INDUSTRIAL TRAINING REPORT 
Done by 
KIRAN SURESH 
Roll No.:1154500010 
At 
Simplex Infrastructures Ltd. 
SIMPLEX HOUSE, 27 SHAKESPEARE SARANI, 
KOLKATA-700017
Submitted to 
Jahangirabad Institute of technology 
Department of Civil Engineering
Acknowledgement 
It is always a pleasure to remind the fine people in the Engineering program for their 
sincere guidance I received to uphold my practical as well as theoretical skills in 
engineering. 
Firstly I would like to thank MR MD RAFIQUE KHWAJA (Director of 
JIT) for meticulously planning academic curriculum in such a way that students are not 
only academically sound but also industry ready by including such industrial training 
patterns. 
I express my immense pleasure and deep sense of gratitude to 
MR. RAVI RAWAT (HOD CIVIL) for his guidness and others with me and also helped me 
in completion of task. 
Finally, I would also like to thanks MR Subrata Kundu (Site- In charge)for giving me 
this opportunity and guiding me during the course of the training.
CONTENTS 
Introduction 
Details of the Project 
Company Profile 
Details 
Formwork 
Diagrams 
plans 
Plant and machineries 
Quality control of site 
Site execution 
Safety 
Material management 
Conclusion
 INTRODUCTION 
 We have been assigned GODREJ PRAKRITI HOUSING COMPLES III 
construction sites for field study by the company.14,78,600sq ft. 
residential project located in Godrej PrakritI,Girja More, B.T. 
Road,Sodepur, Kolkata-700115 .This is a 39 month project with a 
total value of 274 crores.In our phase named GODREJ PRAKRITI, 
Phase III 
 There are 8 number of residential towers being constructed in 
this namely K, M, N, O, P, Q, R and G blocks.R, O and N blocks 
are of floor area 880 sq. meter each consisting of 
(B+G+19) 
 K, P and Q blocks are of floor area 872 sq. meter each consisting 
of (B+G+19) 
 M block of floor area 731 sq. meter and consists of (B+G+4). 
 G block of floor area 870 sq. meter and consists of (G+19).
 DETAILS OF THE PROJECT 
ABOUT THE PROJECT: 
• .GODREJ PRAKRITI, Phase III 
• There are 8 number of residential towers being constructed in this 
namely K, M, N, O, P, Q, R and G blocks. 
• R, O and N blocks are of floor area 880 sq. meter each consisting 
of (B+G+19) 
• K, P and Q blocks are of floor area 872 sq. meter each consisting of 
(B+G+19) 
• M block of floor area 731 sq. meter and consists of (B+G+4). 
• G block of floor area 870 sq. meter and 
consists of (G+19). 
• Number of Flats : 1210 
• Type of Contract : Lump Sum Contract
 COMPANY PROFILE: 
 Company is an ISO family since 2004. 
 Introduced cast in situ driven piles in India. 
 An ISO 9001:2008 approved company certified by Bureau of Indian 
Standards. 
 Employs 8110 people and has Capital Equipment of Rs.1296 Corers 
as of FY, 10. 
 Ranked 7th among “India’s Top 10 Infrastructures Companies” by 
Construction 
 Week. 
 Recognized by World Confederation of Businesses as “Inspirational 
Company 
 with all its Rights & Privileges” in 2010. 
 Awarded by International BID Quality Summit, New York the 
“International Quality Summit Award in Gold Category” for 
achievement in Quality & Excellence in 2009. 
 Major construction works taken up by company in India and abroad 
are Industrial construction, Infrastructures, Power Plants, Fly-overs etc. 
 Has many office branches in India and abroad.
 DETAILS OF FIELD STUDY 
DETAILS OF STRUCTURE 
 Work Progress - 7th floor 
 Floor Area 872 sq. 
meter 
 No. of floors - B+G+19 
 No. of staircase - 2 
 No. of lift - 3 
 Per floor 8 nos. of flat 
P Block
P Block General Plan
O BLOCK 
 Work Progress - 12th floor 
 Floor Area 880 sq. 
meter 
 No. of floors - B+G+19 
 No. of staircase - 2 
 No. of lift – 3 (2 for 
general and 1 for 
emergency and freight) 
 Per floor 4 nos. of 2BHK, 
2nos. of 2.5 BHK & 4 nos. of 
3BHK
O BLOCK GENERAL PLAN
 Formwork 
• Purpose: 
Shuttering or formwork is the temporary arrangement by 
wood/steel/ply to hold concrete in required shape and size 
up to certain period for gaining adequate strength of the 
concrete. Shuttering mainly costs 25-40% of the total cost of 
the project. The Shuttering and Formwork is often similarly 
used but there is a little difference in it in terms of materials 
to be used. In shuttering generally plywood is used by in the 
case of Formwork heavier sections like battens, Waller are 
used.
Material Used: 
 Steel plate and channel 
 Battens (75mm X 100mm and 50mm X 75mm) 
 Plywood of different thickness(Generally Film Face Ply of 2440mmX1220 mm 
cross sections are available) 
 Soft pine Runner 
 Hard Wood Runner 
 MS Wailer 
 MS Channel 
 Acrow Span 
 Vertical adjustable prop 
 Cup lock System( length- 0.5m to 3.5m available) 
 H-frame 
 Clamps 
 Wing Nut 
 Base Plate 
 Sole Plate 
 Tie Rod 
 Nail 
 Binding Wire (18-22 gauge dia. bar used in site)
Principal Apparatus Used: 
 Hammer 
 Crow-bar 
 Crane 
 Plum Bob 
 Measuring Tape 
 Right Angle 
 Rope 
PPE to be used: 
 Head Gear 
 Safety Shoe 
 Safety Harness 
 Hand Gloves 
 Apron 
 Goggles 
 Nose Mask 
 Life line to be placed in case of working in sufficiently higher level from 
ground 
 Safety nets are to be provided at levels where upper floors are engaged for 
work to safeguard any material falling from height and hence protects the worker 
working at ground.
 SOME DIAGRAMS OF FRAME WORK 
Fig: Formwork of a Typical 
Staircase 
Fig: Formwork of a Shear-wall 
(Sideview)
. 
Formwork of a Column(Isometric 
view) 
: Formwork Junction of two 
Shearwall
. 
Formwork of a column (Plan) Formwork Junction of two Shearwall
Formwork of a column (Plan) Formwork
. 
Formwork of a beam Formwork of a Slab
Cover provided to Reinforcement: 
Clear Cover 
Beams 25mm 
Columns 40mm 
Floor/Roof Slab 20mm 
Wall 25mm 
Pile 50mm 
Pile Cap bottom 75mm 
Member/Structure 50mm 
End of reinforcement bar 25mm or twice the diameter of bar whichever 
is grater
DETAILS OF FORMWORK OF A 
COLUMN
 General plan of a Pile Cap 
a 
b 
General plan of a Pile Cap
Measurement of the Quantities for 
the Pile Cap (6BP1)
 R.C Detail of Plan
Section 2-2
Est ima t ion of Pil e Ca p(MKD.:-6BP1) 
Sl. No. 
Description of 
Item 
Length(m) Width(m) Depth(m) 
Estimated 
Quantity 
Unit 
1 Excavation 4.8 3.3 1.1 17.424 m3 
_ 
2 BFS 4.3 2.8 
12.04 m2 
3 PCC 4.3 2.8 0.075 0.903 m3 
4 RCC 3.8 2.3 0.95 8.303 m3 
5 Shuttering 3.8 2.3 0.96 11.59 m2 
Formulas to Determine Quantities of Various Works for a Pile Cap 
1. Excavation = [(a + 2x0.5) x (b + 2x0.5) x (d + 0.15 – 0.25)] m^3 
2. Brick Flat Soling (BFS) = [(a + 0.25x2) x (b + 0.25x2)] m2 
3. Plain Cement Concrete (PCC) = [(a + 0.25x2) x (b + 0.25x2) x 0.075] m3 
4. Reinforced Cement Concrete (RCC) = [a x b x (d – 0.25)] m3 
5. Shuttering = [(a + b) x 2 x (d – 0.25)] m2 
6. Bar bending schedule (BBS).
 Bar Bending schedule 
A 
C 
B 
Theoretical Bending of a Bar 
C= are length, C= (b-B)+(a-A)-2D 
D= Diam 
b
Sl. 
No 
Bar Mark Size/ Shape 
Diameter (mm) 
d 
No 
Length(mm) 
(a+2b) 
Cutting Length (mm) 
(a+2b-2*2d) 
Total 
Length(m) 
Unit Wt. 
(kg/m) 
Total 
Weight(ton) 
1 T/T 
a=2144 
b=300 
12 26 2744 2696 70.096 0.8928 0.06258 
2 B/T 
a=3644 
b=300 
12 16 4244 4196 67.136 0.8928 0.05994 
3 T/B 
a=3676 
b=1059 
16 16 5794 5730 91.68 1.5872 0.14551 
4 B/B 
a=2176 
b=1075 
16 26 4326 4262 110.812 1.5872 0.17588 
5 Skin Bar a=2200 
b=2150 
12 6 6500 6452 38.712 0.8928 0.03456
 PLANT AND MACHINERIES: 
Serial No Machineries Company Name Capacity 
1 Batching Plant SchwingStetter 30m3/hr 
2 Transit Mixture Tata, Ashok Leyland 6m3 
3 Concrete Pump Schwing Stetter 50m3/hr 
4 Hydra ACE 11tons 
5 Backhoe Loader JCB 1m3 
6 Bar Cutting Machine Jaymac, Jaypee C-42 
7 Bar Bending Machine Jaymac, Jaypee B-42 
8 Electric Vibrator -------- 2HP
. 
Fig: Bar Cutting Machine Fig: Hydra (Acer-Hyno)
Capacity of Bar bending machine Bar Bending Machine Transit Mixer receiving concrete 
Bucket of batching plant 
Scrapper in the Batching 
plant 
Concrete Batching plant
Automated control 
machine of Batching Plan 
Tower Crane Concrete pouring Bucket 
Concrete Pump( receives concrete 
from mixer) 
Passenger Hoist Winching Machine
 Quality control at site: 
1. Quality Testing of Materials: The materials is mainly cement, fine aggregate, coarse 
aggregate, water, admixtures, concrete and reinforcement bars. These materials are tested in 
the quality control laboratory by following their test specifications according to their respective 
IS Codes. 
2. Quality Assurance: The test results of respective materials are obtained and checked whether 
they lie within their acceptance limits specified codes. Then they are assured. 
1. Cement (IS 4031) 
Determination of Normal Consistency. 
,, ,, Initial and Final Setting time. 
,, ,, Fineness of Cement. 
,, ,, Compressive Strength Test. 
IS SPECIFICATIONS: 
Initial Setting time: Should not be less than 30 minutes. 
Final Setting time: < 600 minutes. 
Observation: Cement Brand used in Site: Konark 
Type of Cement : Portland Slag Cement 
Normal Consistency of cement: 36%
Water Content(%) Penetration(mm) 
30 12 
32 10 
34 8 
36 5 
Initial Setting Time: 140 minutes, Final Setting Time: 240 minutes. 
Fig - Test Set Up for Initial & Final Setting 
Time 
Test Set Up for Consistency
2) Coarse Aggregates (IS 2386) 
Sieve Analysis of Aggregates(10mm & 20mm). 
Aggregates Impact Value. 
Water Absorbption Test. 
Specific Gravity by Pycnometer. 
Pyconometer
3. Sand (IS- 383) 
Grading or Sieve Analysis of Sand 
Slit and clay content 
Sieve Analysis(For fine aggregate 
4. Concrete(IS-456) 
Compressive Strength test 
Workability test 
5. Brick 
Dimension check of bricks 
Compressive Strength Check of bricks 
Material:Brick, Cement Sand mortar. 
Apparatus: Compressive Strength testing 
machine 
Avg. Compressive Strength of Sample: 10.41 
N/mm^2
e: 10.41 N/mm^2 
SampleafterFailure(Sand filling is 
used) 
Sample before Failure 
Compressive Strength Testing Machine 
6. Steel (IS-1786) 
Rolling Margin test of Reinforcement Bar 
IS Specification: For 8¤-12¤- ±7% 
For12¤-20¤ - ±5% 
For above 20¤- ±3% 
Reading at Site: For 10mm dia. Bar unit weight= 
617gm/m run 
Brand name: Rashmi TMT 500+.
 SITE EXECUTION 
 Execution is the discipline of planning, organizing, motivating, and 
controlling resources to achieve specific goals at construction site as 
per the scheduled planning. A project is a temporary endeavour 
with a defined beginning and end 
Requirements: 
 Excavator 
 Rollers for Soil Compaction if any (Smooth Wheeled or 
Pneumatic or Sheep-foot) 
 Shovel, Spade & Bucket, 
 Auto Level or Total Station if available for knowing RL, 
 Measuring Staff 
 Measuring Tape
 SAFETY 
 Safety Personal Protective Equipments( PPE ): 
 In a particular site if personal safety is maintained by every personnel 
then the total accident in the site can be controlled. It is just acts like 
a pyramid, personal safety is in the base level so if it is controlled 
then other accidents can be controlled simultaneously.
Sl No. Description Picture 
1 
Safety Helmets are used to protect 
the head from falling materials in 
construction site. 
2 
Safety Shoes which give us 
protection on site, it has a steel plate to 
its tow and protect our feet up to an 
extent when a material sudden fails to 
our feet. It is a very important 
equipment in PPE. 
3 
Safety belt & Full body 
Harness is very useful in 
construction work, it used by labor 
when working at heights to reduce 
risk of falling particularly when they 
are in formwork placing or plastering 
of exterior parts. 
etc
Safety controlling at site 
Followings are some of the many precautionary/safety measures that are to be taken at a 
construction site – 
 Water spray on fly ash in order to prevent dust. 
 Saline water is to be provided to workmen during summer to avoid heat related 
illness. Proper rest is taken at intervals. 
 Personal Protective Equipment (PPE) is provided and worn by construction workers at 
site. PPE includes hard hats/helmets, Safety Shoes, Goggles, Masks, Gloves, etc. 
 Medical and First Aid facilities is there. 
 When working at heights, workers should wear double lanyard full body harness being 
anchored. Safety helmets, fall arrester, etc. are used. 
 Earth Leakage Circuit Breaker (ELCB) and Residual Current Circuit Breaker (RCCB) are 
used in electric installations to avoid electric shock. 
 Check for connection and body earthing of machineries. 
 Transporting Vehicles must not exceed the speed limits (usually 15 Km/h max) to avoid 
accidents by vehicles. For the same reason, use of mobile phones at site is minimized. 
 Employees are to remain at a safe distance from all equipment while it is operational. 
 Inspection of the equipment is done before every use. 
 Checking Fire Extinguishers. 
 Hygienic condition of labor hutment. 
 Checking drinking water test report. 
 Safety training program is in practice. 
 Safety Award for safety motivation is conducted. 
 Daily safety observation and correction is done.
 Materials Management 
 Profit Centre 
 With the process of liberalization and opening up of global economy, there 
has been a drastic change in the business environment, resulting in 
organization exposed to intense competition in the market place, Indian 
organizations have been working out various strategies to face the above 
challenges and to cut down operational cost to remain competitive. 
Progressive management have since recognized that materials 
management can provide opportunities to reduce operating cost and can 
be treated as a profit center. 
 On an average, half the sales income is spent on materials. Suppose a firm 
is spending 50% of its volume on materials and the profits are 10% of sales 
volume. A 2% reduction in materials cost will boost the profits to 11% of 
sales or the profits will be increased by 10%. To achieve the same increase 
in profit through sales efforts, a 10% increase in sales volume will be 
necessary. In other words, compared to sales volume, material cost has 
five times the average on profits. Organizations earn or loose large sums 
depending on how effective are their material management
 CONCLUSION 
 The training programme helped in gathering the practical work procedure 
alongside with furnishing the theoretical knowledge learnt till date. The 
programme was scheduled and comprised of five different sections – Safety, 
Planning, Billing, Quality Control and Site Execution. The importance of safe 
working, adopting safety measures and preparedness for any unknown sudden 
accidents at site were explained in the safety department. The work of the 
planning engineer and the procedure of a proper planning and scheduling of the 
construction work, these knowledge were shared in the planning department. 
Billing department enriched us with the financial knowledge, quantification of any 
work and their collaboration with the planning department. The purpose of the 
quality control department, continuous checking of the materials at the site and 
preparation of design mixes were taught. Finally all the gathered knowledge were 
practically viewed during site execution of different blocks. Shuttering procedure, 
different construction works, machineries and all the safety measures adopted 
were clearly explained. Apart from technical knowledge we were grateful enough 
for the engineers who shared their work experience with us. There are a lot of 
things which cannot be learnt from any books or institution but an exposure to 
such a construction site can only provide. Such construction site related essential 
terms & knowledge of work will help us throughout our work life
THANK YOU

Más contenido relacionado

La actualidad más candente

An industrial training report
An industrial training reportAn industrial training report
An industrial training reportborokinni
 
Construction Of Multistoreyed Building
Construction Of Multistoreyed BuildingConstruction Of Multistoreyed Building
Construction Of Multistoreyed BuildingSahla Fathima
 
Ppt summer presentation on finishing Of Police Station Construction Site
Ppt summer presentation on finishing Of Police Station Construction SitePpt summer presentation on finishing Of Police Station Construction Site
Ppt summer presentation on finishing Of Police Station Construction SiteAlok Mishra
 
Construction of residential building summer training ppt
 Construction of residential building summer training ppt Construction of residential building summer training ppt
Construction of residential building summer training pptSumit Singh
 
Construction of residential building
Construction of residential buildingConstruction of residential building
Construction of residential buildingSumit Singh
 
training report civil engg. 7th sem
training report civil engg. 7th semtraining report civil engg. 7th sem
training report civil engg. 7th semRajat kashv
 
Summer Internship Presentation of Building
Summer Internship Presentation of Building Summer Internship Presentation of Building
Summer Internship Presentation of Building Self-employed
 
Report on Residential Construction
Report on Residential ConstructionReport on Residential Construction
Report on Residential ConstructionMayank Walecha
 
RESIDENTIAL CONSTRUCTION BUILDING
RESIDENTIAL CONSTRUCTION BUILDING RESIDENTIAL CONSTRUCTION BUILDING
RESIDENTIAL CONSTRUCTION BUILDING Vikas Sukhwal
 
Industrial training seminar PPT
Industrial training seminar PPTIndustrial training seminar PPT
Industrial training seminar PPTAbhishek Makwana
 
Industrial project report ppt CIVIL ENGINEERING
Industrial project report ppt CIVIL ENGINEERINGIndustrial project report ppt CIVIL ENGINEERING
Industrial project report ppt CIVIL ENGINEERINGJAPJEETSINGH13
 
Different Types of Formwork Syetem Used within Indian Construction Industry
Different Types of Formwork Syetem Used within Indian Construction IndustryDifferent Types of Formwork Syetem Used within Indian Construction Industry
Different Types of Formwork Syetem Used within Indian Construction IndustryAbhishek Shah
 
Method statement for repair of concrete surface
Method statement for repair of concrete surfaceMethod statement for repair of concrete surface
Method statement for repair of concrete surfaceMinh Bui Si
 
CT3 1c aluminium formwork+
CT3 1c aluminium formwork+ CT3 1c aluminium formwork+
CT3 1c aluminium formwork+ Est
 
Building Technology 1
Building Technology 1Building Technology 1
Building Technology 1chongyih2
 
PROJECT ON Construction of a multistory building POWER POINT PRESENTATION
PROJECT ON Construction of a multistory building POWER POINT PRESENTATIONPROJECT ON Construction of a multistory building POWER POINT PRESENTATION
PROJECT ON Construction of a multistory building POWER POINT PRESENTATIONROHITASH ROJ
 
AN INTERNSHIP REPORT ON RESIDENTIAL BUILDING CONSTRUCTION
AN INTERNSHIP  REPORT  ON  RESIDENTIAL  BUILDING  CONSTRUCTIONAN INTERNSHIP  REPORT  ON  RESIDENTIAL  BUILDING  CONSTRUCTION
AN INTERNSHIP REPORT ON RESIDENTIAL BUILDING CONSTRUCTIONAbhishek Singh
 
Continuously reinforced concrete pavement seminar report by chandramohan lodha
Continuously reinforced concrete pavement seminar report by chandramohan lodhaContinuously reinforced concrete pavement seminar report by chandramohan lodha
Continuously reinforced concrete pavement seminar report by chandramohan lodhaChandra Mohan Lodha
 

La actualidad más candente (20)

An industrial training report
An industrial training reportAn industrial training report
An industrial training report
 
Construction Of Multistoreyed Building
Construction Of Multistoreyed BuildingConstruction Of Multistoreyed Building
Construction Of Multistoreyed Building
 
Ppt summer presentation on finishing Of Police Station Construction Site
Ppt summer presentation on finishing Of Police Station Construction SitePpt summer presentation on finishing Of Police Station Construction Site
Ppt summer presentation on finishing Of Police Station Construction Site
 
Construction of residential building summer training ppt
 Construction of residential building summer training ppt Construction of residential building summer training ppt
Construction of residential building summer training ppt
 
Construction of residential building
Construction of residential buildingConstruction of residential building
Construction of residential building
 
training report civil engg. 7th sem
training report civil engg. 7th semtraining report civil engg. 7th sem
training report civil engg. 7th sem
 
Summer Internship Presentation of Building
Summer Internship Presentation of Building Summer Internship Presentation of Building
Summer Internship Presentation of Building
 
Report on Residential Construction
Report on Residential ConstructionReport on Residential Construction
Report on Residential Construction
 
RESIDENTIAL CONSTRUCTION BUILDING
RESIDENTIAL CONSTRUCTION BUILDING RESIDENTIAL CONSTRUCTION BUILDING
RESIDENTIAL CONSTRUCTION BUILDING
 
Industrial training seminar PPT
Industrial training seminar PPTIndustrial training seminar PPT
Industrial training seminar PPT
 
Industrial project report ppt CIVIL ENGINEERING
Industrial project report ppt CIVIL ENGINEERINGIndustrial project report ppt CIVIL ENGINEERING
Industrial project report ppt CIVIL ENGINEERING
 
Different Types of Formwork Syetem Used within Indian Construction Industry
Different Types of Formwork Syetem Used within Indian Construction IndustryDifferent Types of Formwork Syetem Used within Indian Construction Industry
Different Types of Formwork Syetem Used within Indian Construction Industry
 
Car park bq
Car park bqCar park bq
Car park bq
 
Method statement for repair of concrete surface
Method statement for repair of concrete surfaceMethod statement for repair of concrete surface
Method statement for repair of concrete surface
 
CT3 1c aluminium formwork+
CT3 1c aluminium formwork+ CT3 1c aluminium formwork+
CT3 1c aluminium formwork+
 
Building Technology 1
Building Technology 1Building Technology 1
Building Technology 1
 
PROJECT ON Construction of a multistory building POWER POINT PRESENTATION
PROJECT ON Construction of a multistory building POWER POINT PRESENTATIONPROJECT ON Construction of a multistory building POWER POINT PRESENTATION
PROJECT ON Construction of a multistory building POWER POINT PRESENTATION
 
AN INTERNSHIP REPORT ON RESIDENTIAL BUILDING CONSTRUCTION
AN INTERNSHIP  REPORT  ON  RESIDENTIAL  BUILDING  CONSTRUCTIONAN INTERNSHIP  REPORT  ON  RESIDENTIAL  BUILDING  CONSTRUCTION
AN INTERNSHIP REPORT ON RESIDENTIAL BUILDING CONSTRUCTION
 
Boq sample
Boq sampleBoq sample
Boq sample
 
Continuously reinforced concrete pavement seminar report by chandramohan lodha
Continuously reinforced concrete pavement seminar report by chandramohan lodhaContinuously reinforced concrete pavement seminar report by chandramohan lodha
Continuously reinforced concrete pavement seminar report by chandramohan lodha
 

Similar a Industrial training report

IRJET- Design and Analysis of Residential Building
IRJET-  	  Design and Analysis of Residential BuildingIRJET-  	  Design and Analysis of Residential Building
IRJET- Design and Analysis of Residential BuildingIRJET Journal
 
Computer Aided Analysis and Design of Multi-Storeyed Building using Staad Pro
Computer Aided Analysis and Design of Multi-Storeyed Building using Staad ProComputer Aided Analysis and Design of Multi-Storeyed Building using Staad Pro
Computer Aided Analysis and Design of Multi-Storeyed Building using Staad ProIRJET Journal
 
IRJET- Study & Improvement of Design and Construction Methodology of Precast ...
IRJET- Study & Improvement of Design and Construction Methodology of Precast ...IRJET- Study & Improvement of Design and Construction Methodology of Precast ...
IRJET- Study & Improvement of Design and Construction Methodology of Precast ...IRJET Journal
 
Steel Bridge for a construction of highway bridge in Nepal
Steel Bridge for a construction of highway bridge in NepalSteel Bridge for a construction of highway bridge in Nepal
Steel Bridge for a construction of highway bridge in NepalPoudel Dinesh
 
IRJET- Design of the Support Structure for the Pipe Line System
IRJET- Design of the Support Structure for the Pipe Line SystemIRJET- Design of the Support Structure for the Pipe Line System
IRJET- Design of the Support Structure for the Pipe Line SystemIRJET Journal
 
Analysis and Design of Proposed Girls Hostel in JIT Campus, Davanagere
Analysis and Design of Proposed Girls Hostel in JIT Campus, DavanagereAnalysis and Design of Proposed Girls Hostel in JIT Campus, Davanagere
Analysis and Design of Proposed Girls Hostel in JIT Campus, DavanagereIRJET Journal
 
IRJET- Techno – Economic Study of Different Type of Slab
IRJET-  	  Techno – Economic Study of Different Type of SlabIRJET-  	  Techno – Economic Study of Different Type of Slab
IRJET- Techno – Economic Study of Different Type of SlabIRJET Journal
 
Design project of blood bank building
Design project of blood bank buildingDesign project of blood bank building
Design project of blood bank buildingmuthudeva
 
Analysis Of Earthquake Resistant Structure By Base Isolation Method
Analysis Of Earthquake Resistant Structure By Base Isolation MethodAnalysis Of Earthquake Resistant Structure By Base Isolation Method
Analysis Of Earthquake Resistant Structure By Base Isolation MethodIRJET Journal
 
A COMPARATIVE STUDY ON RIGID CONNECTION DESIGN OF FRAMED MULTI STOREYED STEEL...
A COMPARATIVE STUDY ON RIGID CONNECTION DESIGN OF FRAMED MULTI STOREYED STEEL...A COMPARATIVE STUDY ON RIGID CONNECTION DESIGN OF FRAMED MULTI STOREYED STEEL...
A COMPARATIVE STUDY ON RIGID CONNECTION DESIGN OF FRAMED MULTI STOREYED STEEL...IRJET Journal
 
IRJET- Structural Analysis and Design of Pump House
IRJET- Structural Analysis and Design of Pump HouseIRJET- Structural Analysis and Design of Pump House
IRJET- Structural Analysis and Design of Pump HouseIRJET Journal
 
IRJET- Design and Analysis of Progressive Die for Industrial Component Ta...
IRJET-  	  Design and Analysis of Progressive Die for Industrial Component Ta...IRJET-  	  Design and Analysis of Progressive Die for Industrial Component Ta...
IRJET- Design and Analysis of Progressive Die for Industrial Component Ta...IRJET Journal
 
Summer internship report
Summer internship reportSummer internship report
Summer internship reportVijay Kaushik
 
IRJET - Design and Analysis of Residential Institute Building
IRJET - Design and Analysis of Residential Institute BuildingIRJET - Design and Analysis of Residential Institute Building
IRJET - Design and Analysis of Residential Institute BuildingIRJET Journal
 
19R002-SDN-MJB-021-SUP-01.pdf
19R002-SDN-MJB-021-SUP-01.pdf19R002-SDN-MJB-021-SUP-01.pdf
19R002-SDN-MJB-021-SUP-01.pdfChandan Sharma
 
New Microsoft PowerPoint Presentation.pptx
New Microsoft PowerPoint Presentation.pptxNew Microsoft PowerPoint Presentation.pptx
New Microsoft PowerPoint Presentation.pptxRajeshKumar25548
 
Comparative Analysis of Conventional Steel Structure with Diagrid Structures ...
Comparative Analysis of Conventional Steel Structure with Diagrid Structures ...Comparative Analysis of Conventional Steel Structure with Diagrid Structures ...
Comparative Analysis of Conventional Steel Structure with Diagrid Structures ...IRJET Journal
 
IRJET- Design and Development of Modified Jig for Angular Drilling on Cylindr...
IRJET- Design and Development of Modified Jig for Angular Drilling on Cylindr...IRJET- Design and Development of Modified Jig for Angular Drilling on Cylindr...
IRJET- Design and Development of Modified Jig for Angular Drilling on Cylindr...IRJET Journal
 

Similar a Industrial training report (20)

IRJET- Design and Analysis of Residential Building
IRJET-  	  Design and Analysis of Residential BuildingIRJET-  	  Design and Analysis of Residential Building
IRJET- Design and Analysis of Residential Building
 
Computer Aided Analysis and Design of Multi-Storeyed Building using Staad Pro
Computer Aided Analysis and Design of Multi-Storeyed Building using Staad ProComputer Aided Analysis and Design of Multi-Storeyed Building using Staad Pro
Computer Aided Analysis and Design of Multi-Storeyed Building using Staad Pro
 
IRJET- Study & Improvement of Design and Construction Methodology of Precast ...
IRJET- Study & Improvement of Design and Construction Methodology of Precast ...IRJET- Study & Improvement of Design and Construction Methodology of Precast ...
IRJET- Study & Improvement of Design and Construction Methodology of Precast ...
 
Steel Bridge for a construction of highway bridge in Nepal
Steel Bridge for a construction of highway bridge in NepalSteel Bridge for a construction of highway bridge in Nepal
Steel Bridge for a construction of highway bridge in Nepal
 
IRJET- Design of the Support Structure for the Pipe Line System
IRJET- Design of the Support Structure for the Pipe Line SystemIRJET- Design of the Support Structure for the Pipe Line System
IRJET- Design of the Support Structure for the Pipe Line System
 
Analysis and Design of Proposed Girls Hostel in JIT Campus, Davanagere
Analysis and Design of Proposed Girls Hostel in JIT Campus, DavanagereAnalysis and Design of Proposed Girls Hostel in JIT Campus, Davanagere
Analysis and Design of Proposed Girls Hostel in JIT Campus, Davanagere
 
IRJET- Techno – Economic Study of Different Type of Slab
IRJET-  	  Techno – Economic Study of Different Type of SlabIRJET-  	  Techno – Economic Study of Different Type of Slab
IRJET- Techno – Economic Study of Different Type of Slab
 
Design project of blood bank building
Design project of blood bank buildingDesign project of blood bank building
Design project of blood bank building
 
Analysis Of Earthquake Resistant Structure By Base Isolation Method
Analysis Of Earthquake Resistant Structure By Base Isolation MethodAnalysis Of Earthquake Resistant Structure By Base Isolation Method
Analysis Of Earthquake Resistant Structure By Base Isolation Method
 
A COMPARATIVE STUDY ON RIGID CONNECTION DESIGN OF FRAMED MULTI STOREYED STEEL...
A COMPARATIVE STUDY ON RIGID CONNECTION DESIGN OF FRAMED MULTI STOREYED STEEL...A COMPARATIVE STUDY ON RIGID CONNECTION DESIGN OF FRAMED MULTI STOREYED STEEL...
A COMPARATIVE STUDY ON RIGID CONNECTION DESIGN OF FRAMED MULTI STOREYED STEEL...
 
IRJET- Structural Analysis and Design of Pump House
IRJET- Structural Analysis and Design of Pump HouseIRJET- Structural Analysis and Design of Pump House
IRJET- Structural Analysis and Design of Pump House
 
IRJET- Design and Analysis of Progressive Die for Industrial Component Ta...
IRJET-  	  Design and Analysis of Progressive Die for Industrial Component Ta...IRJET-  	  Design and Analysis of Progressive Die for Industrial Component Ta...
IRJET- Design and Analysis of Progressive Die for Industrial Component Ta...
 
Summer internship report
Summer internship reportSummer internship report
Summer internship report
 
IRJET - Design and Analysis of Residential Institute Building
IRJET - Design and Analysis of Residential Institute BuildingIRJET - Design and Analysis of Residential Institute Building
IRJET - Design and Analysis of Residential Institute Building
 
Connecting Bridge
Connecting BridgeConnecting Bridge
Connecting Bridge
 
19R002-SDN-MJB-021-SUP-01.pdf
19R002-SDN-MJB-021-SUP-01.pdf19R002-SDN-MJB-021-SUP-01.pdf
19R002-SDN-MJB-021-SUP-01.pdf
 
Truline Plastic Piling Specifications 2014
Truline Plastic Piling Specifications 2014Truline Plastic Piling Specifications 2014
Truline Plastic Piling Specifications 2014
 
New Microsoft PowerPoint Presentation.pptx
New Microsoft PowerPoint Presentation.pptxNew Microsoft PowerPoint Presentation.pptx
New Microsoft PowerPoint Presentation.pptx
 
Comparative Analysis of Conventional Steel Structure with Diagrid Structures ...
Comparative Analysis of Conventional Steel Structure with Diagrid Structures ...Comparative Analysis of Conventional Steel Structure with Diagrid Structures ...
Comparative Analysis of Conventional Steel Structure with Diagrid Structures ...
 
IRJET- Design and Development of Modified Jig for Angular Drilling on Cylindr...
IRJET- Design and Development of Modified Jig for Angular Drilling on Cylindr...IRJET- Design and Development of Modified Jig for Angular Drilling on Cylindr...
IRJET- Design and Development of Modified Jig for Angular Drilling on Cylindr...
 

Último

Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Christo Ananth
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01KreezheaRecto
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Standamitlee9823
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 

Último (20)

Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 

Industrial training report

  • 1. INDUSTRIAL TRAINING REPORT Done by KIRAN SURESH Roll No.:1154500010 At Simplex Infrastructures Ltd. SIMPLEX HOUSE, 27 SHAKESPEARE SARANI, KOLKATA-700017
  • 2. Submitted to Jahangirabad Institute of technology Department of Civil Engineering
  • 3. Acknowledgement It is always a pleasure to remind the fine people in the Engineering program for their sincere guidance I received to uphold my practical as well as theoretical skills in engineering. Firstly I would like to thank MR MD RAFIQUE KHWAJA (Director of JIT) for meticulously planning academic curriculum in such a way that students are not only academically sound but also industry ready by including such industrial training patterns. I express my immense pleasure and deep sense of gratitude to MR. RAVI RAWAT (HOD CIVIL) for his guidness and others with me and also helped me in completion of task. Finally, I would also like to thanks MR Subrata Kundu (Site- In charge)for giving me this opportunity and guiding me during the course of the training.
  • 4. CONTENTS Introduction Details of the Project Company Profile Details Formwork Diagrams plans Plant and machineries Quality control of site Site execution Safety Material management Conclusion
  • 5.  INTRODUCTION  We have been assigned GODREJ PRAKRITI HOUSING COMPLES III construction sites for field study by the company.14,78,600sq ft. residential project located in Godrej PrakritI,Girja More, B.T. Road,Sodepur, Kolkata-700115 .This is a 39 month project with a total value of 274 crores.In our phase named GODREJ PRAKRITI, Phase III  There are 8 number of residential towers being constructed in this namely K, M, N, O, P, Q, R and G blocks.R, O and N blocks are of floor area 880 sq. meter each consisting of (B+G+19)  K, P and Q blocks are of floor area 872 sq. meter each consisting of (B+G+19)  M block of floor area 731 sq. meter and consists of (B+G+4).  G block of floor area 870 sq. meter and consists of (G+19).
  • 6.  DETAILS OF THE PROJECT ABOUT THE PROJECT: • .GODREJ PRAKRITI, Phase III • There are 8 number of residential towers being constructed in this namely K, M, N, O, P, Q, R and G blocks. • R, O and N blocks are of floor area 880 sq. meter each consisting of (B+G+19) • K, P and Q blocks are of floor area 872 sq. meter each consisting of (B+G+19) • M block of floor area 731 sq. meter and consists of (B+G+4). • G block of floor area 870 sq. meter and consists of (G+19). • Number of Flats : 1210 • Type of Contract : Lump Sum Contract
  • 7.  COMPANY PROFILE:  Company is an ISO family since 2004.  Introduced cast in situ driven piles in India.  An ISO 9001:2008 approved company certified by Bureau of Indian Standards.  Employs 8110 people and has Capital Equipment of Rs.1296 Corers as of FY, 10.  Ranked 7th among “India’s Top 10 Infrastructures Companies” by Construction  Week.  Recognized by World Confederation of Businesses as “Inspirational Company  with all its Rights & Privileges” in 2010.  Awarded by International BID Quality Summit, New York the “International Quality Summit Award in Gold Category” for achievement in Quality & Excellence in 2009.  Major construction works taken up by company in India and abroad are Industrial construction, Infrastructures, Power Plants, Fly-overs etc.  Has many office branches in India and abroad.
  • 8.  DETAILS OF FIELD STUDY DETAILS OF STRUCTURE  Work Progress - 7th floor  Floor Area 872 sq. meter  No. of floors - B+G+19  No. of staircase - 2  No. of lift - 3  Per floor 8 nos. of flat P Block
  • 10. O BLOCK  Work Progress - 12th floor  Floor Area 880 sq. meter  No. of floors - B+G+19  No. of staircase - 2  No. of lift – 3 (2 for general and 1 for emergency and freight)  Per floor 4 nos. of 2BHK, 2nos. of 2.5 BHK & 4 nos. of 3BHK
  • 12.  Formwork • Purpose: Shuttering or formwork is the temporary arrangement by wood/steel/ply to hold concrete in required shape and size up to certain period for gaining adequate strength of the concrete. Shuttering mainly costs 25-40% of the total cost of the project. The Shuttering and Formwork is often similarly used but there is a little difference in it in terms of materials to be used. In shuttering generally plywood is used by in the case of Formwork heavier sections like battens, Waller are used.
  • 13. Material Used:  Steel plate and channel  Battens (75mm X 100mm and 50mm X 75mm)  Plywood of different thickness(Generally Film Face Ply of 2440mmX1220 mm cross sections are available)  Soft pine Runner  Hard Wood Runner  MS Wailer  MS Channel  Acrow Span  Vertical adjustable prop  Cup lock System( length- 0.5m to 3.5m available)  H-frame  Clamps  Wing Nut  Base Plate  Sole Plate  Tie Rod  Nail  Binding Wire (18-22 gauge dia. bar used in site)
  • 14. Principal Apparatus Used:  Hammer  Crow-bar  Crane  Plum Bob  Measuring Tape  Right Angle  Rope PPE to be used:  Head Gear  Safety Shoe  Safety Harness  Hand Gloves  Apron  Goggles  Nose Mask  Life line to be placed in case of working in sufficiently higher level from ground  Safety nets are to be provided at levels where upper floors are engaged for work to safeguard any material falling from height and hence protects the worker working at ground.
  • 15.  SOME DIAGRAMS OF FRAME WORK Fig: Formwork of a Typical Staircase Fig: Formwork of a Shear-wall (Sideview)
  • 16. . Formwork of a Column(Isometric view) : Formwork Junction of two Shearwall
  • 17. . Formwork of a column (Plan) Formwork Junction of two Shearwall
  • 18. Formwork of a column (Plan) Formwork
  • 19. . Formwork of a beam Formwork of a Slab
  • 20. Cover provided to Reinforcement: Clear Cover Beams 25mm Columns 40mm Floor/Roof Slab 20mm Wall 25mm Pile 50mm Pile Cap bottom 75mm Member/Structure 50mm End of reinforcement bar 25mm or twice the diameter of bar whichever is grater
  • 21. DETAILS OF FORMWORK OF A COLUMN
  • 22.  General plan of a Pile Cap a b General plan of a Pile Cap
  • 23. Measurement of the Quantities for the Pile Cap (6BP1)
  • 24.  R.C Detail of Plan
  • 26. Est ima t ion of Pil e Ca p(MKD.:-6BP1) Sl. No. Description of Item Length(m) Width(m) Depth(m) Estimated Quantity Unit 1 Excavation 4.8 3.3 1.1 17.424 m3 _ 2 BFS 4.3 2.8 12.04 m2 3 PCC 4.3 2.8 0.075 0.903 m3 4 RCC 3.8 2.3 0.95 8.303 m3 5 Shuttering 3.8 2.3 0.96 11.59 m2 Formulas to Determine Quantities of Various Works for a Pile Cap 1. Excavation = [(a + 2x0.5) x (b + 2x0.5) x (d + 0.15 – 0.25)] m^3 2. Brick Flat Soling (BFS) = [(a + 0.25x2) x (b + 0.25x2)] m2 3. Plain Cement Concrete (PCC) = [(a + 0.25x2) x (b + 0.25x2) x 0.075] m3 4. Reinforced Cement Concrete (RCC) = [a x b x (d – 0.25)] m3 5. Shuttering = [(a + b) x 2 x (d – 0.25)] m2 6. Bar bending schedule (BBS).
  • 27.  Bar Bending schedule A C B Theoretical Bending of a Bar C= are length, C= (b-B)+(a-A)-2D D= Diam b
  • 28. Sl. No Bar Mark Size/ Shape Diameter (mm) d No Length(mm) (a+2b) Cutting Length (mm) (a+2b-2*2d) Total Length(m) Unit Wt. (kg/m) Total Weight(ton) 1 T/T a=2144 b=300 12 26 2744 2696 70.096 0.8928 0.06258 2 B/T a=3644 b=300 12 16 4244 4196 67.136 0.8928 0.05994 3 T/B a=3676 b=1059 16 16 5794 5730 91.68 1.5872 0.14551 4 B/B a=2176 b=1075 16 26 4326 4262 110.812 1.5872 0.17588 5 Skin Bar a=2200 b=2150 12 6 6500 6452 38.712 0.8928 0.03456
  • 29.  PLANT AND MACHINERIES: Serial No Machineries Company Name Capacity 1 Batching Plant SchwingStetter 30m3/hr 2 Transit Mixture Tata, Ashok Leyland 6m3 3 Concrete Pump Schwing Stetter 50m3/hr 4 Hydra ACE 11tons 5 Backhoe Loader JCB 1m3 6 Bar Cutting Machine Jaymac, Jaypee C-42 7 Bar Bending Machine Jaymac, Jaypee B-42 8 Electric Vibrator -------- 2HP
  • 30. . Fig: Bar Cutting Machine Fig: Hydra (Acer-Hyno)
  • 31. Capacity of Bar bending machine Bar Bending Machine Transit Mixer receiving concrete Bucket of batching plant Scrapper in the Batching plant Concrete Batching plant
  • 32. Automated control machine of Batching Plan Tower Crane Concrete pouring Bucket Concrete Pump( receives concrete from mixer) Passenger Hoist Winching Machine
  • 33.  Quality control at site: 1. Quality Testing of Materials: The materials is mainly cement, fine aggregate, coarse aggregate, water, admixtures, concrete and reinforcement bars. These materials are tested in the quality control laboratory by following their test specifications according to their respective IS Codes. 2. Quality Assurance: The test results of respective materials are obtained and checked whether they lie within their acceptance limits specified codes. Then they are assured. 1. Cement (IS 4031) Determination of Normal Consistency. ,, ,, Initial and Final Setting time. ,, ,, Fineness of Cement. ,, ,, Compressive Strength Test. IS SPECIFICATIONS: Initial Setting time: Should not be less than 30 minutes. Final Setting time: < 600 minutes. Observation: Cement Brand used in Site: Konark Type of Cement : Portland Slag Cement Normal Consistency of cement: 36%
  • 34. Water Content(%) Penetration(mm) 30 12 32 10 34 8 36 5 Initial Setting Time: 140 minutes, Final Setting Time: 240 minutes. Fig - Test Set Up for Initial & Final Setting Time Test Set Up for Consistency
  • 35. 2) Coarse Aggregates (IS 2386) Sieve Analysis of Aggregates(10mm & 20mm). Aggregates Impact Value. Water Absorbption Test. Specific Gravity by Pycnometer. Pyconometer
  • 36. 3. Sand (IS- 383) Grading or Sieve Analysis of Sand Slit and clay content Sieve Analysis(For fine aggregate 4. Concrete(IS-456) Compressive Strength test Workability test 5. Brick Dimension check of bricks Compressive Strength Check of bricks Material:Brick, Cement Sand mortar. Apparatus: Compressive Strength testing machine Avg. Compressive Strength of Sample: 10.41 N/mm^2
  • 37. e: 10.41 N/mm^2 SampleafterFailure(Sand filling is used) Sample before Failure Compressive Strength Testing Machine 6. Steel (IS-1786) Rolling Margin test of Reinforcement Bar IS Specification: For 8¤-12¤- ±7% For12¤-20¤ - ±5% For above 20¤- ±3% Reading at Site: For 10mm dia. Bar unit weight= 617gm/m run Brand name: Rashmi TMT 500+.
  • 38.  SITE EXECUTION  Execution is the discipline of planning, organizing, motivating, and controlling resources to achieve specific goals at construction site as per the scheduled planning. A project is a temporary endeavour with a defined beginning and end Requirements:  Excavator  Rollers for Soil Compaction if any (Smooth Wheeled or Pneumatic or Sheep-foot)  Shovel, Spade & Bucket,  Auto Level or Total Station if available for knowing RL,  Measuring Staff  Measuring Tape
  • 39.  SAFETY  Safety Personal Protective Equipments( PPE ):  In a particular site if personal safety is maintained by every personnel then the total accident in the site can be controlled. It is just acts like a pyramid, personal safety is in the base level so if it is controlled then other accidents can be controlled simultaneously.
  • 40. Sl No. Description Picture 1 Safety Helmets are used to protect the head from falling materials in construction site. 2 Safety Shoes which give us protection on site, it has a steel plate to its tow and protect our feet up to an extent when a material sudden fails to our feet. It is a very important equipment in PPE. 3 Safety belt & Full body Harness is very useful in construction work, it used by labor when working at heights to reduce risk of falling particularly when they are in formwork placing or plastering of exterior parts. etc
  • 41. Safety controlling at site Followings are some of the many precautionary/safety measures that are to be taken at a construction site –  Water spray on fly ash in order to prevent dust.  Saline water is to be provided to workmen during summer to avoid heat related illness. Proper rest is taken at intervals.  Personal Protective Equipment (PPE) is provided and worn by construction workers at site. PPE includes hard hats/helmets, Safety Shoes, Goggles, Masks, Gloves, etc.  Medical and First Aid facilities is there.  When working at heights, workers should wear double lanyard full body harness being anchored. Safety helmets, fall arrester, etc. are used.  Earth Leakage Circuit Breaker (ELCB) and Residual Current Circuit Breaker (RCCB) are used in electric installations to avoid electric shock.  Check for connection and body earthing of machineries.  Transporting Vehicles must not exceed the speed limits (usually 15 Km/h max) to avoid accidents by vehicles. For the same reason, use of mobile phones at site is minimized.  Employees are to remain at a safe distance from all equipment while it is operational.  Inspection of the equipment is done before every use.  Checking Fire Extinguishers.  Hygienic condition of labor hutment.  Checking drinking water test report.  Safety training program is in practice.  Safety Award for safety motivation is conducted.  Daily safety observation and correction is done.
  • 42.
  • 43.  Materials Management  Profit Centre  With the process of liberalization and opening up of global economy, there has been a drastic change in the business environment, resulting in organization exposed to intense competition in the market place, Indian organizations have been working out various strategies to face the above challenges and to cut down operational cost to remain competitive. Progressive management have since recognized that materials management can provide opportunities to reduce operating cost and can be treated as a profit center.  On an average, half the sales income is spent on materials. Suppose a firm is spending 50% of its volume on materials and the profits are 10% of sales volume. A 2% reduction in materials cost will boost the profits to 11% of sales or the profits will be increased by 10%. To achieve the same increase in profit through sales efforts, a 10% increase in sales volume will be necessary. In other words, compared to sales volume, material cost has five times the average on profits. Organizations earn or loose large sums depending on how effective are their material management
  • 44.  CONCLUSION  The training programme helped in gathering the practical work procedure alongside with furnishing the theoretical knowledge learnt till date. The programme was scheduled and comprised of five different sections – Safety, Planning, Billing, Quality Control and Site Execution. The importance of safe working, adopting safety measures and preparedness for any unknown sudden accidents at site were explained in the safety department. The work of the planning engineer and the procedure of a proper planning and scheduling of the construction work, these knowledge were shared in the planning department. Billing department enriched us with the financial knowledge, quantification of any work and their collaboration with the planning department. The purpose of the quality control department, continuous checking of the materials at the site and preparation of design mixes were taught. Finally all the gathered knowledge were practically viewed during site execution of different blocks. Shuttering procedure, different construction works, machineries and all the safety measures adopted were clearly explained. Apart from technical knowledge we were grateful enough for the engineers who shared their work experience with us. There are a lot of things which cannot be learnt from any books or institution but an exposure to such a construction site can only provide. Such construction site related essential terms & knowledge of work will help us throughout our work life