 2030 District
 
Toronto Green Standard & Energy Efficiency
Toronto Green Standard & Energy EfficiencyToronto Green Standard & Energy Efficiency
Toronto Green Standard & Energy EfficiencyToronto 2030 District
 
The Ins & Outs of Energy Efficiency in the Building Code
The Ins & Outs of Energy Efficiency in the Building CodeThe Ins & Outs of Energy Efficiency in the Building Code
The Ins & Outs of Energy Efficiency in the Building CodeToronto 2030 District
 
Low-Impact Development from the Developer Perspective
Low-Impact Development from the Developer PerspectiveLow-Impact Development from the Developer Perspective
Low-Impact Development from the Developer PerspectiveToronto 2030 District
 
Low-Impact Development Case Study Examples
Low-Impact Development Case Study ExamplesLow-Impact Development Case Study Examples
Low-Impact Development Case Study ExamplesToronto 2030 District
 
IMBYism: LID from the Municipal Perspective
IMBYism:  LID from the Municipal PerspectiveIMBYism:  LID from the Municipal Perspective
IMBYism: LID from the Municipal PerspectiveToronto 2030 District
 

Más de Toronto 2030 District (20)

GBF2014 - Rob Thornton - Flexible, Local, Resilient Energy Generation
GBF2014 - Rob Thornton - Flexible, Local, Resilient Energy GenerationGBF2014 - Rob Thornton - Flexible, Local, Resilient Energy Generation
GBF2014 - Rob Thornton - Flexible, Local, Resilient Energy Generation
 
GBF2014 - James Voogt - Climate Change & Cities
GBF2014 - James Voogt - Climate Change & CitiesGBF2014 - James Voogt - Climate Change & Cities
GBF2014 - James Voogt - Climate Change & Cities
 
GBF2014 - Glenn McGillivray - Cities in the Crosshairs
GBF2014 - Glenn McGillivray - Cities in the CrosshairsGBF2014 - Glenn McGillivray - Cities in the Crosshairs
GBF2014 - Glenn McGillivray - Cities in the Crosshairs
 
GBF2014 - Paul Dowsett - Resilient Design
GBF2014 - Paul Dowsett - Resilient DesignGBF2014 - Paul Dowsett - Resilient Design
GBF2014 - Paul Dowsett - Resilient Design
 
GBF2014 - Alec Hay - Planning Climate Resilient Cities
GBF2014 - Alec Hay - Planning Climate Resilient CitiesGBF2014 - Alec Hay - Planning Climate Resilient Cities
GBF2014 - Alec Hay - Planning Climate Resilient Cities
 
Closing The Loops in Malmö, Sweden - Daniel Skog
Closing The Loops in Malmö, Sweden - Daniel SkogClosing The Loops in Malmö, Sweden - Daniel Skog
Closing The Loops in Malmö, Sweden - Daniel Skog
 
Re-Energizing Our Cities: From District to Specific - Integral Group
Re-Energizing Our Cities:  From District to Specific - Integral GroupRe-Energizing Our Cities:  From District to Specific - Integral Group
Re-Energizing Our Cities: From District to Specific - Integral Group
 
Sustainable Cities through an Integrated Approach - Agneta Persson
Sustainable Cities through an Integrated Approach - Agneta PerssonSustainable Cities through an Integrated Approach - Agneta Persson
Sustainable Cities through an Integrated Approach - Agneta Persson
 
Ampersand: A Sustainable Community - Robert Smith
Ampersand:  A Sustainable Community - Robert SmithAmpersand:  A Sustainable Community - Robert Smith
Ampersand: A Sustainable Community - Robert Smith
 
An Emerging Water Management Paradigm - Dr. Khosrow Farabakhsh
An Emerging Water Management Paradigm - Dr. Khosrow FarabakhshAn Emerging Water Management Paradigm - Dr. Khosrow Farabakhsh
An Emerging Water Management Paradigm - Dr. Khosrow Farabakhsh
 
What is "Model" Sustainability? UniverCity's Journey Toward Sustainability T...
What is "Model" Sustainability?  UniverCity's Journey Toward Sustainability T...What is "Model" Sustainability?  UniverCity's Journey Toward Sustainability T...
What is "Model" Sustainability? UniverCity's Journey Toward Sustainability T...
 
B bach energy efficiency in obc2012
B bach energy efficiency in obc2012B bach energy efficiency in obc2012
B bach energy efficiency in obc2012
 
Update on the Enbridge Savings By Design Program
Update on the Enbridge Savings By Design ProgramUpdate on the Enbridge Savings By Design Program
Update on the Enbridge Savings By Design Program
 
Toronto Green Standard & Energy Efficiency
Toronto Green Standard & Energy EfficiencyToronto Green Standard & Energy Efficiency
Toronto Green Standard & Energy Efficiency
 
The Ins & Outs of Energy Efficiency in the Building Code
The Ins & Outs of Energy Efficiency in the Building CodeThe Ins & Outs of Energy Efficiency in the Building Code
The Ins & Outs of Energy Efficiency in the Building Code
 
Stormwater Compliance
Stormwater ComplianceStormwater Compliance
Stormwater Compliance
 
National Energy Code for Buildings
National Energy Code for BuildingsNational Energy Code for Buildings
National Energy Code for Buildings
 
Low-Impact Development from the Developer Perspective
Low-Impact Development from the Developer PerspectiveLow-Impact Development from the Developer Perspective
Low-Impact Development from the Developer Perspective
 
Low-Impact Development Case Study Examples
Low-Impact Development Case Study ExamplesLow-Impact Development Case Study Examples
Low-Impact Development Case Study Examples
 
IMBYism: LID from the Municipal Perspective
IMBYism:  LID from the Municipal PerspectiveIMBYism:  LID from the Municipal Perspective
IMBYism: LID from the Municipal Perspective
 

Último

Punjabi Housewife Call Girls Service Gomti Nagar \ 9548273370 Indian Call Gir...
Punjabi Housewife Call Girls Service Gomti Nagar \ 9548273370 Indian Call Gir...Punjabi Housewife Call Girls Service Gomti Nagar \ 9548273370 Indian Call Gir...
Punjabi Housewife Call Girls Service Gomti Nagar \ 9548273370 Indian Call Gir...nagunakhan
 
Top Rated Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...
Top Rated  Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...Top Rated  Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...
Top Rated Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...Call Girls in Nagpur High Profile
 
VIP College Call Girls Gorakhpur Bhavna 8250192130 Independent Escort Service...
VIP College Call Girls Gorakhpur Bhavna 8250192130 Independent Escort Service...VIP College Call Girls Gorakhpur Bhavna 8250192130 Independent Escort Service...
VIP College Call Girls Gorakhpur Bhavna 8250192130 Independent Escort Service...Suhani Kapoor
 
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...ranjana rawat
 
Stark Industries Marketing Plan (1).pptx
Stark Industries Marketing Plan (1).pptxStark Industries Marketing Plan (1).pptx
Stark Industries Marketing Plan (1).pptxjeswinjees
 
Petrosains Drama Competition (PSDC).pptx
Petrosains Drama Competition (PSDC).pptxPetrosains Drama Competition (PSDC).pptx
Petrosains Drama Competition (PSDC).pptxIgnatiusAbrahamBalin
 
The history of music videos a level presentation
The history of music videos a level presentationThe history of music videos a level presentation
The history of music videos a level presentationamedia6
 
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...Call Girls in Nagpur High Profile
 
AMBER GRAIN EMBROIDERY | Growing folklore elements | Root-based materials, w...
AMBER GRAIN EMBROIDERY | Growing folklore elements |  Root-based materials, w...AMBER GRAIN EMBROIDERY | Growing folklore elements |  Root-based materials, w...
AMBER GRAIN EMBROIDERY | Growing folklore elements | Root-based materials, w...BarusRa
 
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...home
 
CBD Belapur Individual Call Girls In 08976425520 Panvel Only Genuine Call Girls
CBD Belapur Individual Call Girls In 08976425520 Panvel Only Genuine Call GirlsCBD Belapur Individual Call Girls In 08976425520 Panvel Only Genuine Call Girls
CBD Belapur Individual Call Girls In 08976425520 Panvel Only Genuine Call Girlsmodelanjalisharma4
 
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130Suhani Kapoor
 
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdf
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdfThe_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdf
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdfAmirYakdi
 
Verified Trusted Call Girls Adugodi💘 9352852248 Good Looking standard Profil...
Verified Trusted Call Girls Adugodi💘 9352852248  Good Looking standard Profil...Verified Trusted Call Girls Adugodi💘 9352852248  Good Looking standard Profil...
Verified Trusted Call Girls Adugodi💘 9352852248 Good Looking standard Profil...kumaririma588
 
Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...
Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...
Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...Yantram Animation Studio Corporation
 
Dubai Call Girls Pro Domain O525547819 Call Girls Dubai Doux
Dubai Call Girls Pro Domain O525547819 Call Girls Dubai DouxDubai Call Girls Pro Domain O525547819 Call Girls Dubai Doux
Dubai Call Girls Pro Domain O525547819 Call Girls Dubai Douxkojalkojal131
 
VIP Russian Call Girls in Saharanpur Deepika 8250192130 Independent Escort Se...
VIP Russian Call Girls in Saharanpur Deepika 8250192130 Independent Escort Se...VIP Russian Call Girls in Saharanpur Deepika 8250192130 Independent Escort Se...
VIP Russian Call Girls in Saharanpur Deepika 8250192130 Independent Escort Se...Suhani Kapoor
 
CALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun service
CALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun serviceCALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun service
CALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun serviceanilsa9823
 

Último (20)

Punjabi Housewife Call Girls Service Gomti Nagar \ 9548273370 Indian Call Gir...
Punjabi Housewife Call Girls Service Gomti Nagar \ 9548273370 Indian Call Gir...Punjabi Housewife Call Girls Service Gomti Nagar \ 9548273370 Indian Call Gir...
Punjabi Housewife Call Girls Service Gomti Nagar \ 9548273370 Indian Call Gir...
 
Top Rated Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...
Top Rated  Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...Top Rated  Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...
Top Rated Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...
 
VIP College Call Girls Gorakhpur Bhavna 8250192130 Independent Escort Service...
VIP College Call Girls Gorakhpur Bhavna 8250192130 Independent Escort Service...VIP College Call Girls Gorakhpur Bhavna 8250192130 Independent Escort Service...
VIP College Call Girls Gorakhpur Bhavna 8250192130 Independent Escort Service...
 
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...
 
young call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Service
 
Stark Industries Marketing Plan (1).pptx
Stark Industries Marketing Plan (1).pptxStark Industries Marketing Plan (1).pptx
Stark Industries Marketing Plan (1).pptx
 
Petrosains Drama Competition (PSDC).pptx
Petrosains Drama Competition (PSDC).pptxPetrosains Drama Competition (PSDC).pptx
Petrosains Drama Competition (PSDC).pptx
 
The history of music videos a level presentation
The history of music videos a level presentationThe history of music videos a level presentation
The history of music videos a level presentation
 
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
 
escort service sasti (*~Call Girls in Prasad Nagar Metro❤️9953056974
escort service sasti (*~Call Girls in Prasad Nagar Metro❤️9953056974escort service sasti (*~Call Girls in Prasad Nagar Metro❤️9953056974
escort service sasti (*~Call Girls in Prasad Nagar Metro❤️9953056974
 
AMBER GRAIN EMBROIDERY | Growing folklore elements | Root-based materials, w...
AMBER GRAIN EMBROIDERY | Growing folklore elements |  Root-based materials, w...AMBER GRAIN EMBROIDERY | Growing folklore elements |  Root-based materials, w...
AMBER GRAIN EMBROIDERY | Growing folklore elements | Root-based materials, w...
 
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
 
CBD Belapur Individual Call Girls In 08976425520 Panvel Only Genuine Call Girls
CBD Belapur Individual Call Girls In 08976425520 Panvel Only Genuine Call GirlsCBD Belapur Individual Call Girls In 08976425520 Panvel Only Genuine Call Girls
CBD Belapur Individual Call Girls In 08976425520 Panvel Only Genuine Call Girls
 
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
 
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdf
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdfThe_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdf
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdf
 
Verified Trusted Call Girls Adugodi💘 9352852248 Good Looking standard Profil...
Verified Trusted Call Girls Adugodi💘 9352852248  Good Looking standard Profil...Verified Trusted Call Girls Adugodi💘 9352852248  Good Looking standard Profil...
Verified Trusted Call Girls Adugodi💘 9352852248 Good Looking standard Profil...
 
Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...
Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...
Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...
 
Dubai Call Girls Pro Domain O525547819 Call Girls Dubai Doux
Dubai Call Girls Pro Domain O525547819 Call Girls Dubai DouxDubai Call Girls Pro Domain O525547819 Call Girls Dubai Doux
Dubai Call Girls Pro Domain O525547819 Call Girls Dubai Doux
 
VIP Russian Call Girls in Saharanpur Deepika 8250192130 Independent Escort Se...
VIP Russian Call Girls in Saharanpur Deepika 8250192130 Independent Escort Se...VIP Russian Call Girls in Saharanpur Deepika 8250192130 Independent Escort Se...
VIP Russian Call Girls in Saharanpur Deepika 8250192130 Independent Escort Se...
 
CALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun service
CALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun serviceCALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun service
CALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun service
 

SB-10: The Envelope Ultimatum

  • 1. SB-10 – THE ENVELOPE ULTIMATUM Green Building Festival 12 October 2012
  • 2. Energy Efficient Enclosures & SB-10 SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
  • 3. Why does it matter? • Codes demand it • Substantial portion of construction budget – 20% range • Integration with HVAC requires that the building envelope perform • Sustainable buildings often incorporate innovative assemblies and materials • Envelope failure can require costly repairs to re-establish the design intent • Envelopes are complex systems with shared responsibilities and are not typically commissioned SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
  • 4. Why does it matter? 12 10 Performance Gap 8 6 Mechanical Envelope Extract from NCBC 2010 Seminar “Successful Exterior Enclosure Commissioning” 4 2 0 1 2 SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
  • 5. Why does it matter? $90,000.00 $80,000.00 $70,000.00 $60,000.00 $50,000.00 $40,000.00 $30,000.00 $20,000.00 $10,000.00 $- 1 2 3 4 5 6 7 8 9 10 Code Building based on 3% annual inflation 25% Better over 10 years SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
  • 6. Enclosure Failure Energy & Durability SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
  • 7. Enclosure Failure Indoor Environmental Quality SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
  • 8. Energy Code Trends SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
  • 9. Achieving SB-10 SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
  • 10. OBC and SB-10 Design Considerations • Meet ASHRAE 90.1-2010 + SB-10 Envelope Values (i.e. ASHRAE 189) Prescriptive • Exceed ASHRAE 90.1-2010 by minimum 5% Modeled • Exceed MNECB (1997) by minimum 25% Modeled • 40% maximum fenestration-to-wall ratio LEED NC 2009 prerequisite equivalent SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
  • 11. SB-10 Envelope Values Zone Comparison Zone 5 6 7 Max U-value Min. R-Value Max U-value Min. R-Value Max U-value Min. R-Value 2 2 2 Assembly (w/m K) (w/m K) (w/m K) Roof 0.22 R-25 ci 0.18 R-30 ci 0.16 R-35 ci Mass Walls 0.45 R-13.3 ci 0.40 R-15.2 ci 0.34 R-20 ci Metal Building 0.30 R-13 + R-13 ci 0.30 R-13 + R-13 ci 0.30 R-13 + R-13 ci Steel Framed 0.31 R-13 + R-10 ci 0.31 R-13 + R-13 ci 0.31 R-13 + R-10 ci Metal framed 1.99 0.35 SHGC 1.99 0.40 SHGC 1.70 0.45 SHGC fenestration (max 40%) SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
  • 12. Achieving SB-10 Solid Opaque Walls SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
  • 13. Achieving SB-10 Fenestration SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
  • 14. OBC and SB-10 Design Considerations • Meet ASHRAE 90.1-2010 + SB-10 Envelope Values (i.e. ASHRAE 189) Prescriptive • Exceed ASHRAE 90.1-2010 by minimum 5% Modeled • Exceed MNECB (1997) by minimum 25% Modeled • 40% maximum fenestration-to-wall ratio LEED NC 2009 prerequisite equivalent SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
  • 15. Accurate Performance Prediction (Energy Modeling that Works) SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
  • 16. Energy Modeling That Works SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
  • 17. Energy Modeling That Works SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
  • 18. High Performance Enclosures SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
  • 19. High-Performance Enclosures Building-Integrated PV SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
  • 20. High-Performance Enclosures External Shading SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
  • 21. High-Performance Enclosures Vegetated Green Walls SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
  • 22. Analyzing Systems Fenestration © Kawneer.com SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
  • 23. Delivering Quality Enclosure Commissioning SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
  • 24. Verifying Performance Enclosure Commissioning SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
  • 25. Scott R Armstrong Dipl. Arch. Tech., A.Sc.T., LEED AP BD+C Manager, Building Science & Sustainability Associate MMM Group Limited 100 Commerce Valley Drive West Thornhill ON L3T 0A1 ArmstrongS@mmm.ca | m: 647.923.9053 | t: 905.882.4211 xt. 6864 | www.mmm.ca SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
  • 26. Communities Transportation Buildings Infrastructure PROJECT EXPERTISE & RESOURCES Green Buildings & LEED Building Science Consulting SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012