 “Business Case” document will contain
Introduction & background to the proposal -
Current Environment
Proposed project – Outline
Market- Estimated demand for product or
service
Organizational & Operational Infrastructure -
How structure of organization will be affected
by implementation of project.
“Project Evaluation”
 Benefits - A financial value
 Outline Implementation Plan - Marketing,
Promotion and operational and maintenance
infrastructure.
 Costs - Schedule of expected costs with planned
approach.
 The Financial case - Information on income and
costs can be analyzed.
 Risks- Threats to successful project execution –
from business risk – relating to factors threatening
benefits of delivered project
 Management Plan
“Project Portfolio Management”
 Provides an overview of all the
projects that an organization is
undertaking
 It priorities the allocation of resources
to the projects
 Decides which one to be accepted
and which one to be dropped
Concerns of portfolio management
 Identifying which project proposals are
worth implementation
 Assessing the amount of risk of failure
 Deciding how to share limited resources
 Aware of dependencies among projects
 Ensuring that projects do not duplicate
work
Portfolio can be categorized into
 Portfolio Definition
 Portfolio Management
 Portfolio Optimization
Portfolio Definition
 An organization should record in a single
repository details of all current projects
Portfolio Management
 More detailed costing of projects can be
recorded
 Actual performance will be tracked
Portfolio Optimization
 Performance can be tracked by high-level
managers on regular basis
 A better balance of projects may be achieved
 The portfolio should have careful thought-out
balance between two types of projects
 Modest benefit- Fewer risk
 Very profitable- Risky
Evaluation of Individual Projects
 Technical Assessment
 Whether the required functionality can be
achieved with current affordable technologies.
Cost Benefit Analysis (CBA)
You need to:
 Identify all the costs which could be:
 Development Costs - Recruitment and Staff Training
 Set-up Costs – Cost of putting the system into place
 Operational Costs – Operating the system after
installation.
 Expressing these costs and benefits in common
units
 Check benefits are greater than costs
Cost-benefit Evaluation Techniques
 ‘Year 0’ represents all the costs before system in operation
 ‘Cash-flow’ is value of income less outgoing
Year Cash-flow
0 -100,000
1 10,000
2 10,000
3 10,000
4 20,000
5 100,000
Net profit 50,000
Payback Period
 This is the time it takes to break or pay back
the initial investment.
 The project with shortest payback period will
be chosen.
Year Cash-flow Accumulated
0 -100,000 -100,000
1 10,000 -90,000
2 10,000 -80,000
3 10,000 -70,000
4 20,000 -50,000
5 100,000 50,000
Return On Investment (ROI)
ROI = Average Annual Profit
Total Investment
X 100
In the previous example
 Average Annual Profit
= 50,000/5
= 10,000
 ROI = 10,000/100,000 X 100 = 10%
Discount Factor
 Discount factor = 1/(1+r)t
r is the interest rate (e.g. 10% is 0.10)
t is the number of years
In the case of 10% rate and one year
 Discount factor = 1/(1+0.10) = 0.9091
In the case of 10% rate and two years
 Discount factor = 1/(1.10 x 1.10) =0.8294
Net Present Value
 Project evaluation technique that considers
profitability of a project and timing of cash
flows that are produced.
 Present value of any future cash flow :
Present value = value in year t / (1+r)t
Applying Discount Factors
Year Cash-flow Discount factor Discounted
cash flow
0 -100,000 1.0000 -100,000
1 10,000 0.9091 9,091
2 10,000 0.8264 8,264
3 10,000 0.7513 7,513
4 20,000 0.6830 13,660
5 100,000 0.6209 62,090
NPV 618
NPV for a project is obtained by discounting each flow (both negative and
positive) and summing the discounted flows.
NPV-Net Present Value
 NPV for a project is obtained by discounting
each flow (both negative and positive) and
summing the discounted flows.

Más contenido relacionado

La actualidad más candente

Lect-1: Software Project Management - Project Dimensions, Players, SDLC and P...
Lect-1: Software Project Management - Project Dimensions, Players, SDLC and P...Lect-1: Software Project Management - Project Dimensions, Players, SDLC and P...
Lect-1: Software Project Management - Project Dimensions, Players, SDLC and P...
Mubashir Ali
 
Software Risk Management
Software Risk ManagementSoftware Risk Management
Software Risk Management
Gunjan Patel
 

La actualidad más candente (20)

Software Engineering (Project Scheduling)
Software Engineering (Project Scheduling)Software Engineering (Project Scheduling)
Software Engineering (Project Scheduling)
 
Spm unit 1
Spm unit 1Spm unit 1
Spm unit 1
 
Basic Software Effort Estimation
Basic Software Effort EstimationBasic Software Effort Estimation
Basic Software Effort Estimation
 
Spm unit 4
Spm unit 4Spm unit 4
Spm unit 4
 
Programming team structure
Programming team structureProgramming team structure
Programming team structure
 
Software metrics
Software metricsSoftware metrics
Software metrics
 
Unit 2 spm
Unit 2 spmUnit 2 spm
Unit 2 spm
 
Introduction to Software Project Management
Introduction to Software Project ManagementIntroduction to Software Project Management
Introduction to Software Project Management
 
Project Management Control
Project Management ControlProject Management Control
Project Management Control
 
Algorithmic Software Cost Modeling
Algorithmic Software Cost ModelingAlgorithmic Software Cost Modeling
Algorithmic Software Cost Modeling
 
Spm software effort estimation
Spm software effort estimationSpm software effort estimation
Spm software effort estimation
 
Software Project Management
Software Project ManagementSoftware Project Management
Software Project Management
 
Software project management- Software Engineering
Software project management- Software EngineeringSoftware project management- Software Engineering
Software project management- Software Engineering
 
7. (lecture 5) Project scheduling..ppt
7. (lecture 5) Project scheduling..ppt7. (lecture 5) Project scheduling..ppt
7. (lecture 5) Project scheduling..ppt
 
Managing people and organizing teams
Managing people and organizing teamsManaging people and organizing teams
Managing people and organizing teams
 
Software project management introduction
Software project management introductionSoftware project management introduction
Software project management introduction
 
Lect-1: Software Project Management - Project Dimensions, Players, SDLC and P...
Lect-1: Software Project Management - Project Dimensions, Players, SDLC and P...Lect-1: Software Project Management - Project Dimensions, Players, SDLC and P...
Lect-1: Software Project Management - Project Dimensions, Players, SDLC and P...
 
Spm unit iii-risk-intro
Spm unit iii-risk-introSpm unit iii-risk-intro
Spm unit iii-risk-intro
 
Software Risk Management
Software Risk ManagementSoftware Risk Management
Software Risk Management
 
MG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENTMG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENT
 

Destacado (7)

Spm unit iii-risk-monitoring & control1
Spm unit iii-risk-monitoring & control1Spm unit iii-risk-monitoring & control1
Spm unit iii-risk-monitoring & control1
 
Expanding GIS Access to Technical and Non-Technical Users to Enhance Project ...
Expanding GIS Access to Technical and Non-Technical Users to Enhance Project ...Expanding GIS Access to Technical and Non-Technical Users to Enhance Project ...
Expanding GIS Access to Technical and Non-Technical Users to Enhance Project ...
 
Spm unit v-software reliability-
Spm unit v-software reliability-Spm unit v-software reliability-
Spm unit v-software reliability-
 
Problem statement
Problem statementProblem statement
Problem statement
 
Payroll Sytem
Payroll SytemPayroll Sytem
Payroll Sytem
 
Software project management
Software project managementSoftware project management
Software project management
 
Introduction to project management
Introduction to project managementIntroduction to project management
Introduction to project management
 

Similar a SPM Evaluation

L03 integration management
L03 integration managementL03 integration management
L03 integration management
Asa Chan
 
Pm evaluationand selection1
Pm evaluationand selection1Pm evaluationand selection1
Pm evaluationand selection1
eshang0904
 
Training on Financial and Economic Project Evaluation
Training on Financial and Economic Project Evaluation Training on Financial and Economic Project Evaluation
Training on Financial and Economic Project Evaluation
tobiassommer2013
 
Unit2 Chapter 2 Programme Management and Project Evaluation.pdf
Unit2 Chapter  2 Programme Management and Project Evaluation.pdfUnit2 Chapter  2 Programme Management and Project Evaluation.pdf
Unit2 Chapter 2 Programme Management and Project Evaluation.pdf
Deepak Kumar
 
spm-uniti-201022085737.pdf
spm-uniti-201022085737.pdfspm-uniti-201022085737.pdf
spm-uniti-201022085737.pdf
Vinoth Kumar
 
Faculty of Law and Management FUNDAMENTALS OF FINANCE .docx
Faculty of Law and Management FUNDAMENTALS OF FINANCE .docxFaculty of Law and Management FUNDAMENTALS OF FINANCE .docx
Faculty of Law and Management FUNDAMENTALS OF FINANCE .docx
mydrynan
 
Project Management C8 -cost_estimation_and_budgeting
Project Management C8  -cost_estimation_and_budgetingProject Management C8  -cost_estimation_and_budgeting
Project Management C8 -cost_estimation_and_budgeting
Izah Asmadi
 

Similar a SPM Evaluation (20)

L03 integration management
L03 integration managementL03 integration management
L03 integration management
 
Pm evaluationand selection1
Pm evaluationand selection1Pm evaluationand selection1
Pm evaluationand selection1
 
Training on Financial and Economic Project Evaluation
Training on Financial and Economic Project Evaluation Training on Financial and Economic Project Evaluation
Training on Financial and Economic Project Evaluation
 
Unit2 Chapter 2 Programme Management and Project Evaluation.pdf
Unit2 Chapter  2 Programme Management and Project Evaluation.pdfUnit2 Chapter  2 Programme Management and Project Evaluation.pdf
Unit2 Chapter 2 Programme Management and Project Evaluation.pdf
 
Pm assignment
Pm assignmentPm assignment
Pm assignment
 
Software Project Management
Software Project ManagementSoftware Project Management
Software Project Management
 
spm-uniti-201022085737.pdf
spm-uniti-201022085737.pdfspm-uniti-201022085737.pdf
spm-uniti-201022085737.pdf
 
Capital budgeting
Capital budgetingCapital budgeting
Capital budgeting
 
PGBM01 - MBA Financial Management And Control (2015-16 Trm1 A)Lecture 9 lon...
PGBM01 - MBA Financial Management And Control (2015-16 Trm1 A)Lecture 9   lon...PGBM01 - MBA Financial Management And Control (2015-16 Trm1 A)Lecture 9   lon...
PGBM01 - MBA Financial Management And Control (2015-16 Trm1 A)Lecture 9 lon...
 
Faculty of Law and Management FUNDAMENTALS OF FINANCE .docx
Faculty of Law and Management FUNDAMENTALS OF FINANCE .docxFaculty of Law and Management FUNDAMENTALS OF FINANCE .docx
Faculty of Law and Management FUNDAMENTALS OF FINANCE .docx
 
Project_selectionProject_selectionnn.ppt
Project_selectionProject_selectionnn.pptProject_selectionProject_selectionnn.ppt
Project_selectionProject_selectionnn.ppt
 
Introduction to cost management & control in construction projects
Introduction to cost management & control in construction projectsIntroduction to cost management & control in construction projects
Introduction to cost management & control in construction projects
 
Chapter 3.pptx
Chapter 3.pptxChapter 3.pptx
Chapter 3.pptx
 
Cost managment
Cost managmentCost managment
Cost managment
 
Cost Benefit Analysis
Cost Benefit AnalysisCost Benefit Analysis
Cost Benefit Analysis
 
Financial Management for Co-ops
Financial Management  for Co-opsFinancial Management  for Co-ops
Financial Management for Co-ops
 
2 b agile domains
2 b agile domains2 b agile domains
2 b agile domains
 
Investment Appraisal
Investment AppraisalInvestment Appraisal
Investment Appraisal
 
Finanacial anaylsis
Finanacial anaylsisFinanacial anaylsis
Finanacial anaylsis
 
Project Management C8 -cost_estimation_and_budgeting
Project Management C8  -cost_estimation_and_budgetingProject Management C8  -cost_estimation_and_budgeting
Project Management C8 -cost_estimation_and_budgeting
 

Más de Kanchana Devi (8)

Spm unit v-software maintenance-intro
Spm unit v-software maintenance-introSpm unit v-software maintenance-intro
Spm unit v-software maintenance-intro
 
Spm unit iii-configuration mgmt-responsibilities
Spm unit iii-configuration mgmt-responsibilitiesSpm unit iii-configuration mgmt-responsibilities
Spm unit iii-configuration mgmt-responsibilities
 
Spm unit iii-configuration mgmt-intro
Spm unit iii-configuration mgmt-introSpm unit iii-configuration mgmt-intro
Spm unit iii-configuration mgmt-intro
 
Spm unit iii-risk-working in teams
Spm unit iii-risk-working in teamsSpm unit iii-risk-working in teams
Spm unit iii-risk-working in teams
 
Spm unit iii-risk-resource allocation
Spm unit iii-risk-resource allocationSpm unit iii-risk-resource allocation
Spm unit iii-risk-resource allocation
 
Spm unit iii-risk-pert
Spm unit iii-risk-pertSpm unit iii-risk-pert
Spm unit iii-risk-pert
 
Spm ap-network model-
Spm ap-network model-Spm ap-network model-
Spm ap-network model-
 
Open source spm tools
Open source spm toolsOpen source spm tools
Open source spm tools
 

Último

+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
Health
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
jaanualu31
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 

Último (20)

+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
Bridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptxBridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptx
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Rums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfRums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdf
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
Air Compressor reciprocating single stage
Air Compressor reciprocating single stageAir Compressor reciprocating single stage
Air Compressor reciprocating single stage
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 

SPM Evaluation

  • 2. “Project Evaluation”  “Business Case” document will contain Introduction & background to the proposal - Current Environment Proposed project – Outline Market- Estimated demand for product or service Organizational & Operational Infrastructure - How structure of organization will be affected by implementation of project.
  • 3. “Project Evaluation”  Benefits - A financial value  Outline Implementation Plan - Marketing, Promotion and operational and maintenance infrastructure.  Costs - Schedule of expected costs with planned approach.  The Financial case - Information on income and costs can be analyzed.  Risks- Threats to successful project execution – from business risk – relating to factors threatening benefits of delivered project  Management Plan
  • 4. “Project Portfolio Management”  Provides an overview of all the projects that an organization is undertaking  It priorities the allocation of resources to the projects  Decides which one to be accepted and which one to be dropped
  • 5. Concerns of portfolio management  Identifying which project proposals are worth implementation  Assessing the amount of risk of failure  Deciding how to share limited resources  Aware of dependencies among projects  Ensuring that projects do not duplicate work
  • 6. Portfolio can be categorized into  Portfolio Definition  Portfolio Management  Portfolio Optimization
  • 7. Portfolio Definition  An organization should record in a single repository details of all current projects
  • 8. Portfolio Management  More detailed costing of projects can be recorded  Actual performance will be tracked
  • 9. Portfolio Optimization  Performance can be tracked by high-level managers on regular basis  A better balance of projects may be achieved  The portfolio should have careful thought-out balance between two types of projects  Modest benefit- Fewer risk  Very profitable- Risky
  • 10. Evaluation of Individual Projects  Technical Assessment  Whether the required functionality can be achieved with current affordable technologies.
  • 11. Cost Benefit Analysis (CBA) You need to:  Identify all the costs which could be:  Development Costs - Recruitment and Staff Training  Set-up Costs – Cost of putting the system into place  Operational Costs – Operating the system after installation.  Expressing these costs and benefits in common units  Check benefits are greater than costs
  • 12. Cost-benefit Evaluation Techniques  ‘Year 0’ represents all the costs before system in operation  ‘Cash-flow’ is value of income less outgoing Year Cash-flow 0 -100,000 1 10,000 2 10,000 3 10,000 4 20,000 5 100,000 Net profit 50,000
  • 13. Payback Period  This is the time it takes to break or pay back the initial investment.  The project with shortest payback period will be chosen. Year Cash-flow Accumulated 0 -100,000 -100,000 1 10,000 -90,000 2 10,000 -80,000 3 10,000 -70,000 4 20,000 -50,000 5 100,000 50,000
  • 14. Return On Investment (ROI) ROI = Average Annual Profit Total Investment X 100 In the previous example  Average Annual Profit = 50,000/5 = 10,000  ROI = 10,000/100,000 X 100 = 10%
  • 15. Discount Factor  Discount factor = 1/(1+r)t r is the interest rate (e.g. 10% is 0.10) t is the number of years In the case of 10% rate and one year  Discount factor = 1/(1+0.10) = 0.9091 In the case of 10% rate and two years  Discount factor = 1/(1.10 x 1.10) =0.8294
  • 16. Net Present Value  Project evaluation technique that considers profitability of a project and timing of cash flows that are produced.  Present value of any future cash flow : Present value = value in year t / (1+r)t
  • 17. Applying Discount Factors Year Cash-flow Discount factor Discounted cash flow 0 -100,000 1.0000 -100,000 1 10,000 0.9091 9,091 2 10,000 0.8264 8,264 3 10,000 0.7513 7,513 4 20,000 0.6830 13,660 5 100,000 0.6209 62,090 NPV 618 NPV for a project is obtained by discounting each flow (both negative and positive) and summing the discounted flows.
  • 18. NPV-Net Present Value  NPV for a project is obtained by discounting each flow (both negative and positive) and summing the discounted flows.