Prepared by:


            Jimit Dhruv
         Elect.Engg,Dept.
Valiya Institute Of Technology-Valiya
Introduction
 Core material:
   Basic material are Alloy Steel having main
    content Silicon & carbon
   Which increases permeability & reduces losses
 HRS:

   HRS not used now a days
   As it has random direction &hard to measure
   Magnetic properties


 CRGOS:

   CRGOS shows excellent Magnetic properties
   So CRGOS is more used
Core construction
 Due to Pulsating flux, core should be
  laminated
 Transformer of larger size may forms in
  cut “C” or cut “E” type.




 Types of Interleaving:
    I.  Simple Interleaving
    II. Meter core Interleaving:

        1)45 ˙
       2) 33 ˙ /55 ˙ overlapping

  In 3-Ø Shell type transformer middle
   winding is reversed
  If not then 73% more core is used
   which leads in increase in over all cost
Transformer winding
Concentric
                                       Sandwich
 Spiral: It is used 100
  A& for low Voltage
  Winding
    Mechanically very
     strong                     Sandwich: mostly used
 Helical :Intermediate          for shell type transformer
  range of current                 Control leakage
    Suitable for LV winding
                                    reactance
     of large transformer          HV & LV are near so
                                    leakage flux is reduced
 Cross-over: suitable of
                                   mmf of each section is
  current not exceeding 20
                                    same.
  A
    Use for HV winding of
     small transformer
 Continuous disc: no of
  turns wound radially over
  one another
    separated by spacers
    HV winding
    Mechanically strong
Insulations
Two main kinds of Insulations:

1. Major Insulation:
    Insulating cylinder between LV & core
    Also between HV & LV
    Insulating barriers between limbs, coils & core
       yoke
    Oil impregnated paper used as it has high
       dielectric strength
2. Minor Insulation:
    Insulation between
   individual turns & between layers
    Conductor Insulation: paper&cotton
    Air insulated Transformer
       insulation used is glass tap
Bushing
 Up to 66kv non-condenser bushing are used is
  porcelain & oil filled

 Above 66kv condenser bushing are used for
  economic reasons.

 Condenser type bushing: It is formed by
  inserting Aluminum foiled layers into a paper
  winding at predetermined radius.

 “Partial capacitance”


 In outdoor substation the
  bushing are covered by a
  porcelain rain shade
Tapping
 Main two location:
  1. Inside Tank
  2. Outside Tank
 Considered as integral part of transformer


Tapping operation

 (1)On load    (2)Off load
tap changer    tap changer


 Tapping is terminated just bellow oil level
 External handle
 Taping is done on HV winding
 Provided in middle (axial & radial force)
Transformer Tank
 Plain sheet steel
  Tank

 Tube Tank


 Corrugated Tank


 Radiator Tank


 Tank with separate
   coolers
Conservator
 What is Conservator ?


 The expansion of oil from Transformer
  tank takes up in Conservator



 When oil contracts, air from
  atmosphere enters in Conservator .

 Risk of contamination of oil in transformer


 Breather valve is mounted to avoide
  moisture

 Breather contain silica in it
Buchholz Relay
 Operation:
 Gas operated relay
 AT the time of fault to maintain the continuity
  of the supply
 Fault detected particularly in incipient stage ,
  major fault can be avoided
 Which is placed between conservator
  and transformer tank
Transformer oil
 Double purpose :
   ie cooling & Insulating


 Permittivity is 2.5


 As per I.A.S breakdown strength of oil
  used must be 50kv RMS

 Major disadvantage is sluging


 To overcome this, synthetic oil is prefered


 One of the e.g is Chlorinated dephenyl is a
  synthetic oil its permittivity is 4.5
WORKSHOP(TPT DEPT.)

WINDING SHOP

  CORE & ACTIVE PART

      FINAL ASSEMBLY

          QUALITY TEST

             FINAL TESTING
WINDING SHOP
 TYPES OF WINDING

   i.   NORMAL WINDING
   ii. INTERLEAVE WINDING
   iii. TERITARY WINDING
                                             ROTARY

              HORIZONTAL      HELICAL
                                               K-
 MACHINES                                 TRANSPOSITION
                                              TYPE
                             CONTINUOUS
                VERTICAL
                                DISC




• End Rings & shielding for prevention purpose
 Conductor Insulation:

    1. Precompressed press board insulation(CRIP
       PAPER)
    2. Craft paper
    3. Also spacers as insulation




 Moisture Control

        Winding Auto Clave: Uses temp. of 110º
         C to 130º C and Vacuum of about 0.4 to
         0.5 mbar.
        Insulating Oven : Uses Heating Only

    Pressure Machine
    Brazing Machine with use of SILPHOS
     ALLOY
    Post Insulation
 PROCEDURE:
CORE & ACTIVE
 PART
 ACTIVE PART
 C.R.G.O. STRIPS
 1-STRIP HAS WIDTH OF 0.27 mm
 COIL OR WINDING ASSEMBLY
 PROCEDURE:
 Manufacturing of LIMB
 Core Insulation
 Removal of TOP FRAM for Coil assembly
 Winding insulation detail
 TOP YOKE FILLING
 VAPOUR PHASE OVEN
 HV & LV leads from top & bottom to the bushings
 REGULATING COILS to the tap changer
FINAL ASSEMBLY
 Installation of active part and assembly of
  accessories
 TRANSFORMER TANK


                      • JOINED AT
      BELL TYPE         BOTTOM
                        SIDE


                      • JOINED AT
   CONVECTIONAL
       TYPE
                        UPPER
                        SIDE
 ACCESSORIES:

  Blanker : Leakage of oil & Radiators
  adjointment

  Buchholz Relay: To trip the transformer


  OSR (oil serge relay): To indicate the level
  and quality of oil

  MOLG(magnate oil gage): It indicates the
  level of oil in the conservator

  Breather Valve: Provide dry air using silica
   gel and have air seal of neoprene
  Cooling Equipment: Generally for cooling
   of oil in a tank
     1.   Radiators
     2.   Thermosyphan
 Method of Cooling:
    i.   ONAN
    ii. ONAF
    iii. OFAF
    iv. For very high temp using HEAT
         EXCHANGER


 CT(Current Transformer):Two
         purposes;
    1.     Winding temp indicator (WTI)
    2.     Oil temp indicator (OTI)
        BUSHINGS: The leads from top and
         bottom of the winding are brought out to a
         length of few cm only and the outdoor
         terminal of the transformer are provided
         by bushings
 PROCEDURE
  Vacuuming of Tank(up to 0.3 mbar) for about
   24hrs to 36hrs

  The Leak Rate Test with the use of water & air


  Oil Test which includes BDV & PPM


  Oil Filling


  After the IMPREGNATION TIME the whole
   accessories are to be attached.
QUALITY TEST
 ANALYSIS WITH “SIGMA CARD”


 Sigma card includes below required data
    Design
    Process Time
    M/C size specification
    Process of manufacturing
    Dimension specification
    Testing specification
    Information about control points
FINAL TESTING

                  ROUTINE TESTS   TYPE TESTS


NO LOAD TETS
                                                        TEMPRETURE
                                                           TEST


 LOAD LOSS


INSULATION                              IMPULSE TEST
   TEST




CAPACITANCE &                                          ZERO SEQUENCE
    TAN δ                                                IMPEDANCE
                                                            TEST


  SEPARATE
   SOURCE                            HARMONIC AND
                                      NOISE LEVEL
                                         TEST


  INDUCED OVER
     VOLTAGE




WINDING TEST




  VOLTAGE RATIO
CT (CURRENT TRANSFORMER)
 Generally CT is use for the below four
  purposes:
    Measurement of Current
    Measurement of Power
    Isolation between High voltage and Low Voltage
    Inputs to Relays & Protection Systems
 PROCEDURE OF CURRENT
  TRANSFORMER:
 CO NDUCTORS USES :ALUMINIUM OR
  COPPER(HIGH CURRENT RATING)

 In the manufacturing of the primary winding or
  protection core there will be the creation of the
  capacitance as below.

    GRADING & SUB GRADING.
    MAIN GRADING HAS WRAPPED
     ALUMINIUM FOIL & CRIP PAPER
    AT 300MM DISTANCE PERFORATED ALU.
     FOIL (400MM) AND CRIP PAPER.
    SIMULTANEOUSLY INSULATION MAKE
     CAPACITANCE
 Quartz in CT

 Reduces the quantity of oil
 Provides mechanical strength for the
    conductors
   Improves the quality of oil by absorbing
    moisture
   Being a bad conductor of heat, it allows slow
    heating /cooling of the CT.
    Finally expansion tank is attached and after
    that evacuation of oil and gas filling will be
    there .
   There is also one imp term is D3 point which
    is also called the earth point.
Thank You

Más contenido relacionado

La actualidad más candente

Transformer repairing & manufacturing.pptx
Transformer repairing & manufacturing.pptxTransformer repairing & manufacturing.pptx
Transformer repairing & manufacturing.pptx
VishalSen33
 
Industrial training report
Industrial training report Industrial training report
Industrial training report
Pritam Samanta
 
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGHHIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
Shankar Singh
 

La actualidad más candente (20)

Presentation on Power Transformer
Presentation on Power TransformerPresentation on Power Transformer
Presentation on Power Transformer
 
Report on industrial summer training on 220 kv substation
Report  on industrial summer training on 220 kv substationReport  on industrial summer training on 220 kv substation
Report on industrial summer training on 220 kv substation
 
Internship report
Internship report Internship report
Internship report
 
Power transformer manufacturing process and testing
Power transformer manufacturing process and testingPower transformer manufacturing process and testing
Power transformer manufacturing process and testing
 
Power Transformer in DPL
Power Transformer in DPLPower Transformer in DPL
Power Transformer in DPL
 
PPT on 33/11 sub-station uppcl
PPT on 33/11 sub-station uppclPPT on 33/11 sub-station uppcl
PPT on 33/11 sub-station uppcl
 
Presentation on Power transformer
Presentation on Power transformerPresentation on Power transformer
Presentation on Power transformer
 
Excitation system for alternator
Excitation system for alternatorExcitation system for alternator
Excitation system for alternator
 
summer internship report on erection, commissioning and pre-comissioning of50...
summer internship report on erection, commissioning and pre-comissioning of50...summer internship report on erection, commissioning and pre-comissioning of50...
summer internship report on erection, commissioning and pre-comissioning of50...
 
Transformer repairing & manufacturing.pptx
Transformer repairing & manufacturing.pptxTransformer repairing & manufacturing.pptx
Transformer repairing & manufacturing.pptx
 
Electrical HT/LT Motor protection
Electrical HT/LT Motor protectionElectrical HT/LT Motor protection
Electrical HT/LT Motor protection
 
Industrial training report
Industrial training report Industrial training report
Industrial training report
 
Distribution Transformer Manufacturing at Navana Electronics ltd (Aliv)
Distribution Transformer Manufacturing at Navana Electronics ltd (Aliv)Distribution Transformer Manufacturing at Navana Electronics ltd (Aliv)
Distribution Transformer Manufacturing at Navana Electronics ltd (Aliv)
 
Operation and maintenance of transformer
Operation and maintenance of transformerOperation and maintenance of transformer
Operation and maintenance of transformer
 
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGHHIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
 
substation internship report
substation internship report substation internship report
substation internship report
 
TRANSFORMER PPT
TRANSFORMER PPT TRANSFORMER PPT
TRANSFORMER PPT
 
33/11 KV SUBSTATION
33/11 KV SUBSTATION33/11 KV SUBSTATION
33/11 KV SUBSTATION
 
Transformer manufacturing and Internship Report
Transformer manufacturing and Internship ReportTransformer manufacturing and Internship Report
Transformer manufacturing and Internship Report
 
132 33kv substation documentation
132 33kv substation documentation132 33kv substation documentation
132 33kv substation documentation
 

Similar a PRESENTATION ON MANUFACTURING OF TRANSFORMER By Dhruv Jimit

Presentation_Power_Transformers-1
Presentation_Power_Transformers-1Presentation_Power_Transformers-1
Presentation_Power_Transformers-1
Nageswar Rao
 
transformer Sales, after sales & service presentation
transformer Sales, after sales & service presentationtransformer Sales, after sales & service presentation
transformer Sales, after sales & service presentation
Fawaz Baik
 
Pre commissioning steam turbines load trial
Pre commissioning steam turbines load trialPre commissioning steam turbines load trial
Pre commissioning steam turbines load trial
Nagesh H
 
Generator cooling and sealing system 2
Generator cooling and sealing system 2Generator cooling and sealing system 2
Generator cooling and sealing system 2
Mohammad Basid
 
Sc50 cummins Groupe électrogène, Plantas Eléctricas
Sc50 cummins Groupe électrogène, Plantas EléctricasSc50 cummins Groupe électrogène, Plantas Eléctricas
Sc50 cummins Groupe électrogène, Plantas Eléctricas
SUNSHINE MACHINERY
 
Sc30 cummins Groupe électrogène
Sc30 cummins Groupe électrogèneSc30 cummins Groupe électrogène
Sc30 cummins Groupe électrogène
SUNSHINE MACHINERY
 
Sc150 cummins generation Groupe électrogène, Plantas Eléctricas,
Sc150 cummins generation Groupe électrogène, Plantas Eléctricas,Sc150 cummins generation Groupe électrogène, Plantas Eléctricas,
Sc150 cummins generation Groupe électrogène, Plantas Eléctricas,
SUNSHINE MACHINERY
 

Similar a PRESENTATION ON MANUFACTURING OF TRANSFORMER By Dhruv Jimit (20)

transformers.ppt
transformers.ppttransformers.ppt
transformers.ppt
 
Presentation_Power_Transformers-1
Presentation_Power_Transformers-1Presentation_Power_Transformers-1
Presentation_Power_Transformers-1
 
transformer Sales, after sales & service presentation
transformer Sales, after sales & service presentationtransformer Sales, after sales & service presentation
transformer Sales, after sales & service presentation
 
Pre commissioning steam turbines load trial
Pre commissioning steam turbines load trialPre commissioning steam turbines load trial
Pre commissioning steam turbines load trial
 
Transformer Protection
Transformer Protection Transformer Protection
Transformer Protection
 
Industrial training ppt bhel bhopal
Industrial training ppt bhel bhopalIndustrial training ppt bhel bhopal
Industrial training ppt bhel bhopal
 
Transformer Accessories for Testing and Protection
Transformer Accessories for Testing and ProtectionTransformer Accessories for Testing and Protection
Transformer Accessories for Testing and Protection
 
Sc30 cummins gensets
Sc30 cummins gensetsSc30 cummins gensets
Sc30 cummins gensets
 
Sp33 data sheet
Sp33 data sheetSp33 data sheet
Sp33 data sheet
 
Sc50 cummins generator sets diesel gensets
Sc50 cummins generator sets diesel gensetsSc50 cummins generator sets diesel gensets
Sc50 cummins generator sets diesel gensets
 
Generator cooling and sealing system 2
Generator cooling and sealing system 2Generator cooling and sealing system 2
Generator cooling and sealing system 2
 
Sp184 3 phase data sheet
Sp184 3 phase data sheetSp184 3 phase data sheet
Sp184 3 phase data sheet
 
Sp30 perkins 30kva Groupe électrogène standby single phase data sheet
Sp30 perkins 30kva Groupe électrogène standby single phase data sheetSp30 perkins 30kva Groupe électrogène standby single phase data sheet
Sp30 perkins 30kva Groupe électrogène standby single phase data sheet
 
Sc44 cummins gensets generator
Sc44 cummins gensets generatorSc44 cummins gensets generator
Sc44 cummins gensets generator
 
Sc50 cummins Groupe électrogène, Plantas Eléctricas
Sc50 cummins Groupe électrogène, Plantas EléctricasSc50 cummins Groupe électrogène, Plantas Eléctricas
Sc50 cummins Groupe électrogène, Plantas Eléctricas
 
Sc30 cummins Groupe électrogène
Sc30 cummins Groupe électrogèneSc30 cummins Groupe électrogène
Sc30 cummins Groupe électrogène
 
Sc30 cummins
Sc30 cumminsSc30 cummins
Sc30 cummins
 
Sc150 cummins
Sc150 cumminsSc150 cummins
Sc150 cummins
 
Sc150 cummins generation Groupe électrogène, Plantas Eléctricas,
Sc150 cummins generation Groupe électrogène, Plantas Eléctricas,Sc150 cummins generation Groupe électrogène, Plantas Eléctricas,
Sc150 cummins generation Groupe électrogène, Plantas Eléctricas,
 
Sc70 cummins generating sets
Sc70 cummins generating setsSc70 cummins generating sets
Sc70 cummins generating sets
 

Último

Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
amitlee9823
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
dlhescort
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
lizamodels9
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
amitlee9823
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Sheetaleventcompany
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
Abortion pills in Kuwait Cytotec pills in Kuwait
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
lizamodels9
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
dlhescort
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 

Último (20)

Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
Falcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in indiaFalcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in india
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 

PRESENTATION ON MANUFACTURING OF TRANSFORMER By Dhruv Jimit

  • 1. Prepared by: Jimit Dhruv Elect.Engg,Dept. Valiya Institute Of Technology-Valiya
  • 2. Introduction  Core material:  Basic material are Alloy Steel having main content Silicon & carbon  Which increases permeability & reduces losses
  • 3.  HRS:  HRS not used now a days  As it has random direction &hard to measure Magnetic properties  CRGOS:  CRGOS shows excellent Magnetic properties  So CRGOS is more used
  • 4. Core construction  Due to Pulsating flux, core should be laminated  Transformer of larger size may forms in cut “C” or cut “E” type.  Types of Interleaving: I. Simple Interleaving II. Meter core Interleaving: 1)45 ˙ 2) 33 ˙ /55 ˙ overlapping  In 3-Ø Shell type transformer middle winding is reversed  If not then 73% more core is used which leads in increase in over all cost
  • 6. Concentric Sandwich  Spiral: It is used 100 A& for low Voltage Winding  Mechanically very strong  Sandwich: mostly used  Helical :Intermediate for shell type transformer range of current  Control leakage  Suitable for LV winding reactance of large transformer  HV & LV are near so leakage flux is reduced  Cross-over: suitable of  mmf of each section is current not exceeding 20 same. A  Use for HV winding of small transformer  Continuous disc: no of turns wound radially over one another  separated by spacers  HV winding  Mechanically strong
  • 7. Insulations Two main kinds of Insulations: 1. Major Insulation:  Insulating cylinder between LV & core  Also between HV & LV  Insulating barriers between limbs, coils & core yoke  Oil impregnated paper used as it has high dielectric strength 2. Minor Insulation:  Insulation between individual turns & between layers  Conductor Insulation: paper&cotton  Air insulated Transformer insulation used is glass tap
  • 8. Bushing  Up to 66kv non-condenser bushing are used is porcelain & oil filled  Above 66kv condenser bushing are used for economic reasons.  Condenser type bushing: It is formed by inserting Aluminum foiled layers into a paper winding at predetermined radius.  “Partial capacitance”  In outdoor substation the bushing are covered by a porcelain rain shade
  • 9. Tapping  Main two location: 1. Inside Tank 2. Outside Tank  Considered as integral part of transformer Tapping operation (1)On load (2)Off load tap changer tap changer  Tapping is terminated just bellow oil level  External handle  Taping is done on HV winding  Provided in middle (axial & radial force)
  • 10. Transformer Tank  Plain sheet steel Tank  Tube Tank  Corrugated Tank  Radiator Tank  Tank with separate coolers
  • 11. Conservator  What is Conservator ?  The expansion of oil from Transformer tank takes up in Conservator  When oil contracts, air from atmosphere enters in Conservator .  Risk of contamination of oil in transformer  Breather valve is mounted to avoide moisture  Breather contain silica in it
  • 12. Buchholz Relay  Operation:  Gas operated relay  AT the time of fault to maintain the continuity of the supply  Fault detected particularly in incipient stage , major fault can be avoided  Which is placed between conservator and transformer tank
  • 13. Transformer oil  Double purpose :  ie cooling & Insulating  Permittivity is 2.5  As per I.A.S breakdown strength of oil used must be 50kv RMS  Major disadvantage is sluging  To overcome this, synthetic oil is prefered  One of the e.g is Chlorinated dephenyl is a synthetic oil its permittivity is 4.5
  • 14. WORKSHOP(TPT DEPT.) WINDING SHOP CORE & ACTIVE PART FINAL ASSEMBLY QUALITY TEST FINAL TESTING
  • 15. WINDING SHOP  TYPES OF WINDING i. NORMAL WINDING ii. INTERLEAVE WINDING iii. TERITARY WINDING ROTARY HORIZONTAL HELICAL K- MACHINES TRANSPOSITION TYPE CONTINUOUS VERTICAL DISC • End Rings & shielding for prevention purpose
  • 16.  Conductor Insulation: 1. Precompressed press board insulation(CRIP PAPER) 2. Craft paper 3. Also spacers as insulation  Moisture Control  Winding Auto Clave: Uses temp. of 110º C to 130º C and Vacuum of about 0.4 to 0.5 mbar.  Insulating Oven : Uses Heating Only  Pressure Machine  Brazing Machine with use of SILPHOS ALLOY  Post Insulation
  • 18. CORE & ACTIVE PART  ACTIVE PART  C.R.G.O. STRIPS  1-STRIP HAS WIDTH OF 0.27 mm  COIL OR WINDING ASSEMBLY  PROCEDURE:  Manufacturing of LIMB  Core Insulation  Removal of TOP FRAM for Coil assembly  Winding insulation detail  TOP YOKE FILLING  VAPOUR PHASE OVEN  HV & LV leads from top & bottom to the bushings  REGULATING COILS to the tap changer
  • 19. FINAL ASSEMBLY  Installation of active part and assembly of accessories  TRANSFORMER TANK • JOINED AT BELL TYPE BOTTOM SIDE • JOINED AT CONVECTIONAL TYPE UPPER SIDE
  • 20.  ACCESSORIES:  Blanker : Leakage of oil & Radiators adjointment  Buchholz Relay: To trip the transformer  OSR (oil serge relay): To indicate the level and quality of oil  MOLG(magnate oil gage): It indicates the level of oil in the conservator  Breather Valve: Provide dry air using silica gel and have air seal of neoprene  Cooling Equipment: Generally for cooling of oil in a tank 1. Radiators 2. Thermosyphan
  • 21.  Method of Cooling: i. ONAN ii. ONAF iii. OFAF iv. For very high temp using HEAT EXCHANGER  CT(Current Transformer):Two purposes; 1. Winding temp indicator (WTI) 2. Oil temp indicator (OTI)  BUSHINGS: The leads from top and bottom of the winding are brought out to a length of few cm only and the outdoor terminal of the transformer are provided by bushings
  • 22.  PROCEDURE  Vacuuming of Tank(up to 0.3 mbar) for about 24hrs to 36hrs  The Leak Rate Test with the use of water & air  Oil Test which includes BDV & PPM  Oil Filling  After the IMPREGNATION TIME the whole accessories are to be attached.
  • 23. QUALITY TEST  ANALYSIS WITH “SIGMA CARD”  Sigma card includes below required data  Design  Process Time  M/C size specification  Process of manufacturing  Dimension specification  Testing specification  Information about control points
  • 24. FINAL TESTING ROUTINE TESTS TYPE TESTS NO LOAD TETS TEMPRETURE TEST LOAD LOSS INSULATION IMPULSE TEST TEST CAPACITANCE & ZERO SEQUENCE TAN δ IMPEDANCE TEST SEPARATE SOURCE HARMONIC AND NOISE LEVEL TEST INDUCED OVER VOLTAGE WINDING TEST VOLTAGE RATIO
  • 25. CT (CURRENT TRANSFORMER)  Generally CT is use for the below four purposes:  Measurement of Current  Measurement of Power  Isolation between High voltage and Low Voltage  Inputs to Relays & Protection Systems  PROCEDURE OF CURRENT TRANSFORMER:  CO NDUCTORS USES :ALUMINIUM OR COPPER(HIGH CURRENT RATING)  In the manufacturing of the primary winding or protection core there will be the creation of the capacitance as below.  GRADING & SUB GRADING.  MAIN GRADING HAS WRAPPED ALUMINIUM FOIL & CRIP PAPER  AT 300MM DISTANCE PERFORATED ALU. FOIL (400MM) AND CRIP PAPER.  SIMULTANEOUSLY INSULATION MAKE CAPACITANCE
  • 26.
  • 27.  Quartz in CT  Reduces the quantity of oil  Provides mechanical strength for the conductors  Improves the quality of oil by absorbing moisture  Being a bad conductor of heat, it allows slow heating /cooling of the CT.  Finally expansion tank is attached and after that evacuation of oil and gas filling will be there .  There is also one imp term is D3 point which is also called the earth point.