53. Project Close-Out Substantial Completion Punchlist Example Pinpoints Items Needing Correction or Completion Page 1 ARCHITECTURAL INTERIOR Substantial Completion Punchlist, The following items require the attention of the Contractor for completion or correction. This list may not be all-inclusive, and the failure to include any items on this list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents. GENERAL: 1. Clean all the windows throughout the facility. 2. Securely fasten the glass stops to all wood door glazing throughout the facility. 3. Complete staining the edge of all wood doors, hinge side. FIRST FLOOR: Room #100: 1. Seal the void between the casework counter top and the east window frame. 2. Remove the paint from the carpet adjacent to door # 111.1. /