P.L. 114-94
Fixing America’s Surface
Transportation (FAST) Act
Key Highway Provisions
FASTAct
• Signed by President Obama on December 4, 2015
• First long-term authorization act in a decade
• Result of bipartisan cooperation and compromise
• Provides 5 years of funding certainty for infrastructure
planning and investment
• Authorizes $305 B (all modes) over FY 2016-2020
• $70 B in transfers to keep the Highway Trust Fund solvent;
fully “paid for” (offset) by unrelated savings
2
$305 B (all modes) over FY2016-2020
Program 5-Year Funding
(billions)
Federal Highway Administration $ 226.3
Federal Transit Administration 61.1
Federal Motor Carrier Safety Administration 3.2
Pipeline and Hazardous Materials Administration 0.4
National Highway Traffic Safety Administration 4.7
Federal Railroad Administration 10.3
Total 305.0
3
Key Highway Facts
• $226.3 B for highways over five years (FY 2016-2020)
• $225.2 B in contract authority
• $1.1 B from the General Fund
• Builds on the program structure and reforms of MAP-21
• Continued focus on accelerating project delivery
• Adds a new freight formula and expands freight network
• Adds a new discretionary program for nationally
significant freight and highway projects
• Provides a new tribal self-governance option
4
Highway contract authority grows each year
$41.0
$43.1 $44.0 $45.0 $46.0 $47.1
$0
$10
$20
$30
$40
$50
FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020
Highway Authorizations from Trust Fund (billions)
•
5
APPORTIONED
PROGRAMS
6
Growth Varies by Program
Program Avg. Annual
Funding
(millions)
Change from
FY 2015
National Highway Performance Program $ 23,280 +6.3%
Surface Transportation Block Grant Program 11,654 +15.6
Transportation Alternatives Set-aside [760] +3.3
Recreational Trails Program Set-aside [84] 0.0
Surface Transportation Block Grant Program
(net of TA & Rec Trails)
[10,809] +7.3
Congestion Mitigation & Air Quality Improvement 2,405 +6.1
Highway Safety Improvement Program 2,317 +5.7
Railway-Highway Crossings Program 235 +6.8
Metropolitan Planning 343 +9.5
National Highway Freight Program 1,249 NEW +100.0
7
HSIP
92% of Highway Funds Are Apportioned
CMAQ
8
Transportation
Alternatives
Rec Trails
Grade Crossings
Surface
Transportation
Block Grant
(STBG)
Program
Metro Planning
National
Highway
Performance
Program
National Highway
Freight Program
$207.4 B
over 5 years
Changes to NHPP and STP
Prgm Changes
NHPP • TIFIA costs and V2I communication equipment now eligible
• Bridge resurfacing/preservation/reconstruction on non-NHS Federal-
aid highways now eligible
STP • Renamed: Surface Transportation Block Grant Program (STBG)
• Eligibilities restated with none eliminated; new eligibilities for TIFIA
costs, State P3 office, V2I communication equipment
• In border States, up to 5% for infrastructure projects eligible under the
SAFETEA-LU border program
• More suballocation: +1%/year up to 55% (vs. 50% today)
• Set-asides for Transportation Alternatives and Recreational Trails (see
next slide)
9
Changes to TAP, CMAQ, and HSIP
Prgm Changes
“TAP” • Same program, but no longer called TAP; no name specified
• All funds set aside from STBG (vs. from all formula programs today)
• Nonprofits responsible for local transportation safety programs may be
project sponsors
CMAQ • V2I communication equipment eligible
• Port-related equipment & vehicles eligible under PM2.5 set-aside
• Exception from PM2.5 set-aside for low population density States
(under certain conditions)
HSIP • Only listed project types eligible—mostly infrastructure-related
• Adds eligibility for V2I communication equipment and certain
pedestrian safety improvements
• State need not collect certain data on unpaved roads
(but can’t use HSIP funds on those roads until it collects the data)
10
FREIGHT
11
National Highway Freight Program | NEW
• $1.2 B / year (average), apportioned to States by formula
• Eligible activities include construction, operational
improvements, freight planning and performance measures
• Highway focus, but 10% for rail/port/intermodal projects
• No State freight plan, no freight formula $ (beginning FY 2018)
• Federal share is determined under 23 USC 120
• Repeals special Federal share for freight projects
12
Natl. Significant Freight & Hwy. Projects | NEW
• $900 M/year (average) for competitive grants or TIFIA loans for
projects $100 M (reduced for States w/ small programs)
• Eligible activities:
• Highway freight projects on National Highway Freight Network
• NHS highway/bridge projects, projects in National Scenic Areas
• Freight rail/intermodal/port projects ($500 M over 5-year period)
• Rail-highway grade crossing or grade separation projects
• States, large MPOs, Tribes, localities, and FLMAs may apply
• OST selects projects; Congress has 60 days to disapprove
• Set-asides for rural areas and projects below cost threshold
13
Other Freight Provisions
• Freight policy goals and multi-modal national freight strategic plan
• State freight plans (required) & advisory committees (encouraged)
• National multimodal freight network
• National Highway Freight Network, to include:
• Primary Highway Freight System (PHFS); initially 41K miles
• Critical rural freight corridors identified by States
• Critical urban freight corridors with State-MPO consultation
• Portions of Interstate System not included in the PHFS
• Highway network re-designated every 5 years (w/up to 3% growth)
14
PLANNING, PERFORMANCE &
PROJECT DELIVERY
15
Accelerating Project Delivery
A major theme of the FAST Act, with 18 separate provisions
in the highway title alone.
The Act—
• Adds New Flexibilities
• Section 4(f) exemption for some bridges
• Authorizes taking of nesting swallows in at-risk bridges
• Refines Existing Provisions
• Narrows concurrence requirement for PEL
• Pilot for substitution of State law for NEPA
16
Accelerating Project Delivery, cont’d
• Adds to Procedural Requirements
• Requires a schedule, a checklist, and response to project
initiation
• Adds some new specific time frames for notices and reviews
• Builds on Existing Activities
• Requires permitting dashboard (but covers all EISs & EAs)
• DOT to maximize use of authority to delegate project
oversight to States on both a project and programmatic basis
17
OTHER PROGRAMS &
PROVISIONS
18
Other Provisions
• Specifically allows multiple similar bridge projects to be
handled (“bundled”) into a single project
• DOT to designate national electric vehicle charging and
hydrogen, natural gas, and propane fueling corridors
• Encouragement of vegetation management practices that
improve habitat and forage for pollinators
• State may opt for Federal share <100% for Appalachian
Development Highway System (ADHS) projects
19
Drop slide?
Questions

Más contenido relacionado

La actualidad más candente

The Potential of Regional Power Sector Integration Gulf Cooperation Council C...
The Potential of Regional Power Sector Integration Gulf Cooperation Council C...The Potential of Regional Power Sector Integration Gulf Cooperation Council C...
The Potential of Regional Power Sector Integration Gulf Cooperation Council C...
Power System Operation
 
Hattiesburg final document
Hattiesburg final documentHattiesburg final document
Hattiesburg final document
Donna Lum
 
Caltrans: Overview of Public Private Partnerships (P3)
Caltrans: Overview of Public Private Partnerships (P3)Caltrans: Overview of Public Private Partnerships (P3)
Caltrans: Overview of Public Private Partnerships (P3)
AGC of California
 

La actualidad más candente (20)

Bernadette kyova freight summit (fast act and freight)
Bernadette kyova freight summit (fast act and freight)Bernadette kyova freight summit (fast act and freight)
Bernadette kyova freight summit (fast act and freight)
 
2050 Long Range Transportation Plan Update October 2020 public meeting
2050 Long Range Transportation Plan Update October 2020 public meeting2050 Long Range Transportation Plan Update October 2020 public meeting
2050 Long Range Transportation Plan Update October 2020 public meeting
 
Reston Funding Plan: Potential Cost Allocations
Reston Funding Plan: Potential Cost AllocationsReston Funding Plan: Potential Cost Allocations
Reston Funding Plan: Potential Cost Allocations
 
The Potential of Regional Power Sector Integration Gulf Cooperation Council C...
The Potential of Regional Power Sector Integration Gulf Cooperation Council C...The Potential of Regional Power Sector Integration Gulf Cooperation Council C...
The Potential of Regional Power Sector Integration Gulf Cooperation Council C...
 
Reston Transportation Funding Plan: Updates and Recommendations: Jan. 13, 2017
Reston Transportation Funding Plan: Updates and Recommendations: Jan. 13, 2017Reston Transportation Funding Plan: Updates and Recommendations: Jan. 13, 2017
Reston Transportation Funding Plan: Updates and Recommendations: Jan. 13, 2017
 
FHWA MAP-21 Summary
FHWA MAP-21 SummaryFHWA MAP-21 Summary
FHWA MAP-21 Summary
 
Twenty Years of Rural Transportation Planning: Revisiting and Renewing North ...
Twenty Years of Rural Transportation Planning: Revisiting and Renewing North ...Twenty Years of Rural Transportation Planning: Revisiting and Renewing North ...
Twenty Years of Rural Transportation Planning: Revisiting and Renewing North ...
 
Request to Use Draft Embark Land Use (BRT Scenario) in the Regional Cooperati...
Request to Use Draft Embark Land Use (BRT Scenario) in the Regional Cooperati...Request to Use Draft Embark Land Use (BRT Scenario) in the Regional Cooperati...
Request to Use Draft Embark Land Use (BRT Scenario) in the Regional Cooperati...
 
Fairfax County TDM in Land Development: April 19, 2016
Fairfax County TDM in Land Development: April 19, 2016   Fairfax County TDM in Land Development: April 19, 2016
Fairfax County TDM in Land Development: April 19, 2016
 
Reston Transportation Funding Plan: Funding Scenarios Continued: Sept. 26, 2016
Reston Transportation Funding Plan: Funding Scenarios Continued: Sept. 26, 2016Reston Transportation Funding Plan: Funding Scenarios Continued: Sept. 26, 2016
Reston Transportation Funding Plan: Funding Scenarios Continued: Sept. 26, 2016
 
Transportation Funding: Implementing HB 2313, Funding Process, Benefit Cost A...
Transportation Funding: Implementing HB 2313, Funding Process, Benefit Cost A...Transportation Funding: Implementing HB 2313, Funding Process, Benefit Cost A...
Transportation Funding: Implementing HB 2313, Funding Process, Benefit Cost A...
 
Transportation Improvement Program 2014 - 2019
Transportation Improvement Program 2014 - 2019Transportation Improvement Program 2014 - 2019
Transportation Improvement Program 2014 - 2019
 
Hattiesburg final document
Hattiesburg final documentHattiesburg final document
Hattiesburg final document
 
Caltrans: Overview of Public Private Partnerships (P3)
Caltrans: Overview of Public Private Partnerships (P3)Caltrans: Overview of Public Private Partnerships (P3)
Caltrans: Overview of Public Private Partnerships (P3)
 
Cleveland Peer Exchange - National Perspective
Cleveland Peer Exchange - National PerspectiveCleveland Peer Exchange - National Perspective
Cleveland Peer Exchange - National Perspective
 
Update on Route 1 Multimodal Alternatives Analysis
Update on Route 1 Multimodal Alternatives AnalysisUpdate on Route 1 Multimodal Alternatives Analysis
Update on Route 1 Multimodal Alternatives Analysis
 
Briefing on MIG Expenditure for Select Committee on Appropriations 12 May 2015
Briefing on MIG Expenditure for Select Committee on Appropriations 12 May 2015Briefing on MIG Expenditure for Select Committee on Appropriations 12 May 2015
Briefing on MIG Expenditure for Select Committee on Appropriations 12 May 2015
 
Rural Long Range Transportation Plan 2005 - 2030
Rural Long Range Transportation Plan 2005 - 2030Rural Long Range Transportation Plan 2005 - 2030
Rural Long Range Transportation Plan 2005 - 2030
 
Kyriakos Tyrologos
Kyriakos TyrologosKyriakos Tyrologos
Kyriakos Tyrologos
 
Outline Of 163 Proposed Changes 1 31 11 (S Long)
Outline Of 163 Proposed Changes 1 31 11 (S  Long)Outline Of 163 Proposed Changes 1 31 11 (S  Long)
Outline Of 163 Proposed Changes 1 31 11 (S Long)
 

Destacado

Destacado (18)

Cements in Nebraska: NDOR Research Into FlyAsh Alternatives
Cements in Nebraska: NDOR Research Into FlyAsh AlternativesCements in Nebraska: NDOR Research Into FlyAsh Alternatives
Cements in Nebraska: NDOR Research Into FlyAsh Alternatives
 
Washington County Sheriff's Office - Blair, NE
Washington County Sheriff's Office - Blair, NEWashington County Sheriff's Office - Blair, NE
Washington County Sheriff's Office - Blair, NE
 
Pavement Sealers: Blondo St.
Pavement Sealers: Blondo St.Pavement Sealers: Blondo St.
Pavement Sealers: Blondo St.
 
The Primrose East Bridge
The Primrose East BridgeThe Primrose East Bridge
The Primrose East Bridge
 
Product Availability from A to Z
Product Availability from A to ZProduct Availability from A to Z
Product Availability from A to Z
 
Using Real-time Smoothness Equipment to Achieve Smoother Pavements
Using Real-time Smoothness Equipment to Achieve Smoother PavementsUsing Real-time Smoothness Equipment to Achieve Smoother Pavements
Using Real-time Smoothness Equipment to Achieve Smoother Pavements
 
Stringless Paving: Preparing & Handling Models
Stringless Paving: Preparing & Handling ModelsStringless Paving: Preparing & Handling Models
Stringless Paving: Preparing & Handling Models
 
Construction and Work Zone Safety; Workzone Intrusion Systems
Construction and Work Zone Safety; Workzone Intrusion SystemsConstruction and Work Zone Safety; Workzone Intrusion Systems
Construction and Work Zone Safety; Workzone Intrusion Systems
 
Australian Bauxite, CEO, Ian Levy
Australian Bauxite, CEO, Ian LevyAustralian Bauxite, CEO, Ian Levy
Australian Bauxite, CEO, Ian Levy
 
TechCrete and ASR Repairs
TechCrete and ASR RepairsTechCrete and ASR Repairs
TechCrete and ASR Repairs
 
Designing Airport Whitetopping Projects
Designing Airport Whitetopping ProjectsDesigning Airport Whitetopping Projects
Designing Airport Whitetopping Projects
 
High Friction Surface Treatment
High Friction Surface TreatmentHigh Friction Surface Treatment
High Friction Surface Treatment
 
Roundabout Construction: 14th Street & Superior
Roundabout Construction: 14th Street & SuperiorRoundabout Construction: 14th Street & Superior
Roundabout Construction: 14th Street & Superior
 
Viagrip® - Improved braking and roadholding
Viagrip® - Improved braking and roadholdingViagrip® - Improved braking and roadholding
Viagrip® - Improved braking and roadholding
 
Bauxite
BauxiteBauxite
Bauxite
 
Science friction
Science frictionScience friction
Science friction
 
Subgrade Stabilization: Materials & Methods
Subgrade Stabilization: Materials & MethodsSubgrade Stabilization: Materials & Methods
Subgrade Stabilization: Materials & Methods
 
Friction
FrictionFriction
Friction
 

Similar a Fixing America's Surface Transportation (FAST) Act

Artba Senate Summary
Artba Senate SummaryArtba Senate Summary
Artba Senate Summary
artba
 

Similar a Fixing America's Surface Transportation (FAST) Act (20)

07 steve healow
07 steve healow07 steve healow
07 steve healow
 
Continuation of Countywide Dialogue on Transportation: Project Selection A Si...
Continuation of Countywide Dialogue on Transportation: Project Selection A Si...Continuation of Countywide Dialogue on Transportation: Project Selection A Si...
Continuation of Countywide Dialogue on Transportation: Project Selection A Si...
 
Transportation Priorities: Project Timelines and the 2014 Bond Referendum
Transportation Priorities: Project Timelines and the 2014 Bond ReferendumTransportation Priorities: Project Timelines and the 2014 Bond Referendum
Transportation Priorities: Project Timelines and the 2014 Bond Referendum
 
Artba Senate Summary
Artba Senate SummaryArtba Senate Summary
Artba Senate Summary
 
UDOT Presentation to 2019 Legislature
UDOT Presentation to 2019 LegislatureUDOT Presentation to 2019 Legislature
UDOT Presentation to 2019 Legislature
 
Transportation Infrastructure FInancing and Value Capture
Transportation Infrastructure FInancing and Value CaptureTransportation Infrastructure FInancing and Value Capture
Transportation Infrastructure FInancing and Value Capture
 
Implementation of HB2 (2014) and HB 1887 (2015)
Implementation of HB2 (2014) and HB 1887 (2015)Implementation of HB2 (2014) and HB 1887 (2015)
Implementation of HB2 (2014) and HB 1887 (2015)
 
Transit Network Plan Update and Financial Strategy
 Transit Network Plan Update and Financial Strategy Transit Network Plan Update and Financial Strategy
Transit Network Plan Update and Financial Strategy
 
Visualize 2045: Highlights from the Draft Plan
Visualize 2045: Highlights from the Draft PlanVisualize 2045: Highlights from the Draft Plan
Visualize 2045: Highlights from the Draft Plan
 
Surface Transportation - Finance Context & Issues
Surface Transportation - Finance Context & IssuesSurface Transportation - Finance Context & Issues
Surface Transportation - Finance Context & Issues
 
Public Private Partnerships (P3) - Kome Ajese AGC 01.2011 Presentation
Public Private Partnerships (P3) - Kome Ajese AGC 01.2011 PresentationPublic Private Partnerships (P3) - Kome Ajese AGC 01.2011 Presentation
Public Private Partnerships (P3) - Kome Ajese AGC 01.2011 Presentation
 
Transit in the Charlotte Region
Transit in the Charlotte RegionTransit in the Charlotte Region
Transit in the Charlotte Region
 
Highway Safety Improvement Program and Safety Performance Management Measures...
Highway Safety Improvement Program and Safety Performance Management Measures...Highway Safety Improvement Program and Safety Performance Management Measures...
Highway Safety Improvement Program and Safety Performance Management Measures...
 
General Assembly Actions Related to Utility Undergrounding
General Assembly Actions Related to Utility UndergroundingGeneral Assembly Actions Related to Utility Undergrounding
General Assembly Actions Related to Utility Undergrounding
 
I-66 Inside the Beltway Initial Traffic Analysis and Framework Agreement
I-66 Inside the Beltway Initial Traffic Analysis and Framework AgreementI-66 Inside the Beltway Initial Traffic Analysis and Framework Agreement
I-66 Inside the Beltway Initial Traffic Analysis and Framework Agreement
 
Reston Funding Plan
Reston Funding PlanReston Funding Plan
Reston Funding Plan
 
Update of Fairfax County's Transportation Priorities Plan (TPP)
Update of Fairfax County's Transportation Priorities Plan (TPP)Update of Fairfax County's Transportation Priorities Plan (TPP)
Update of Fairfax County's Transportation Priorities Plan (TPP)
 
VTA 2016 Measure B Program Areas
VTA 2016 Measure B Program AreasVTA 2016 Measure B Program Areas
VTA 2016 Measure B Program Areas
 
TPO FPC SMART Financial Plan Framework presentation
TPO FPC SMART Financial Plan Framework presentationTPO FPC SMART Financial Plan Framework presentation
TPO FPC SMART Financial Plan Framework presentation
 
NIRPC Green Fleet: Funding Process for Transportation Projects
NIRPC Green Fleet: Funding Process for Transportation ProjectsNIRPC Green Fleet: Funding Process for Transportation Projects
NIRPC Green Fleet: Funding Process for Transportation Projects
 

Más de Jill Reeves

Proper Maintenance for the Long Life of Concrete Pavements
Proper Maintenance for the Long Life of Concrete PavementsProper Maintenance for the Long Life of Concrete Pavements
Proper Maintenance for the Long Life of Concrete Pavements
Jill Reeves
 
Drone Applications in Concrete Paving
Drone Applications in Concrete PavingDrone Applications in Concrete Paving
Drone Applications in Concrete Paving
Jill Reeves
 
Optimization of Pavement Concrete
Optimization of Pavement ConcreteOptimization of Pavement Concrete
Optimization of Pavement Concrete
Jill Reeves
 
Concrete Overlays: A Proven Resurfacing Strategy
Concrete Overlays: A Proven Resurfacing StrategyConcrete Overlays: A Proven Resurfacing Strategy
Concrete Overlays: A Proven Resurfacing Strategy
Jill Reeves
 
Performance Engineered: Mixtures and AASHTO PP 84: It's Time for a Change
Performance Engineered: Mixtures and AASHTO PP 84: It's Time for a ChangePerformance Engineered: Mixtures and AASHTO PP 84: It's Time for a Change
Performance Engineered: Mixtures and AASHTO PP 84: It's Time for a Change
Jill Reeves
 
Accelerated Delivery - NDOT Design-Build Project
Accelerated Delivery - NDOT Design-Build ProjectAccelerated Delivery - NDOT Design-Build Project
Accelerated Delivery - NDOT Design-Build Project
Jill Reeves
 

Más de Jill Reeves (20)

Proper Maintenance for the Long Life of Concrete Pavements
Proper Maintenance for the Long Life of Concrete PavementsProper Maintenance for the Long Life of Concrete Pavements
Proper Maintenance for the Long Life of Concrete Pavements
 
Drone Applications in Concrete Paving
Drone Applications in Concrete PavingDrone Applications in Concrete Paving
Drone Applications in Concrete Paving
 
PCC Pavement: Repair vs. Overlay vs. Reconstruction
PCC Pavement: Repair vs. Overlay vs. ReconstructionPCC Pavement: Repair vs. Overlay vs. Reconstruction
PCC Pavement: Repair vs. Overlay vs. Reconstruction
 
Thrasher Commercial Group
Thrasher Commercial GroupThrasher Commercial Group
Thrasher Commercial Group
 
Low Density Cellular Concrete
Low Density Cellular ConcreteLow Density Cellular Concrete
Low Density Cellular Concrete
 
40th Annual NCPA Workshop
40th Annual NCPA Workshop40th Annual NCPA Workshop
40th Annual NCPA Workshop
 
Optimization of Pavement Concrete
Optimization of Pavement ConcreteOptimization of Pavement Concrete
Optimization of Pavement Concrete
 
Concrete Overlays: A Proven Resurfacing Strategy
Concrete Overlays: A Proven Resurfacing StrategyConcrete Overlays: A Proven Resurfacing Strategy
Concrete Overlays: A Proven Resurfacing Strategy
 
Slag Cement: Helping Concrete Perform Better
Slag Cement: Helping Concrete Perform BetterSlag Cement: Helping Concrete Perform Better
Slag Cement: Helping Concrete Perform Better
 
Performance Engineered: Mixtures and AASHTO PP 84: It's Time for a Change
Performance Engineered: Mixtures and AASHTO PP 84: It's Time for a ChangePerformance Engineered: Mixtures and AASHTO PP 84: It's Time for a Change
Performance Engineered: Mixtures and AASHTO PP 84: It's Time for a Change
 
Product Availability: Fly Ash
Product Availability: Fly AshProduct Availability: Fly Ash
Product Availability: Fly Ash
 
Federal Motor Carrier Rules and Regulations
Federal Motor Carrier Rules and RegulationsFederal Motor Carrier Rules and Regulations
Federal Motor Carrier Rules and Regulations
 
Silica Rule Update / Silica Mitigation Equipment
Silica Rule Update / Silica Mitigation EquipmentSilica Rule Update / Silica Mitigation Equipment
Silica Rule Update / Silica Mitigation Equipment
 
ABC in Nebraska: Belden to Laurel Bridge
ABC in Nebraska: Belden to Laurel BridgeABC in Nebraska: Belden to Laurel Bridge
ABC in Nebraska: Belden to Laurel Bridge
 
Upcoming Airport Projects
Upcoming Airport ProjectsUpcoming Airport Projects
Upcoming Airport Projects
 
Accelerated Delivery - NDOT Design-Build Project
Accelerated Delivery - NDOT Design-Build ProjectAccelerated Delivery - NDOT Design-Build Project
Accelerated Delivery - NDOT Design-Build Project
 
Pavement Asset Management
Pavement Asset ManagementPavement Asset Management
Pavement Asset Management
 
Iowa DOT - Council Bluffs Border City Agreements
Iowa DOT - Council Bluffs Border City AgreementsIowa DOT - Council Bluffs Border City Agreements
Iowa DOT - Council Bluffs Border City Agreements
 
2018 Interground/Blended Cements
2018 Interground/Blended Cements2018 Interground/Blended Cements
2018 Interground/Blended Cements
 
Central Plains Cement Company
Central Plains Cement CompanyCentral Plains Cement Company
Central Plains Cement Company
 

Último

If this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New NigeriaIf this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New Nigeria
Kayode Fayemi
 
Bring back lost lover in USA, Canada ,Uk ,Australia ,London Lost Love Spell C...
Bring back lost lover in USA, Canada ,Uk ,Australia ,London Lost Love Spell C...Bring back lost lover in USA, Canada ,Uk ,Australia ,London Lost Love Spell C...
Bring back lost lover in USA, Canada ,Uk ,Australia ,London Lost Love Spell C...
amilabibi1
 
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
Sheetaleventcompany
 
Uncommon Grace The Autobiography of Isaac Folorunso
Uncommon Grace The Autobiography of Isaac FolorunsoUncommon Grace The Autobiography of Isaac Folorunso
Uncommon Grace The Autobiography of Isaac Folorunso
Kayode Fayemi
 

Último (20)

BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort Service
 
If this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New NigeriaIf this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New Nigeria
 
Dreaming Marissa Sánchez Music Video Treatment
Dreaming Marissa Sánchez Music Video TreatmentDreaming Marissa Sánchez Music Video Treatment
Dreaming Marissa Sánchez Music Video Treatment
 
Causes of poverty in France presentation.pptx
Causes of poverty in France presentation.pptxCauses of poverty in France presentation.pptx
Causes of poverty in France presentation.pptx
 
Bring back lost lover in USA, Canada ,Uk ,Australia ,London Lost Love Spell C...
Bring back lost lover in USA, Canada ,Uk ,Australia ,London Lost Love Spell C...Bring back lost lover in USA, Canada ,Uk ,Australia ,London Lost Love Spell C...
Bring back lost lover in USA, Canada ,Uk ,Australia ,London Lost Love Spell C...
 
Presentation on Engagement in Book Clubs
Presentation on Engagement in Book ClubsPresentation on Engagement in Book Clubs
Presentation on Engagement in Book Clubs
 
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
 
Dreaming Music Video Treatment _ Project & Portfolio III
Dreaming Music Video Treatment _ Project & Portfolio IIIDreaming Music Video Treatment _ Project & Portfolio III
Dreaming Music Video Treatment _ Project & Portfolio III
 
Sector 62, Noida Call girls :8448380779 Noida Escorts | 100% verified
Sector 62, Noida Call girls :8448380779 Noida Escorts | 100% verifiedSector 62, Noida Call girls :8448380779 Noida Escorts | 100% verified
Sector 62, Noida Call girls :8448380779 Noida Escorts | 100% verified
 
Busty Desi⚡Call Girls in Sector 51 Noida Escorts >༒8448380779 Escort Service-...
Busty Desi⚡Call Girls in Sector 51 Noida Escorts >༒8448380779 Escort Service-...Busty Desi⚡Call Girls in Sector 51 Noida Escorts >༒8448380779 Escort Service-...
Busty Desi⚡Call Girls in Sector 51 Noida Escorts >༒8448380779 Escort Service-...
 
Report Writing Webinar Training
Report Writing Webinar TrainingReport Writing Webinar Training
Report Writing Webinar Training
 
BDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort Service
 
Introduction to Prompt Engineering (Focusing on ChatGPT)
Introduction to Prompt Engineering (Focusing on ChatGPT)Introduction to Prompt Engineering (Focusing on ChatGPT)
Introduction to Prompt Engineering (Focusing on ChatGPT)
 
Aesthetic Colaba Mumbai Cst Call girls 📞 7738631006 Grant road Call Girls ❤️-...
Aesthetic Colaba Mumbai Cst Call girls 📞 7738631006 Grant road Call Girls ❤️-...Aesthetic Colaba Mumbai Cst Call girls 📞 7738631006 Grant road Call Girls ❤️-...
Aesthetic Colaba Mumbai Cst Call girls 📞 7738631006 Grant road Call Girls ❤️-...
 
The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdf
The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdfThe workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdf
The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdf
 
Uncommon Grace The Autobiography of Isaac Folorunso
Uncommon Grace The Autobiography of Isaac FolorunsoUncommon Grace The Autobiography of Isaac Folorunso
Uncommon Grace The Autobiography of Isaac Folorunso
 
lONG QUESTION ANSWER PAKISTAN STUDIES10.
lONG QUESTION ANSWER PAKISTAN STUDIES10.lONG QUESTION ANSWER PAKISTAN STUDIES10.
lONG QUESTION ANSWER PAKISTAN STUDIES10.
 
AWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdf
AWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdfAWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdf
AWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdf
 
Thirunelveli call girls Tamil escorts 7877702510
Thirunelveli call girls Tamil escorts 7877702510Thirunelveli call girls Tamil escorts 7877702510
Thirunelveli call girls Tamil escorts 7877702510
 
SaaStr Workshop Wednesday w/ Lucas Price, Yardstick
SaaStr Workshop Wednesday w/ Lucas Price, YardstickSaaStr Workshop Wednesday w/ Lucas Price, Yardstick
SaaStr Workshop Wednesday w/ Lucas Price, Yardstick
 

Fixing America's Surface Transportation (FAST) Act

  • 1. P.L. 114-94 Fixing America’s Surface Transportation (FAST) Act Key Highway Provisions
  • 2. FASTAct • Signed by President Obama on December 4, 2015 • First long-term authorization act in a decade • Result of bipartisan cooperation and compromise • Provides 5 years of funding certainty for infrastructure planning and investment • Authorizes $305 B (all modes) over FY 2016-2020 • $70 B in transfers to keep the Highway Trust Fund solvent; fully “paid for” (offset) by unrelated savings 2
  • 3. $305 B (all modes) over FY2016-2020 Program 5-Year Funding (billions) Federal Highway Administration $ 226.3 Federal Transit Administration 61.1 Federal Motor Carrier Safety Administration 3.2 Pipeline and Hazardous Materials Administration 0.4 National Highway Traffic Safety Administration 4.7 Federal Railroad Administration 10.3 Total 305.0 3
  • 4. Key Highway Facts • $226.3 B for highways over five years (FY 2016-2020) • $225.2 B in contract authority • $1.1 B from the General Fund • Builds on the program structure and reforms of MAP-21 • Continued focus on accelerating project delivery • Adds a new freight formula and expands freight network • Adds a new discretionary program for nationally significant freight and highway projects • Provides a new tribal self-governance option 4
  • 5. Highway contract authority grows each year $41.0 $43.1 $44.0 $45.0 $46.0 $47.1 $0 $10 $20 $30 $40 $50 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 Highway Authorizations from Trust Fund (billions) • 5
  • 7. Growth Varies by Program Program Avg. Annual Funding (millions) Change from FY 2015 National Highway Performance Program $ 23,280 +6.3% Surface Transportation Block Grant Program 11,654 +15.6 Transportation Alternatives Set-aside [760] +3.3 Recreational Trails Program Set-aside [84] 0.0 Surface Transportation Block Grant Program (net of TA & Rec Trails) [10,809] +7.3 Congestion Mitigation & Air Quality Improvement 2,405 +6.1 Highway Safety Improvement Program 2,317 +5.7 Railway-Highway Crossings Program 235 +6.8 Metropolitan Planning 343 +9.5 National Highway Freight Program 1,249 NEW +100.0 7
  • 8. HSIP 92% of Highway Funds Are Apportioned CMAQ 8 Transportation Alternatives Rec Trails Grade Crossings Surface Transportation Block Grant (STBG) Program Metro Planning National Highway Performance Program National Highway Freight Program $207.4 B over 5 years
  • 9. Changes to NHPP and STP Prgm Changes NHPP • TIFIA costs and V2I communication equipment now eligible • Bridge resurfacing/preservation/reconstruction on non-NHS Federal- aid highways now eligible STP • Renamed: Surface Transportation Block Grant Program (STBG) • Eligibilities restated with none eliminated; new eligibilities for TIFIA costs, State P3 office, V2I communication equipment • In border States, up to 5% for infrastructure projects eligible under the SAFETEA-LU border program • More suballocation: +1%/year up to 55% (vs. 50% today) • Set-asides for Transportation Alternatives and Recreational Trails (see next slide) 9
  • 10. Changes to TAP, CMAQ, and HSIP Prgm Changes “TAP” • Same program, but no longer called TAP; no name specified • All funds set aside from STBG (vs. from all formula programs today) • Nonprofits responsible for local transportation safety programs may be project sponsors CMAQ • V2I communication equipment eligible • Port-related equipment & vehicles eligible under PM2.5 set-aside • Exception from PM2.5 set-aside for low population density States (under certain conditions) HSIP • Only listed project types eligible—mostly infrastructure-related • Adds eligibility for V2I communication equipment and certain pedestrian safety improvements • State need not collect certain data on unpaved roads (but can’t use HSIP funds on those roads until it collects the data) 10
  • 12. National Highway Freight Program | NEW • $1.2 B / year (average), apportioned to States by formula • Eligible activities include construction, operational improvements, freight planning and performance measures • Highway focus, but 10% for rail/port/intermodal projects • No State freight plan, no freight formula $ (beginning FY 2018) • Federal share is determined under 23 USC 120 • Repeals special Federal share for freight projects 12
  • 13. Natl. Significant Freight & Hwy. Projects | NEW • $900 M/year (average) for competitive grants or TIFIA loans for projects $100 M (reduced for States w/ small programs) • Eligible activities: • Highway freight projects on National Highway Freight Network • NHS highway/bridge projects, projects in National Scenic Areas • Freight rail/intermodal/port projects ($500 M over 5-year period) • Rail-highway grade crossing or grade separation projects • States, large MPOs, Tribes, localities, and FLMAs may apply • OST selects projects; Congress has 60 days to disapprove • Set-asides for rural areas and projects below cost threshold 13
  • 14. Other Freight Provisions • Freight policy goals and multi-modal national freight strategic plan • State freight plans (required) & advisory committees (encouraged) • National multimodal freight network • National Highway Freight Network, to include: • Primary Highway Freight System (PHFS); initially 41K miles • Critical rural freight corridors identified by States • Critical urban freight corridors with State-MPO consultation • Portions of Interstate System not included in the PHFS • Highway network re-designated every 5 years (w/up to 3% growth) 14
  • 16. Accelerating Project Delivery A major theme of the FAST Act, with 18 separate provisions in the highway title alone. The Act— • Adds New Flexibilities • Section 4(f) exemption for some bridges • Authorizes taking of nesting swallows in at-risk bridges • Refines Existing Provisions • Narrows concurrence requirement for PEL • Pilot for substitution of State law for NEPA 16
  • 17. Accelerating Project Delivery, cont’d • Adds to Procedural Requirements • Requires a schedule, a checklist, and response to project initiation • Adds some new specific time frames for notices and reviews • Builds on Existing Activities • Requires permitting dashboard (but covers all EISs & EAs) • DOT to maximize use of authority to delegate project oversight to States on both a project and programmatic basis 17
  • 19. Other Provisions • Specifically allows multiple similar bridge projects to be handled (“bundled”) into a single project • DOT to designate national electric vehicle charging and hydrogen, natural gas, and propane fueling corridors • Encouragement of vegetation management practices that improve habitat and forage for pollinators • State may opt for Federal share <100% for Appalachian Development Highway System (ADHS) projects 19 Drop slide?