ARTIFICIAL GROUNDWATER
RECHARGE TECHNIQUES
NightFox
© NightFox
© NightFox
CONTENTS
• Introduction : groundwater
• What is artificial recharge?
• Importance of AR
• Identification of area for recharge
• Recharge techniques
• Direct methods
• Indirect methods
• Advantages
 GROUNDWATER:
• The water which is stored in the pores of the soil strata by
infiltration is known as groundwater.
• Therefore the groundwater may defined as all the water present
below the earth surface.
INTRODUCTION
WHAT IS ARTIFICIAL RECHARGE?
• It is the process by which the ground
water is improved at a rate much
higher than those under natural
condition of percolation.
IMPORTANCE OF ARTIFICIAL RECHARGE
• To maximize storage (long-term & seasonal)
• Water quality improvement through dilution
• Preventing saline-water intrusion & land subsidence
• Reducing reduction volumes from river flow
• Controlling effects of climate change
• Maintaining declining ground water levels
IDENTIFICATION OF AREAS FOR RECHARGE
• Where ground water levels are declining due to over-
exploitation.
• Where substantial part of the aquifer has already been de-
saturated. i.e. regeneration of water in wells and hand pumps
is slow after some water has been drawn.
• Where availability of water from wells and hand pumps is
inadequate during the lean months.
• Where ground water quality is poor and there is no alternative
source of water.
TECHNIQUES
Direct Methods
Surface method: to enhance
groundwater infiltration by
providing more residence
time with the help of
structural and non-
structural measures
Subsurface method
Indirect Methods
Induced Recharge Method
Aquifer Modification Method
SURFACE METHODS
PERCOLATI
ON TANK
FLOODING
STREAM
AUGMENTA
TION
DITCH &
FURROW
SYSTEM
CONTOUR
BUND
SUBSURFACE METHODS
RECHARGE
WELLS
DUG WELL
PITS &
SHAFTS
PERCOLATION TANK
• Series of earthen dams are
constructed on suitable sites
for storing of adequate
quantity of surface water.
• Tank area should be selected
in such a way that significant
amount of water infiltrates
through the bed of the tank
and reaches the groundwater
table. Contd…
• Effective in alluvial area, hard
rock area.
• Useful in providing continuous
recharge after the monsoon.
• Size of tank depend upon
percolation capacity of strata.
Contd…
FLOODING
• Flat region where water can be spread
as a thin layer.
• Water is distributed over the region
using a distribution system.
• This method can achieve higher rate of
infiltration in a region having thin
vegetation cover or sand soil cover.
STREAM AUGMENTATION
• Seepage from natural
stream or river is
artificially increased by
putting some series of
check dams across the
river or stream.
ARIZONA
• The placing of check dams spread the water in a larger area
which eventually increases groundwater recharge.
• The sites for the check dams should be selected in such a
way that sufficient thickness of permeable bed or
weathered bed is available for quick recharging the stored
water.
Contd…
DITCH & FURROW SYSTEM
• A system of closely spaced flat
bottom ditch or furrow is used to
carry the water from the source.
• This system provides more
opportunity to percolate the water
into the ground.
• The spacing of the ditch depends
on the permeability of the soil.
• For less permeable soil, more
densely spaced ditch or furrow
should be provided.
• Uneven terrain.
CONTOUR BUND
• Contour bund is a small
embankment constructed
along the contour in hilly
region to retain the surface
runoff for longer time.
• This scheme is adopted for
low rainfall area where
internal subsurface drainage
is good.
CHINA RISE PADDIES
RECHARGE WELL
• Recharge wells are used to recharge water
directly to the aquifer.
• Recharge wells are similar to pumping wells.
• This method is suitable to recharge single
wells or multiple wells.
• This method is costlier than the other method
as wells are required to be bored. However,
sometimes abandoned tube wells can be used
for recharging water into the aquifer
DUG WELL
• In alluvial as well as hard
rock areas there are
thousand of dug wells have
either gone dry due to
considerable decline of water
levels
• These dug wells can be used for recharging groundwater.
The water from various sources can be collected through a
distribution system and can be discharged at the dug wells.
• Water for recharge should be guided through a pipe to the
bottom of well to avoid entrapment of bubbles in the aquifer.
Contd…
PITS & SHAFTS
• Recharge pits of variable dimensions
• Most of the time, especially in case of agricultural field, a
layer of less permeable soil exist.
• So the surface flooding methods of recharge do not show
satisfactory performance so recharge pit can be excavated
which are sufficiently deep to penetrate the less permeable
strata.
RECHARGE PIT
RECHARGE SHAFT
• Recharge shaft is similar to the
recharge pits, but the cross
sectional size of the recharge
shaft is much lesser than the
recharge pits.
• Like the recharge pits, recharge shafts
are also used to recharge water to
unconfined aquifer whose water table
is deep below the land surface and a
poorly impermeable strata exist at the
surface level.
INDIRECT METHODS
INDUCED RECHARGE
AQUIFER
MODIFICATION
METHODS
INDUCED RECHARGE
• Water is pumped from the aquifer
hydraulically connected to the surface water
sources like stream, river or lake.
• Due to pumping, a reverse gradient is formed
and water from the surface water source
enters into the aquifer and thus the aquifer is
recharged.
• This method is good, especially when quality of the surface water is
poor.
• The filtration of surface water through soil strata removes the
impurities of the water.
• Thus the quality of the water receives in the wells is much better than
the surface water.
Contd…
AQUIFER MODIFICATION METHOD
• This is used to change aquifer characteristics so it
can store more water and transmit more water . After
application of it more recharge take place under
natural as well as artificial condition.
TYPES OF AQUIFER MODIFICATION METHODS
BORE BLASTING
HYDRO-FRACTURING
JACKET WELL TECHNIQUE
PRESSURE INJECTION GROUTING
STREAM BLASTING
1.BORE BLASTING METHOD
• This method is used to increase the
fracture porosity of an aquifer.
• Shallow bore wells are drilled in the area
where fracture porosity of the aquifer is
planned to increase.
• These bore holes are blasted with the help
of explosive which creates fracture porosity
in the aquifer
2.HYDRO-FRACTURING METHOD
• Hydro-fracturing is used to improve the yield of a bore well.
• In this technique, water is injected at a very high pressure to
widening the existing fracture of the rock.
• The high pressure injection of water also helps in removing of
clogging, creates interconnection between the fractures, and
extends the existing length of the old fracture.
• The high pressure injection also creates new fracture in the
rock strata. As a result of these, the water storing and
transmitting capacity of the strata increases.
3. PRESSURE INJECTION GROUTING
• This technique is used to control the
outflow from an aquifer.
• Cement slurry is injected into the aquifer
using mechanical means or manually near
to the aquifer outlet like spring, etc.
• The injection of cement slurry helps in
reducing the fracture porosity of the aquifer
near the outlet which will eventually reduce
the outflow from the aquifer.
4. JACKET WELL TECHNIQUES
• Jacket well technique is used to
increase the yield of a dug well.
• In this method, the effective diameter
of the well is increased by drilling
small diameter bores around the well
in a circular pattern.
5. STREAM BLASTING
• Blasting and widening cracks
near the streams and joining
them to the lineament or
aquifer so that the water
retention capacity of rises
along the banks of the
stream.
ADVANTAGES
• To enhance the ground water yield in depleted the aquifer
due to urbanization.
• Conservation and storage of excess surface water for future
requirements.
• To improve the quality of existing ground water through
dilution.
• To remove bacteriological & other impurities from sewage and
waste water by natural filtration, so that water is suitable for
re-use.
Thank you3rd year
© NightFox

Más contenido relacionado

La actualidad más candente

Estimation of Groundwater Potential
Estimation of Groundwater PotentialEstimation of Groundwater Potential
Estimation of Groundwater Potential
C. P. Kumar
 
Chapter 4 groundwater hydrology
Chapter 4 groundwater hydrologyChapter 4 groundwater hydrology
Chapter 4 groundwater hydrology
Mohammed Salahat
 
Chapter 1 occurrence of groundwater
Chapter 1  occurrence of groundwaterChapter 1  occurrence of groundwater
Chapter 1 occurrence of groundwater
Usama Waly
 

La actualidad más candente (20)

Estimation of Groundwater Potential
Estimation of Groundwater PotentialEstimation of Groundwater Potential
Estimation of Groundwater Potential
 
Groundwater improvement techniques
Groundwater improvement techniques Groundwater improvement techniques
Groundwater improvement techniques
 
Sub surface water
Sub surface waterSub surface water
Sub surface water
 
Sea water intrusion
Sea water intrusion Sea water intrusion
Sea water intrusion
 
Aquifer
AquiferAquifer
Aquifer
 
Ground Water (Unit-V)
Ground Water (Unit-V)Ground Water (Unit-V)
Ground Water (Unit-V)
 
Darcy's law
Darcy's lawDarcy's law
Darcy's law
 
Pumping test
Pumping testPumping test
Pumping test
 
DARCY’S LAW
DARCY’S LAWDARCY’S LAW
DARCY’S LAW
 
Darcys law
Darcys lawDarcys law
Darcys law
 
Vertical distribution of groundwater
Vertical distribution of groundwaterVertical distribution of groundwater
Vertical distribution of groundwater
 
Aquifers
AquifersAquifers
Aquifers
 
GROUNDWATER LEVEL FLUCTUATION
GROUNDWATER LEVEL FLUCTUATIONGROUNDWATER LEVEL FLUCTUATION
GROUNDWATER LEVEL FLUCTUATION
 
Chapter 4 groundwater hydrology
Chapter 4 groundwater hydrologyChapter 4 groundwater hydrology
Chapter 4 groundwater hydrology
 
Ground Water Hydrology
Ground Water HydrologyGround Water Hydrology
Ground Water Hydrology
 
Groundwater Properties
Groundwater PropertiesGroundwater Properties
Groundwater Properties
 
Well Hydraulics
Well HydraulicsWell Hydraulics
Well Hydraulics
 
Chapter 1 occurrence of groundwater
Chapter 1  occurrence of groundwaterChapter 1  occurrence of groundwater
Chapter 1 occurrence of groundwater
 
Groundwater exploration methods
Groundwater exploration methodsGroundwater exploration methods
Groundwater exploration methods
 
Hydrology cycle and ground water (GT&AG)
Hydrology cycle and ground water (GT&AG)Hydrology cycle and ground water (GT&AG)
Hydrology cycle and ground water (GT&AG)
 

Similar a Groundwater recharge techniques

GWRM-Theory 4b.pdf
GWRM-Theory 4b.pdfGWRM-Theory 4b.pdf
GWRM-Theory 4b.pdf
WageYado
 

Similar a Groundwater recharge techniques (20)

Artificial recharge
Artificial rechargeArtificial recharge
Artificial recharge
 
GROUND WATER IMPROVEMENT TECHNIQUES
GROUND WATER IMPROVEMENT TECHNIQUESGROUND WATER IMPROVEMENT TECHNIQUES
GROUND WATER IMPROVEMENT TECHNIQUES
 
Artificial recharge techniques by kedar v
Artificial recharge techniques by kedar vArtificial recharge techniques by kedar v
Artificial recharge techniques by kedar v
 
Water harvesting
Water harvestingWater harvesting
Water harvesting
 
GWRM-Theory 4b.pdf
GWRM-Theory 4b.pdfGWRM-Theory 4b.pdf
GWRM-Theory 4b.pdf
 
PPT.pptx
PPT.pptxPPT.pptx
PPT.pptx
 
Artificial recahrge system.pptx
Artificial recahrge system.pptxArtificial recahrge system.pptx
Artificial recahrge system.pptx
 
Irigation types
Irigation typesIrigation types
Irigation types
 
Environmental engineering I Mumbai University
Environmental engineering I Mumbai UniversityEnvironmental engineering I Mumbai University
Environmental engineering I Mumbai University
 
Methos of irrigation
Methos  of  irrigationMethos  of  irrigation
Methos of irrigation
 
Ground water hydrology
Ground water hydrologyGround water hydrology
Ground water hydrology
 
DEWATERING (1).pptx
DEWATERING (1).pptxDEWATERING (1).pptx
DEWATERING (1).pptx
 
fet_ci_projects_Project-GM_3.pdf
fet_ci_projects_Project-GM_3.pdffet_ci_projects_Project-GM_3.pdf
fet_ci_projects_Project-GM_3.pdf
 
IRRIGATION ENGINEERING
IRRIGATION ENGINEERINGIRRIGATION ENGINEERING
IRRIGATION ENGINEERING
 
Water harvesting and its technique
Water harvesting and its techniqueWater harvesting and its technique
Water harvesting and its technique
 
Canal of design
Canal of designCanal of design
Canal of design
 
Rain water harvesting
Rain water harvestingRain water harvesting
Rain water harvesting
 
Special Methods of Sub Surface Drainage: Agricultural Draining Engineering
Special Methods of Sub Surface Drainage: Agricultural Draining EngineeringSpecial Methods of Sub Surface Drainage: Agricultural Draining Engineering
Special Methods of Sub Surface Drainage: Agricultural Draining Engineering
 
Sources and de mand and water supply
Sources and de mand and water supplySources and de mand and water supply
Sources and de mand and water supply
 
Irrigation Engineering Unit-II
Irrigation Engineering Unit-IIIrrigation Engineering Unit-II
Irrigation Engineering Unit-II
 

Más de kaushal gadariya

Más de kaushal gadariya (20)

Engine Cooling system
Engine Cooling systemEngine Cooling system
Engine Cooling system
 
Digital image processing
Digital image processingDigital image processing
Digital image processing
 
soil erosion modelling by RUSLE
soil erosion modelling by RUSLEsoil erosion modelling by RUSLE
soil erosion modelling by RUSLE
 
national agricutural research system
national agricutural research systemnational agricutural research system
national agricutural research system
 
Solar dryers
Solar dryersSolar dryers
Solar dryers
 
pwm for speed control
pwm for speed controlpwm for speed control
pwm for speed control
 
hydraulic system of tractor
hydraulic system of tractorhydraulic system of tractor
hydraulic system of tractor
 
Robotics in agriculture kvg
Robotics in agriculture kvgRobotics in agriculture kvg
Robotics in agriculture kvg
 
Introduction of fuel system kvg
Introduction of fuel system kvgIntroduction of fuel system kvg
Introduction of fuel system kvg
 
Strip packaging kvg
Strip packaging kvgStrip packaging kvg
Strip packaging kvg
 
Agriculture Structures
Agriculture StructuresAgriculture Structures
Agriculture Structures
 
Types of tractors kvg
Types of tractors kvgTypes of tractors kvg
Types of tractors kvg
 
Drip irrigation kvg
Drip irrigation kvgDrip irrigation kvg
Drip irrigation kvg
 
micro irrigation system kvg
micro irrigation system kvgmicro irrigation system kvg
micro irrigation system kvg
 
Types of tractors kvg
Types of tractors kvgTypes of tractors kvg
Types of tractors kvg
 
Introduction of ggrc
Introduction of ggrcIntroduction of ggrc
Introduction of ggrc
 
Promotion of micro irrigation kvg
Promotion of micro irrigation kvgPromotion of micro irrigation kvg
Promotion of micro irrigation kvg
 
Automation in micro irrigation kvg
Automation in micro irrigation kvgAutomation in micro irrigation kvg
Automation in micro irrigation kvg
 
Fertigation in micro irrigation kvg
Fertigation in micro irrigation kvgFertigation in micro irrigation kvg
Fertigation in micro irrigation kvg
 
Soil erosion kvg
Soil erosion kvgSoil erosion kvg
Soil erosion kvg
 

Último

Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
amitlee9823
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 

Último (20)

Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 

Groundwater recharge techniques

  • 2. CONTENTS • Introduction : groundwater • What is artificial recharge? • Importance of AR • Identification of area for recharge • Recharge techniques • Direct methods • Indirect methods • Advantages
  • 3.  GROUNDWATER: • The water which is stored in the pores of the soil strata by infiltration is known as groundwater. • Therefore the groundwater may defined as all the water present below the earth surface. INTRODUCTION
  • 4. WHAT IS ARTIFICIAL RECHARGE? • It is the process by which the ground water is improved at a rate much higher than those under natural condition of percolation.
  • 5. IMPORTANCE OF ARTIFICIAL RECHARGE • To maximize storage (long-term & seasonal) • Water quality improvement through dilution • Preventing saline-water intrusion & land subsidence • Reducing reduction volumes from river flow • Controlling effects of climate change • Maintaining declining ground water levels
  • 6. IDENTIFICATION OF AREAS FOR RECHARGE • Where ground water levels are declining due to over- exploitation. • Where substantial part of the aquifer has already been de- saturated. i.e. regeneration of water in wells and hand pumps is slow after some water has been drawn. • Where availability of water from wells and hand pumps is inadequate during the lean months. • Where ground water quality is poor and there is no alternative source of water.
  • 7. TECHNIQUES Direct Methods Surface method: to enhance groundwater infiltration by providing more residence time with the help of structural and non- structural measures Subsurface method Indirect Methods Induced Recharge Method Aquifer Modification Method
  • 8. SURFACE METHODS PERCOLATI ON TANK FLOODING STREAM AUGMENTA TION DITCH & FURROW SYSTEM CONTOUR BUND SUBSURFACE METHODS RECHARGE WELLS DUG WELL PITS & SHAFTS
  • 9. PERCOLATION TANK • Series of earthen dams are constructed on suitable sites for storing of adequate quantity of surface water. • Tank area should be selected in such a way that significant amount of water infiltrates through the bed of the tank and reaches the groundwater table. Contd…
  • 10. • Effective in alluvial area, hard rock area. • Useful in providing continuous recharge after the monsoon. • Size of tank depend upon percolation capacity of strata. Contd…
  • 11. FLOODING • Flat region where water can be spread as a thin layer. • Water is distributed over the region using a distribution system. • This method can achieve higher rate of infiltration in a region having thin vegetation cover or sand soil cover.
  • 12. STREAM AUGMENTATION • Seepage from natural stream or river is artificially increased by putting some series of check dams across the river or stream. ARIZONA
  • 13. • The placing of check dams spread the water in a larger area which eventually increases groundwater recharge. • The sites for the check dams should be selected in such a way that sufficient thickness of permeable bed or weathered bed is available for quick recharging the stored water. Contd…
  • 14. DITCH & FURROW SYSTEM • A system of closely spaced flat bottom ditch or furrow is used to carry the water from the source. • This system provides more opportunity to percolate the water into the ground. • The spacing of the ditch depends on the permeability of the soil. • For less permeable soil, more densely spaced ditch or furrow should be provided. • Uneven terrain.
  • 15. CONTOUR BUND • Contour bund is a small embankment constructed along the contour in hilly region to retain the surface runoff for longer time. • This scheme is adopted for low rainfall area where internal subsurface drainage is good. CHINA RISE PADDIES
  • 16. RECHARGE WELL • Recharge wells are used to recharge water directly to the aquifer. • Recharge wells are similar to pumping wells. • This method is suitable to recharge single wells or multiple wells. • This method is costlier than the other method as wells are required to be bored. However, sometimes abandoned tube wells can be used for recharging water into the aquifer
  • 17. DUG WELL • In alluvial as well as hard rock areas there are thousand of dug wells have either gone dry due to considerable decline of water levels
  • 18. • These dug wells can be used for recharging groundwater. The water from various sources can be collected through a distribution system and can be discharged at the dug wells. • Water for recharge should be guided through a pipe to the bottom of well to avoid entrapment of bubbles in the aquifer. Contd…
  • 19. PITS & SHAFTS • Recharge pits of variable dimensions • Most of the time, especially in case of agricultural field, a layer of less permeable soil exist. • So the surface flooding methods of recharge do not show satisfactory performance so recharge pit can be excavated which are sufficiently deep to penetrate the less permeable strata.
  • 20. RECHARGE PIT RECHARGE SHAFT • Recharge shaft is similar to the recharge pits, but the cross sectional size of the recharge shaft is much lesser than the recharge pits. • Like the recharge pits, recharge shafts are also used to recharge water to unconfined aquifer whose water table is deep below the land surface and a poorly impermeable strata exist at the surface level.
  • 22. INDUCED RECHARGE • Water is pumped from the aquifer hydraulically connected to the surface water sources like stream, river or lake. • Due to pumping, a reverse gradient is formed and water from the surface water source enters into the aquifer and thus the aquifer is recharged.
  • 23. • This method is good, especially when quality of the surface water is poor. • The filtration of surface water through soil strata removes the impurities of the water. • Thus the quality of the water receives in the wells is much better than the surface water. Contd…
  • 24. AQUIFER MODIFICATION METHOD • This is used to change aquifer characteristics so it can store more water and transmit more water . After application of it more recharge take place under natural as well as artificial condition.
  • 25. TYPES OF AQUIFER MODIFICATION METHODS BORE BLASTING HYDRO-FRACTURING JACKET WELL TECHNIQUE PRESSURE INJECTION GROUTING STREAM BLASTING
  • 26. 1.BORE BLASTING METHOD • This method is used to increase the fracture porosity of an aquifer. • Shallow bore wells are drilled in the area where fracture porosity of the aquifer is planned to increase. • These bore holes are blasted with the help of explosive which creates fracture porosity in the aquifer
  • 27. 2.HYDRO-FRACTURING METHOD • Hydro-fracturing is used to improve the yield of a bore well. • In this technique, water is injected at a very high pressure to widening the existing fracture of the rock. • The high pressure injection of water also helps in removing of clogging, creates interconnection between the fractures, and extends the existing length of the old fracture. • The high pressure injection also creates new fracture in the rock strata. As a result of these, the water storing and transmitting capacity of the strata increases.
  • 28. 3. PRESSURE INJECTION GROUTING • This technique is used to control the outflow from an aquifer. • Cement slurry is injected into the aquifer using mechanical means or manually near to the aquifer outlet like spring, etc. • The injection of cement slurry helps in reducing the fracture porosity of the aquifer near the outlet which will eventually reduce the outflow from the aquifer.
  • 29. 4. JACKET WELL TECHNIQUES • Jacket well technique is used to increase the yield of a dug well. • In this method, the effective diameter of the well is increased by drilling small diameter bores around the well in a circular pattern.
  • 30. 5. STREAM BLASTING • Blasting and widening cracks near the streams and joining them to the lineament or aquifer so that the water retention capacity of rises along the banks of the stream.
  • 31. ADVANTAGES • To enhance the ground water yield in depleted the aquifer due to urbanization. • Conservation and storage of excess surface water for future requirements. • To improve the quality of existing ground water through dilution. • To remove bacteriological & other impurities from sewage and waste water by natural filtration, so that water is suitable for re-use.