Monorail Implementation 
Project - Phase 1
Malabe 
Talahena 
Robert 
Gunawardana 
Mawatha 
National Hospital 
Union Place 
World Trade Centre 
Colombo Fort
Existing problem 
Heavy traffic congestions in Malabe corridor 
• highest number of vehicles entering the city per day (60 000) 
• second highest number of persons entering the city (150,000) 
• no rail based public transport system 
• lack of space for further widening of the road network 
Change we wish to achieve 
• Reduce traffic congestion 
• Encourage the usage of public transport 
services
Stakeholders Reasons 
Ministry of Transport 
Have embarked the project under the Urban Transport 
Development Project for Colombo Metropolitan Region 
Urban Development 
Authority 
Road Development 
Authority 
Japanese International 
Cooperation Agency 
(JICA) 
Assistance 
Fund the first phase 
NTC Providing relevant policies, regulations and plans 
Korean investors furnishing an economic study and EIA on the route and more 
details on the type of technology that will be provided 
Government Providing necessary acts and approve them at the parliament 
Capital cost of building the line 
General Public Users
Existing overall socio-economic policy decisions 
affecting this project 
• regulating the public transport fares at low levels (inclusivity) 
• inability to provide more equitable opportunities for all income groups such as 
different classes of service (equity) 
• financing a government subsidy through other tax sources including foods 
consumed by people in rural regions who do not travel on the monorail due to 
its high operating and maintenance cost (cost) 
• socio policies regarding the democracy of the Members of Parliament and 
VVIPs as a monorail over the road on concrete poles in the middle of the road 
leading to Sri Jayawardhanapura can disturb VIP movements
Desired outcomes expected from the project 
1. Enhance Mobility for daily commuters in Colombo metropolitan area and 
its suburbs 
2. Enhance Accessibility for people 
3. Support economic vitality of the metropolitan area through enabling 
productivity and efficiency 
4. Protect and enhance environmental quality 
5. Ensure coordination among the planning and development activities of the 
county
Objectives to achieve the above set of goals 
Goal 1 - Enhance Mobility for daily commuters in Colombo metropolitan area and its suburbs 
• Minimize the vehicular traffic flow on the city 
• Improve safety on the road network 
• Provide affordable, high quality, comfortable public transport service 
Goal 2 - Enhance Accessibility for people 
• Enhance the connectivity of key County activity centers, employment centers and public services 
• Enhance access to land uses 
• Better manage connectivity trough multimodal terminals and the Colombo Transport Hub in Pettah 
• Ensure all citizens including differently abled and persons who lack access to automobiles are 
provided with adequate levels of access to the services 
Goal 3 – Support economic vitality of the metropolitan area through enabling productivity and 
efficiency 
• Maximize investment in transportation system from private sector 
• Relieve congestion and transport costs 
• Provide inclusive and equitable development through equal distribution of benefits to the country
Goal 4 - Protect and Enhance Environmental Quality 
• Minimize air quality impacts of transportation investment 
• Encourage measures to reduce fossil fuel consumption 
• Preserve the natural and environmentally sensitive areas 
• Preserve and enhance the character of the historic and existing communities 
Goal 5 - Ensure Coordination among the Planning and Development Activities of the 
County 
• Incorporate new technologies to enhance capacity and extend the useful life of facilities 
• Eliminate conflicts between transport modes 
• Encourage the use of Intelligent Transportation Systems
Implementation of the project 
Top- down approach 
• The decision to implement this project will be decided on the basis of availability of 
funding sources 
• The Government will take the final decision to implement whatever the possible 
measures to streamline the traffic along the city streets and to develop a new 
transport mode such as monorail system to make the public transport system more 
efficient on a short term, medium term and long term basis 
Bottom- up approach 
• The study was started in May 2012 after JICA gave a grant for a comprehensive 
study to reduce the traffic congestion in the Colombo Metropolitan area and suburbs 
• Feasibility studies are being carried out to recognize the passenger demand and the 
affordability for the public to use this transport system to the masses
Existing transport policy conditions 
*State Railway Operations 
|linkage between rail and road 
| participation of the private sector 
*Environmental Principles 
|concerns air , noise, flora and fauna 
|transport technologies with less polluting 
*Energy 
|promoting public transport 
|improved vehicle technology 
*Modernization of Technology & Research 
|encourages innovation ,modernization of transport sector 
|supports the research, development 
*Safety
*Fares 
* Provision of a Choice on Modes of transport 
|BRT, LRT, MRT systems 
|monorail 
* Improved Sustainability 
Transport policy reform required 
•Participation of the private sector 
•Optimum composition of public sector and private sector entities 
•New card system for travelling fare 
•New price classes for passengers
Cost involved the investment 
1. Construction cost 
• Cost varies with several factors like “total length of the system, 
topography(terrain) ,speed, land acquisition and numbers of station needed. 
• Most of the construction materials needed are made with pre casted 
concrete. 
• Minimum land acquisition is needed. Only at stations 
2. Operation and Maintenance Cost 
• O & M cost is only for the rolling stock and stations. 
• In rolling stocks maintenance is needed only for motors and tires 
• Electricity is the main operating cost driver. 
3. Life Cycle Cost 
• Cost of rolling stock 
Cost Per km cost Total cost 
Construction cost $ 42 Mn $ 1.3 Bn 
O & M cost $ 2.5 per car km $ 58 per trip 
Recourses : Urban development plan. (ComTrans), 
http://www.lankabusinessonline.com/news/sri-lanka-to-build-us$1.3bn-monorail-with-japan-finance/ 
1056043503 , http://www.monorails.org/
Equity impacts 
•This project needs immense investment, and the source is taxes and loans. But 
the whole country has to repay regardless whether they use it or not. 
•Would have to charge higher fares due to the high investment and O & M, 
high quality service provided. Thus making it unaffordable for poor people. 
Investment 
Option 1 Option 2 Option 3 
Investment for both 
rolling stock and 
infrastructures are borne 
by the government. Total 
operation is under the 
government control (SLR) 
Government invest for 
the infrastructure is borne 
by the government. 
Operation and investment 
of rolling stocks are borne 
by both public and private 
sector(PPP). 
A BOT system where an 
investor is invited to make 
investment, operate and 
then transfer it.
Sustainability 
• Financial stability will be mainly achieved through the revenue generated from the 
money coming from the monorail passengers. 
• Social sustainability will be achieved through creating new opportunities for 
business environment, Reduction in road accidents, Increased land values, Job 
opportunities through the new project, Urban development, Increase education and 
employment access. 
• Reducing congestion cost, crashes, energy imports and pollution costs will ensure 
environmental sustainability. 
• Economic sustainability can be achieved by; 
• Improving access to key County activity centers, employment centers and 
public services 
• Improving the accessibility and the mobility of the factors of production. 
Economic 
Sustainability 
Social Environment
Risks and Disadvantages of a Mono-Rail 
System 
 High Initial Cost 
 This is because the system requires the elevated track and supports, which 
are more costly than a basic railroad. 
 Might have to charge a higher price initially which will distract private 
vehicle users. 
 Such a condition will jeopardize the expected outcomes of the project. 
 In case of an emergency ? 
 The greatest drawback for monorails is what happens when something 
does go wrong, either with the track or train. On a standard railway there 
are many lines a train can travel on; on a monorail it is limited to one. If a 
section of track needs to be replaced, the entire system needs to be shut 
down resulting in no service rather than reduced service.
• Compatibility among different versions; 
• Another disadvantage of monorails is their incompatibility with other rail 
systems, and often between monorails systems by differing manufacturers. 
Monorail infrastructure and vehicles are often made by separate manufacturers, 
with different manufacturers using incompatible designs. 
• Turnouts; 
• Especially at high speeds, may be marginally more difficult compared to 
conventional railway points, although certainly not impossible.
External costs of the project 
 Monorails harm the aesthetics of the environment 
 The land and property values will decrease in the areas in between 
stations 
 Equity issues 
• Solutions 
 Building the station architecture designed to match the surrounding 
environment. 
 The equity issue is minimized by providing several classes of 
compartments.
Consumer surpluses and the producer surpluses 
Consumer surplus 
• Time saving 
• consumer convenience 
• reduction of private vehicles 
 Less environmental pollution 
 Fuel saving 
Producer surplus 
•Healthy profits 
•less wastage 
•customer satisfaction 
•Less damage to environment
Regulations For The Project 
• The government will have the authority to handle the whole mono rail 
system. 
• Sri Lanka railway department will have the power to decide rates and 
adjust the rates of mono rail system. 
• The ministry of transport Sri Lanka will assist the policy and planning 
of the project.
Alternative A: Introduce a Bus Rapid Transit(BRT) system from Malambe to Pettah. 
Alternative B: Construct a new railway line from Pettah to Malabe and implement a new 
train service from Malabe to Pettah. 
1 2 3
Revenue calculation 
Origin Passenger demand Distance Ticket price Revenue (Rs) 
Per day 
Malabe =150,000*.35*.12 
=6300 
8km =9*10 
=90 
=6300*80*2 
=1008000 
Battaramulla =150,000*.35*.09 
=4725 
13km =16*10 
=160 
=4725*130*2 
=1228500 
Colombo =150,000*.35*.79 
=41,475 
21km =21*10 
=210 
=41,475*210*2 
=17419500 
Revenue per year = Rs. 6149.5 million
NPV calculation 
Y-0 Y-1 Y-2 Y-3 Y-4 Y-5 Y-6 Y-7 Y-8 Y-9 Y-10 
INVESTMENT 
(Rs m) 
(13160 
0) 
REVENUE 
(Rs m) 
6149.5* 
1.1 
6149.5* 
1.12 
6149.5* 
1.13 
6149.5* 
1.14 
6149.5* 
1.15 
6149.5*1 
.16 
6149.5* 
1.17 
6149.5* 
1.18 
6149.5*1 
.19 
6277.6 
*1.110 
OPERATING 
COST 
(Rs m) 
8.67*1.1 8.67* 
1.12 
8.67* 
1.13 
8.67 
*1.14 
8.67* 
1.15 
8.67* 
1.16 
8.67* 
1.17 
8.67* 
1.18 
8.67* 
1.19 
8.67* 
1.110 
Scrap value after 20 years 12110 
NET CASH 
INFLOW 
(Rs m) 
6755 7430.5 8173.5 8991 9890 10879 11967 13164 14480 15928 
D.F(@10%) .9090 .8264 .7513 .6830 .6209 .5644 .5131 .4665 .4241 .3855 
PRESENT 
VALUE 
(Rs m) 
6149.5 6149.5 6149.5 6149.5 6149.5 6149.5 6149.5 6149.5 6149.5 6149.5 
Net present value = 3500 millions
Payback calculation 
Year Net cash inflow(Rs m) Cumulative N.C.F (Rs m) 
Y1-19 6149.5 116840.5 
Y20 6149.5 122990 
Payback period = 21years 4months 
IRR calculation 
NPV @ 20% D.F =6771.1*.8333+7448.2*.6944+8193.1*.5787+9012.4*.4822+9913.6*.4018 
+10905.0*.3348+11995.5*.2790+13195*.2325+14514.5*.1918+30671*.161 
5-(25972) 
=15797.5 
NPV @ 10% D.F =3500 
IRR = 12.367%
Any Questions????????
Thank You !!!

Más contenido relacionado

La actualidad más candente

DRAINAGE OF PAVEMENT AND WATER PERCOLATION ppt.pptx
DRAINAGE OF PAVEMENT AND WATER PERCOLATION ppt.pptxDRAINAGE OF PAVEMENT AND WATER PERCOLATION ppt.pptx
DRAINAGE OF PAVEMENT AND WATER PERCOLATION ppt.pptx
AmitYadav363360
 

La actualidad más candente (20)

Construction equipments
Construction equipmentsConstruction equipments
Construction equipments
 
Crossectional Elements of Road.pdf
Crossectional Elements of Road.pdfCrossectional Elements of Road.pdf
Crossectional Elements of Road.pdf
 
Caissons
Caissons Caissons
Caissons
 
Advanced road transporlation system report
Advanced road transporlation system reportAdvanced road transporlation system report
Advanced road transporlation system report
 
Unit 2
Unit 2Unit 2
Unit 2
 
Civil Engineering Internship Presentation-Anis Rahman Khokan
Civil Engineering Internship Presentation-Anis Rahman KhokanCivil Engineering Internship Presentation-Anis Rahman Khokan
Civil Engineering Internship Presentation-Anis Rahman Khokan
 
traffic characteristics
traffic characteristicstraffic characteristics
traffic characteristics
 
Highway failure & their maintenance seminar report
Highway failure & their maintenance seminar reportHighway failure & their maintenance seminar report
Highway failure & their maintenance seminar report
 
Vacuum dewatering
Vacuum dewateringVacuum dewatering
Vacuum dewatering
 
Public-Private Partnership in Urban Transport
Public-Private Partnership in Urban TransportPublic-Private Partnership in Urban Transport
Public-Private Partnership in Urban Transport
 
Road construction report
Road construction reportRoad construction report
Road construction report
 
Highway Development & Planning
Highway Development & PlanningHighway Development & Planning
Highway Development & Planning
 
DRAINAGE OF PAVEMENT AND WATER PERCOLATION ppt.pptx
DRAINAGE OF PAVEMENT AND WATER PERCOLATION ppt.pptxDRAINAGE OF PAVEMENT AND WATER PERCOLATION ppt.pptx
DRAINAGE OF PAVEMENT AND WATER PERCOLATION ppt.pptx
 
1.TRAFFIC CHARACTERISTICS (TE) 2170613 GTU
1.TRAFFIC CHARACTERISTICS (TE) 2170613 GTU1.TRAFFIC CHARACTERISTICS (TE) 2170613 GTU
1.TRAFFIC CHARACTERISTICS (TE) 2170613 GTU
 
Unit 1
Unit 1Unit 1
Unit 1
 
Highway Construction
Highway Construction  Highway Construction
Highway Construction
 
Indian Road Congress (IRC) & National Rural Road Development Agency (NRRDA)
Indian Road Congress (IRC) & National Rural Road Development Agency (NRRDA)Indian Road Congress (IRC) & National Rural Road Development Agency (NRRDA)
Indian Road Congress (IRC) & National Rural Road Development Agency (NRRDA)
 
Under reamed piles
Under reamed pilesUnder reamed piles
Under reamed piles
 
Internship Report on metro project
Internship Report on metro projectInternship Report on metro project
Internship Report on metro project
 
Kochi Metro Rail Project.doc
Kochi Metro Rail Project.docKochi Metro Rail Project.doc
Kochi Metro Rail Project.doc
 

Similar a monorail system implication in Sri Lanka

How will the Transport Bill (Scotland) affect community transport? - CTA's Pe...
How will the Transport Bill (Scotland) affect community transport? - CTA's Pe...How will the Transport Bill (Scotland) affect community transport? - CTA's Pe...
How will the Transport Bill (Scotland) affect community transport? - CTA's Pe...
Community Transport Association
 
Creating a Sustainable Transportation Platform.pptx
Creating a Sustainable Transportation Platform.pptxCreating a Sustainable Transportation Platform.pptx
Creating a Sustainable Transportation Platform.pptx
aditimeena173
 
First – Last Mile_MBPJ_2015
First – Last Mile_MBPJ_2015First – Last Mile_MBPJ_2015
First – Last Mile_MBPJ_2015
Norma Nun
 
Afa Interpretation Of Financial Statements Sbs Transist Vs Smrt
Afa Interpretation Of Financial Statements   Sbs Transist Vs SmrtAfa Interpretation Of Financial Statements   Sbs Transist Vs Smrt
Afa Interpretation Of Financial Statements Sbs Transist Vs Smrt
ruoting
 
Sprawled City; Lesson 7.pptx
Sprawled City; Lesson 7.pptxSprawled City; Lesson 7.pptx
Sprawled City; Lesson 7.pptx
ssuserc1ed5e
 

Similar a monorail system implication in Sri Lanka (20)

How will the Transport Bill (Scotland) affect community transport? - CTA's Pe...
How will the Transport Bill (Scotland) affect community transport? - CTA's Pe...How will the Transport Bill (Scotland) affect community transport? - CTA's Pe...
How will the Transport Bill (Scotland) affect community transport? - CTA's Pe...
 
Routes to Clean Air 2015 - Prof. Graham Parkhurst
Routes to Clean Air 2015 - Prof. Graham ParkhurstRoutes to Clean Air 2015 - Prof. Graham Parkhurst
Routes to Clean Air 2015 - Prof. Graham Parkhurst
 
Alternatives to traffic congestion in Vadodara
Alternatives to traffic congestion in VadodaraAlternatives to traffic congestion in Vadodara
Alternatives to traffic congestion in Vadodara
 
Ppp final project
Ppp final projectPpp final project
Ppp final project
 
Routes to Clean Air 2016 - Dr Jon Lamonte, Transport for Greater Manchester
Routes to Clean Air 2016  -  Dr Jon Lamonte, Transport for Greater ManchesterRoutes to Clean Air 2016  -  Dr Jon Lamonte, Transport for Greater Manchester
Routes to Clean Air 2016 - Dr Jon Lamonte, Transport for Greater Manchester
 
Creating a Sustainable Transportation Platform.pptx
Creating a Sustainable Transportation Platform.pptxCreating a Sustainable Transportation Platform.pptx
Creating a Sustainable Transportation Platform.pptx
 
UTP.pptx
UTP.pptxUTP.pptx
UTP.pptx
 
Mohinder Singh - Gestión Institucional del Sistema de Transporte de Singapur
Mohinder Singh - Gestión Institucional del Sistema de Transporte de SingapurMohinder Singh - Gestión Institucional del Sistema de Transporte de Singapur
Mohinder Singh - Gestión Institucional del Sistema de Transporte de Singapur
 
Transport Thursday Niel van Oort
Transport Thursday Niel van OortTransport Thursday Niel van Oort
Transport Thursday Niel van Oort
 
Presentation on Closed Toll & Toll Systems
Presentation on Closed Toll & Toll SystemsPresentation on Closed Toll & Toll Systems
Presentation on Closed Toll & Toll Systems
 
Economics of Crossrail (Microeconomics)
Economics of Crossrail (Microeconomics)Economics of Crossrail (Microeconomics)
Economics of Crossrail (Microeconomics)
 
First – Last Mile_MBPJ_2015
First – Last Mile_MBPJ_2015First – Last Mile_MBPJ_2015
First – Last Mile_MBPJ_2015
 
Economics of Crossrail
Economics of CrossrailEconomics of Crossrail
Economics of Crossrail
 
Economics of Crossrail
Economics of CrossrailEconomics of Crossrail
Economics of Crossrail
 
Tarun_PPT[1].pptx
Tarun_PPT[1].pptxTarun_PPT[1].pptx
Tarun_PPT[1].pptx
 
Afa Interpretation Of Financial Statements Sbs Transist Vs Smrt
Afa Interpretation Of Financial Statements   Sbs Transist Vs SmrtAfa Interpretation Of Financial Statements   Sbs Transist Vs Smrt
Afa Interpretation Of Financial Statements Sbs Transist Vs Smrt
 
project ppt.pptx
project ppt.pptxproject ppt.pptx
project ppt.pptx
 
Session 7b: Part I- Decarbonising urban transport - WB
Session 7b: Part I- Decarbonising urban transport - WBSession 7b: Part I- Decarbonising urban transport - WB
Session 7b: Part I- Decarbonising urban transport - WB
 
Sprawled City; Lesson 7.pptx
Sprawled City; Lesson 7.pptxSprawled City; Lesson 7.pptx
Sprawled City; Lesson 7.pptx
 
A quality Public Transport System, elements for consideration
A quality Public Transport System, elements for considerationA quality Public Transport System, elements for consideration
A quality Public Transport System, elements for consideration
 

Último

VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts ServiceVVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
aroranaina404
 
Government polytechnic college-1.pptxabcd
Government polytechnic college-1.pptxabcdGovernment polytechnic college-1.pptxabcd
Government polytechnic college-1.pptxabcd
shivubhavv
 
call girls in Dakshinpuri (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
call girls in Dakshinpuri  (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️call girls in Dakshinpuri  (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
call girls in Dakshinpuri (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Design Inspiration for College by Slidesgo.pptx
Design Inspiration for College by Slidesgo.pptxDesign Inspiration for College by Slidesgo.pptx
Design Inspiration for College by Slidesgo.pptx
TusharBahuguna2
 
Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
amitlee9823
 
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
home
 
2-tool presenthdbdbdbdbddhdhddation.pptx
2-tool presenthdbdbdbdbddhdhddation.pptx2-tool presenthdbdbdbdbddhdhddation.pptx
2-tool presenthdbdbdbdbddhdhddation.pptx
suhanimunjal27
 
Editorial design Magazine design project.pdf
Editorial design Magazine design project.pdfEditorial design Magazine design project.pdf
Editorial design Magazine design project.pdf
tbatkhuu1
 
CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service 🧵
CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service  🧵CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service  🧵
CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service 🧵
anilsa9823
 
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
amitlee9823
 
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️Call Girls in Kalkaji Delhi 8264348440 call girls ❤️
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️
soniya singh
 
Peaches App development presentation deck
Peaches App development presentation deckPeaches App development presentation deck
Peaches App development presentation deck
tbatkhuu1
 
Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...
Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...
Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...
amitlee9823
 
Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)
amitlee9823
 

Último (20)

VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts ServiceVVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
 
Government polytechnic college-1.pptxabcd
Government polytechnic college-1.pptxabcdGovernment polytechnic college-1.pptxabcd
Government polytechnic college-1.pptxabcd
 
call girls in Dakshinpuri (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
call girls in Dakshinpuri  (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️call girls in Dakshinpuri  (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
call girls in Dakshinpuri (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
 
Design Inspiration for College by Slidesgo.pptx
Design Inspiration for College by Slidesgo.pptxDesign Inspiration for College by Slidesgo.pptx
Design Inspiration for College by Slidesgo.pptx
 
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
 
Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
 
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
 
2-tool presenthdbdbdbdbddhdhddation.pptx
2-tool presenthdbdbdbdbddhdhddation.pptx2-tool presenthdbdbdbdbddhdhddation.pptx
2-tool presenthdbdbdbdbddhdhddation.pptx
 
Editorial design Magazine design project.pdf
Editorial design Magazine design project.pdfEditorial design Magazine design project.pdf
Editorial design Magazine design project.pdf
 
Tapestry Clothing Brands: Collapsing the Funnel
Tapestry Clothing Brands: Collapsing the FunnelTapestry Clothing Brands: Collapsing the Funnel
Tapestry Clothing Brands: Collapsing the Funnel
 
CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service 🧵
CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service  🧵CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service  🧵
CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service 🧵
 
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
 
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779Best VIP Call Girls Noida Sector 47 Call Me: 8448380779
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779
 
💫✅jodhpur 24×7 BEST GENUINE PERSON LOW PRICE CALL GIRL SERVICE FULL SATISFACT...
💫✅jodhpur 24×7 BEST GENUINE PERSON LOW PRICE CALL GIRL SERVICE FULL SATISFACT...💫✅jodhpur 24×7 BEST GENUINE PERSON LOW PRICE CALL GIRL SERVICE FULL SATISFACT...
💫✅jodhpur 24×7 BEST GENUINE PERSON LOW PRICE CALL GIRL SERVICE FULL SATISFACT...
 
SD_The MATATAG Curriculum Training Design.pptx
SD_The MATATAG Curriculum Training Design.pptxSD_The MATATAG Curriculum Training Design.pptx
SD_The MATATAG Curriculum Training Design.pptx
 
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️Call Girls in Kalkaji Delhi 8264348440 call girls ❤️
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️
 
Peaches App development presentation deck
Peaches App development presentation deckPeaches App development presentation deck
Peaches App development presentation deck
 
Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...
Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...
Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...
 
call girls in Vasundhra (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...
call girls in Vasundhra (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...call girls in Vasundhra (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...
call girls in Vasundhra (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...
 
Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)
 

monorail system implication in Sri Lanka

  • 2. Malabe Talahena Robert Gunawardana Mawatha National Hospital Union Place World Trade Centre Colombo Fort
  • 3. Existing problem Heavy traffic congestions in Malabe corridor • highest number of vehicles entering the city per day (60 000) • second highest number of persons entering the city (150,000) • no rail based public transport system • lack of space for further widening of the road network Change we wish to achieve • Reduce traffic congestion • Encourage the usage of public transport services
  • 4. Stakeholders Reasons Ministry of Transport Have embarked the project under the Urban Transport Development Project for Colombo Metropolitan Region Urban Development Authority Road Development Authority Japanese International Cooperation Agency (JICA) Assistance Fund the first phase NTC Providing relevant policies, regulations and plans Korean investors furnishing an economic study and EIA on the route and more details on the type of technology that will be provided Government Providing necessary acts and approve them at the parliament Capital cost of building the line General Public Users
  • 5. Existing overall socio-economic policy decisions affecting this project • regulating the public transport fares at low levels (inclusivity) • inability to provide more equitable opportunities for all income groups such as different classes of service (equity) • financing a government subsidy through other tax sources including foods consumed by people in rural regions who do not travel on the monorail due to its high operating and maintenance cost (cost) • socio policies regarding the democracy of the Members of Parliament and VVIPs as a monorail over the road on concrete poles in the middle of the road leading to Sri Jayawardhanapura can disturb VIP movements
  • 6. Desired outcomes expected from the project 1. Enhance Mobility for daily commuters in Colombo metropolitan area and its suburbs 2. Enhance Accessibility for people 3. Support economic vitality of the metropolitan area through enabling productivity and efficiency 4. Protect and enhance environmental quality 5. Ensure coordination among the planning and development activities of the county
  • 7. Objectives to achieve the above set of goals Goal 1 - Enhance Mobility for daily commuters in Colombo metropolitan area and its suburbs • Minimize the vehicular traffic flow on the city • Improve safety on the road network • Provide affordable, high quality, comfortable public transport service Goal 2 - Enhance Accessibility for people • Enhance the connectivity of key County activity centers, employment centers and public services • Enhance access to land uses • Better manage connectivity trough multimodal terminals and the Colombo Transport Hub in Pettah • Ensure all citizens including differently abled and persons who lack access to automobiles are provided with adequate levels of access to the services Goal 3 – Support economic vitality of the metropolitan area through enabling productivity and efficiency • Maximize investment in transportation system from private sector • Relieve congestion and transport costs • Provide inclusive and equitable development through equal distribution of benefits to the country
  • 8. Goal 4 - Protect and Enhance Environmental Quality • Minimize air quality impacts of transportation investment • Encourage measures to reduce fossil fuel consumption • Preserve the natural and environmentally sensitive areas • Preserve and enhance the character of the historic and existing communities Goal 5 - Ensure Coordination among the Planning and Development Activities of the County • Incorporate new technologies to enhance capacity and extend the useful life of facilities • Eliminate conflicts between transport modes • Encourage the use of Intelligent Transportation Systems
  • 9. Implementation of the project Top- down approach • The decision to implement this project will be decided on the basis of availability of funding sources • The Government will take the final decision to implement whatever the possible measures to streamline the traffic along the city streets and to develop a new transport mode such as monorail system to make the public transport system more efficient on a short term, medium term and long term basis Bottom- up approach • The study was started in May 2012 after JICA gave a grant for a comprehensive study to reduce the traffic congestion in the Colombo Metropolitan area and suburbs • Feasibility studies are being carried out to recognize the passenger demand and the affordability for the public to use this transport system to the masses
  • 10. Existing transport policy conditions *State Railway Operations |linkage between rail and road | participation of the private sector *Environmental Principles |concerns air , noise, flora and fauna |transport technologies with less polluting *Energy |promoting public transport |improved vehicle technology *Modernization of Technology & Research |encourages innovation ,modernization of transport sector |supports the research, development *Safety
  • 11. *Fares * Provision of a Choice on Modes of transport |BRT, LRT, MRT systems |monorail * Improved Sustainability Transport policy reform required •Participation of the private sector •Optimum composition of public sector and private sector entities •New card system for travelling fare •New price classes for passengers
  • 12. Cost involved the investment 1. Construction cost • Cost varies with several factors like “total length of the system, topography(terrain) ,speed, land acquisition and numbers of station needed. • Most of the construction materials needed are made with pre casted concrete. • Minimum land acquisition is needed. Only at stations 2. Operation and Maintenance Cost • O & M cost is only for the rolling stock and stations. • In rolling stocks maintenance is needed only for motors and tires • Electricity is the main operating cost driver. 3. Life Cycle Cost • Cost of rolling stock Cost Per km cost Total cost Construction cost $ 42 Mn $ 1.3 Bn O & M cost $ 2.5 per car km $ 58 per trip Recourses : Urban development plan. (ComTrans), http://www.lankabusinessonline.com/news/sri-lanka-to-build-us$1.3bn-monorail-with-japan-finance/ 1056043503 , http://www.monorails.org/
  • 13. Equity impacts •This project needs immense investment, and the source is taxes and loans. But the whole country has to repay regardless whether they use it or not. •Would have to charge higher fares due to the high investment and O & M, high quality service provided. Thus making it unaffordable for poor people. Investment Option 1 Option 2 Option 3 Investment for both rolling stock and infrastructures are borne by the government. Total operation is under the government control (SLR) Government invest for the infrastructure is borne by the government. Operation and investment of rolling stocks are borne by both public and private sector(PPP). A BOT system where an investor is invited to make investment, operate and then transfer it.
  • 14. Sustainability • Financial stability will be mainly achieved through the revenue generated from the money coming from the monorail passengers. • Social sustainability will be achieved through creating new opportunities for business environment, Reduction in road accidents, Increased land values, Job opportunities through the new project, Urban development, Increase education and employment access. • Reducing congestion cost, crashes, energy imports and pollution costs will ensure environmental sustainability. • Economic sustainability can be achieved by; • Improving access to key County activity centers, employment centers and public services • Improving the accessibility and the mobility of the factors of production. Economic Sustainability Social Environment
  • 15. Risks and Disadvantages of a Mono-Rail System  High Initial Cost  This is because the system requires the elevated track and supports, which are more costly than a basic railroad.  Might have to charge a higher price initially which will distract private vehicle users.  Such a condition will jeopardize the expected outcomes of the project.  In case of an emergency ?  The greatest drawback for monorails is what happens when something does go wrong, either with the track or train. On a standard railway there are many lines a train can travel on; on a monorail it is limited to one. If a section of track needs to be replaced, the entire system needs to be shut down resulting in no service rather than reduced service.
  • 16. • Compatibility among different versions; • Another disadvantage of monorails is their incompatibility with other rail systems, and often between monorails systems by differing manufacturers. Monorail infrastructure and vehicles are often made by separate manufacturers, with different manufacturers using incompatible designs. • Turnouts; • Especially at high speeds, may be marginally more difficult compared to conventional railway points, although certainly not impossible.
  • 17. External costs of the project  Monorails harm the aesthetics of the environment  The land and property values will decrease in the areas in between stations  Equity issues • Solutions  Building the station architecture designed to match the surrounding environment.  The equity issue is minimized by providing several classes of compartments.
  • 18. Consumer surpluses and the producer surpluses Consumer surplus • Time saving • consumer convenience • reduction of private vehicles  Less environmental pollution  Fuel saving Producer surplus •Healthy profits •less wastage •customer satisfaction •Less damage to environment
  • 19. Regulations For The Project • The government will have the authority to handle the whole mono rail system. • Sri Lanka railway department will have the power to decide rates and adjust the rates of mono rail system. • The ministry of transport Sri Lanka will assist the policy and planning of the project.
  • 20. Alternative A: Introduce a Bus Rapid Transit(BRT) system from Malambe to Pettah. Alternative B: Construct a new railway line from Pettah to Malabe and implement a new train service from Malabe to Pettah. 1 2 3
  • 21. Revenue calculation Origin Passenger demand Distance Ticket price Revenue (Rs) Per day Malabe =150,000*.35*.12 =6300 8km =9*10 =90 =6300*80*2 =1008000 Battaramulla =150,000*.35*.09 =4725 13km =16*10 =160 =4725*130*2 =1228500 Colombo =150,000*.35*.79 =41,475 21km =21*10 =210 =41,475*210*2 =17419500 Revenue per year = Rs. 6149.5 million
  • 22. NPV calculation Y-0 Y-1 Y-2 Y-3 Y-4 Y-5 Y-6 Y-7 Y-8 Y-9 Y-10 INVESTMENT (Rs m) (13160 0) REVENUE (Rs m) 6149.5* 1.1 6149.5* 1.12 6149.5* 1.13 6149.5* 1.14 6149.5* 1.15 6149.5*1 .16 6149.5* 1.17 6149.5* 1.18 6149.5*1 .19 6277.6 *1.110 OPERATING COST (Rs m) 8.67*1.1 8.67* 1.12 8.67* 1.13 8.67 *1.14 8.67* 1.15 8.67* 1.16 8.67* 1.17 8.67* 1.18 8.67* 1.19 8.67* 1.110 Scrap value after 20 years 12110 NET CASH INFLOW (Rs m) 6755 7430.5 8173.5 8991 9890 10879 11967 13164 14480 15928 D.F(@10%) .9090 .8264 .7513 .6830 .6209 .5644 .5131 .4665 .4241 .3855 PRESENT VALUE (Rs m) 6149.5 6149.5 6149.5 6149.5 6149.5 6149.5 6149.5 6149.5 6149.5 6149.5 Net present value = 3500 millions
  • 23. Payback calculation Year Net cash inflow(Rs m) Cumulative N.C.F (Rs m) Y1-19 6149.5 116840.5 Y20 6149.5 122990 Payback period = 21years 4months IRR calculation NPV @ 20% D.F =6771.1*.8333+7448.2*.6944+8193.1*.5787+9012.4*.4822+9913.6*.4018 +10905.0*.3348+11995.5*.2790+13195*.2325+14514.5*.1918+30671*.161 5-(25972) =15797.5 NPV @ 10% D.F =3500 IRR = 12.367%