SlideShare una empresa de Scribd logo
1 de 4
Descargar para leer sin conexión
JISC KAPTUR

Business, Financial and Sustainability Plan Template

Purpose
The deliverable of the Business, Financial and Sustainability Plans form part of Work Package 5:
Application and Testing along with the RDM policies and the case studies. The Business, Financial
and Sustainability Plans will support the work of the Research Data Management (RDM) policies by
outlining how RDM best practice will be taken forward at each of the four institutions after the end of
the JISC KAPTUR project (2011-13).


Audience
The Plan is an internal document for each institution. It is expected that the audience will include the
existing stakeholders established through the RDM working groups and the members of the
committees that approved the RDM policies. This will vary at each institution.


Ownership
This template constitutes guidance only; please prioritise your own institutional processes and
procedures. The Plan may be transferred to an institutional template or worked up at a later stage into
a full Business Case following internal procedures.


Method of Delivery
The Plans are not expected to be made publicly available due to the confidential nature of much of
the content; however information from the Options Appraisal and Evaluation sections will need to be
supplied to the Project Manager to incorporate into the KAPTUR final project report. Additionally the
KAPTUR Project Manager will make this template available from the KAPTUR outputs page:
http://www.vads.ac.uk/kaptur/outputs/index.html


References
Beagrie, N. (2010) Business Case Guidance for the RDMI programme pilot projects. Charles Beagrie
Ltd.

Beagrie, N. and Pink, C. (2012) Benefits from Research Data Management in Universities for Industry
and Not-for-Profit Research Partners. Charles Beagrie Ltd and University of Bath. Available from:
http://opus.bath.ac.uk/32509/ (Last accessed: 12th February 2013)

Garrett, L., Gramstadt, M-T, and Spalding, A. (2012) Discussion Paper: Towards a Research Data
Management (RDM) Policy. KAPTUR. Available from: http://www.slideshare.net/kaptur_mrd/research-
data-management-rdm-discussion-paper (Last accessed: 12th February 2013)

Office of Government Commerce. (2005) 4th ed. Managing Successful Projects with Prince2TM
Norwich: Her Majesty's Stationery Office.

Silva, C. and Gramstadt, M-T (2013) IT Costs for Research Data Management. KAPTUR. Available
from: http://www.slideshare.net/kaptur_mrd/kaptur-it-costs-public (Last accessed: 12th February 2013)




                                                                                                           1
JISC KAPTUR

Business, Financial and Sustainability Plan Template

Document Title                Business, Financial and Sustainability Plan
Document Directory
Path & Filename

Document Owner                e.g. Project Sponsor or key member of RDM working group or committee
Owner Contact Details

Author(s), Role(s), and                 e.g. Project Officer's details
Contact Details                     
                                    



Version       Date                  Comments
1.0
1.1
1.2

Background
Describe the background for the Plan; the institution's involvement in the KAPTUR project; relevant
external factors such as the Finch report or the RCUK policy; relevant internal factors such as
institutional strategic aims and objectives and/or related internal policies such as Research Integrity,
Records Management, Open Access and FOI.


Objectives
        bullet points listing key objectives relating to your RDM policy
    


Stakeholders
Stakeholder Group (examples             Benefits                            Responsibilities
below from Beagrie and Pink
2012: 3 - could also refer to the
KAPTUR project plan or RDM
policies)
Academic Staff and                      e.g. "Provision of data as          e.g. Principle Investigators of
Researchers                             teaching resources" (Beagrie        research projects to ...(as
                                        and Pink 2012: 3)                   mentioned in the RDM policies).
Institution                             e.g. Improved rate of               e.g. Institution to provide RDM
                                        compliance with funder and          training for researchers
                                        institutional requirements
Professional Services
Students




                                                                                                              2
JISC KAPTUR

Business, Financial and Sustainability Plan Template




Strategic Alignment
Institutional Strategic    Key Performance            Research Data               Estimated Timescale
Objective                  Target/s                   Management                  for Delivery (e.g. state
                                                      Objectives (from            if ongoing or if
                                                      Objectives section          expected in next
                                                      above)                      year/next 5 years/next
                                                                                  10 years)




Options Appraisal
This section will inform the KAPTUR final report. The partner institutions will be required to report their
current choice of options for continuing RDM best practice post KAPTUR. It is recognised, as stated
in the RDM policies, that implementation may take several years and so the options may include a
range of both short term measures - such as up-skilling existing staff and use of the KAPTUR toolkits
- to longer term measures - such as recruiting enough staff to support all prospective Principal
Investigators with completing their Data Management Plans.


Option                     Owner                      Dependencies                Timescale
e.g. Up-skill existing     e.g. Head of relevant      e.g. Support of relevant    e.g. state if ongoing or
staff to support RDM       department e.g.            department including        if expected in next 6
best practice              Research Office            interest from staff to be   months/next year/next
                                                      up-skilled                  5 years/next 10 years
e.g. Recruitment of
new staff to support
RDM best practice




Risk Management
The table below can be used to list risks which may impact upon the delivery of RDM best practice
e.g. commercial, economic, environmental, legal, organisational, political, strategic or technical.
Please also explain which group/s and/or individuals will have responsibility for monitoring the risk/s
(Owner).




                                                                                                             3
JISC KAPTUR

Business, Financial and Sustainability Plan Template

Owner        Risk                                                          Probability Severity Score




Cost Analysis
Refer to work done by the institution on the KAPTUR IT Costs Model (a public version is available
from: http://www.slideshare.net/kaptur_mrd/kaptur-it-costs-public) and internal cost analysis
processes for other aspects such as staffing costs for providing RDM training.


Evaluation
This section will inform the KAPTUR final report. The most significant aspect of the Business,
Financial and Sustainability Plans is to ensure that RDM best practice will be supported at each
institution beyond the lifetime of the KAPTUR project. In particular to ensure that the RDM policies will
be periodically reviewed and amended as the institution moves towards implementing some of the
more aspirational aspects.


Evaluation/monitoring      Owner                      Method                     Timescale
Review of RDM policy       e.g. Research &            e.g. rolling item on       e.g. insert dates of
                           Enterprise Committee       agenda                     committee meetings
Ongoing tracking of the    e.g. relevant              e.g. online survey         e.g. survey repeated
benefits of RDM best       department/s                                          yearly (on date)
practice
Ongoing budgeting for      e.g. relevant              e.g. managing the          e.g. timing when
RDM support                department/s               budget                     budget reports are
                                                                                 required
Appropriateness of         e.g. relevant
technical infrastructure   department/s
for research data
Appropriateness of
RDM training provision
etc...




                                                                                                        4

Más contenido relacionado

Similar a Kaptur business-plan-template-public

Save USD 25 billion thru new project management practices!
Save USD 25 billion thru new project management practices!Save USD 25 billion thru new project management practices!
Save USD 25 billion thru new project management practices!sanjeeev bahadur, m.tech,mba
 
IRJET- An Overview on Project Management
IRJET- An Overview on Project ManagementIRJET- An Overview on Project Management
IRJET- An Overview on Project ManagementIRJET Journal
 
3. Pre-feasibility Study.pptx of project
3. Pre-feasibility Study.pptx of project3. Pre-feasibility Study.pptx of project
3. Pre-feasibility Study.pptx of projectamritkhatri5
 
Week 2 24 - 28 July 2023 (1).pptx
Week 2 24 - 28 July 2023 (1).pptxWeek 2 24 - 28 July 2023 (1).pptx
Week 2 24 - 28 July 2023 (1).pptxXuanQin3
 
1707.01377
1707.013771707.01377
1707.01377Karim T
 
PMINEO_2010_03_Resource_Management
PMINEO_2010_03_Resource_ManagementPMINEO_2010_03_Resource_Management
PMINEO_2010_03_Resource_ManagementBob Zoller
 
Portfolio Planning in Higher Education Industry
Portfolio Planning in Higher Education IndustryPortfolio Planning in Higher Education Industry
Portfolio Planning in Higher Education IndustryKaali Dass PMP, PhD.
 
Strategy Implementation of Financial and General Services Development (FGSD)
Strategy Implementation of Financial and General Services Development (FGSD)  Strategy Implementation of Financial and General Services Development (FGSD)
Strategy Implementation of Financial and General Services Development (FGSD) jo bitonio
 
PCM+LFA-_food.forthought
PCM+LFA-_food.forthoughtPCM+LFA-_food.forthought
PCM+LFA-_food.forthoughtEla Gerthnerova
 
Technological Forecasting: Methodology Embrapa Brazilian Company
Technological Forecasting: Methodology Embrapa Brazilian Company Technological Forecasting: Methodology Embrapa Brazilian Company
Technological Forecasting: Methodology Embrapa Brazilian Company IJERA Editor
 
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...IRJET Journal
 
Innovative project management practices for large power sector projects.
Innovative project management  practices for large power sector projects.Innovative project management  practices for large power sector projects.
Innovative project management practices for large power sector projects.sanjeeev bahadur, m.tech,mba
 
PMO - Strategic Model & Concepts Overview
PMO - Strategic Model & Concepts OverviewPMO - Strategic Model & Concepts Overview
PMO - Strategic Model & Concepts OverviewPMOfficers PMOAcademy
 
A fresh project management perspective - from 2011 - RICS Article
A fresh project management perspective - from 2011 - RICS ArticleA fresh project management perspective - from 2011 - RICS Article
A fresh project management perspective - from 2011 - RICS ArticleDonnie MacNicol
 
Project Charter Scoring GuideCRITERIA NON-PERFORMANCE BASI.docx
Project Charter Scoring GuideCRITERIA NON-PERFORMANCE BASI.docxProject Charter Scoring GuideCRITERIA NON-PERFORMANCE BASI.docx
Project Charter Scoring GuideCRITERIA NON-PERFORMANCE BASI.docxstilliegeorgiana
 
1010 cd overview light
1010 cd overview light1010 cd overview light
1010 cd overview lightAndrew Hudson
 
3.activity 2 differentiating between applied research and basic research
3.activity 2  differentiating between applied research and basic research3.activity 2  differentiating between applied research and basic research
3.activity 2 differentiating between applied research and basic researchNazrin Nazdri
 
Zubin_Shahnawaz_CV_August_2016
Zubin_Shahnawaz_CV_August_2016Zubin_Shahnawaz_CV_August_2016
Zubin_Shahnawaz_CV_August_2016Zubin Shahnawaz
 

Similar a Kaptur business-plan-template-public (20)

Save USD 25 billion thru new project management practices!
Save USD 25 billion thru new project management practices!Save USD 25 billion thru new project management practices!
Save USD 25 billion thru new project management practices!
 
IRJET- An Overview on Project Management
IRJET- An Overview on Project ManagementIRJET- An Overview on Project Management
IRJET- An Overview on Project Management
 
3. Pre-feasibility Study.pptx of project
3. Pre-feasibility Study.pptx of project3. Pre-feasibility Study.pptx of project
3. Pre-feasibility Study.pptx of project
 
Week 2 24 - 28 July 2023 (1).pptx
Week 2 24 - 28 July 2023 (1).pptxWeek 2 24 - 28 July 2023 (1).pptx
Week 2 24 - 28 July 2023 (1).pptx
 
1707.01377
1707.013771707.01377
1707.01377
 
Preparation on managing iaj initiatives
Preparation on managing iaj initiativesPreparation on managing iaj initiatives
Preparation on managing iaj initiatives
 
PMINEO_2010_03_Resource_Management
PMINEO_2010_03_Resource_ManagementPMINEO_2010_03_Resource_Management
PMINEO_2010_03_Resource_Management
 
Portfolio Planning in Higher Education Industry
Portfolio Planning in Higher Education IndustryPortfolio Planning in Higher Education Industry
Portfolio Planning in Higher Education Industry
 
PERT
PERTPERT
PERT
 
Strategy Implementation of Financial and General Services Development (FGSD)
Strategy Implementation of Financial and General Services Development (FGSD)  Strategy Implementation of Financial and General Services Development (FGSD)
Strategy Implementation of Financial and General Services Development (FGSD)
 
PCM+LFA-_food.forthought
PCM+LFA-_food.forthoughtPCM+LFA-_food.forthought
PCM+LFA-_food.forthought
 
Technological Forecasting: Methodology Embrapa Brazilian Company
Technological Forecasting: Methodology Embrapa Brazilian Company Technological Forecasting: Methodology Embrapa Brazilian Company
Technological Forecasting: Methodology Embrapa Brazilian Company
 
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
 
Innovative project management practices for large power sector projects.
Innovative project management  practices for large power sector projects.Innovative project management  practices for large power sector projects.
Innovative project management practices for large power sector projects.
 
PMO - Strategic Model & Concepts Overview
PMO - Strategic Model & Concepts OverviewPMO - Strategic Model & Concepts Overview
PMO - Strategic Model & Concepts Overview
 
A fresh project management perspective - from 2011 - RICS Article
A fresh project management perspective - from 2011 - RICS ArticleA fresh project management perspective - from 2011 - RICS Article
A fresh project management perspective - from 2011 - RICS Article
 
Project Charter Scoring GuideCRITERIA NON-PERFORMANCE BASI.docx
Project Charter Scoring GuideCRITERIA NON-PERFORMANCE BASI.docxProject Charter Scoring GuideCRITERIA NON-PERFORMANCE BASI.docx
Project Charter Scoring GuideCRITERIA NON-PERFORMANCE BASI.docx
 
1010 cd overview light
1010 cd overview light1010 cd overview light
1010 cd overview light
 
3.activity 2 differentiating between applied research and basic research
3.activity 2  differentiating between applied research and basic research3.activity 2  differentiating between applied research and basic research
3.activity 2 differentiating between applied research and basic research
 
Zubin_Shahnawaz_CV_August_2016
Zubin_Shahnawaz_CV_August_2016Zubin_Shahnawaz_CV_August_2016
Zubin_Shahnawaz_CV_August_2016
 

Más de JISC funded KAPTUR project (20)

A working archive in the studio and on screen
A working archive in the studio and on screenA working archive in the studio and on screen
A working archive in the studio and on screen
 
Research data-visual arts-presentation
Research data-visual arts-presentationResearch data-visual arts-presentation
Research data-visual arts-presentation
 
Leigh garrett
Leigh garrettLeigh garrett
Leigh garrett
 
Simon hodson
Simon hodsonSimon hodson
Simon hodson
 
Carlos silva
Carlos silvaCarlos silva
Carlos silva
 
Anne spalding
Anne spaldingAnne spalding
Anne spalding
 
Andrew gray
Andrew grayAndrew gray
Andrew gray
 
Robin burgess
Robin burgessRobin burgess
Robin burgess
 
Sarah mahurter
Sarah mahurterSarah mahurter
Sarah mahurter
 
20130222 kaptur training_goldsmiths
20130222 kaptur training_goldsmiths20130222 kaptur training_goldsmiths
20130222 kaptur training_goldsmiths
 
The prayer companion_boucher_et_al
The prayer companion_boucher_et_alThe prayer companion_boucher_et_al
The prayer companion_boucher_et_al
 
Gsa rdm training
Gsa rdm trainingGsa rdm training
Gsa rdm training
 
Lm gsa training
Lm gsa trainingLm gsa training
Lm gsa training
 
Dcc roadshow dundee_rb
Dcc roadshow dundee_rbDcc roadshow dundee_rb
Dcc roadshow dundee_rb
 
Kaptur mrd example
Kaptur mrd exampleKaptur mrd example
Kaptur mrd example
 
Kaptur mrd questions
Kaptur mrd questionsKaptur mrd questions
Kaptur mrd questions
 
Uca mrd presentation january 2013
Uca mrd presentation january 2013Uca mrd presentation january 2013
Uca mrd presentation january 2013
 
Rdm training presentation 16.01.2013
Rdm training presentation 16.01.2013Rdm training presentation 16.01.2013
Rdm training presentation 16.01.2013
 
20130116 dmp training
20130116 dmp training20130116 dmp training
20130116 dmp training
 
Kaptur IT costs public
Kaptur IT costs publicKaptur IT costs public
Kaptur IT costs public
 

Último

The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docxPoojaSen20
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxRoyAbrique
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991RKavithamani
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppCeline George
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 

Último (20)

The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docx
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website App
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 

Kaptur business-plan-template-public

  • 1. JISC KAPTUR Business, Financial and Sustainability Plan Template Purpose The deliverable of the Business, Financial and Sustainability Plans form part of Work Package 5: Application and Testing along with the RDM policies and the case studies. The Business, Financial and Sustainability Plans will support the work of the Research Data Management (RDM) policies by outlining how RDM best practice will be taken forward at each of the four institutions after the end of the JISC KAPTUR project (2011-13). Audience The Plan is an internal document for each institution. It is expected that the audience will include the existing stakeholders established through the RDM working groups and the members of the committees that approved the RDM policies. This will vary at each institution. Ownership This template constitutes guidance only; please prioritise your own institutional processes and procedures. The Plan may be transferred to an institutional template or worked up at a later stage into a full Business Case following internal procedures. Method of Delivery The Plans are not expected to be made publicly available due to the confidential nature of much of the content; however information from the Options Appraisal and Evaluation sections will need to be supplied to the Project Manager to incorporate into the KAPTUR final project report. Additionally the KAPTUR Project Manager will make this template available from the KAPTUR outputs page: http://www.vads.ac.uk/kaptur/outputs/index.html References Beagrie, N. (2010) Business Case Guidance for the RDMI programme pilot projects. Charles Beagrie Ltd. Beagrie, N. and Pink, C. (2012) Benefits from Research Data Management in Universities for Industry and Not-for-Profit Research Partners. Charles Beagrie Ltd and University of Bath. Available from: http://opus.bath.ac.uk/32509/ (Last accessed: 12th February 2013) Garrett, L., Gramstadt, M-T, and Spalding, A. (2012) Discussion Paper: Towards a Research Data Management (RDM) Policy. KAPTUR. Available from: http://www.slideshare.net/kaptur_mrd/research- data-management-rdm-discussion-paper (Last accessed: 12th February 2013) Office of Government Commerce. (2005) 4th ed. Managing Successful Projects with Prince2TM Norwich: Her Majesty's Stationery Office. Silva, C. and Gramstadt, M-T (2013) IT Costs for Research Data Management. KAPTUR. Available from: http://www.slideshare.net/kaptur_mrd/kaptur-it-costs-public (Last accessed: 12th February 2013) 1
  • 2. JISC KAPTUR Business, Financial and Sustainability Plan Template Document Title Business, Financial and Sustainability Plan Document Directory Path & Filename Document Owner e.g. Project Sponsor or key member of RDM working group or committee Owner Contact Details Author(s), Role(s), and  e.g. Project Officer's details Contact Details   Version Date Comments 1.0 1.1 1.2 Background Describe the background for the Plan; the institution's involvement in the KAPTUR project; relevant external factors such as the Finch report or the RCUK policy; relevant internal factors such as institutional strategic aims and objectives and/or related internal policies such as Research Integrity, Records Management, Open Access and FOI. Objectives  bullet points listing key objectives relating to your RDM policy  Stakeholders Stakeholder Group (examples Benefits Responsibilities below from Beagrie and Pink 2012: 3 - could also refer to the KAPTUR project plan or RDM policies) Academic Staff and e.g. "Provision of data as e.g. Principle Investigators of Researchers teaching resources" (Beagrie research projects to ...(as and Pink 2012: 3) mentioned in the RDM policies). Institution e.g. Improved rate of e.g. Institution to provide RDM compliance with funder and training for researchers institutional requirements Professional Services Students 2
  • 3. JISC KAPTUR Business, Financial and Sustainability Plan Template Strategic Alignment Institutional Strategic Key Performance Research Data Estimated Timescale Objective Target/s Management for Delivery (e.g. state Objectives (from if ongoing or if Objectives section expected in next above) year/next 5 years/next 10 years) Options Appraisal This section will inform the KAPTUR final report. The partner institutions will be required to report their current choice of options for continuing RDM best practice post KAPTUR. It is recognised, as stated in the RDM policies, that implementation may take several years and so the options may include a range of both short term measures - such as up-skilling existing staff and use of the KAPTUR toolkits - to longer term measures - such as recruiting enough staff to support all prospective Principal Investigators with completing their Data Management Plans. Option Owner Dependencies Timescale e.g. Up-skill existing e.g. Head of relevant e.g. Support of relevant e.g. state if ongoing or staff to support RDM department e.g. department including if expected in next 6 best practice Research Office interest from staff to be months/next year/next up-skilled 5 years/next 10 years e.g. Recruitment of new staff to support RDM best practice Risk Management The table below can be used to list risks which may impact upon the delivery of RDM best practice e.g. commercial, economic, environmental, legal, organisational, political, strategic or technical. Please also explain which group/s and/or individuals will have responsibility for monitoring the risk/s (Owner). 3
  • 4. JISC KAPTUR Business, Financial and Sustainability Plan Template Owner Risk Probability Severity Score Cost Analysis Refer to work done by the institution on the KAPTUR IT Costs Model (a public version is available from: http://www.slideshare.net/kaptur_mrd/kaptur-it-costs-public) and internal cost analysis processes for other aspects such as staffing costs for providing RDM training. Evaluation This section will inform the KAPTUR final report. The most significant aspect of the Business, Financial and Sustainability Plans is to ensure that RDM best practice will be supported at each institution beyond the lifetime of the KAPTUR project. In particular to ensure that the RDM policies will be periodically reviewed and amended as the institution moves towards implementing some of the more aspirational aspects. Evaluation/monitoring Owner Method Timescale Review of RDM policy e.g. Research & e.g. rolling item on e.g. insert dates of Enterprise Committee agenda committee meetings Ongoing tracking of the e.g. relevant e.g. online survey e.g. survey repeated benefits of RDM best department/s yearly (on date) practice Ongoing budgeting for e.g. relevant e.g. managing the e.g. timing when RDM support department/s budget budget reports are required Appropriateness of e.g. relevant technical infrastructure department/s for research data Appropriateness of RDM training provision etc... 4