WORK STUDY
UNIT - II
WORK STUDY
 Today’s competitive market industry must be
aware of latest developments for new
technology.
1. By improving the process of manufacture
2. By improving the operation of existing
facilities( Plant and Human)
DEFINITION OF WORK
STUDY
 Study of human work in all aspects in order to
increase the effectiveness with which work is
done.
 Work study aimed to achieving higher
productivity
 By finding the most efficient use of available
resource to create output.
ELEMENTS OF WORK STUDY
 Work study = Method study + Work measurement
 Method study = Developing easier and more
effective method.
 Work measurement = Time for a qualified worker to
carry out a specific job at different level of
peformance
 Work study gives higher productivity.
OBJECTIVES OF
WORK STUDY
 Most economical way for work
 To simplify and standardise the methods,
materials and tools.
 Time required for a qualified worker
 To plan training program for the worker for
new method.
PURPOSE OF WORK STUDY
 Raising productivity
 Increase productivity without capital
expenditure
 It helps to eliminate / reduce waste
 Better quality of product at reasonable price
Work study procedure (16 mark)
1. Select (job or process selected)
2. Record (record by various techniques)
3. Examine (asking questions who,when)
4. Develop (Economical method)
5. Measure (amount of work involved)
6. Define (new method)
7. Install (new method standard pratice)
8. Maintain (proper control the above pratice)
METHOD STUDY
 Systematic analysis for the better utilisation of
resources
 It is developing better method for doing a
job.
 Other wise called as method engineering,
Method analysis, Work improvement
Objectives of Method study
 To improve process and procedures
 To improve design plant and equipment
 Improve plant layout
 Improve men , material.
 Standardise methods
 Improve safety methods
Basic procedure for method
study (16 Mark)
1. Select (job or process selected)
2. Record (record by various techniques)
3. Examine (asking questions who,when)
4. Develop (Economical method)
5. Define (new method)
6. Install (new method standard pratice)
7. Maintain (proper control the above pratice)
 1) SELECTION OF JOB FOR METHOD STUDIES
 1) Economic considerations:
 Waste of time for long investigation
 Operations involved excess man power
 By tracking materials
 Repetative work
 Operations having poor utilisation of resources
 2) Techinical consideration:
 To ensure adequate technology is available to carry out
the study successfully.
 3) Human reactions:
 All concern persons accept the method study for
improve.
 2) RECORD
 After selection the job record the Relevant facts of
existing methods.
 RECORDONG METHODS
 CHARTS
 Outline process chart
 Flow process chart
 Multiple activity chart wth time scale
 Simo chart
 CHARTS AND DIAGRAMS
 Flow diagram
 String diagram
 3) EXAMINE
 Relevant informations and procedures are recorder
next stem examine that.
 CRITICAL QUESTIONS
1. PRIMARY QUESTIONS
2. SECONDARY QUESTIONS
4) DEVELOP
Evaluate successfully the four step formula are
1. Eliminate all un necessary operations
2. Combine two or more operations
3. Sequence of various activities
 5) DEFINE NEW METHOD
 By analysing the above methods We Define newer
method by agreeing the various workers and
management.
 6) INSTALL NEW METHOD
 Install new method
 Train the workers for the new method
 The proposed method was accepted by supervisors, etc.
7) MAINTAIN THE PROPOSED METHOD
 Adopting various monitoring techniques
 Data collection and interruption
 Feed back from evaluated reports
RECORDING TECHNIQES
(16 mark)
1. CHARTS
1. METHOD STUDY
2. PROCESS CHARTS
1. OUTLINE PROCESS CHARTS
2. FLOW PROCESS CHARTS
3. TWO HANDED PROCESS CHARTS
2. DIAGRAMS
1. FLOW DIAGRAM
2. STRING DIAGRAM
3. TRAVEL CHART
4. CYCLE GRAPH
METHOD STUDY( PROCESS
CHART SYMBOLS)
CIRCLE is used for operation
RECTANGLE is used for inspection
TRANSPORT (movement of workers, equipments )
DELAY (Temporary storage)
STORAGE (PERMANENT STORAGE)
PROCESS CHART
 1) OUTLINE PROCESS CHART
 It is otherwise called as operation process chart
 Overall view of the whole process
 INPUT- OPERATION- OUTPUT
2) FLOW PROCESS CHART
 It includes graphical representation of ALL
OPERATIONS, INSPECTIONS, DELAYS,
STORAGES etc.,
 DEF: Sequence of flow of product or
procedure
 TYPES OF FLOW CHART
 Flow process chart (Man type)
 Flow process chart (Material type)
 Flow process chart (Equipment type)
FLOW PROCESS CHART
EXAMPLE
TWO HANDED PROCESS
CHART
 Other wise called as left and right handed process
chart
 Activities of the worker’s hand are recorded
 To eliminate the unwanted motion to minimum
 ADV:
 Balance the motion and reduce fatigue
 To eliminate and reduce motions
 Train new operations in ideal method
CHARTS USING TIME SCALE
 1) MULTIPLE ACTIVITY CHART:
 It is a chart more than one subject(men, machine, item)
are recorded on a common time scale
 USES OF MULTIPLE ACTIVITY CHART:
 To analyses ideal time of men and machine.
 Determine number of machines handle by an operator
 IMPORTANT TYPES OF MULTI ACTIVITY CHART:
1. Man machine activity(1 operator, 1 machine)
2. Multi man activity(many operators, 1 machine)
3. Man-multi machine activity(1 operator, many machine)
4. Multi machine activity chart (group of operators
,central machine)
 2) SIMO chart (SIMULTANEOUS MOTION
CYCLE CHART)
 Record the activities, of two hands or other parts.
 SIMO chart constructed from Data collected motion flim
analysis
 THERBLINGS
 Therblings are the symbols used to denote various
activities and movements done for different purpose.
THERBLINGS
DIAGRAMS
 1) FLOW DIAGRAMS:
 Plan drawing in a working area, showing a
location of various activities by symbols.
 CONSTRUCTION PROCEDURE:
 Draw the work area
 Mark the positions of tools, benches
 Trace the path
 Indicate the direction of movement
 Different colours for the different type of movement
FLOW DIAGRAM
STRING DIAGRAM
 It is a scale plan or model THREAD is used to
trace and measure the path of materials ,
machine in define path.
CYCLE GRAPH
 The techniques are developed by Gilberth.
 It is the record of path movement , Usually
traced by continuous source of light on
photograph.
 For these small electric bulb is attached to the
hand or finger, the motion can be recorded.
CHRONOCYCLE graph is a special form of
cycle graph in which light source is suitable
interrupted so thet path appears peer- dot
shaped.
PRINCIPLES OF MOTION
ECONOMY
 These principles are developed from improved
methods
 These principles are groped in to THREE
headings
1. Use of human body
2. Arrangement of workplace
3. Design of tools and equipment.
Principles with the use of HUMAN BODY
 Two hands should began and end their movements in same
time.
 Two hands should not be ideal at same time
 Hand motions should symmetrically opposite direction
 Momentum should be help of the worker during work
 Countineous curved movements preferred to straight line
motions during sudden changes in direction.
 Free swinging movements are faster for controlling
movements
 Work should be arranged to eye comfort for easier work
PRINCIPLES OF THE ARRANGEMENT
OF WORKPLACE
 Fixed station to provide all tools
 Pre position of tools to reduce searching
 Scrap bins are closer to the working area
 Tools should be arranged permit for the best
sequence
 Ejectors should provide whenever possible for
disposal purpose.
PRINCIPLES OF TOOLS AND EQUIPMENTS
 Equipments are fixed by using jigs and fixtures.
 Two or more tools should be combined whenever
possible
 Load should be distributed accordingly for the
type writing purpose
 Handles such as large screw drivers are designed
for easy handling purpose
 Levers , crossbars , handwheels are places for a
mechanical advantage.
MICRO MOTION STUDY
(8mark)
 It is a detailed motion study employing either
video taps, or motion pictures operating in a
constant speed.
 Picture camera is utilized for study, then the
procedure is known micro motion study
MICRO MOTION STUDY
PROCEDURE
1. Filming the operation to be studied
2. Analysing the films
3. Recordings/ presenting the data.
 Filming the operation
 16mm movie camera
 Other equipments like, reflectors, exposure meter
 2)ANALYSING THE FILMS
 Once the operation over film is viewed through
projector.
1. Film is run at normal speed to get the movement
involved
2. A regular work cycle( process) is selected among
the film
3. Film is run at very slowly for backward purpose.
3) RECORDING / PRESENTING THE DATA
 Once the film analysis over
 Next to prepare SIOM chart for the micro
motion of limbs
PURPOSE OF MICRO MOTION AND ITS
ADVANTAGES
 To study the nature and path of movements
 To study the activities of the machine and operator
 To keep permanent record of most efficient way of
performing task
 Carry out research in the field of method and time
study
ADVANTAGES:
 It gives very accurate time for operation
 Fast, short , repetitive cycles by this process
 Easy comparison of present method and proposed
method
MEMO MOTION
(8 mark)
 It is developed by Marvin Mudrel
 It is special type of micro motion,
ACTIVITIES ARE FLIMED AT SLOWER
SPEED 60 or 100 frames per second.
 It is best suited for many activities and less
than micro study
 For quantity checking purpose in continues
production activity in company.
PROCEDURE OF MEMO MOTION STUDY
1. Study of operations to be filmed
2. Obtain the film
3. Analysis the film
4. Construct a suitable chart depending up on the
nature of the film
5. Improve the methods by using the motion
economy
PURPOSE OF MEMO MOTION STUDY AND
ADVANTAGES
 To study job involving cycles
 To study team work and create activities
 To study flow of material
 Analyses the material handling
 For collecting motion time data
ADVANTAGES:
 More economical than micro motion study
 Consumes less film
 Film analyses in smaller time than micro motion stud
WORK MEASUREMENT
 It is also known as TIME STUDY
 Time for a specific job for a worker
USES OF WORK MEASUREMENT:
 To determine time standards
 Alternate method for doing a job
 Eliminate in effective time
 Estimate the cost of the product
 To determine staff and product requirements
TECHNIQUES OF WORK MEASUREMENT
1. Stop watch time study(It deals with time and
rate of working)
2. Work sampling( Large number of
observations from random samples)
3. Pre determined time standards
(PTS)(Basic human motion for increase in
performance)
4. Standard data.( Time for a job in continuous
process )
Stop watch time study
 It is a measurement technique
 Records the time and rates of working for the
elements of a specified job.
 TIME STUDY EQUIPMENT
 Stop watch
 Electronic devices
 Motion picture camera
 STOP WATCH
 To measure the elemental timings
 It has two hands
 i) Small hand (one revolution in 30 min)
 Ii) Large hand (One revolution in one minute)
 TYPES OF STOPWATCH
 Non-fly back
 Fly back
 Non-fly back
 First pressure on winding knob Starts the long
hand
 Second pressure stops the long hand
 Third pressure returns hand to Zero position
 Fly back
 Start and stop with the help of slide
 Pressuring the wind knob brings the hand back to zero.
BASIC TIME STUDY
PROCEDURE
 SELECT (The job to be studied)
 OBTAIN & RECORD (All the details about the job
and operator)
 BREAK DOWN (the job into suitable elements)
 MEASURE (Time duration for each element and
assess the rating)
 EXTEND ( Observed time into normal time)
 DETERMINE (The allowances to be made)
 COMPUTE (The standard time by adding allowances
to normal time)
PPC-Unit II- WORK STUDY
PPC-Unit II- WORK STUDY
PPC-Unit II- WORK STUDY
PPC-Unit II- WORK STUDY
PPC-Unit II- WORK STUDY
PPC-Unit II- WORK STUDY

Más contenido relacionado

La actualidad más candente

Mass production
Mass productionMass production
Mass production
krish_3991
 
Work Study: Method Study & Work Measurement
Work Study: Method Study & Work MeasurementWork Study: Method Study & Work Measurement
Work Study: Method Study & Work Measurement
Harinadh Karimikonda
 

La actualidad más candente (20)

Time study
Time studyTime study
Time study
 
137 work study
137 work study137 work study
137 work study
 
types of production system
types of production systemtypes of production system
types of production system
 
Method study
Method studyMethod study
Method study
 
Work study
Work studyWork study
Work study
 
Line balancing
Line balancingLine balancing
Line balancing
 
job shop production system in productions and operations system
job shop production system in productions and operations systemjob shop production system in productions and operations system
job shop production system in productions and operations system
 
Group technology _ flexible manufacturing system_supply chain management
Group technology _ flexible manufacturing system_supply chain managementGroup technology _ flexible manufacturing system_supply chain management
Group technology _ flexible manufacturing system_supply chain management
 
Group Technology
Group TechnologyGroup Technology
Group Technology
 
Work Study & Productivity
Work Study & ProductivityWork Study & Productivity
Work Study & Productivity
 
Mass production
Mass productionMass production
Mass production
 
Work measurement
Work measurementWork measurement
Work measurement
 
Work Measurement
Work MeasurementWork Measurement
Work Measurement
 
TIME STUDY
TIME STUDYTIME STUDY
TIME STUDY
 
Group technology, Production flow Analysis
Group technology, Production flow AnalysisGroup technology, Production flow Analysis
Group technology, Production flow Analysis
 
Types of production processes
Types of production processesTypes of production processes
Types of production processes
 
Computer Integrated Manufacturing System
Computer Integrated Manufacturing SystemComputer Integrated Manufacturing System
Computer Integrated Manufacturing System
 
Introduction to production planning and control
Introduction to production planning and controlIntroduction to production planning and control
Introduction to production planning and control
 
Shop floor control and management in CIM
Shop floor control and management in CIMShop floor control and management in CIM
Shop floor control and management in CIM
 
Work Study: Method Study & Work Measurement
Work Study: Method Study & Work MeasurementWork Study: Method Study & Work Measurement
Work Study: Method Study & Work Measurement
 

Similar a PPC-Unit II- WORK STUDY

Om4 bbm(l) 25.03.11
Om4 bbm(l) 25.03.11Om4 bbm(l) 25.03.11
Om4 bbm(l) 25.03.11
Rahul Jain
 
Method study(abhishekkumar)
Method study(abhishekkumar)Method study(abhishekkumar)
Method study(abhishekkumar)
Abhishek Kumar
 

Similar a PPC-Unit II- WORK STUDY (20)

Work study-150303084338-conversion-gate01
Work study-150303084338-conversion-gate01Work study-150303084338-conversion-gate01
Work study-150303084338-conversion-gate01
 
Method study
Method studyMethod study
Method study
 
PRODUCTION PLANNING AND CONTROL-WORK STUDY
PRODUCTION  PLANNING AND CONTROL-WORK STUDYPRODUCTION  PLANNING AND CONTROL-WORK STUDY
PRODUCTION PLANNING AND CONTROL-WORK STUDY
 
Work study
Work studyWork study
Work study
 
Om4 bbm(l) 25.03.11
Om4 bbm(l) 25.03.11Om4 bbm(l) 25.03.11
Om4 bbm(l) 25.03.11
 
UNIT 2 - WORK STUDY
UNIT 2 -  WORK STUDYUNIT 2 -  WORK STUDY
UNIT 2 - WORK STUDY
 
Ppc unit-2-work study
Ppc   unit-2-work studyPpc   unit-2-work study
Ppc unit-2-work study
 
Method study(abhishekkumar)
Method study(abhishekkumar)Method study(abhishekkumar)
Method study(abhishekkumar)
 
Method study
Method studyMethod study
Method study
 
Unit 3 iem part 2
Unit 3  iem part  2Unit 3  iem part  2
Unit 3 iem part 2
 
Facility Layout/Production Planning & Control(PPC)/ Method Study/ Capacity Pl...
Facility Layout/Production Planning & Control(PPC)/ Method Study/ Capacity Pl...Facility Layout/Production Planning & Control(PPC)/ Method Study/ Capacity Pl...
Facility Layout/Production Planning & Control(PPC)/ Method Study/ Capacity Pl...
 
Time study part 2
Time study part 2Time study part 2
Time study part 2
 
02 Method Study part_2.pdf
02 Method Study part_2.pdf02 Method Study part_2.pdf
02 Method Study part_2.pdf
 
Unit 2 PPC
Unit 2 PPCUnit 2 PPC
Unit 2 PPC
 
Unit 2-IE6605 & PRODUCTION PLANNING AND CONTROL
Unit 2-IE6605 & PRODUCTION PLANNING AND CONTROLUnit 2-IE6605 & PRODUCTION PLANNING AND CONTROL
Unit 2-IE6605 & PRODUCTION PLANNING AND CONTROL
 
Unit 2
Unit 2Unit 2
Unit 2
 
Unit 2
Unit 2Unit 2
Unit 2
 
PRODUCTION PLANNING AND CONTROL UNIT 2
PRODUCTION PLANNING AND CONTROL UNIT 2PRODUCTION PLANNING AND CONTROL UNIT 2
PRODUCTION PLANNING AND CONTROL UNIT 2
 
unit 2.pptx
unit 2.pptxunit 2.pptx
unit 2.pptx
 
PRODUCTION PLANNING AND CONTROL-Unit 2
PRODUCTION PLANNING AND CONTROL-Unit 2PRODUCTION PLANNING AND CONTROL-Unit 2
PRODUCTION PLANNING AND CONTROL-Unit 2
 

Más de Dr.PERIASAMY K

Más de Dr.PERIASAMY K (20)

UNIT-III.ppt
UNIT-III.pptUNIT-III.ppt
UNIT-III.ppt
 
UNIT-II updated.ppt
UNIT-II updated.pptUNIT-II updated.ppt
UNIT-II updated.ppt
 
UNIT 1.ppt
UNIT 1.pptUNIT 1.ppt
UNIT 1.ppt
 
PPCE Unit-5.pptx
PPCE Unit-5.pptxPPCE Unit-5.pptx
PPCE Unit-5.pptx
 
PPCE Unit-4.pptx
PPCE Unit-4.pptxPPCE Unit-4.pptx
PPCE Unit-4.pptx
 
PPCE Unit-3.pptx
PPCE Unit-3.pptxPPCE Unit-3.pptx
PPCE Unit-3.pptx
 
PPCE Unit-2.pptx
PPCE Unit-2.pptxPPCE Unit-2.pptx
PPCE Unit-2.pptx
 
PPCE Unit -1.pptx
PPCE Unit -1.pptxPPCE Unit -1.pptx
PPCE Unit -1.pptx
 
POM UNIT-3.pptx
POM UNIT-3.pptxPOM UNIT-3.pptx
POM UNIT-3.pptx
 
POM UNIT-4.pptx
POM UNIT-4.pptxPOM UNIT-4.pptx
POM UNIT-4.pptx
 
Unit 5 Controlling.ppt
Unit 5 Controlling.pptUnit 5 Controlling.ppt
Unit 5 Controlling.ppt
 
POM UNIT-2.pptx
POM UNIT-2.pptxPOM UNIT-2.pptx
POM UNIT-2.pptx
 
POM UNIT-I.pdf
POM UNIT-I.pdfPOM UNIT-I.pdf
POM UNIT-I.pdf
 
MANUFACTURING PROCESS-II
MANUFACTURING PROCESS-IIMANUFACTURING PROCESS-II
MANUFACTURING PROCESS-II
 
MANUFACTURING PROCESS-II
MANUFACTURING PROCESS-IIMANUFACTURING PROCESS-II
MANUFACTURING PROCESS-II
 
MANUFACTURING PROCESS-II
MANUFACTURING PROCESS-IIMANUFACTURING PROCESS-II
MANUFACTURING PROCESS-II
 
MANUFACTURING PROCESS-I
MANUFACTURING PROCESS-IMANUFACTURING PROCESS-I
MANUFACTURING PROCESS-I
 
MANUFACTURING PROCESS-I
MANUFACTURING PROCESS-IMANUFACTURING PROCESS-I
MANUFACTURING PROCESS-I
 
MANUFACTURING PROCESS-I
MANUFACTURING PROCESS-IMANUFACTURING PROCESS-I
MANUFACTURING PROCESS-I
 
MANUFACTURING PROCESS-I
MANUFACTURING PROCESS-IMANUFACTURING PROCESS-I
MANUFACTURING PROCESS-I
 

Último

Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Christo Ananth
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Christo Ananth
 

Último (20)

Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 

PPC-Unit II- WORK STUDY

  • 2. WORK STUDY  Today’s competitive market industry must be aware of latest developments for new technology. 1. By improving the process of manufacture 2. By improving the operation of existing facilities( Plant and Human)
  • 3. DEFINITION OF WORK STUDY  Study of human work in all aspects in order to increase the effectiveness with which work is done.  Work study aimed to achieving higher productivity  By finding the most efficient use of available resource to create output.
  • 4. ELEMENTS OF WORK STUDY  Work study = Method study + Work measurement  Method study = Developing easier and more effective method.  Work measurement = Time for a qualified worker to carry out a specific job at different level of peformance  Work study gives higher productivity.
  • 5. OBJECTIVES OF WORK STUDY  Most economical way for work  To simplify and standardise the methods, materials and tools.  Time required for a qualified worker  To plan training program for the worker for new method.
  • 6. PURPOSE OF WORK STUDY  Raising productivity  Increase productivity without capital expenditure  It helps to eliminate / reduce waste  Better quality of product at reasonable price
  • 7. Work study procedure (16 mark) 1. Select (job or process selected) 2. Record (record by various techniques) 3. Examine (asking questions who,when) 4. Develop (Economical method) 5. Measure (amount of work involved) 6. Define (new method) 7. Install (new method standard pratice) 8. Maintain (proper control the above pratice)
  • 8. METHOD STUDY  Systematic analysis for the better utilisation of resources  It is developing better method for doing a job.  Other wise called as method engineering, Method analysis, Work improvement
  • 9. Objectives of Method study  To improve process and procedures  To improve design plant and equipment  Improve plant layout  Improve men , material.  Standardise methods  Improve safety methods
  • 10. Basic procedure for method study (16 Mark) 1. Select (job or process selected) 2. Record (record by various techniques) 3. Examine (asking questions who,when) 4. Develop (Economical method) 5. Define (new method) 6. Install (new method standard pratice) 7. Maintain (proper control the above pratice)
  • 11.  1) SELECTION OF JOB FOR METHOD STUDIES  1) Economic considerations:  Waste of time for long investigation  Operations involved excess man power  By tracking materials  Repetative work  Operations having poor utilisation of resources  2) Techinical consideration:  To ensure adequate technology is available to carry out the study successfully.  3) Human reactions:  All concern persons accept the method study for improve.
  • 12.  2) RECORD  After selection the job record the Relevant facts of existing methods.  RECORDONG METHODS  CHARTS  Outline process chart  Flow process chart  Multiple activity chart wth time scale  Simo chart  CHARTS AND DIAGRAMS  Flow diagram  String diagram
  • 13.  3) EXAMINE  Relevant informations and procedures are recorder next stem examine that.  CRITICAL QUESTIONS 1. PRIMARY QUESTIONS 2. SECONDARY QUESTIONS 4) DEVELOP Evaluate successfully the four step formula are 1. Eliminate all un necessary operations 2. Combine two or more operations 3. Sequence of various activities
  • 14.  5) DEFINE NEW METHOD  By analysing the above methods We Define newer method by agreeing the various workers and management.  6) INSTALL NEW METHOD  Install new method  Train the workers for the new method  The proposed method was accepted by supervisors, etc. 7) MAINTAIN THE PROPOSED METHOD  Adopting various monitoring techniques  Data collection and interruption  Feed back from evaluated reports
  • 15. RECORDING TECHNIQES (16 mark) 1. CHARTS 1. METHOD STUDY 2. PROCESS CHARTS 1. OUTLINE PROCESS CHARTS 2. FLOW PROCESS CHARTS 3. TWO HANDED PROCESS CHARTS 2. DIAGRAMS 1. FLOW DIAGRAM 2. STRING DIAGRAM 3. TRAVEL CHART 4. CYCLE GRAPH
  • 16. METHOD STUDY( PROCESS CHART SYMBOLS) CIRCLE is used for operation RECTANGLE is used for inspection
  • 17. TRANSPORT (movement of workers, equipments ) DELAY (Temporary storage) STORAGE (PERMANENT STORAGE)
  • 18. PROCESS CHART  1) OUTLINE PROCESS CHART  It is otherwise called as operation process chart  Overall view of the whole process  INPUT- OPERATION- OUTPUT
  • 19. 2) FLOW PROCESS CHART  It includes graphical representation of ALL OPERATIONS, INSPECTIONS, DELAYS, STORAGES etc.,  DEF: Sequence of flow of product or procedure  TYPES OF FLOW CHART  Flow process chart (Man type)  Flow process chart (Material type)  Flow process chart (Equipment type)
  • 21. TWO HANDED PROCESS CHART  Other wise called as left and right handed process chart  Activities of the worker’s hand are recorded  To eliminate the unwanted motion to minimum  ADV:  Balance the motion and reduce fatigue  To eliminate and reduce motions  Train new operations in ideal method
  • 22.
  • 23. CHARTS USING TIME SCALE  1) MULTIPLE ACTIVITY CHART:  It is a chart more than one subject(men, machine, item) are recorded on a common time scale  USES OF MULTIPLE ACTIVITY CHART:  To analyses ideal time of men and machine.  Determine number of machines handle by an operator  IMPORTANT TYPES OF MULTI ACTIVITY CHART: 1. Man machine activity(1 operator, 1 machine) 2. Multi man activity(many operators, 1 machine) 3. Man-multi machine activity(1 operator, many machine) 4. Multi machine activity chart (group of operators ,central machine)
  • 24.  2) SIMO chart (SIMULTANEOUS MOTION CYCLE CHART)  Record the activities, of two hands or other parts.  SIMO chart constructed from Data collected motion flim analysis  THERBLINGS  Therblings are the symbols used to denote various activities and movements done for different purpose.
  • 26. DIAGRAMS  1) FLOW DIAGRAMS:  Plan drawing in a working area, showing a location of various activities by symbols.  CONSTRUCTION PROCEDURE:  Draw the work area  Mark the positions of tools, benches  Trace the path  Indicate the direction of movement  Different colours for the different type of movement
  • 28. STRING DIAGRAM  It is a scale plan or model THREAD is used to trace and measure the path of materials , machine in define path.
  • 29. CYCLE GRAPH  The techniques are developed by Gilberth.  It is the record of path movement , Usually traced by continuous source of light on photograph.  For these small electric bulb is attached to the hand or finger, the motion can be recorded.
  • 30. CHRONOCYCLE graph is a special form of cycle graph in which light source is suitable interrupted so thet path appears peer- dot shaped.
  • 31. PRINCIPLES OF MOTION ECONOMY  These principles are developed from improved methods  These principles are groped in to THREE headings 1. Use of human body 2. Arrangement of workplace 3. Design of tools and equipment.
  • 32. Principles with the use of HUMAN BODY  Two hands should began and end their movements in same time.  Two hands should not be ideal at same time  Hand motions should symmetrically opposite direction  Momentum should be help of the worker during work  Countineous curved movements preferred to straight line motions during sudden changes in direction.  Free swinging movements are faster for controlling movements  Work should be arranged to eye comfort for easier work
  • 33. PRINCIPLES OF THE ARRANGEMENT OF WORKPLACE  Fixed station to provide all tools  Pre position of tools to reduce searching  Scrap bins are closer to the working area  Tools should be arranged permit for the best sequence  Ejectors should provide whenever possible for disposal purpose.
  • 34. PRINCIPLES OF TOOLS AND EQUIPMENTS  Equipments are fixed by using jigs and fixtures.  Two or more tools should be combined whenever possible  Load should be distributed accordingly for the type writing purpose  Handles such as large screw drivers are designed for easy handling purpose  Levers , crossbars , handwheels are places for a mechanical advantage.
  • 35. MICRO MOTION STUDY (8mark)  It is a detailed motion study employing either video taps, or motion pictures operating in a constant speed.  Picture camera is utilized for study, then the procedure is known micro motion study
  • 36. MICRO MOTION STUDY PROCEDURE 1. Filming the operation to be studied 2. Analysing the films 3. Recordings/ presenting the data.  Filming the operation  16mm movie camera  Other equipments like, reflectors, exposure meter
  • 37.  2)ANALYSING THE FILMS  Once the operation over film is viewed through projector. 1. Film is run at normal speed to get the movement involved 2. A regular work cycle( process) is selected among the film 3. Film is run at very slowly for backward purpose. 3) RECORDING / PRESENTING THE DATA  Once the film analysis over  Next to prepare SIOM chart for the micro motion of limbs
  • 38. PURPOSE OF MICRO MOTION AND ITS ADVANTAGES  To study the nature and path of movements  To study the activities of the machine and operator  To keep permanent record of most efficient way of performing task  Carry out research in the field of method and time study ADVANTAGES:  It gives very accurate time for operation  Fast, short , repetitive cycles by this process  Easy comparison of present method and proposed method
  • 39. MEMO MOTION (8 mark)  It is developed by Marvin Mudrel  It is special type of micro motion, ACTIVITIES ARE FLIMED AT SLOWER SPEED 60 or 100 frames per second.  It is best suited for many activities and less than micro study  For quantity checking purpose in continues production activity in company.
  • 40. PROCEDURE OF MEMO MOTION STUDY 1. Study of operations to be filmed 2. Obtain the film 3. Analysis the film 4. Construct a suitable chart depending up on the nature of the film 5. Improve the methods by using the motion economy
  • 41. PURPOSE OF MEMO MOTION STUDY AND ADVANTAGES  To study job involving cycles  To study team work and create activities  To study flow of material  Analyses the material handling  For collecting motion time data ADVANTAGES:  More economical than micro motion study  Consumes less film  Film analyses in smaller time than micro motion stud
  • 42. WORK MEASUREMENT  It is also known as TIME STUDY  Time for a specific job for a worker USES OF WORK MEASUREMENT:  To determine time standards  Alternate method for doing a job  Eliminate in effective time  Estimate the cost of the product  To determine staff and product requirements
  • 43. TECHNIQUES OF WORK MEASUREMENT 1. Stop watch time study(It deals with time and rate of working) 2. Work sampling( Large number of observations from random samples) 3. Pre determined time standards (PTS)(Basic human motion for increase in performance) 4. Standard data.( Time for a job in continuous process )
  • 44. Stop watch time study  It is a measurement technique  Records the time and rates of working for the elements of a specified job.  TIME STUDY EQUIPMENT  Stop watch  Electronic devices  Motion picture camera
  • 45.  STOP WATCH  To measure the elemental timings  It has two hands  i) Small hand (one revolution in 30 min)  Ii) Large hand (One revolution in one minute)  TYPES OF STOPWATCH  Non-fly back  Fly back
  • 46.  Non-fly back  First pressure on winding knob Starts the long hand  Second pressure stops the long hand  Third pressure returns hand to Zero position  Fly back  Start and stop with the help of slide  Pressuring the wind knob brings the hand back to zero.
  • 47. BASIC TIME STUDY PROCEDURE  SELECT (The job to be studied)  OBTAIN & RECORD (All the details about the job and operator)  BREAK DOWN (the job into suitable elements)  MEASURE (Time duration for each element and assess the rating)  EXTEND ( Observed time into normal time)  DETERMINE (The allowances to be made)  COMPUTE (The standard time by adding allowances to normal time)