January 2014, East Chicago Harbor Carnegie Library Restoration
1. East Chicago Harbor Carnegie Library Restoration VRA Architects, Inc. 1018 Busse Highway, Park Ridge, IL 60068 James D. Smith, AIA Principal/Project Architect 03/09/10 Carnegie Performing Arts Center, East Chicago Indiana
2.
3.
4. Post Card images of the original 1913 Branch Carnegie Performing Arts Center, East Chicago Indiana Looking southeast from Grand Blvd.
15. Interior Restoration: Carnegie Performing Arts Center, East Chicago Indiana The main book stack area at the far east of the “new” addition has experienced the least amount of damage. The ceiling plaster detail is intact. The shabby appearance is only peeling paint. This portion of the building will be helpful as a model for design of the interior restoration.
16. Interior Restoration Carnegie Performing Arts Center, East Chicago Indiana In the 1931 addition, plaster detail cornices from The Decorators Supply Company, in Chicago were used. The company is still in existence and the same designs are available for our restoration work
17. Interior Restoration Carnegie Performing Arts Center, East Chicago Indiana Interior detail section from 1931 addition drawings showing the Decorators Supply Catalog numbers
25. Work in progress Carnegie Performing Arts Center, East Chicago Indiana
26. Carnegie Performing Arts Center, East Chicago Indiana Contractor setting up for roof restoration
27. Carnegie Performing Arts Center, East Chicago Indiana The roof tile is extensively damaged as is some of the underlying wood deck, however, damage is limited and does not affect the main carrying structure.
28. Carnegie Performing Arts Center, East Chicago Indiana Roof Restoration Startup Replacement of damaged roof deck Detail view of tile and wood deck deterioration
32. Interior Demolition Carnegie Performing Arts Center, East Chicago Indiana We have determined that the existing structural walls and roof framing have no significant damage and will be suitable for the proposed restoration
33. Phase Three, Exterior Restoration Underway at this time Carnegie Performing Arts Center, East Chicago Indiana All wood windows have been removed and are being restored. The sash was in very good condition and only a few trim items and glazing be replaced. New wood storm windows will be provided to protect the restored windows as well as offer insulation. Existing sash Existing 4’x8’ double hung window. Among those now being restored Basement window opening. Window removed for restoration. Jamb framing is being restored in place. Remaining interior trim is to be restored and re-installed . Existing trim to be used as template for missing trim
34. Brick Cleaning and Restoration Carnegie Performing Arts Center, East Chicago Indiana Brick mortar matching samples Brick Cleaning in Progress Masons grinding mortar joints in preparation for tuck pointing Damaged or missing brick and deteriorated lintels are being replaced.
35. Foundation Has been excavated for inspection and repair and application of waterproofing. Carnegie Performing Arts Center, East Chicago Indiana Insulation and footing drains have been installed along with the water proofing. Final Coat of Waterproofing membrane Existing Foundation Wall Has Been Exposed, Inspected And Repaired As Necessary Back Filling After All Waterproofing, Repair and Insulation are Complete Damaged Foundation Wall Has Been repaired.
36. New Stairs and ADA Ramp Under Construction. Carnegie Performing Arts Center, East Chicago Indiana Northwest Stair Being Removed. New Stair Will Replace the Badly Deteriorated Existing Stair. Formwork Preparation for New East Exit Stair From Performance Hall Two Views Of Foundation For New ADA Ramp at West Entrance.
37. New Stairs and ADA Ramp Under Construction. Carnegie Performing Arts Center, East Chicago Indiana Northwest Stair has been replaced with new concrete stair and matching stone. New East Exit Stair From Performance Hall and basement nearing completion Sample of Decorative stair railing. Installation nearing completion Two Views Of New ADA Ramp at West Entrance nearing completion.
38. Rebuilding Chimneys. Carnegie Performing Arts Center, East Chicago Indiana South chimney nearing completion. Masonry was taken down and restored from parapet up. The two west chimneys have been restored from roof line to top. All original detail has been restored.
39. Overall View Carnegie Performing Arts Center, East Chicago Indiana Overall View of building looking northeast. Windows and storm windows nearing completion. Copper gutters and downspouts nearing completion