SlideShare una empresa de Scribd logo
1 de 7
Descargar para leer sin conexión
CV Jingo Jude Allan
Page 1/ 7 1
P.O. BOX 6660 KAMPALA Phone(+250)784981514
E-mail : jingo.allan@gmail.com
twitter @jingoaj
Skype ; jingo.jude.allan
JINGOJUDE ALLAN
Sex MALE
DateofBirth 31 – 5 – 1978
Nationality UGANDAN
Profession CIVIL ENGINEERING - Construction Management
Vision To be a leading professional engaged in infrastructure development in Africa.
SummaryofProfessional
experience
14 years project management experience across Uganda, Rwanda and Burundi. Key
strengths on Quality assurance, Supervision of tender preparation;Project planning and
construction management of building and civil works, rural water supply and sanitation
projects, road pavement construction and telecom facilities; trainer of Occupational health
and safety practices for construction sites; Audit evaluation of project lifecycle and
consultancy involvement with risk prone populations.
Continuous professional improvement within advanced industries in Holland and regionally within
eastern Africa.
SummaryofVoluntary
experience
10 years as a community volunteer attaining leadership assignment for Rotary international
(Rotary district 9200 – Uganda, Kenya, Tanzania, Eritrea and Ethiopia) as youth leader and
eventually as a Rotarian with Rotary club of Kampala south.
Youth empowerment and mentorship
Education
BSC.CIVILENGINEERING
1996 - 2001 Makerere University Kampala, Uganda
GCE (A LEVEL)
1994 – 1996 Aga Khan Academy Nairobi, Kenya
UCE (O LEVEL)
1993 – 1994 Namasagali College Kamuli, Uganda
1991 – 1992 Namilyango College Mukono, Uganda
PLE
1990 Makonzi Boarding Primary School, Mityana, Uganda
Workshopsattended April 2015
Stage 1 – FIDIC form of contract management seminar held at Legacy hotel, Kigali
CV Jingo Jude Allan
Page 2/ 7 2
March – April 2011
Study tour of Dutch Construction Industry courtesy of PUM Holland (www.pum.nl) and Management
Contractor Hegeman+ (www.hegeman.com)
Overall experience gained was of the Innovation programs and techniques undertaken by
construction companies within a mature and specialized Industry; proactive management
techniques to enhance Quality, Environmental, Health and safety(QHSE); Establishment and
monitoring of companywide cash flows and profits; emerging technologies in architectural
practice; typical applications of precast concrete industry.
Construction
Engineering Work
experience over 14
years
February 2011: Occupational , Health and Safety training of trainers with Uganda breweries Limited
and Tullow Oil plc
Dec 2009: Uganda Engineers Registration Board (ERB) at Imperial Royal Hotel - “Theme: Dealing
with deep excavations in construction industry” at Kampala
October 2009: Building Better without Bricks – Demonstration on a new
method of construction that is safer, less expensive and up to 15x stronger than bricks, conducted
by Spider Tie USA at Hotel Africana
Aug 28, 2009: UIPE CPD Seminar – “Theme: Engineers in Management”
July 2007: Public Procurement and Disposal of Assets Authority (PPDA) training in procurement
and disposal procedures; role of the user department in Contract management, the responsibilities
of the evaluation committee and disposal procedures at Imperial Botanical Beach Hotel, Entebbe,
Uganda
July 2006: OH & S permit to work shop for Uganda Breweries Limited,
16/8/2001: National Budget Review under Uganda National Association of Building and Civil
Engineering Contractors.
Private practice within Rwanda on assorted buildings and roads
WORK WITH REAL CONTRACTORS LTD (www.realcontractorsltd.com) from April 2012 – Nov
2015
Project Engineer
Overall responsibilities:
 Quality assurance
 Project supervision and representation of company to project stakeholders
 Health and Safety awareness and enforcement within Technical department
 Documentation and process change in readiness of ISO certification.
 Quantity surveying and value addition
 Design studies and presentations
 Preparation of tenders
September 2015
TRANSFORM AFRICA AND INTERPOL CONFERENCES 2015 HOST VENUE IN KIGALI
Construction of infrastructure services and project management
October 2014 – Nov 2015
PROPOSED RELOCATION OF 5 NO INDUSTRIES FROM GIKONDO INDUSTRIAL PARK TO
PRIME ECONOMIC ZONES[ design and build contract]
USD 24,776,773.34
December 2014 – February 2015
REMODELING OF KIGALI INTERNATIONAL AIRPORT VVIP WING
Rwf1,200,000,000
April 2012 – March 2014
CV Jingo Jude Allan
Page 3/ 7 3
CONSTRUCTION OF NATIONAL BANK OF RWANDA REGIONAL CURRENCY CENTER AT
KAMEMBE, RUSIZI DISTRICT, Rwf 2,892,431,998 RWF
Nov 2013 –march 2014
CONSTRUCTION OF LAKE KIVU MARINA BAY HOTEL (PHASE 1A) - RWF 2,640,000,000 RWF
Partial work until temporary halting of works before resumption later in 2015.
WORK WITH COSTRA-R in Rwanda and Burundi from August 2011 – March 2012
Contracts Manager
Overall responsibilities:
 Supervision of tender preparation and follow up
 Project supervision and representation of company to project stakeholders
 Quality assurance
DESIGN AND CONSTRUCTION OF LIFT SHAFT (5 STOREYS) AND INSTALLATION OF LIFT
CABIN FOR HOTEL AMAHORO, BUJUMBURA, BURUNDI (USD 160,000)
CONSTRUCTION OF BANK POPULAIRE RWANDA ( BPR) KIGALI CITY MARKET BRANCH: Rwf
53,950,163
DESIGN AND CONSTRUCTION OF BANK OF KIGALI NYANZA BRANCH, Rwf 77,848,848
DESIGN AND CONSTRUCTION OF MEMORIAL MONUMENT FOR NATIONAL BANK OF
RWANDA – Kigali headquarters, Rwf 53,010,355
WORK WITH BABCON UGANDA LIMITED in Uganda from 2001 - 2011
Technical manager march 2008 – June 2011
Overall responsibilities:
 Supervision of tender preparation and follow up
 Quality assurance
 Project supervision and representation of company to project stakeholders
 Health and safety implementation across sites
May 2011 – June 2011
BOUNDARY SURVEYING AND CONSTRUCTION OF PERIMETER FENCING OF PLOT NO.
M833 KYAMBOGO FOR INTER UNIVERSITY COUNCIL OF EAST AFRICA
Contract Sum – UgX 65,933,900/=
March 2011 –June 2011
EXTENSION OF CASE MEDICAL CENTER PLOT 69/71 BUGANDA ROAD (PHASE 1 – 4
STORIED PARKING LOT)
Contract Sum – Ugx 984,946,501 (Labour Only)
RECONSTRUCTION OF 42KM MATTE – SEKANYONYI – KIKONGE GRAVEL ROAD FOR UNRA
Contract Sum – Ugx 424,352,000/=
Sep 2010 – June 2011
DESIGN AND CONSTRUCTION OF KYEHORO HEALTH CENTER II, KYEHORO PRIMARY
SCHOOL AND SEBAGORO HEALTH CENTRE III FOR TULLOW OIL PLC
Contract Sum – Us $ 1,070,092
February 2010 – August 2010
RENOVATION WORKS OF STATE LODGE NAKASERO FOR OFFICE OF THE PRESIDENT.
CV Jingo Jude Allan
Page 4/ 7 4
Contract Sum – US $ 209,772
March 2010 – October 2010
CONSTRUCTION OF COVERED WALKWAY CANOPY FOR BANK OF UGANDA
HEADQUARTERS
Contract sum – US $ 196,075
January - May 2009
CONSTRUCTION OF 3NO. BTS SITES FOR UGANDA TELECOM (KASENYI,
NAMIREMBE&KABOWA SITES, 50 METER TOWERS)
Contract Sum: - US $ 108,908
February – June 2009
CONSTRUCTION OF 3 NO. BTS SITES FOR MANAGEMENT CONTRACTOR ALCATEL LUCENT
FOR ORANGE UGANDA LTD.
Contract Sum: - US $ 226,945.
December 2008 – Dec 2010
PROPOSED REDEVELOPMENT OF KYABAZINGA’S PALACE AT IGENGE HILL, WANYANGE
Contract Sum: - US $ 1,828,656
September 2008 – August 2011
REHABILITATION OF MOROTO BARRACKS FOR MINISTRY OF DEFENCE
Contract sum:- US $ 2,130,287
August 2008 – August 2011
CONSTRUCTION, REMODELING AND REFURBISHMENT OF LAND ADMINISTRATION
BUILDINGS IN KAMPALA, MASAKA AND MBARARA SITES
Contract Sum:- US $ 1,221,392
August 2008 – January 2009
PROPOSED BANKING HALL FIT-OUT MBARARA BRANCH FOR HOUSING FINANCE BANK
Contract Sum: - US $ 52,300
July – December 2008
PROPOSED FIT OUT OF MBARARA BRANCH FOR UMEME
Contract Value: US $50,847
October 2007 – September 2008
CONSTRUCTION OF HEADQUARTERS BUILDING FOR UGANDA POLICE FORCE (PHASE 1 –
with 4 STOREYS)
Contract Sum: - Ugx 2,144,000,000
WORK AS SITE ENGINEER WITH BABCON UGANDA LIMITED
November 2006 – December 2007
SITECOORDINATOR,REMODELINGOFCAFETERIABLOCKINTOCONFERENCEHALLATUGANDA
INDUSTRIALRESEARCHINSTITUTE
Contract Sum: - Ugx 544,533,243/=
January 2007 – April 2007
SITECOORDINATOR,REPLACEMENTOFPLATFORMSANDREMODELINGOFJETTYSTRUCTURES
INTOLAKEVICTORIAONATENTEBBEAIRPORTFORCIVILAVIATIONAUTHORITY
Contract Sum: - Ugx 83,331,596.-
July 2006 – May 2007
SITEAGENT,REHABILITATIONOFPERIMETERFENCEANDCARPARKINGLOTATUGANDAMUSEUM
FORMINISTRYOFTOURISM,TRADEANDINDUSTRY
Contract Sum: - Ugx 177, 922,915.-
CV Jingo Jude Allan
Page 5/ 7 5
February 2005 – Feb. 2006
SITECOORDINATOR,DWDBULANGATOWNWATERSUPPLY(POPN:13,000)
Contract Sum: - Ugx,480,000,000.-
March 2005 – June 2006:
ASST. SITE COORDINATOR; RUKUNGIRI DISTRICT LOCAL ADMINISTRATION
HEADQUARTERS COMPLEX – PHASE 1 ( 4 STOREYS)
Contract Sum – Ugx.478,500,000.-
July 2004 – Dec. 2005
SITE COORDINATOR; UTL NURP II SHELTERS
 Construction of 9 No. Equipment Shelters.
Contract Sum: Ugx.560,000,000.-
September 2004 – September 2005
SITE COORDINATOR; SIEMENS NURP II TOWN BASES AND SOLAR PANELS
 Construction of 10 No. Tower Bases & Solar Panels on UTL NURP II Projects
 Contract Sum: USD.616,000.00
Aug. 2004 – Nov. 2004
ASST. SITE COORDINATOR; ALCATELTOWER BASES
 Construction of 15 No. Tower Bases in Central, Eastern & Western Uganda
 Contract Sum: Ugx.430,000,000.-
Aug. 2004 – Nov. 2004
SITE COORDINATOR; UTL NURP I BUILDING RENOVATIONS
 Building Renovations at Otuboi, Wanaale, Moru and KumiCentres
 Contract Sum: US $ 320,914.00
Sept 2004 – 2005
ASST. SITE AGENT: COMPLETION OF PUBLISHING & COMPUTER DATA CENTRE AT FIRRI,
JINJA
 Contract Sum: US$.75,588.00
MAINTENANCE CONTRACTS DONE FOR UGANDA BREWERIES LTD AND BRITISH AMERICAN
TOBACCO UGANDA IN CAPACITY OF SITE COORDINATOR BETWEEN AUG 2003 – JAN 2004
 Construction of storage Concrete Hard standing Area 1500 SM(Ugx.242,000,000)
 Refurbishment of Engine room and Generator House ( Ugx.58,000,000)
 Works for New Cable Route from Engine Room (Ugx.20,000,000.)
 Renovations and Alterations to Uganda Breweries Ltd. Tank at the Distillery Dept.
Contract Sum: Ugx.17,500,000.-
 Repair of Distillery Access Road, Driveway and Car park (UgX95,300,000)
 Refurbishment of Brewhouse, Old fermenters and DPV Phase I (UgX 175,500,000.)
 Refurbishment of foul drainage systems and provision of new water tank and tower Contract
sum: Ugx.33,000,000.-
May 2003 – Aug. 2003
Site Coordinator, UTL NURP 1
 Coordinated 8 No. Sites forming Kampala – Masindi – Gulu Telecommunications line.
CV Jingo Jude Allan
Page 6/ 7 6
Involved rehabilitation of equipment stations and civil works to mast and solar bases.(UgX
563, 000,000.-)
Mar 2003 – Apr. 2003,
SITE AGENT, CONSTRUCTION OF DPP REGIONAL OFFICES, MBALE
Contract Sum: - Ugx.112,028,462.-
Aug. 2001 – Feb. 2003,
ASST. SITE ENGINEER, FACULTY OF DEVELOPMENT STUDIES, MBARARA UNIVERSITY.
 Contract sum: Ugx.1, 500,000.-
July – Sept. 2000 Kirima and Sons Ltd. Nairobi, Kenya
Student Trainee
 Involved supervision of plumbing fittings, internal finishes and electrical wiring for a multi-
urban 4 story building with 48 flats and 16 shops in Parklands suburb.
July – Sept. 1999 Stirling international Kampala, Uganda
Student Trainee
 Involved in road and drainage surveys, Quality assurance for road works including gravel,
Hot mix asphalt at Mukono.
July – Sept. 1998 Uganda Electricity Board Jinja, Uganda
Student Trainee:
 Renovation of parasitical residences, Quantity Surveying, general maintenance works to
turbines and dam faces at Owen Falls dams
Publicationsauthored COMPARISON OF THE PRIVATE AND PUBLIC CONTRACTOR SELECTION MECHANISMS
USED IN THE UGANDA CONSTRUCTION INDUSTRY; MUK 2000.
INTEGRATION OF A CAR PARK INTO A SIGNAL CONTROLLED JUNCTION – CASE OF NAKAWA
JUNCTION, KAMPALA; MUK; 2001
Softwareapplications MS Office suite, AutoCAD, ArchiCAD, Visio Technical,
Software am still studying using trial versions are;
WinQS, IBIS, Primavera, TILOS
Languages Luganda (spoken = good, written = fair);
English (spoken = good, written = good);
Swahili (spoken = good, written = fair)
Rwandese (spoken = fair, written = poor)
Drivingpermit Class B, clean record. Total driving experience to date : 12 years
Interestsandactivities Swimming, traveling, novel reading, collection of engineering documentaries. Am an active football
fan.
CV Jingo Jude Allan
Page 7/ 7 7
References Moses Muwonge, Deputy general manager Operations, Real contractors Limited Kigali, Phone
+2507883068116, +250782228872; mmuwonge@real.rw
Arch Joash Onyango, Country Manager, ICON CONSORTIUM, P. O. Box 6160, Kigali – Rwanda.
+250783315292 (Mob.); Email: joash@iconconsortium.com
Clay Bonishuli, Property Manager, National Bank of Rwanda, Tel. +250788384086, email:
cbonishuli@bnr.rw
Arch Tom Kajumba, KK PARTNERSHIP ARCHITECTS, P.O. Box 4906, Kampala. 0772500651
(Mob.) 0414 533499(Office)
Jackson Karyarugookwe, formerly Country -Director, ENGEN (U) Ltd; Board member BABCON Uganda
Limited+256 772 751812 (Mob.), +256 312 262120, +256 414 257066 (Office)
Signed: …………………………………. Date: November, 2015

Más contenido relacionado

Destacado (13)

CURRICULUMVITAEEMMANUEL.docx (1)
CURRICULUMVITAEEMMANUEL.docx (1)CURRICULUMVITAEEMMANUEL.docx (1)
CURRICULUMVITAEEMMANUEL.docx (1)
 
BLAISE CV JUNE 2015
BLAISE  CV  JUNE 2015BLAISE  CV  JUNE 2015
BLAISE CV JUNE 2015
 
MUGANYIZI DOUGLAS EDITTED CV 2016
MUGANYIZI DOUGLAS EDITTED CV 2016MUGANYIZI DOUGLAS EDITTED CV 2016
MUGANYIZI DOUGLAS EDITTED CV 2016
 
Gaithuma Peter Resume
Gaithuma Peter ResumeGaithuma Peter Resume
Gaithuma Peter Resume
 
New CV Marus
New CV MarusNew CV Marus
New CV Marus
 
george cv
george cvgeorge cv
george cv
 
DENNIS OSAWA OWADE Updated CV(1)
DENNIS OSAWA OWADE Updated CV(1)DENNIS OSAWA OWADE Updated CV(1)
DENNIS OSAWA OWADE Updated CV(1)
 
Dickens Thunde CV November, 2016
Dickens Thunde CV November, 2016Dickens Thunde CV November, 2016
Dickens Thunde CV November, 2016
 
Cv for derek lakudzala
Cv for derek lakudzalaCv for derek lakudzala
Cv for derek lakudzala
 
Emmanuel cv
Emmanuel cvEmmanuel cv
Emmanuel cv
 
CV Patrick - 2014
CV Patrick - 2014CV Patrick - 2014
CV Patrick - 2014
 
CV Harriet Kivumbi- June 2016
CV Harriet Kivumbi- June 2016CV Harriet Kivumbi- June 2016
CV Harriet Kivumbi- June 2016
 
Harriet Kivumbi-CV-May 2015- Consultant
Harriet Kivumbi-CV-May 2015- ConsultantHarriet Kivumbi-CV-May 2015- Consultant
Harriet Kivumbi-CV-May 2015- Consultant
 

Similar a CURRICULUM VITAE - Allan Jingo november 2015

Similar a CURRICULUM VITAE - Allan Jingo november 2015 (20)

CV -Nildo M. Nhaliginga
CV -Nildo M. NhaligingaCV -Nildo M. Nhaliginga
CV -Nildo M. Nhaliginga
 
CV - Hassan Ssentamu
CV - Hassan SsentamuCV - Hassan Ssentamu
CV - Hassan Ssentamu
 
Updated CV Nov 26 2015
Updated CV Nov 26 2015Updated CV Nov 26 2015
Updated CV Nov 26 2015
 
Updated CV Aug 6 2015
Updated CV Aug 6 2015Updated CV Aug 6 2015
Updated CV Aug 6 2015
 
Sajeevresume_June-28-2015
Sajeevresume_June-28-2015Sajeevresume_June-28-2015
Sajeevresume_June-28-2015
 
Lourrain cv (2) updated Jan 2016
Lourrain cv (2) updated Jan 2016Lourrain cv (2) updated Jan 2016
Lourrain cv (2) updated Jan 2016
 
CV_Alfred_Coning2014
CV_Alfred_Coning2014CV_Alfred_Coning2014
CV_Alfred_Coning2014
 
Ugeshan Naidoo1
Ugeshan Naidoo1Ugeshan Naidoo1
Ugeshan Naidoo1
 
CAD Operator_EDWARD AFFUL-PACKSON CV
CAD Operator_EDWARD AFFUL-PACKSON CV CAD Operator_EDWARD AFFUL-PACKSON CV
CAD Operator_EDWARD AFFUL-PACKSON CV
 
MONG-CV-KABIA-Newest
MONG-CV-KABIA-NewestMONG-CV-KABIA-Newest
MONG-CV-KABIA-Newest
 
RG Goodyear Procurement CV Feb 2015
RG Goodyear Procurement CV Feb 2015RG Goodyear Procurement CV Feb 2015
RG Goodyear Procurement CV Feb 2015
 
george nasralla CV
george nasralla CVgeorge nasralla CV
george nasralla CV
 
CV
CVCV
CV
 
ALVIN'S CURRICULUM VITAE 2017
ALVIN'S CURRICULUM VITAE 2017ALVIN'S CURRICULUM VITAE 2017
ALVIN'S CURRICULUM VITAE 2017
 
Final Report
Final ReportFinal Report
Final Report
 
Graeme Fulton Resume Rev A
Graeme Fulton Resume Rev A Graeme Fulton Resume Rev A
Graeme Fulton Resume Rev A
 
Bongani Mamkeli CV Rev.Jan2017
Bongani Mamkeli CV Rev.Jan2017Bongani Mamkeli CV Rev.Jan2017
Bongani Mamkeli CV Rev.Jan2017
 
ABIODUN AKALA- CV 2015 rev2
ABIODUN AKALA- CV 2015 rev2ABIODUN AKALA- CV 2015 rev2
ABIODUN AKALA- CV 2015 rev2
 
hdebelenjr-latest-CV
hdebelenjr-latest-CVhdebelenjr-latest-CV
hdebelenjr-latest-CV
 
Muneesh Gupta ( CV )
Muneesh Gupta ( CV )Muneesh Gupta ( CV )
Muneesh Gupta ( CV )
 

CURRICULUM VITAE - Allan Jingo november 2015

  • 1. CV Jingo Jude Allan Page 1/ 7 1 P.O. BOX 6660 KAMPALA Phone(+250)784981514 E-mail : jingo.allan@gmail.com twitter @jingoaj Skype ; jingo.jude.allan JINGOJUDE ALLAN Sex MALE DateofBirth 31 – 5 – 1978 Nationality UGANDAN Profession CIVIL ENGINEERING - Construction Management Vision To be a leading professional engaged in infrastructure development in Africa. SummaryofProfessional experience 14 years project management experience across Uganda, Rwanda and Burundi. Key strengths on Quality assurance, Supervision of tender preparation;Project planning and construction management of building and civil works, rural water supply and sanitation projects, road pavement construction and telecom facilities; trainer of Occupational health and safety practices for construction sites; Audit evaluation of project lifecycle and consultancy involvement with risk prone populations. Continuous professional improvement within advanced industries in Holland and regionally within eastern Africa. SummaryofVoluntary experience 10 years as a community volunteer attaining leadership assignment for Rotary international (Rotary district 9200 – Uganda, Kenya, Tanzania, Eritrea and Ethiopia) as youth leader and eventually as a Rotarian with Rotary club of Kampala south. Youth empowerment and mentorship Education BSC.CIVILENGINEERING 1996 - 2001 Makerere University Kampala, Uganda GCE (A LEVEL) 1994 – 1996 Aga Khan Academy Nairobi, Kenya UCE (O LEVEL) 1993 – 1994 Namasagali College Kamuli, Uganda 1991 – 1992 Namilyango College Mukono, Uganda PLE 1990 Makonzi Boarding Primary School, Mityana, Uganda Workshopsattended April 2015 Stage 1 – FIDIC form of contract management seminar held at Legacy hotel, Kigali
  • 2. CV Jingo Jude Allan Page 2/ 7 2 March – April 2011 Study tour of Dutch Construction Industry courtesy of PUM Holland (www.pum.nl) and Management Contractor Hegeman+ (www.hegeman.com) Overall experience gained was of the Innovation programs and techniques undertaken by construction companies within a mature and specialized Industry; proactive management techniques to enhance Quality, Environmental, Health and safety(QHSE); Establishment and monitoring of companywide cash flows and profits; emerging technologies in architectural practice; typical applications of precast concrete industry. Construction Engineering Work experience over 14 years February 2011: Occupational , Health and Safety training of trainers with Uganda breweries Limited and Tullow Oil plc Dec 2009: Uganda Engineers Registration Board (ERB) at Imperial Royal Hotel - “Theme: Dealing with deep excavations in construction industry” at Kampala October 2009: Building Better without Bricks – Demonstration on a new method of construction that is safer, less expensive and up to 15x stronger than bricks, conducted by Spider Tie USA at Hotel Africana Aug 28, 2009: UIPE CPD Seminar – “Theme: Engineers in Management” July 2007: Public Procurement and Disposal of Assets Authority (PPDA) training in procurement and disposal procedures; role of the user department in Contract management, the responsibilities of the evaluation committee and disposal procedures at Imperial Botanical Beach Hotel, Entebbe, Uganda July 2006: OH & S permit to work shop for Uganda Breweries Limited, 16/8/2001: National Budget Review under Uganda National Association of Building and Civil Engineering Contractors. Private practice within Rwanda on assorted buildings and roads WORK WITH REAL CONTRACTORS LTD (www.realcontractorsltd.com) from April 2012 – Nov 2015 Project Engineer Overall responsibilities:  Quality assurance  Project supervision and representation of company to project stakeholders  Health and Safety awareness and enforcement within Technical department  Documentation and process change in readiness of ISO certification.  Quantity surveying and value addition  Design studies and presentations  Preparation of tenders September 2015 TRANSFORM AFRICA AND INTERPOL CONFERENCES 2015 HOST VENUE IN KIGALI Construction of infrastructure services and project management October 2014 – Nov 2015 PROPOSED RELOCATION OF 5 NO INDUSTRIES FROM GIKONDO INDUSTRIAL PARK TO PRIME ECONOMIC ZONES[ design and build contract] USD 24,776,773.34 December 2014 – February 2015 REMODELING OF KIGALI INTERNATIONAL AIRPORT VVIP WING Rwf1,200,000,000 April 2012 – March 2014
  • 3. CV Jingo Jude Allan Page 3/ 7 3 CONSTRUCTION OF NATIONAL BANK OF RWANDA REGIONAL CURRENCY CENTER AT KAMEMBE, RUSIZI DISTRICT, Rwf 2,892,431,998 RWF Nov 2013 –march 2014 CONSTRUCTION OF LAKE KIVU MARINA BAY HOTEL (PHASE 1A) - RWF 2,640,000,000 RWF Partial work until temporary halting of works before resumption later in 2015. WORK WITH COSTRA-R in Rwanda and Burundi from August 2011 – March 2012 Contracts Manager Overall responsibilities:  Supervision of tender preparation and follow up  Project supervision and representation of company to project stakeholders  Quality assurance DESIGN AND CONSTRUCTION OF LIFT SHAFT (5 STOREYS) AND INSTALLATION OF LIFT CABIN FOR HOTEL AMAHORO, BUJUMBURA, BURUNDI (USD 160,000) CONSTRUCTION OF BANK POPULAIRE RWANDA ( BPR) KIGALI CITY MARKET BRANCH: Rwf 53,950,163 DESIGN AND CONSTRUCTION OF BANK OF KIGALI NYANZA BRANCH, Rwf 77,848,848 DESIGN AND CONSTRUCTION OF MEMORIAL MONUMENT FOR NATIONAL BANK OF RWANDA – Kigali headquarters, Rwf 53,010,355 WORK WITH BABCON UGANDA LIMITED in Uganda from 2001 - 2011 Technical manager march 2008 – June 2011 Overall responsibilities:  Supervision of tender preparation and follow up  Quality assurance  Project supervision and representation of company to project stakeholders  Health and safety implementation across sites May 2011 – June 2011 BOUNDARY SURVEYING AND CONSTRUCTION OF PERIMETER FENCING OF PLOT NO. M833 KYAMBOGO FOR INTER UNIVERSITY COUNCIL OF EAST AFRICA Contract Sum – UgX 65,933,900/= March 2011 –June 2011 EXTENSION OF CASE MEDICAL CENTER PLOT 69/71 BUGANDA ROAD (PHASE 1 – 4 STORIED PARKING LOT) Contract Sum – Ugx 984,946,501 (Labour Only) RECONSTRUCTION OF 42KM MATTE – SEKANYONYI – KIKONGE GRAVEL ROAD FOR UNRA Contract Sum – Ugx 424,352,000/= Sep 2010 – June 2011 DESIGN AND CONSTRUCTION OF KYEHORO HEALTH CENTER II, KYEHORO PRIMARY SCHOOL AND SEBAGORO HEALTH CENTRE III FOR TULLOW OIL PLC Contract Sum – Us $ 1,070,092 February 2010 – August 2010 RENOVATION WORKS OF STATE LODGE NAKASERO FOR OFFICE OF THE PRESIDENT.
  • 4. CV Jingo Jude Allan Page 4/ 7 4 Contract Sum – US $ 209,772 March 2010 – October 2010 CONSTRUCTION OF COVERED WALKWAY CANOPY FOR BANK OF UGANDA HEADQUARTERS Contract sum – US $ 196,075 January - May 2009 CONSTRUCTION OF 3NO. BTS SITES FOR UGANDA TELECOM (KASENYI, NAMIREMBE&KABOWA SITES, 50 METER TOWERS) Contract Sum: - US $ 108,908 February – June 2009 CONSTRUCTION OF 3 NO. BTS SITES FOR MANAGEMENT CONTRACTOR ALCATEL LUCENT FOR ORANGE UGANDA LTD. Contract Sum: - US $ 226,945. December 2008 – Dec 2010 PROPOSED REDEVELOPMENT OF KYABAZINGA’S PALACE AT IGENGE HILL, WANYANGE Contract Sum: - US $ 1,828,656 September 2008 – August 2011 REHABILITATION OF MOROTO BARRACKS FOR MINISTRY OF DEFENCE Contract sum:- US $ 2,130,287 August 2008 – August 2011 CONSTRUCTION, REMODELING AND REFURBISHMENT OF LAND ADMINISTRATION BUILDINGS IN KAMPALA, MASAKA AND MBARARA SITES Contract Sum:- US $ 1,221,392 August 2008 – January 2009 PROPOSED BANKING HALL FIT-OUT MBARARA BRANCH FOR HOUSING FINANCE BANK Contract Sum: - US $ 52,300 July – December 2008 PROPOSED FIT OUT OF MBARARA BRANCH FOR UMEME Contract Value: US $50,847 October 2007 – September 2008 CONSTRUCTION OF HEADQUARTERS BUILDING FOR UGANDA POLICE FORCE (PHASE 1 – with 4 STOREYS) Contract Sum: - Ugx 2,144,000,000 WORK AS SITE ENGINEER WITH BABCON UGANDA LIMITED November 2006 – December 2007 SITECOORDINATOR,REMODELINGOFCAFETERIABLOCKINTOCONFERENCEHALLATUGANDA INDUSTRIALRESEARCHINSTITUTE Contract Sum: - Ugx 544,533,243/= January 2007 – April 2007 SITECOORDINATOR,REPLACEMENTOFPLATFORMSANDREMODELINGOFJETTYSTRUCTURES INTOLAKEVICTORIAONATENTEBBEAIRPORTFORCIVILAVIATIONAUTHORITY Contract Sum: - Ugx 83,331,596.- July 2006 – May 2007 SITEAGENT,REHABILITATIONOFPERIMETERFENCEANDCARPARKINGLOTATUGANDAMUSEUM FORMINISTRYOFTOURISM,TRADEANDINDUSTRY Contract Sum: - Ugx 177, 922,915.-
  • 5. CV Jingo Jude Allan Page 5/ 7 5 February 2005 – Feb. 2006 SITECOORDINATOR,DWDBULANGATOWNWATERSUPPLY(POPN:13,000) Contract Sum: - Ugx,480,000,000.- March 2005 – June 2006: ASST. SITE COORDINATOR; RUKUNGIRI DISTRICT LOCAL ADMINISTRATION HEADQUARTERS COMPLEX – PHASE 1 ( 4 STOREYS) Contract Sum – Ugx.478,500,000.- July 2004 – Dec. 2005 SITE COORDINATOR; UTL NURP II SHELTERS  Construction of 9 No. Equipment Shelters. Contract Sum: Ugx.560,000,000.- September 2004 – September 2005 SITE COORDINATOR; SIEMENS NURP II TOWN BASES AND SOLAR PANELS  Construction of 10 No. Tower Bases & Solar Panels on UTL NURP II Projects  Contract Sum: USD.616,000.00 Aug. 2004 – Nov. 2004 ASST. SITE COORDINATOR; ALCATELTOWER BASES  Construction of 15 No. Tower Bases in Central, Eastern & Western Uganda  Contract Sum: Ugx.430,000,000.- Aug. 2004 – Nov. 2004 SITE COORDINATOR; UTL NURP I BUILDING RENOVATIONS  Building Renovations at Otuboi, Wanaale, Moru and KumiCentres  Contract Sum: US $ 320,914.00 Sept 2004 – 2005 ASST. SITE AGENT: COMPLETION OF PUBLISHING & COMPUTER DATA CENTRE AT FIRRI, JINJA  Contract Sum: US$.75,588.00 MAINTENANCE CONTRACTS DONE FOR UGANDA BREWERIES LTD AND BRITISH AMERICAN TOBACCO UGANDA IN CAPACITY OF SITE COORDINATOR BETWEEN AUG 2003 – JAN 2004  Construction of storage Concrete Hard standing Area 1500 SM(Ugx.242,000,000)  Refurbishment of Engine room and Generator House ( Ugx.58,000,000)  Works for New Cable Route from Engine Room (Ugx.20,000,000.)  Renovations and Alterations to Uganda Breweries Ltd. Tank at the Distillery Dept. Contract Sum: Ugx.17,500,000.-  Repair of Distillery Access Road, Driveway and Car park (UgX95,300,000)  Refurbishment of Brewhouse, Old fermenters and DPV Phase I (UgX 175,500,000.)  Refurbishment of foul drainage systems and provision of new water tank and tower Contract sum: Ugx.33,000,000.- May 2003 – Aug. 2003 Site Coordinator, UTL NURP 1  Coordinated 8 No. Sites forming Kampala – Masindi – Gulu Telecommunications line.
  • 6. CV Jingo Jude Allan Page 6/ 7 6 Involved rehabilitation of equipment stations and civil works to mast and solar bases.(UgX 563, 000,000.-) Mar 2003 – Apr. 2003, SITE AGENT, CONSTRUCTION OF DPP REGIONAL OFFICES, MBALE Contract Sum: - Ugx.112,028,462.- Aug. 2001 – Feb. 2003, ASST. SITE ENGINEER, FACULTY OF DEVELOPMENT STUDIES, MBARARA UNIVERSITY.  Contract sum: Ugx.1, 500,000.- July – Sept. 2000 Kirima and Sons Ltd. Nairobi, Kenya Student Trainee  Involved supervision of plumbing fittings, internal finishes and electrical wiring for a multi- urban 4 story building with 48 flats and 16 shops in Parklands suburb. July – Sept. 1999 Stirling international Kampala, Uganda Student Trainee  Involved in road and drainage surveys, Quality assurance for road works including gravel, Hot mix asphalt at Mukono. July – Sept. 1998 Uganda Electricity Board Jinja, Uganda Student Trainee:  Renovation of parasitical residences, Quantity Surveying, general maintenance works to turbines and dam faces at Owen Falls dams Publicationsauthored COMPARISON OF THE PRIVATE AND PUBLIC CONTRACTOR SELECTION MECHANISMS USED IN THE UGANDA CONSTRUCTION INDUSTRY; MUK 2000. INTEGRATION OF A CAR PARK INTO A SIGNAL CONTROLLED JUNCTION – CASE OF NAKAWA JUNCTION, KAMPALA; MUK; 2001 Softwareapplications MS Office suite, AutoCAD, ArchiCAD, Visio Technical, Software am still studying using trial versions are; WinQS, IBIS, Primavera, TILOS Languages Luganda (spoken = good, written = fair); English (spoken = good, written = good); Swahili (spoken = good, written = fair) Rwandese (spoken = fair, written = poor) Drivingpermit Class B, clean record. Total driving experience to date : 12 years Interestsandactivities Swimming, traveling, novel reading, collection of engineering documentaries. Am an active football fan.
  • 7. CV Jingo Jude Allan Page 7/ 7 7 References Moses Muwonge, Deputy general manager Operations, Real contractors Limited Kigali, Phone +2507883068116, +250782228872; mmuwonge@real.rw Arch Joash Onyango, Country Manager, ICON CONSORTIUM, P. O. Box 6160, Kigali – Rwanda. +250783315292 (Mob.); Email: joash@iconconsortium.com Clay Bonishuli, Property Manager, National Bank of Rwanda, Tel. +250788384086, email: cbonishuli@bnr.rw Arch Tom Kajumba, KK PARTNERSHIP ARCHITECTS, P.O. Box 4906, Kampala. 0772500651 (Mob.) 0414 533499(Office) Jackson Karyarugookwe, formerly Country -Director, ENGEN (U) Ltd; Board member BABCON Uganda Limited+256 772 751812 (Mob.), +256 312 262120, +256 414 257066 (Office) Signed: …………………………………. Date: November, 2015