RESOURCE ALLOCATION
    By: Kemuel Bryan G. Luciaja
Resource


  An economic or productive factor required to
accomplish an activity, or as means to undertake
an enterprise and achieve desired outcome.
The Three Most Basic Resources
Land
Includes all natural resources (“gifts of nature”) used in the
production process, such as arable land, forests, mineral and oil
deposits, and water resources.

Labor
Consists of the physical and mental talents of individuals used in
producing goods and services.

Capital
Refers not to money but to tools, machinery, and
other productive equipment.
Other Resources


•Energy
•Entrepreneurship
•Information
•Expertise
•Management
•Time
Resources in Project Management

anything used up to execute the project

•Budget
•People
•Technology
•Time
•Space
•Tools
•Equipment
•and etc.
Resource Allocation

Resource allocation is used to assign the available
resources in an economic way.

In project management, resource allocation is the
scheduling of activities and the resources required
by those activities while taking into consideration
both the resource availability and the project time.
Resource Allocation Plan


1.Basic Allocation Decision


2.Contingency mechanisms
1. Basic allocation decision

• The choice of which items to fund in the plan
• What level of funding it should receive
• Which to leave unfunded
• The resources are allocated to some items, not to
others
2. Contingency mechanisms

A.There is a priority ranking of items excluded from the
plan, showing which items to fund if more resources should
become available.


B.There is a priority ranking of some items included in the
plan, showing which items should be sacrificed if total
funding must be reduced.
Example of Resource Allocation for Jobs

                      Assume that the active resource
                      plan is called “Night Plan”.

                      3 Job classes:
                      DW Consumer Group
                      OLTP Consumer Group
                      Other Consumer Group
Resource leveling

A project management technique used to examine
unbalanced use of resources (usually people or equipment)
over time, and for resolving over-allocations or conflicts.

Leveling resources involves redistributing an imbalance of
allocated work. It assists project team members by keeping
them from becoming overwhelmed, working overtime, or
running into project burnout.
Resource leveling

           If DW Consumer Group do not
           fully use the allocated 60%, the
           unused portion is available for use
           by jobs in OLTP and Other
           Consumer Group.
Resource leveling
The Two Key Elements of Resource Leveling:

1. As the main aim of resource leveling is to allocate resource
   efficiently, so that the project can be completed in the given time
   period. Hence, resource leveling can be broken down into two main
   areas; projects that can be completed by using up all resources
   which are available and projects that can be completed with limited
   resources.
2. Projects which use limited resources can be extended for over a
   period of time until the resources required are available. If then
   again, the number of projects that an organization undertakes
   exceeds the resources available. Then it's wiser to postpone the
   project for a later date.
Resource Over-allocation

Over-allocation of a resource is when a resource
has been assigned more work than can be
completed during normal work hours. Resource
allocation often leads to overtime and
overspending on financial resources.
Techniques for Avoiding Resource Overload

1.   Resource Leveling
2.   Prioritize Projects
3.   Linking Tasks
4.   Leaving Breathing Room
5.   Avoid the “Putting out fires” approach to project
     management
Techniques for Avoiding Resource Overload

1. Resource Leveling
            In this method, the project manager
   can either level resources by hand
   (complicated, but perhaps more sound) or use a
   software program such as Microsoft Project to
   level resources for you.
Techniques for Avoiding Resource Overload

2. Prioritize Projects
             By prioritizing projects, when a
   resource allocation overload is apparent or a
   task conflict exists, it can be resolved without
   piling pressure on the individual or team (or
   requiring the individual or team to put in a
   couple twelve-hour days).
Techniques for Avoiding Resource Overload

3. Linking Tasks
            Linking tasks is more of a logistical
   solution. If the resource has been assigned to
   research the markets for project A and project
   B, these tasks could be linked. In this manner,
   when it appears that a resource has been over-
   allocated, really the tasks are similar enough to
   count for two projects. By linking these tasks
   from the different projects, the problem can be
   resolved.
Techniques for Avoiding Resource Overload

4. Leaving Breathing Room
             When scheduling the project, it is vital
   to leave breathing room between tasks.
   However, it is important to not under-allocate
   resources as this could lead to a loss of budget
   monies meaning resource allocations problems
   will affect your project's health. A fine balance
   must be achieved between breathing room and
   not moving forward quickly enough.
Techniques for Avoiding Resource Overload

5. Avoid the “Putting out fires” approach to project
   management
              If your team is consistently putting out
   fires, it makes it difficult to focus on the project.
   Moreover, by putting out fires, the team
   becomes knee-deep in ash, while project tasks
   pile up. This is where project management
   techniques such as Scrum come in handy.
Thank you!

Más contenido relacionado

La actualidad más candente

Project management & Network analysis
Project management & Network analysisProject management & Network analysis
Project management & Network analysis
Harinadh Karimikonda
 

La actualidad más candente (20)

Project identification
Project identificationProject identification
Project identification
 
Project management & Network analysis
Project management & Network analysisProject management & Network analysis
Project management & Network analysis
 
Resource Planning
Resource PlanningResource Planning
Resource Planning
 
crashing of project
crashing of project crashing of project
crashing of project
 
Project planning
Project planning Project planning
Project planning
 
project management concepts
project management conceptsproject management concepts
project management concepts
 
Budgeting
BudgetingBudgeting
Budgeting
 
Project Implementation
Project ImplementationProject Implementation
Project Implementation
 
Project management PPT
Project management  PPTProject management  PPT
Project management PPT
 
Network Problem CPM & PERT
Network Problem CPM &  PERTNetwork Problem CPM &  PERT
Network Problem CPM & PERT
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
 
6.5 Resource Leveling and Resource Smoothing
6.5 Resource Leveling and Resource Smoothing6.5 Resource Leveling and Resource Smoothing
6.5 Resource Leveling and Resource Smoothing
 
Sources of project financing
Sources of project financingSources of project financing
Sources of project financing
 
Project implimentation
Project implimentationProject implimentation
Project implimentation
 
Critical path method
Critical path methodCritical path method
Critical path method
 
Difference between PERT and CPM
Difference between PERT and CPMDifference between PERT and CPM
Difference between PERT and CPM
 
Demand forecasting
Demand forecastingDemand forecasting
Demand forecasting
 
PROJECT PLANNING AND MANAGEMENT
PROJECT PLANNING AND MANAGEMENTPROJECT PLANNING AND MANAGEMENT
PROJECT PLANNING AND MANAGEMENT
 
Project Planning
Project PlanningProject Planning
Project Planning
 
Matrix organization
Matrix organizationMatrix organization
Matrix organization
 

Destacado

Chapter 7 strategic management
Chapter 7 strategic management Chapter 7 strategic management
Chapter 7 strategic management
Kalsoom Fatima
 
Resource Scheduling
Resource SchedulingResource Scheduling
Resource Scheduling
Nicola2903
 
Planning, scheduling and resource allocation
Planning, scheduling and resource allocationPlanning, scheduling and resource allocation
Planning, scheduling and resource allocation
Jatin Mandhyan
 
Techniques of Strategic Evaluation & Strategic
Techniques of Strategic Evaluation & Strategic Techniques of Strategic Evaluation & Strategic
Techniques of Strategic Evaluation & Strategic
Manik Kudyar
 
Strategic control
Strategic controlStrategic control
Strategic control
nitinsoni02
 

Destacado (19)

10 Lessons for New Managers
10 Lessons for New Managers10 Lessons for New Managers
10 Lessons for New Managers
 
Chapter 7 strategic management
Chapter 7 strategic management Chapter 7 strategic management
Chapter 7 strategic management
 
Different levels of strategy
Different levels of strategyDifferent levels of strategy
Different levels of strategy
 
A Survey on Resource Allocation & Monitoring in Cloud Computing
A Survey on Resource Allocation & Monitoring in Cloud ComputingA Survey on Resource Allocation & Monitoring in Cloud Computing
A Survey on Resource Allocation & Monitoring in Cloud Computing
 
Production scheduling
Production schedulingProduction scheduling
Production scheduling
 
How To Create Strategic Marketing Plan
How To Create Strategic Marketing PlanHow To Create Strategic Marketing Plan
How To Create Strategic Marketing Plan
 
Dynamic Resource Allocation Using Virtual Machines for Cloud Computing Enviro...
Dynamic Resource Allocation Using Virtual Machines for Cloud Computing Enviro...Dynamic Resource Allocation Using Virtual Machines for Cloud Computing Enviro...
Dynamic Resource Allocation Using Virtual Machines for Cloud Computing Enviro...
 
Resource planning and resource allocation
Resource planning and resource allocationResource planning and resource allocation
Resource planning and resource allocation
 
Resource Scheduling
Resource SchedulingResource Scheduling
Resource Scheduling
 
Planning, scheduling and resource allocation
Planning, scheduling and resource allocationPlanning, scheduling and resource allocation
Planning, scheduling and resource allocation
 
Spm unit 5
Spm unit 5Spm unit 5
Spm unit 5
 
Spm unit 4
Spm unit 4Spm unit 4
Spm unit 4
 
Spm unit 3
Spm unit 3Spm unit 3
Spm unit 3
 
Strategic control
Strategic controlStrategic control
Strategic control
 
Functional level strategies
Functional level strategiesFunctional level strategies
Functional level strategies
 
Strategy and Resource Allocation
Strategy and Resource Allocation Strategy and Resource Allocation
Strategy and Resource Allocation
 
Techniques of Strategic Evaluation & Strategic
Techniques of Strategic Evaluation & Strategic Techniques of Strategic Evaluation & Strategic
Techniques of Strategic Evaluation & Strategic
 
Strategic control
Strategic controlStrategic control
Strategic control
 
Slideshare ppt
Slideshare pptSlideshare ppt
Slideshare ppt
 

Similar a Resource allocation

Wbs & Project Scheduling
Wbs & Project SchedulingWbs & Project Scheduling
Wbs & Project Scheduling
sslovepk
 
Resource Optimization of Construction Project Using Primavera P6
Resource Optimization of Construction Project Using Primavera P6Resource Optimization of Construction Project Using Primavera P6
Resource Optimization of Construction Project Using Primavera P6
IOSRJMCE
 
Savvy PMOs Guide to Resource Planning EB945LTREN.pdf
Savvy PMOs Guide to Resource Planning EB945LTREN.pdfSavvy PMOs Guide to Resource Planning EB945LTREN.pdf
Savvy PMOs Guide to Resource Planning EB945LTREN.pdf
Alisa Smith
 

Similar a Resource allocation (20)

Resource Allocation In Software Project Management
Resource Allocation In Software Project ManagementResource Allocation In Software Project Management
Resource Allocation In Software Project Management
 
RESOURCE_MANAGEMENT_pptx.pptx
RESOURCE_MANAGEMENT_pptx.pptxRESOURCE_MANAGEMENT_pptx.pptx
RESOURCE_MANAGEMENT_pptx.pptx
 
The Ultimate Guide To Project Resources Management
The Ultimate Guide To Project Resources ManagementThe Ultimate Guide To Project Resources Management
The Ultimate Guide To Project Resources Management
 
PMSE_seminar3.pptx
PMSE_seminar3.pptxPMSE_seminar3.pptx
PMSE_seminar3.pptx
 
Ch6 resources
Ch6 resourcesCh6 resources
Ch6 resources
 
Wbs & Project Scheduling
Wbs & Project SchedulingWbs & Project Scheduling
Wbs & Project Scheduling
 
Top 10 Reasons- Why You Need Effective Resource Allocation
Top 10 Reasons- Why You Need Effective Resource AllocationTop 10 Reasons- Why You Need Effective Resource Allocation
Top 10 Reasons- Why You Need Effective Resource Allocation
 
Resource Optimization of Construction Project Using Primavera P6
Resource Optimization of Construction Project Using Primavera P6Resource Optimization of Construction Project Using Primavera P6
Resource Optimization of Construction Project Using Primavera P6
 
Best Project Scheduling Techniques.
Best Project Scheduling Techniques.Best Project Scheduling Techniques.
Best Project Scheduling Techniques.
 
Savvy PMOs Guide to Resource Planning EB945LTREN.pdf
Savvy PMOs Guide to Resource Planning EB945LTREN.pdfSavvy PMOs Guide to Resource Planning EB945LTREN.pdf
Savvy PMOs Guide to Resource Planning EB945LTREN.pdf
 
7 qualities of an effective resource management system
7 qualities of an effective resource management system7 qualities of an effective resource management system
7 qualities of an effective resource management system
 
PM Session 6
PM Session 6PM Session 6
PM Session 6
 
PROJECT PLANNING METHODOLOGIES.pdf
PROJECT  PLANNING METHODOLOGIES.pdfPROJECT  PLANNING METHODOLOGIES.pdf
PROJECT PLANNING METHODOLOGIES.pdf
 
Critical chain - Eliyahu goldratt
Critical chain - Eliyahu goldrattCritical chain - Eliyahu goldratt
Critical chain - Eliyahu goldratt
 
Project Resource Allocation
Project Resource AllocationProject Resource Allocation
Project Resource Allocation
 
Estimating time and cost resoures
Estimating time and cost resouresEstimating time and cost resoures
Estimating time and cost resoures
 
SPM Resource Management
SPM Resource ManagementSPM Resource Management
SPM Resource Management
 
SPM Resource Management
SPM Resource ManagementSPM Resource Management
SPM Resource Management
 
SPM Resource Management
SPM Resource ManagementSPM Resource Management
SPM Resource Management
 
Project management and Success Criteria
Project management and Success Criteria Project management and Success Criteria
Project management and Success Criteria
 

Último

Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in OmanMifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
instagramfab782445
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
allensay1
 
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
DUBAI (+971)581248768 BUY ABORTION PILLS IN ABU dhabi...Qatar
 

Último (20)

Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Falcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow ChallengesFalcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow Challenges
 
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdfTVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
New 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateNew 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck Template
 
Over the Top (OTT) Market Size & Growth Outlook 2024-2030
Over the Top (OTT) Market Size & Growth Outlook 2024-2030Over the Top (OTT) Market Size & Growth Outlook 2024-2030
Over the Top (OTT) Market Size & Growth Outlook 2024-2030
 
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in OmanMifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptx
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
 
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
 
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGParadip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Cracking the 'Career Pathing' Slideshare
Cracking the 'Career Pathing' SlideshareCracking the 'Career Pathing' Slideshare
Cracking the 'Career Pathing' Slideshare
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAIGetting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
 

Resource allocation

  • 1. RESOURCE ALLOCATION By: Kemuel Bryan G. Luciaja
  • 2. Resource An economic or productive factor required to accomplish an activity, or as means to undertake an enterprise and achieve desired outcome.
  • 3. The Three Most Basic Resources Land Includes all natural resources (“gifts of nature”) used in the production process, such as arable land, forests, mineral and oil deposits, and water resources. Labor Consists of the physical and mental talents of individuals used in producing goods and services. Capital Refers not to money but to tools, machinery, and other productive equipment.
  • 5. Resources in Project Management anything used up to execute the project •Budget •People •Technology •Time •Space •Tools •Equipment •and etc.
  • 6. Resource Allocation Resource allocation is used to assign the available resources in an economic way. In project management, resource allocation is the scheduling of activities and the resources required by those activities while taking into consideration both the resource availability and the project time.
  • 7. Resource Allocation Plan 1.Basic Allocation Decision 2.Contingency mechanisms
  • 8. 1. Basic allocation decision • The choice of which items to fund in the plan • What level of funding it should receive • Which to leave unfunded • The resources are allocated to some items, not to others
  • 9. 2. Contingency mechanisms A.There is a priority ranking of items excluded from the plan, showing which items to fund if more resources should become available. B.There is a priority ranking of some items included in the plan, showing which items should be sacrificed if total funding must be reduced.
  • 10. Example of Resource Allocation for Jobs Assume that the active resource plan is called “Night Plan”. 3 Job classes: DW Consumer Group OLTP Consumer Group Other Consumer Group
  • 11. Resource leveling A project management technique used to examine unbalanced use of resources (usually people or equipment) over time, and for resolving over-allocations or conflicts. Leveling resources involves redistributing an imbalance of allocated work. It assists project team members by keeping them from becoming overwhelmed, working overtime, or running into project burnout.
  • 12. Resource leveling If DW Consumer Group do not fully use the allocated 60%, the unused portion is available for use by jobs in OLTP and Other Consumer Group.
  • 13. Resource leveling The Two Key Elements of Resource Leveling: 1. As the main aim of resource leveling is to allocate resource efficiently, so that the project can be completed in the given time period. Hence, resource leveling can be broken down into two main areas; projects that can be completed by using up all resources which are available and projects that can be completed with limited resources. 2. Projects which use limited resources can be extended for over a period of time until the resources required are available. If then again, the number of projects that an organization undertakes exceeds the resources available. Then it's wiser to postpone the project for a later date.
  • 14. Resource Over-allocation Over-allocation of a resource is when a resource has been assigned more work than can be completed during normal work hours. Resource allocation often leads to overtime and overspending on financial resources.
  • 15. Techniques for Avoiding Resource Overload 1. Resource Leveling 2. Prioritize Projects 3. Linking Tasks 4. Leaving Breathing Room 5. Avoid the “Putting out fires” approach to project management
  • 16. Techniques for Avoiding Resource Overload 1. Resource Leveling In this method, the project manager can either level resources by hand (complicated, but perhaps more sound) or use a software program such as Microsoft Project to level resources for you.
  • 17. Techniques for Avoiding Resource Overload 2. Prioritize Projects By prioritizing projects, when a resource allocation overload is apparent or a task conflict exists, it can be resolved without piling pressure on the individual or team (or requiring the individual or team to put in a couple twelve-hour days).
  • 18. Techniques for Avoiding Resource Overload 3. Linking Tasks Linking tasks is more of a logistical solution. If the resource has been assigned to research the markets for project A and project B, these tasks could be linked. In this manner, when it appears that a resource has been over- allocated, really the tasks are similar enough to count for two projects. By linking these tasks from the different projects, the problem can be resolved.
  • 19. Techniques for Avoiding Resource Overload 4. Leaving Breathing Room When scheduling the project, it is vital to leave breathing room between tasks. However, it is important to not under-allocate resources as this could lead to a loss of budget monies meaning resource allocations problems will affect your project's health. A fine balance must be achieved between breathing room and not moving forward quickly enough.
  • 20. Techniques for Avoiding Resource Overload 5. Avoid the “Putting out fires” approach to project management If your team is consistently putting out fires, it makes it difficult to focus on the project. Moreover, by putting out fires, the team becomes knee-deep in ash, while project tasks pile up. This is where project management techniques such as Scrum come in handy.