PROBLEMA DEL TRANSPORTE

                          COSTO DE ENVIO($/UNIDAD)
FABRICAS/ALMACENES        BOGOTA      MEDELLIN    CALI            CAPACIDAD (UNIDADES)
PEREIRA                          $ 14          $9           $7                           30
ARMENIA                           $8         $ 10           $5                           20
DEMANDA (UNIDADES)                 25          15           10


                          UNIDADES A ENVIAR
FABRICAS/ALMACENES        BOGOTA      MEDELLIN    CALI            CAPACIDAD (UNIDADES)
PEREIRA                             5          15            10                       30
ARMENIA                            20           0             0                       20
DEMANDA (UNIDADES)                 25          15            10                      435


RTA                       ENVIAR 5 ARTICULOS DE PEREIRA A BOGOTA; 15 DE PEREIRA A MEDELLIN; 10 DE PEREIRA A
<= COSTO TOTAL ($)


A A MEDELLIN; 10 DE PEREIRA A CALI…, PARA UN COSTO MINIMO DE 435$
cosoto de envio
planta/almacen           1              2          3     4     5
                   1   600            200        350   400   200
                   2   900            300        150   300   300
                   3   400            100        200   150   400
                   4   100            200        200   200   100
demanda (unidad)        20             10         20    10    20




                             unidades de envio
planta/almacen           1              2          3     4     5
                   1     0              0          0     0    10
                   2     0              0         20     0     0
                   3     0             10          0    10     0
                   4    20              0          0     0    10
demanda (unidad)        20             10         20    10    20
capacidad(unidad)
                    10
                    20
                    20
                    30




capacidad(unidad)
                10
                20
                20
                30
             10500
cosoto de envio
planta             bogota           medellin      cali           capacidad(unidad)
envigado                        5              2             3                        10000
bucaramnga                      4              3             4                        20000
palmira                         9              7             5                        30000
cartago                        10              4             2                        40000
pereira                         8              4             3                        30000
demanda (unidad)            45000          50000         35000


                                    unidades a enviar
planta             bogota           medellin      cali           capacidad(unidad)
envigado                        0          10000             0                        10000
bucaramnga                  20000               0            0                        20000
palmira                     25000           5000             0                        30000
cartago                         0           5000         35000                        40000
pereira                         0          30000             0                        30000
demanda (unidad)            45000          50000         35000                       570000


RTA                debe 10000 de envigado a medellin… para minimizar un costo de 570000
to de 570000
problema de trasporte- MODELO GENERAL

                      X11        X12         X13        X21        X22        X23     costo total ($)
funcion objetivo            14           9          7          8         10         5           435

restricciones                                                                           TOTALES
CAPACIDAD PEREIRA            1           1          1                                             30
CAPACIDAD ARMENIA                                              1          1         1             20
DEMANDA BOGOTA               1                                 1                                  25
DEMANDA MEDELLIN                         1                                1                       15
DEMANDA CALI                                        1                               1             10

SOLUCION                     5          15         10         20          0         0

RTA                   ENVIAR DE PEREIRA A BOGOTA 5 UNIDADES; DE PEREIRA A MEDELLIN 15; DE PEREIRA A CALI 10…
sto total ($)


                SIGNO   RESTRICCION
                =                 30
                =                 20
                =                 25
                =                 15
                =                 10




DELLIN 15; DE PEREIRA A CALI 10…
modelo de transporte
                       costo de envio
fabrica/almacen        A1            A2          A3         capacidad
F1                               400       200        350               30
F2                               900       300        250               10
F3                               500       350        200               20
demanda                           20        20         20


                       unidades a enviar
fabrica/almacen        A1            A2          A3         capacidad
F1                               20         10          0            30
F2                                 0        10          0            10
F3                                 0         0         20            20
demanda                          20         20         20         17000
problema de trasporte- MODELO GENERAL

                         X11            X12         X13         X21         X22
funcion objetivo                  400         200         350         900         300

restricciones
CAPACIDAD F1                        1           1           1
CAPACIDAD F2                                                            1           1
CAPACIDAD F3
DEMANDA A1                          1                                   1
DEMANDA A2                                      1                                   1
DEMANDA A3                                                  1

SOLUCION                           20          10           0           0          10
X23         X31         X32         X33       costo total ($)
      250         500         350         200        17000

                                                TOTALES         SIGNO   RESTRICCION
                                                          30    =                 30
        1                                                 10    =                 10
                    1           1           1             20    =                 20
                    1                                     20    =                 20
                                1                         20    =                 20
        1                                   1             20    =                 20

        0           0           0          20
modelo de transporte
                       costo de envio
fabrica/almacen        A1            A2          A3         A4         capacidad
F1                               300       200        350        200               30
F2                               900       300        150        300               30
F3                               400       100        200        150               20
demanda                           20        20         20         20


                       unidades a enviar
fabrica/almacen        A1            A2          A3         A4         capacidad
F1                               20          0          0         10            30
F2                                 0         0         20         10            30
F3                                 0        20          0          0            20
demanda                          20         20         20         20         16000
problema de trasporte- MODELO GENERAL

                         X11            X12         X13         X14         X21
funcion objetivo                 300          200         350         200         900

restricciones
CAPACIDAD F1                       1            1           1           1
CAPACIDAD F2                                                                        1
CAPACIDAD F3
DEMANDA A1                         1                                                1
DEMANDA A2                                      1
DEMANDA A3                                                  1
DEMANDA A4                                                              1

SOLUCION                          20            0           0          10           0
X22         X23         X24         X31         X32         X33         X34
      300         150         300         400         100         200         150




        1           1           1
                                            1           1           1           1
                                            1
        1                                               1
                    1                                               1
                                1                                               1

        0          20          10           0          20           0           0
costo total ($)
       16000

TOTALES           SIGNO   RESTRICCION
           30     =                 30
           30     =                 30
           20     =                 20
           20     =                 20
           20     =                 20
           20     =                 20
           20     =                 20
ASIGNACION

                    TIEMPO DE DURACION LIDER X PROYECTO
LIDERES/PROYECTOS             1           2           3 RESTRICCION
                  1          10          15           9             1
                  2           9          18           5             1
                  3           6          14           3             1
DEMANDA                       1           1           1


                    ASIGNACION DE LIDERES A PROYECTOS
LIDERES/PROYECTOS             1            2             3 RESTRICCION
                  1           0            1             0             1
                  2           0            0             1             1
                  3           1            0             0             1
DEMANDA                       1            1             1            26


RTA                 LIDER 1 CLIENTE 2; LIDER 2 CLIENTE 3; LIDER 3 CLIENTE 1 PARA UN TIEMPO MINIMO DE 26
MINIMO DE 26
problema de transporte- mod compacto


fabrica/almacen                1          2     3 capacidad (unid)
                  1          400        200   350                 30
                  2          900        300   250                 10
                  3          500        350   200                 20
demanda (unid)                20         20    20

                    unidades a enviar
fabrica/almacen                 1         2     3 capacidad (unid)
                  1           20         10     0                 30
                  2             0        10     0                 10
                  3             0         0    20                 20
demanda (unid)                20         20    20             17000
problema de trasporte- MODELO GENERAL

                            X11               X12         X13         X21         X22
funcion objetivo                        400         200         350         900         300

restricciones
CAPCIDAD 1                                1           1           1
CAPACIDAD 2                                                                   1           1
CAPACIDAD3
DEMANDA 1                                 1                                   1
DEMANDA 2                                             1                                   1
DEMANDA 3                                                         1

SOLUCION                                 20          10           0           0          10

RTA                         20 ARTICULOS DE F1 A A1; 10 DE F1 A A2… 20 DE F3 A A3
X23         X31         X32         X33       costo total ($)
      250         500         350         200        17000

                                                TOTALES         SIGNO   RESTRICCION
                                                          30    =                 30
        1                                                 10    =                 10
                    1           1           1             20    =                 20
                    1                                     20    =                 20
                                1                         20    =                 20
        1                                   1             20    =                 20

        0           0           0          20
ASIGNACION

fabrica/almacen   ALFA          BETA         GAMA         LANDA         capacidad (unid)
PUENTE                     95           96          100            88                        1
ESCUELA                   112          120          120           136                        1
PARQUE                    192          188          180           170                        1
HOSPITAL                   84           88          108            92                        1
demanda (unid)              1            1            1             1

                  unidades a enviar
fabrica/almacen   ALFA          BETA         GAMA         LANDA         capacidad (unid)
PUENTE                        0          0            0             1                        1
ESCUELA                       1          0            0             0                        1
PARQUE                        0          0            1             0                        1
HOSPITAL                      0          1            0             0                        1
demanda (unid)                1          1            1             1                      468


RTA               PUENTE A LANDA; ESCUELA A ALFA; PARQUE A GAMA Y HOSPITAL A BETA PARA UN TIEMPO MINIMO DE 4
UN TIEMPO MINIMO DE 468

Más contenido relacionado

Destacado

2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by HubspotMarius Sescu
 
Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTExpeed Software
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsPixeldarts
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthThinkNow
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfmarketingartwork
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024Neil Kimberley
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)contently
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024Albert Qian
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsKurio // The Social Media Age(ncy)
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Search Engine Journal
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summarySpeakerHub
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next Tessa Mero
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentLily Ray
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best PracticesVit Horky
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project managementMindGenius
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...RachelPearson36
 

Destacado (20)

2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot
 
Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPT
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage Engineerings
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental Health
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
 
Skeleton Culture Code
Skeleton Culture CodeSkeleton Culture Code
Skeleton Culture Code
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 

Inv Operativa Mod De Trasnportes

  • 1. PROBLEMA DEL TRANSPORTE COSTO DE ENVIO($/UNIDAD) FABRICAS/ALMACENES BOGOTA MEDELLIN CALI CAPACIDAD (UNIDADES) PEREIRA $ 14 $9 $7 30 ARMENIA $8 $ 10 $5 20 DEMANDA (UNIDADES) 25 15 10 UNIDADES A ENVIAR FABRICAS/ALMACENES BOGOTA MEDELLIN CALI CAPACIDAD (UNIDADES) PEREIRA 5 15 10 30 ARMENIA 20 0 0 20 DEMANDA (UNIDADES) 25 15 10 435 RTA ENVIAR 5 ARTICULOS DE PEREIRA A BOGOTA; 15 DE PEREIRA A MEDELLIN; 10 DE PEREIRA A
  • 2. <= COSTO TOTAL ($) A A MEDELLIN; 10 DE PEREIRA A CALI…, PARA UN COSTO MINIMO DE 435$
  • 3. cosoto de envio planta/almacen 1 2 3 4 5 1 600 200 350 400 200 2 900 300 150 300 300 3 400 100 200 150 400 4 100 200 200 200 100 demanda (unidad) 20 10 20 10 20 unidades de envio planta/almacen 1 2 3 4 5 1 0 0 0 0 10 2 0 0 20 0 0 3 0 10 0 10 0 4 20 0 0 0 10 demanda (unidad) 20 10 20 10 20
  • 4. capacidad(unidad) 10 20 20 30 capacidad(unidad) 10 20 20 30 10500
  • 5. cosoto de envio planta bogota medellin cali capacidad(unidad) envigado 5 2 3 10000 bucaramnga 4 3 4 20000 palmira 9 7 5 30000 cartago 10 4 2 40000 pereira 8 4 3 30000 demanda (unidad) 45000 50000 35000 unidades a enviar planta bogota medellin cali capacidad(unidad) envigado 0 10000 0 10000 bucaramnga 20000 0 0 20000 palmira 25000 5000 0 30000 cartago 0 5000 35000 40000 pereira 0 30000 0 30000 demanda (unidad) 45000 50000 35000 570000 RTA debe 10000 de envigado a medellin… para minimizar un costo de 570000
  • 7. problema de trasporte- MODELO GENERAL X11 X12 X13 X21 X22 X23 costo total ($) funcion objetivo 14 9 7 8 10 5 435 restricciones TOTALES CAPACIDAD PEREIRA 1 1 1 30 CAPACIDAD ARMENIA 1 1 1 20 DEMANDA BOGOTA 1 1 25 DEMANDA MEDELLIN 1 1 15 DEMANDA CALI 1 1 10 SOLUCION 5 15 10 20 0 0 RTA ENVIAR DE PEREIRA A BOGOTA 5 UNIDADES; DE PEREIRA A MEDELLIN 15; DE PEREIRA A CALI 10…
  • 8. sto total ($) SIGNO RESTRICCION = 30 = 20 = 25 = 15 = 10 DELLIN 15; DE PEREIRA A CALI 10…
  • 9. modelo de transporte costo de envio fabrica/almacen A1 A2 A3 capacidad F1 400 200 350 30 F2 900 300 250 10 F3 500 350 200 20 demanda 20 20 20 unidades a enviar fabrica/almacen A1 A2 A3 capacidad F1 20 10 0 30 F2 0 10 0 10 F3 0 0 20 20 demanda 20 20 20 17000
  • 10. problema de trasporte- MODELO GENERAL X11 X12 X13 X21 X22 funcion objetivo 400 200 350 900 300 restricciones CAPACIDAD F1 1 1 1 CAPACIDAD F2 1 1 CAPACIDAD F3 DEMANDA A1 1 1 DEMANDA A2 1 1 DEMANDA A3 1 SOLUCION 20 10 0 0 10
  • 11. X23 X31 X32 X33 costo total ($) 250 500 350 200 17000 TOTALES SIGNO RESTRICCION 30 = 30 1 10 = 10 1 1 1 20 = 20 1 20 = 20 1 20 = 20 1 1 20 = 20 0 0 0 20
  • 12. modelo de transporte costo de envio fabrica/almacen A1 A2 A3 A4 capacidad F1 300 200 350 200 30 F2 900 300 150 300 30 F3 400 100 200 150 20 demanda 20 20 20 20 unidades a enviar fabrica/almacen A1 A2 A3 A4 capacidad F1 20 0 0 10 30 F2 0 0 20 10 30 F3 0 20 0 0 20 demanda 20 20 20 20 16000
  • 13. problema de trasporte- MODELO GENERAL X11 X12 X13 X14 X21 funcion objetivo 300 200 350 200 900 restricciones CAPACIDAD F1 1 1 1 1 CAPACIDAD F2 1 CAPACIDAD F3 DEMANDA A1 1 1 DEMANDA A2 1 DEMANDA A3 1 DEMANDA A4 1 SOLUCION 20 0 0 10 0
  • 14. X22 X23 X24 X31 X32 X33 X34 300 150 300 400 100 200 150 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 20 10 0 20 0 0
  • 15. costo total ($) 16000 TOTALES SIGNO RESTRICCION 30 = 30 30 = 30 20 = 20 20 = 20 20 = 20 20 = 20 20 = 20
  • 16. ASIGNACION TIEMPO DE DURACION LIDER X PROYECTO LIDERES/PROYECTOS 1 2 3 RESTRICCION 1 10 15 9 1 2 9 18 5 1 3 6 14 3 1 DEMANDA 1 1 1 ASIGNACION DE LIDERES A PROYECTOS LIDERES/PROYECTOS 1 2 3 RESTRICCION 1 0 1 0 1 2 0 0 1 1 3 1 0 0 1 DEMANDA 1 1 1 26 RTA LIDER 1 CLIENTE 2; LIDER 2 CLIENTE 3; LIDER 3 CLIENTE 1 PARA UN TIEMPO MINIMO DE 26
  • 18. problema de transporte- mod compacto fabrica/almacen 1 2 3 capacidad (unid) 1 400 200 350 30 2 900 300 250 10 3 500 350 200 20 demanda (unid) 20 20 20 unidades a enviar fabrica/almacen 1 2 3 capacidad (unid) 1 20 10 0 30 2 0 10 0 10 3 0 0 20 20 demanda (unid) 20 20 20 17000
  • 19. problema de trasporte- MODELO GENERAL X11 X12 X13 X21 X22 funcion objetivo 400 200 350 900 300 restricciones CAPCIDAD 1 1 1 1 CAPACIDAD 2 1 1 CAPACIDAD3 DEMANDA 1 1 1 DEMANDA 2 1 1 DEMANDA 3 1 SOLUCION 20 10 0 0 10 RTA 20 ARTICULOS DE F1 A A1; 10 DE F1 A A2… 20 DE F3 A A3
  • 20. X23 X31 X32 X33 costo total ($) 250 500 350 200 17000 TOTALES SIGNO RESTRICCION 30 = 30 1 10 = 10 1 1 1 20 = 20 1 20 = 20 1 20 = 20 1 1 20 = 20 0 0 0 20
  • 21. ASIGNACION fabrica/almacen ALFA BETA GAMA LANDA capacidad (unid) PUENTE 95 96 100 88 1 ESCUELA 112 120 120 136 1 PARQUE 192 188 180 170 1 HOSPITAL 84 88 108 92 1 demanda (unid) 1 1 1 1 unidades a enviar fabrica/almacen ALFA BETA GAMA LANDA capacidad (unid) PUENTE 0 0 0 1 1 ESCUELA 1 0 0 0 1 PARQUE 0 0 1 0 1 HOSPITAL 0 1 0 0 1 demanda (unid) 1 1 1 1 468 RTA PUENTE A LANDA; ESCUELA A ALFA; PARQUE A GAMA Y HOSPITAL A BETA PARA UN TIEMPO MINIMO DE 4