13. Water compensaƟon
Expansion tank
Chiller/Heat Pump
Water supply Vent valve By-pass valve
Water return
Pump
InstallaƟon Drawing of Air Cooled Gas-Fired AbsorpƟon Chiller/Heat Pump
Legend: Water flow switch Valve Check valve Flexible connector
Y-Stainer Pressure gauge Temperature gauge
Note: Should water quality not meet the requirement, please install water soŌener and electronic water treatment.
www.unipu.com
14. Water compensaƟon
Expansion tank
Water supply Vent valve
By-pass valve
Water return Chiller/Heat Pump
Pump 1 2 3 4
8 7 6 5
well well
Cooling: open valve 1, 3, 5, 7; close valve 2, 4, 6, 8.
HeaƟng: close valve 1, 3, 5, 7; open valve 2, 4, 6, 8.
water pump
InstallaƟon Drawing of Geothermal Gas-Fired AbsorpƟon Heat Pump
Legend: Water flow switch Valve Check valve Flexible connector
Y-Stainer Pressure gauge Temperature gauge
Note:
1. Should water quality not meet the requirement, please install water soŌener and electronic water treatment;
2. Besides using ground water type, user can also use surface water type or buried pipeline type.