SlideShare una empresa de Scribd logo
1 de 21
Descargar para leer sin conexión
1
2	

On September 28th of 2012, a solid rain episode took
place in Puerto Lumbreras that poured 120 litres/m2 in
one hour
Watercourses of Béjar and Viznaga overflowed
A wide area was flooded and several roads were
completely closed. As a result part of the population
had to be evacuated and even rescued from the
rooftops
6 people deceased
3	

One day accumulated
precipitation;
5	

112 Emergency Center received 1.649 calls which have
led the emergency device presence in 1.463 incidents
releated to heavy rains.
Ø 456 balling actuations
Ø 152 rescues and lifesavings
Ø 64 actuations for falling debris and partial colapses
Ø 221 public safety actuations
Ø 570 attention and information actions to the citizens
6	

FLOOD EMERGENCY PLAN OF CIVIL PROTECTION IN THE
REGION OF MURCIA (INUNMUR)
7	

q INUNMUR Plan was activated in pre-emergency stage on September
27th, because of AEMET warning. (State Meteorological Agency)
q Emergency Stage Level 1 for INUNMUR, was activated at 12:45 on
September 28th, and became a Level 2 at 13:05 due to unfavorable
evolution of the meteorological conditions. Military Emergency Unit (UME)
intervention was requested.
8	

6 people deceased
More than 8.000 heads of cattle lost
Large farming damages
9	

Emergency Specialists
Firefighters
Healthcare professionals
State Forces & Corps
Environmental brigades
Military Emergency Unit
Red Cross
Housing Directorate staff
Regional Farming Office staff
Public Health staff
Civil Defence volunteers
…..
10
11	

PUESTO DE MANDO
AVANZADO
MANDO DEL GRUPO DE
INTERVENCIÓN
COORDINADOR DEL
GRUPO DE DAÑOS
COORDINADOR DEL
GRUPO DE
RESTABLECIMIENTO DE
SERVICIOS ESENCIALES
COORDINADOR DEL
GRUPO SANITARIO
MANDO DEL GRUPO DE
ORDEN
COORDINADOR DEL
GRUPO LOGÍSTICO
COORDINADOR DEL
GRUPO ACCIÓN SOCIAL
Advanced
Command
Position
Intervention Team
Command
Damage evaluation team
Coordinator
Essential recovery
services group
Coordinator
Health group
Coordinator
Logistic group
Coordinator
Social action group
Coordinator
Order group Command
12	

PMA (advanced command position)
13	

MANDO DEL GRUPO DE
INTERVENCIÓN
EQUIPO DE BOMBEROS
EQUIPO DE BÚSQUEDA
Y RESCATE
EQUIPO DE
EVACUACIÓN
Firefighters
Team
Evacuation
Team
Search&Res
cue Team
Intervention
group
Command
14	

Primary actuations
•  Evacuation of people on risk situation
•  Main people rescues
•  Lost people searching
•  Dead animals management
•  Roads opening, cleaning and balling
works
•  Drinkable water supply for houses and
cattle tanks
15	

COORDINADOR DEL
GRUPO DE
RESTABLECIMIENTO DE
SERVICIOS ESENCIALES
EQUIPO DE
RESTABLECIMIENTO DE
AGUA POTABLE
EQUIPO DE
RESTABLECIMIENTO DE
GAS
EQUIPO DE
RESTABLECIMIENTO DE
ELECTRICIDAD
EQUIPO DE
RESTABLECIMIENTO DE
TELEFONÍA, RADIO Y TV
EQUIPO DE
RESTABLECIMIENTO DE
CARRETERAS
EQUIPO DE
RESTABLECIMIENTO DE
SANEAMIENTO
EQUIPO DE
RESTABLECIMIENTO DE
VÍAS URBANAS
Coordinator
Drinkable water Team
Gas recovery Team
Phone, radio, TV
recovery Team
Roads recovery Team
Streets & Lanes
recovery Team
Water&Sanitati
on recovery
Team
Electricity recovery Team
16	

ROADS affected:
–  A-7 Puerto Lumbreras-Lorca, through Béjar watercourse, due to bridge collapse.
–  A-7 Puerto Lumbreras-Almería, on km. 583.
–  RM-D20 Garrobillo-Ramonete, close to city of Lorca.
–  RM-621 Lorca-Purias, from km. 4 to km. 4,8.
–  RM-517 , around Cehegín, from km. 2 to km. 4.
–  RM-D10 around councils Campillo Purias.
–  D-4 exit from Mazarrón direction Leiva y Morata.
–  E-10 between Alhama y Costera road, around industrial area Las Salinas.
–  RM-23 Km 0 to Km 0,25
–  RM 303 Santomera- Alquerías Km 0,1 to 0,3
TRAIN: completely interrupted railway traffic on Lorca-Águilas & Lorca-La Hoya lines.
DRINKABLE WATER: Drinkable net serius damages around districts of Lorca and Puerto
Lumbreras: El Campillo, Almenara, Altobordo, La Escucha
PUERTO LUMBRERAS COMMUNITY HEALTH CENTER: it was moved to El Riscal Hotel, in the
same district.
PHONE: Interrupted in Puerto Lumbreras only 1 day (September 28th).
17	

A7 motorway, over Béjar
watercourse
18	

Railway Lorca - Baza
19
20	

EMERGENCY STAGE DESACTIVATED ON
OCTOBER 11st 2012 TO STANDAR STAGE
21	

THANK YOU FOR YOUR
ATTENTION

Más contenido relacionado

Similar a Luis gestoso inundaciones 2012 eng v1

Liongson Chair2000
Liongson Chair2000Liongson Chair2000
Liongson Chair2000
leony1948
 
Apresentacao Ingles Infra Agosto10
Apresentacao Ingles Infra Agosto10Apresentacao Ingles Infra Agosto10
Apresentacao Ingles Infra Agosto10
taikopro
 
Apresentacao Ingles Infra Agosto10
Apresentacao Ingles Infra Agosto10Apresentacao Ingles Infra Agosto10
Apresentacao Ingles Infra Agosto10
taikopro
 
Clean water and sanitation Moise Cristiana Olivia - Romanian team
Clean water and sanitation   Moise  Cristiana Olivia - Romanian teamClean water and sanitation   Moise  Cristiana Olivia - Romanian team
Clean water and sanitation Moise Cristiana Olivia - Romanian team
magdajanusz
 

Similar a Luis gestoso inundaciones 2012 eng v1 (20)

Huerta de las Pilas - Acuifero english version
Huerta de las Pilas - Acuifero   english versionHuerta de las Pilas - Acuifero   english version
Huerta de las Pilas - Acuifero english version
 
Aznalcollar's spilling
Aznalcollar's spillingAznalcollar's spilling
Aznalcollar's spilling
 
Report to city council severe weather jan 2014
Report to city council   severe weather jan 2014Report to city council   severe weather jan 2014
Report to city council severe weather jan 2014
 
Lengua tutorials 1
Lengua tutorials 1Lengua tutorials 1
Lengua tutorials 1
 
Boscastle flood timeline
Boscastle flood timelineBoscastle flood timeline
Boscastle flood timeline
 
Sustainability East - East of England Climate Change Adaptation
Sustainability East - East of England Climate Change AdaptationSustainability East - East of England Climate Change Adaptation
Sustainability East - East of England Climate Change Adaptation
 
Disaster management
Disaster management   Disaster management
Disaster management
 
DUMAGUETE The City of Gentle People: Climate Change Adaptation & Disaster Ri...
DUMAGUETE The City of Gentle People: Climate Change Adaptation & Disaster Ri...DUMAGUETE The City of Gentle People: Climate Change Adaptation & Disaster Ri...
DUMAGUETE The City of Gentle People: Climate Change Adaptation & Disaster Ri...
 
WHS Emergency Service lessons from flood events
WHS Emergency Service lessons from flood eventsWHS Emergency Service lessons from flood events
WHS Emergency Service lessons from flood events
 
AQA GCSE Geography Physical Case Studies
AQA GCSE Geography Physical Case StudiesAQA GCSE Geography Physical Case Studies
AQA GCSE Geography Physical Case Studies
 
Mr.Victor Cifuentes IEWP @ 1st Indo-European Water Forum, 23-24 novembre 2015
Mr.Victor Cifuentes IEWP @ 1st Indo-European Water Forum, 23-24 novembre 2015Mr.Victor Cifuentes IEWP @ 1st Indo-European Water Forum, 23-24 novembre 2015
Mr.Victor Cifuentes IEWP @ 1st Indo-European Water Forum, 23-24 novembre 2015
 
Lecture cyclone 2
Lecture cyclone 2Lecture cyclone 2
Lecture cyclone 2
 
Yale Tulane Special Report - Typhoon Haiyan (Yolanda) - 8 NOV 2013
Yale Tulane Special Report - Typhoon Haiyan (Yolanda) -  8 NOV 2013Yale Tulane Special Report - Typhoon Haiyan (Yolanda) -  8 NOV 2013
Yale Tulane Special Report - Typhoon Haiyan (Yolanda) - 8 NOV 2013
 
Liongson Chair2000
Liongson Chair2000Liongson Chair2000
Liongson Chair2000
 
Sustainable development on natural disaster problem (flood)
Sustainable development on natural disaster problem (flood) Sustainable development on natural disaster problem (flood)
Sustainable development on natural disaster problem (flood)
 
Historical Overview of and Updates on Mining in Marinduque
Historical Overview of and Updates on Mining in MarinduqueHistorical Overview of and Updates on Mining in Marinduque
Historical Overview of and Updates on Mining in Marinduque
 
Apresentacao Ingles Infra Agosto10
Apresentacao Ingles Infra Agosto10Apresentacao Ingles Infra Agosto10
Apresentacao Ingles Infra Agosto10
 
Apresentacao Ingles Infra Agosto10
Apresentacao Ingles Infra Agosto10Apresentacao Ingles Infra Agosto10
Apresentacao Ingles Infra Agosto10
 
Clean water and sanitation Moise Cristiana Olivia - Romanian team
Clean water and sanitation   Moise  Cristiana Olivia - Romanian teamClean water and sanitation   Moise  Cristiana Olivia - Romanian team
Clean water and sanitation Moise Cristiana Olivia - Romanian team
 
Disaster related and management situation by pralay janaPralay.ppt
Disaster related and management situation by pralay janaPralay.pptDisaster related and management situation by pralay janaPralay.ppt
Disaster related and management situation by pralay janaPralay.ppt
 

Más de know4drr

M melchiorri unece_know4_drr_red
M melchiorri unece_know4_drr_redM melchiorri unece_know4_drr_red
M melchiorri unece_know4_drr_red
know4drr
 
Know4drr placar dpresentation_leitner_270515_final_conferencechambery
Know4drr placar dpresentation_leitner_270515_final_conferencechamberyKnow4drr placar dpresentation_leitner_270515_final_conferencechambery
Know4drr placar dpresentation_leitner_270515_final_conferencechambery
know4drr
 

Más de know4drr (20)

Why know 4-drr conference final 19 5
Why know 4-drr conference final 19 5Why know 4-drr conference final 19 5
Why know 4-drr conference final 19 5
 
Sudmeier may 2015 know 4 final
Sudmeier may 2015  know 4 finalSudmeier may 2015  know 4 final
Sudmeier may 2015 know 4 final
 
Resurgence chambery 27 may 20115 pdf
Resurgence chambery 27 may 20115 pdfResurgence chambery 27 may 20115 pdf
Resurgence chambery 27 may 20115 pdf
 
Puma chambery2552015
Puma chambery2552015Puma chambery2552015
Puma chambery2552015
 
Presentation atun et al
Presentation atun et alPresentation atun et al
Presentation atun et al
 
Nat semmadridcsic 27may rev1
Nat semmadridcsic 27may rev1Nat semmadridcsic 27may rev1
Nat semmadridcsic 27may rev1
 
M melchiorri unece_know4_drr_red
M melchiorri unece_know4_drr_redM melchiorri unece_know4_drr_red
M melchiorri unece_know4_drr_red
 
Mm unece kno4_wdrr_red_v2
Mm unece kno4_wdrr_red_v2Mm unece kno4_wdrr_red_v2
Mm unece kno4_wdrr_red_v2
 
Living labumbria
Living labumbriaLiving labumbria
Living labumbria
 
Know4 drr shadrock_roberts_may2015
Know4 drr shadrock_roberts_may2015Know4 drr shadrock_roberts_may2015
Know4 drr shadrock_roberts_may2015
 
Know4 drr savoia_hua_v2
Know4 drr savoia_hua_v2Know4 drr savoia_hua_v2
Know4 drr savoia_hua_v2
 
Know4drr placar dpresentation_leitner_270515_final_conferencechambery
Know4drr placar dpresentation_leitner_270515_final_conferencechamberyKnow4drr placar dpresentation_leitner_270515_final_conferencechambery
Know4drr placar dpresentation_leitner_270515_final_conferencechambery
 
Know4drr final conferencechambery_placar_dpresentation_leitner_v04_270515
Know4drr final conferencechambery_placar_dpresentation_leitner_v04_270515Know4drr final conferencechambery_placar_dpresentation_leitner_v04_270515
Know4drr final conferencechambery_placar_dpresentation_leitner_v04_270515
 
Know4DRR chambery_pedoth_final
Know4DRR chambery_pedoth_finalKnow4DRR chambery_pedoth_final
Know4DRR chambery_pedoth_final
 
Know4DRR vischi
Know4DRR vischiKnow4DRR vischi
Know4DRR vischi
 
Know4 ddr ir_mav2
Know4 ddr ir_mav2Know4 ddr ir_mav2
Know4 ddr ir_mav2
 
Ir ma know4_ddr
Ir ma know4_ddrIr ma know4_ddr
Ir ma know4_ddr
 
Gar15 ppt chambery
Gar15 ppt chamberyGar15 ppt chambery
Gar15 ppt chambery
 
Final meeting spiekermann know4DRR
Final meeting spiekermann know4DRRFinal meeting spiekermann know4DRR
Final meeting spiekermann know4DRR
 
Dwf k4 drr mapping presentation for unisavoie workshop v3
Dwf k4 drr mapping presentation for unisavoie workshop v3Dwf k4 drr mapping presentation for unisavoie workshop v3
Dwf k4 drr mapping presentation for unisavoie workshop v3
 

Último

Último (20)

UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxOn_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptx
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
 
Plant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxPlant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptx
 
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
 
Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptx
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 

Luis gestoso inundaciones 2012 eng v1

  • 1. 1
  • 2. 2 On September 28th of 2012, a solid rain episode took place in Puerto Lumbreras that poured 120 litres/m2 in one hour Watercourses of Béjar and Viznaga overflowed A wide area was flooded and several roads were completely closed. As a result part of the population had to be evacuated and even rescued from the rooftops 6 people deceased
  • 4.
  • 5. 5 112 Emergency Center received 1.649 calls which have led the emergency device presence in 1.463 incidents releated to heavy rains. Ø 456 balling actuations Ø 152 rescues and lifesavings Ø 64 actuations for falling debris and partial colapses Ø 221 public safety actuations Ø 570 attention and information actions to the citizens
  • 6. 6 FLOOD EMERGENCY PLAN OF CIVIL PROTECTION IN THE REGION OF MURCIA (INUNMUR)
  • 7. 7 q INUNMUR Plan was activated in pre-emergency stage on September 27th, because of AEMET warning. (State Meteorological Agency) q Emergency Stage Level 1 for INUNMUR, was activated at 12:45 on September 28th, and became a Level 2 at 13:05 due to unfavorable evolution of the meteorological conditions. Military Emergency Unit (UME) intervention was requested.
  • 8. 8 6 people deceased More than 8.000 heads of cattle lost Large farming damages
  • 9. 9 Emergency Specialists Firefighters Healthcare professionals State Forces & Corps Environmental brigades Military Emergency Unit Red Cross Housing Directorate staff Regional Farming Office staff Public Health staff Civil Defence volunteers …..
  • 10. 10
  • 11. 11 PUESTO DE MANDO AVANZADO MANDO DEL GRUPO DE INTERVENCIÓN COORDINADOR DEL GRUPO DE DAÑOS COORDINADOR DEL GRUPO DE RESTABLECIMIENTO DE SERVICIOS ESENCIALES COORDINADOR DEL GRUPO SANITARIO MANDO DEL GRUPO DE ORDEN COORDINADOR DEL GRUPO LOGÍSTICO COORDINADOR DEL GRUPO ACCIÓN SOCIAL Advanced Command Position Intervention Team Command Damage evaluation team Coordinator Essential recovery services group Coordinator Health group Coordinator Logistic group Coordinator Social action group Coordinator Order group Command
  • 13. 13 MANDO DEL GRUPO DE INTERVENCIÓN EQUIPO DE BOMBEROS EQUIPO DE BÚSQUEDA Y RESCATE EQUIPO DE EVACUACIÓN Firefighters Team Evacuation Team Search&Res cue Team Intervention group Command
  • 14. 14 Primary actuations •  Evacuation of people on risk situation •  Main people rescues •  Lost people searching •  Dead animals management •  Roads opening, cleaning and balling works •  Drinkable water supply for houses and cattle tanks
  • 15. 15 COORDINADOR DEL GRUPO DE RESTABLECIMIENTO DE SERVICIOS ESENCIALES EQUIPO DE RESTABLECIMIENTO DE AGUA POTABLE EQUIPO DE RESTABLECIMIENTO DE GAS EQUIPO DE RESTABLECIMIENTO DE ELECTRICIDAD EQUIPO DE RESTABLECIMIENTO DE TELEFONÍA, RADIO Y TV EQUIPO DE RESTABLECIMIENTO DE CARRETERAS EQUIPO DE RESTABLECIMIENTO DE SANEAMIENTO EQUIPO DE RESTABLECIMIENTO DE VÍAS URBANAS Coordinator Drinkable water Team Gas recovery Team Phone, radio, TV recovery Team Roads recovery Team Streets & Lanes recovery Team Water&Sanitati on recovery Team Electricity recovery Team
  • 16. 16 ROADS affected: –  A-7 Puerto Lumbreras-Lorca, through Béjar watercourse, due to bridge collapse. –  A-7 Puerto Lumbreras-Almería, on km. 583. –  RM-D20 Garrobillo-Ramonete, close to city of Lorca. –  RM-621 Lorca-Purias, from km. 4 to km. 4,8. –  RM-517 , around Cehegín, from km. 2 to km. 4. –  RM-D10 around councils Campillo Purias. –  D-4 exit from Mazarrón direction Leiva y Morata. –  E-10 between Alhama y Costera road, around industrial area Las Salinas. –  RM-23 Km 0 to Km 0,25 –  RM 303 Santomera- Alquerías Km 0,1 to 0,3 TRAIN: completely interrupted railway traffic on Lorca-Águilas & Lorca-La Hoya lines. DRINKABLE WATER: Drinkable net serius damages around districts of Lorca and Puerto Lumbreras: El Campillo, Almenara, Altobordo, La Escucha PUERTO LUMBRERAS COMMUNITY HEALTH CENTER: it was moved to El Riscal Hotel, in the same district. PHONE: Interrupted in Puerto Lumbreras only 1 day (September 28th).
  • 17. 17 A7 motorway, over Béjar watercourse
  • 19. 19
  • 20. 20 EMERGENCY STAGE DESACTIVATED ON OCTOBER 11st 2012 TO STANDAR STAGE
  • 21. 21 THANK YOU FOR YOUR ATTENTION