THE 'IMPACT ANALYSIS' OR DETAILED STUDY PHASE OF
EIA INVOLVES
 identifying the impacts more specifically
 predicting the characteristics of the main impacts
 evaluating the significance of the residual impact
2
IMPACT IDENTIFICATION METHODS
• Adhoc method
• Checklists
• Matrices
• Networks
• Overlays and geographical information systems
(GIS)
• Expert systems
• Professional judgement
3
CHOICE OF EIA METHOD DEPENDS ON
 The type and size of the proposal
 The type of alternatives being considered
 The nature of the likely impacts;
 The availability of impact identification methods
 The experience of the EIA team with their use
 The resources available - cost, information, time,
personnel
4
5
Functions of EIA Methods
• Impact identification
• Impact prediction
• Impact interpretation
• Communication of information
• Devising monitoring schemes
6
1. Ad Hoc Method of EIA
• No structure
• Brainstorming
• Basis for other methods?
• More effective the wider the consultation
7
2. Checklist Methods of EIA s
• Simple checklists
• Descriptive checklists : Suggests prediction
techniques
• Scaling checklist : Forces interpretation by including
thresholds of concern”
• Questionnaire checklist :Gives rough idea of impacts
8
3. Matrices
• Leopold matrix
• Simple matrix
• Component interaction matrix
9
UNEP Training Resource Manual Topic 6 Slide 9
10
Soucre: google search Image
11
Soucre: google search Image
12
Soucre: google search Image
13
4. Networks
• Need big sheet of paper
• Excellent for indirect impacts
• Excellent for interlinkage
EXAMPLE OF A NETWORK
14
(showing linkages leading to changes in quality of life, wildlife and tourism)
(Bisset)
15
5 Overlays Method
• McHarg overlays
• Geographical Information Systems (GIS)
• The various EIA methods draw on a broad range of tools, including many
general purpose data processing and analytical methods.
• The most important ones among them are:
• geographical information systems (GIS), for the capture, management,
display, and analysis of geo-referenced data; basic methods include overlay
and buffer analysis.
• statistical analysis, with basic tools such as time series analysis, histograms,
regression, analysis of variance, cluster analysis, etc.
16
17
18
MAIN ADVANTAGES AND DISADVANTAGES OF
IMPACT IDENTIFICATION METHODS
19
Methods
ADVANTAGES DISADVANTAGES
Checklists
easy to understand and use
good for site selection and priority
setting simple ranking and weighting
do not distinguish between direct and indirect impacts
do not link action and impact
the process of incorporating values
can be controversial
Matrices
link action to impact good method for
displaying EIA results
difficult to distinguish direct and indirect impacts
have potential for double-counting of
impacts
Networks
link action to impact useful in
simplified form for checking
for second order impacts
handles direct and
indirect impacts
can become very complex if used beyond simplified version
Overlays easy to understand focus and display
spatial impacts good siting tool
can be cumbersome poorly suited to address impact duration
or probability
GIS and computer expert
systems
excellent for impact identification and
spatial analysis good for
'experimenting'
heavy reliance on knowledge and data often complex and
expensive
METHODS OF IMPACT PREDICTION
• ‘Best estimate’ professional judgement
• Quantitative mathematical models
• Experiments and physical models
• Case studies as analogues or references
20
TYPES OF UNCERTAINTY IN IMPACT PREDICTION
 scientific uncertainty – limited understanding of the ecosystem or community
affected
 data uncertainty – incomplete information or insufficient methodology
 policy uncertainty – unclear or disputed objectives or standards
21
TYPES OF SOCIAL IMPACT
 demographic – changes to population numbers, distribution
 cultural – changes to customs, traditions and values
 community – changes to cohesion, relationships etc.
 socio-psychological – changes to quality of life and well being
22
HEALTH IMPACTS
23
Examples of health impacts by sector
Communicable
disease
Non
communicable
disease
Nutrition Injury Psychosocial
disorder and
loss of well-
being
Mining Tuberculosis Dust induced
lung disease
Crushing Labour migration
Agriculture Parasitic
infections
Pesticide
poisoning
Loss of
subsistence
Industry Poisoning by
pollutants
Occupational
injury
Disempowerment
Forestry Loss of food
production
Occupational
injury
Dams and
irrigation
schemes
Water borne
diseases
Poisoning by
pollutants
Increased food
production
Drowning Involuntary
displacement
Transportation HIV/Aids Heart disease Traffic injury Noise and
induced stress
Energy Indoor air
pollution
Electromagnetic
radiation
Community
displacement
Source: Birley, 2000
FACTORS AFFECTING ECONOMIC IMPACTS
• Duration of construction and operation
• Workforce requirements for each period
• Skill requirements (local availability)
• Earning
• Raw material and other input purchases
• Capital investment
• Outputs
• The characteristics of the local economy
24
FACTORS AFFECTING FISCAL IMPACTS
• Size of investment and workforce requirements
• Capacity of existing service delivery and infrastructure systems
• Local/regional tax or other revenue raising processes
• Demographic changes arising from project requirements
25
26
Impact Prediction
• Impact prediction is a way of ‘mapping’ the environmental consequences of the
significant aspects of the project and its alternatives. Environmental impact can never
be predicted with absolute certainty and this is all the more reason to consider all
possible factors and take all possible precautions for reducing the degree of
uncertainty.
27
Here’s a example that we can consider for what we need to predict in
regards to different criteria during a planning phase of transportation
project
• Air
• changes in ambient levels and ground level concentrations due to total
emissions from point, line and area sources
• effects on soils, materials, vegetation, and human health
• Noise
• changes in ambient levels due to noise generated from equipment and
movement of vehicles
• effect on fauna and human health
• Water
• availability to competing users
• changes in quality
• sediment transport
• ingress of saline water
·
28
• Land
• Changes in land use and drainage pattern
• Changes in land quality including effects of waste disposal
• Changes in shoreline/riverbank and their stability
• Biological
• Deforestation/tree-cutting and shrinkage of animal habitat.
• Impact on fauna and flora (including aquatic species if any) due to
contaminants/pollutants
• Impact on rare and endangered species, endemic species, and migratory
path/route of animals.
• Impact on breeding and nesting grounds
• Socio-economic
• Impact on the local community including demographic changes.
• Impact on economic status
• Impact on human health.
• Impact of increased traffic
MAIN ENVIRONMENTAL PROBLEMS COMMONLY ASSOCIATED WITH RURAL
ROADS PROJECTS.
• Encroachment into precious ecological resources, including forests and swamps.
• Encroachment into historical areas and cultural monuments.
• Impairment of fisheries, aquatic ecology and other beneficial water uses, due t
changes in surface hydrology.
• Erosion and silt runoff from exposed areas, which may also cause impairment of
• Downstream water quality and damage to land values.
• Dust nuisances caused by both the road usage and during construction.
CONCLUSION
Environmental Impact Assessment (EIA) OF TRANSPORTATION
PROJECTS study is a time-consuming process because it has a large
number of dependent and independent variables which have to be taken
into account (e.g. land use, land price, population density, socio-
economic level, road accessibility, railway accessibility, air quality,
ground water quality, noise level, biological content, historical value,
archeological and visual importance), which also have different
consequences. Traditionally, environmental data was collected to test
hypotheses and simulate environmental systems using in situ (field)
methodology

Más contenido relacionado

La actualidad más candente

Environmental impact assessment of mining projects 17.03.09
Environmental impact assessment of mining projects 17.03.09Environmental impact assessment of mining projects 17.03.09
Environmental impact assessment of mining projects 17.03.09
Mohit Singh
 
Unit 7 eia and sd
Unit 7 eia and sd Unit 7 eia and sd
Unit 7 eia and sd
Kumar
 

La actualidad más candente (20)

Seminar on Environmental Impact Assessment
Seminar on Environmental Impact AssessmentSeminar on Environmental Impact Assessment
Seminar on Environmental Impact Assessment
 
Factor considered for Environment Impact assessment (EIA) in legal procedure ...
Factor considered for Environment Impact assessment (EIA) in legal procedure ...Factor considered for Environment Impact assessment (EIA) in legal procedure ...
Factor considered for Environment Impact assessment (EIA) in legal procedure ...
 
Environmental impact assessment of mining projects 17.03.09
Environmental impact assessment of mining projects 17.03.09Environmental impact assessment of mining projects 17.03.09
Environmental impact assessment of mining projects 17.03.09
 
Developing Guidelines for Public Participation on Environmental Impact Assess...
Developing Guidelines for Public Participation on Environmental Impact Assess...Developing Guidelines for Public Participation on Environmental Impact Assess...
Developing Guidelines for Public Participation on Environmental Impact Assess...
 
Environmental Impact Assessment(EIA)
Environmental Impact Assessment(EIA)Environmental Impact Assessment(EIA)
Environmental Impact Assessment(EIA)
 
Environmental impact assessment (EIA)
Environmental impact assessment (EIA)Environmental impact assessment (EIA)
Environmental impact assessment (EIA)
 
IEE and screening in EIA
IEE and screening in EIAIEE and screening in EIA
IEE and screening in EIA
 
Environmental impact assessment methodology
Environmental impact assessment methodologyEnvironmental impact assessment methodology
Environmental impact assessment methodology
 
Impact prediction, evaluation and mitigation in eia
Impact prediction, evaluation and mitigation in eiaImpact prediction, evaluation and mitigation in eia
Impact prediction, evaluation and mitigation in eia
 
Eia methodogies
Eia methodogiesEia methodogies
Eia methodogies
 
Environmental Audit
Environmental AuditEnvironmental Audit
Environmental Audit
 
Environmental impact assessment (EIA)
Environmental impact assessment (EIA)Environmental impact assessment (EIA)
Environmental impact assessment (EIA)
 
Environmental Impact Assessment and Environmental Audit- Unit III
Environmental Impact Assessment and Environmental Audit- Unit IIIEnvironmental Impact Assessment and Environmental Audit- Unit III
Environmental Impact Assessment and Environmental Audit- Unit III
 
Iee
IeeIee
Iee
 
Environmental Impact Assessment, Initial Environmental Examination
Environmental Impact Assessment, Initial Environmental ExaminationEnvironmental Impact Assessment, Initial Environmental Examination
Environmental Impact Assessment, Initial Environmental Examination
 
EIA process
EIA processEIA process
EIA process
 
Environment impact assessment study
Environment impact assessment studyEnvironment impact assessment study
Environment impact assessment study
 
Environmental Impact Evaluation of Mining
Environmental Impact Evaluation of MiningEnvironmental Impact Evaluation of Mining
Environmental Impact Evaluation of Mining
 
Unit 7 eia and sd
Unit 7 eia and sd Unit 7 eia and sd
Unit 7 eia and sd
 
Stages of EIA
Stages of EIAStages of EIA
Stages of EIA
 

Destacado

Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
Prithvi Ghag
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
Nigel Gardner
 
Trophic Pyramids
Trophic PyramidsTrophic Pyramids
Trophic Pyramids
e.walters
 
Section and development
Section and developmentSection and development
Section and development
gtuautonomous
 

Destacado (20)

EIA Methods
EIA MethodsEIA Methods
EIA Methods
 
Eia prediction, evaluation & mitigration
Eia prediction, evaluation & mitigrationEia prediction, evaluation & mitigration
Eia prediction, evaluation & mitigration
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
 
Methods of eia(environmental impact assessment)
Methods of eia(environmental impact assessment)Methods of eia(environmental impact assessment)
Methods of eia(environmental impact assessment)
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
 
Methods of prediction and assessment techniques of impacts soil
Methods of prediction and assessment techniques of impacts soilMethods of prediction and assessment techniques of impacts soil
Methods of prediction and assessment techniques of impacts soil
 
Public Participation in Urban Transport Projects: Lessons from China
Public Participation in Urban Transport Projects: Lessons from ChinaPublic Participation in Urban Transport Projects: Lessons from China
Public Participation in Urban Transport Projects: Lessons from China
 
ENVI 3 energy flow in an ecosystem FINAL
ENVI 3 energy flow in an ecosystem FINALENVI 3 energy flow in an ecosystem FINAL
ENVI 3 energy flow in an ecosystem FINAL
 
Trophic Pyramids
Trophic PyramidsTrophic Pyramids
Trophic Pyramids
 
02 traffic impact assessment
02 traffic impact assessment02 traffic impact assessment
02 traffic impact assessment
 
Seminar
SeminarSeminar
Seminar
 
Ms project general introduction
Ms project general introductionMs project general introduction
Ms project general introduction
 
Survey responses
Survey responsesSurvey responses
Survey responses
 
Uts congestion components
Uts congestion componentsUts congestion components
Uts congestion components
 
Key factors related to traffic crashes by Malyar Talash
Key factors related to traffic crashes by Malyar TalashKey factors related to traffic crashes by Malyar Talash
Key factors related to traffic crashes by Malyar Talash
 
sMs project tutorial_iit
sMs project tutorial_iitsMs project tutorial_iit
sMs project tutorial_iit
 
Coordinate Systems
Coordinate SystemsCoordinate Systems
Coordinate Systems
 
Section and development
Section and developmentSection and development
Section and development
 
Civil 3 d overview general
Civil 3 d overview generalCivil 3 d overview general
Civil 3 d overview general
 

Similar a Eia methods for transportation project

Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
Bahadur Prasad
 
Lecture on Environmental Impact Assessment.pdf
Lecture on Environmental Impact Assessment.pdfLecture on Environmental Impact Assessment.pdf
Lecture on Environmental Impact Assessment.pdf
apratim7
 

Similar a Eia methods for transportation project (20)

Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
 
EIA
EIAEIA
EIA
 
Environmental Impact Assessment methods.pdf
Environmental Impact Assessment methods.pdfEnvironmental Impact Assessment methods.pdf
Environmental Impact Assessment methods.pdf
 
ENVIRONMENT IMPACT ASSESSMENT
ENVIRONMENT IMPACT ASSESSMENTENVIRONMENT IMPACT ASSESSMENT
ENVIRONMENT IMPACT ASSESSMENT
 
Mwalyosi-ImpactIdentificationPrediction-1999.pdf
Mwalyosi-ImpactIdentificationPrediction-1999.pdfMwalyosi-ImpactIdentificationPrediction-1999.pdf
Mwalyosi-ImpactIdentificationPrediction-1999.pdf
 
Evaluating the impact of climate services for farmers
Evaluating the impact of climate services for farmersEvaluating the impact of climate services for farmers
Evaluating the impact of climate services for farmers
 
Environmental impact assessment and life cycle assessment and their role in s...
Environmental impact assessment and life cycle assessment and their role in s...Environmental impact assessment and life cycle assessment and their role in s...
Environmental impact assessment and life cycle assessment and their role in s...
 
Lecture on Environmental Impact Assessment.pdf
Lecture on Environmental Impact Assessment.pdfLecture on Environmental Impact Assessment.pdf
Lecture on Environmental Impact Assessment.pdf
 
Environmental Impact Assignment
Environmental Impact Assignment Environmental Impact Assignment
Environmental Impact Assignment
 
Unit 6 environmental_impact_assessment
Unit 6 environmental_impact_assessmentUnit 6 environmental_impact_assessment
Unit 6 environmental_impact_assessment
 
Tewodros Tefera - ESPA Alter Project
Tewodros Tefera - ESPA Alter ProjectTewodros Tefera - ESPA Alter Project
Tewodros Tefera - ESPA Alter Project
 
EIA Methodologies
EIA MethodologiesEIA Methodologies
EIA Methodologies
 
FUNCTIONS OF EPA
FUNCTIONS OF EPAFUNCTIONS OF EPA
FUNCTIONS OF EPA
 
Environmental impact assessment (eia) By Mr Allah Dad Khan Visiting Professor...
Environmental impact assessment (eia) By Mr Allah Dad Khan Visiting Professor...Environmental impact assessment (eia) By Mr Allah Dad Khan Visiting Professor...
Environmental impact assessment (eia) By Mr Allah Dad Khan Visiting Professor...
 
EIA
EIAEIA
EIA
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
 
Pro environmental behaviors, energy efficiency and sustainable development
Pro environmental behaviors, energy efficiency and sustainable developmentPro environmental behaviors, energy efficiency and sustainable development
Pro environmental behaviors, energy efficiency and sustainable development
 
Measuring Progress: Indicators, data sources and assessment | Laszlo Pinter, ...
Measuring Progress: Indicators, data sources and assessment | Laszlo Pinter, ...Measuring Progress: Indicators, data sources and assessment | Laszlo Pinter, ...
Measuring Progress: Indicators, data sources and assessment | Laszlo Pinter, ...
 
Using the discovery farms project to study the effectiveness of vegetared rip...
Using the discovery farms project to study the effectiveness of vegetared rip...Using the discovery farms project to study the effectiveness of vegetared rip...
Using the discovery farms project to study the effectiveness of vegetared rip...
 

Más de Kushal Patel

Más de Kushal Patel (13)

Moscow, ID case study traffic operation
Moscow, ID case study traffic operationMoscow, ID case study traffic operation
Moscow, ID case study traffic operation
 
Presentation hcm 2010 case study
Presentation hcm 2010 case studyPresentation hcm 2010 case study
Presentation hcm 2010 case study
 
Ms project working example
Ms project working exampleMs project working example
Ms project working example
 
Scales in Engineering
Scales in EngineeringScales in Engineering
Scales in Engineering
 
Design guidance for freeway mainline ramp terminals
Design guidance for freeway mainline ramp terminalsDesign guidance for freeway mainline ramp terminals
Design guidance for freeway mainline ramp terminals
 
Autodesk civil3 d_tutorail
Autodesk civil3 d_tutorailAutodesk civil3 d_tutorail
Autodesk civil3 d_tutorail
 
Types of bridge(theory.explanation)
Types of bridge(theory.explanation)Types of bridge(theory.explanation)
Types of bridge(theory.explanation)
 
Types of bridge(concept)
Types of bridge(concept)Types of bridge(concept)
Types of bridge(concept)
 
Plane table survey
Plane table surveyPlane table survey
Plane table survey
 
Enviromental impact assesment for highway projects
Enviromental impact assesment for highway projectsEnviromental impact assesment for highway projects
Enviromental impact assesment for highway projects
 
Land use planning
Land use planningLand use planning
Land use planning
 
Airport lighting airport engineering
Airport lighting  airport engineeringAirport lighting  airport engineering
Airport lighting airport engineering
 
Road geometrics
Road geometricsRoad geometrics
Road geometrics
 

Último

AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Último (20)

AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Intro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfIntro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdf
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 

Eia methods for transportation project

  • 1.
  • 2. THE 'IMPACT ANALYSIS' OR DETAILED STUDY PHASE OF EIA INVOLVES  identifying the impacts more specifically  predicting the characteristics of the main impacts  evaluating the significance of the residual impact 2
  • 3. IMPACT IDENTIFICATION METHODS • Adhoc method • Checklists • Matrices • Networks • Overlays and geographical information systems (GIS) • Expert systems • Professional judgement 3
  • 4. CHOICE OF EIA METHOD DEPENDS ON  The type and size of the proposal  The type of alternatives being considered  The nature of the likely impacts;  The availability of impact identification methods  The experience of the EIA team with their use  The resources available - cost, information, time, personnel 4
  • 5. 5 Functions of EIA Methods • Impact identification • Impact prediction • Impact interpretation • Communication of information • Devising monitoring schemes
  • 6. 6 1. Ad Hoc Method of EIA • No structure • Brainstorming • Basis for other methods? • More effective the wider the consultation
  • 7. 7 2. Checklist Methods of EIA s • Simple checklists • Descriptive checklists : Suggests prediction techniques • Scaling checklist : Forces interpretation by including thresholds of concern” • Questionnaire checklist :Gives rough idea of impacts
  • 8. 8 3. Matrices • Leopold matrix • Simple matrix • Component interaction matrix
  • 9. 9 UNEP Training Resource Manual Topic 6 Slide 9
  • 13. 13 4. Networks • Need big sheet of paper • Excellent for indirect impacts • Excellent for interlinkage
  • 14. EXAMPLE OF A NETWORK 14 (showing linkages leading to changes in quality of life, wildlife and tourism) (Bisset)
  • 15. 15 5 Overlays Method • McHarg overlays • Geographical Information Systems (GIS) • The various EIA methods draw on a broad range of tools, including many general purpose data processing and analytical methods. • The most important ones among them are: • geographical information systems (GIS), for the capture, management, display, and analysis of geo-referenced data; basic methods include overlay and buffer analysis. • statistical analysis, with basic tools such as time series analysis, histograms, regression, analysis of variance, cluster analysis, etc.
  • 16. 16
  • 17. 17
  • 18. 18
  • 19. MAIN ADVANTAGES AND DISADVANTAGES OF IMPACT IDENTIFICATION METHODS 19 Methods ADVANTAGES DISADVANTAGES Checklists easy to understand and use good for site selection and priority setting simple ranking and weighting do not distinguish between direct and indirect impacts do not link action and impact the process of incorporating values can be controversial Matrices link action to impact good method for displaying EIA results difficult to distinguish direct and indirect impacts have potential for double-counting of impacts Networks link action to impact useful in simplified form for checking for second order impacts handles direct and indirect impacts can become very complex if used beyond simplified version Overlays easy to understand focus and display spatial impacts good siting tool can be cumbersome poorly suited to address impact duration or probability GIS and computer expert systems excellent for impact identification and spatial analysis good for 'experimenting' heavy reliance on knowledge and data often complex and expensive
  • 20. METHODS OF IMPACT PREDICTION • ‘Best estimate’ professional judgement • Quantitative mathematical models • Experiments and physical models • Case studies as analogues or references 20
  • 21. TYPES OF UNCERTAINTY IN IMPACT PREDICTION  scientific uncertainty – limited understanding of the ecosystem or community affected  data uncertainty – incomplete information or insufficient methodology  policy uncertainty – unclear or disputed objectives or standards 21
  • 22. TYPES OF SOCIAL IMPACT  demographic – changes to population numbers, distribution  cultural – changes to customs, traditions and values  community – changes to cohesion, relationships etc.  socio-psychological – changes to quality of life and well being 22
  • 23. HEALTH IMPACTS 23 Examples of health impacts by sector Communicable disease Non communicable disease Nutrition Injury Psychosocial disorder and loss of well- being Mining Tuberculosis Dust induced lung disease Crushing Labour migration Agriculture Parasitic infections Pesticide poisoning Loss of subsistence Industry Poisoning by pollutants Occupational injury Disempowerment Forestry Loss of food production Occupational injury Dams and irrigation schemes Water borne diseases Poisoning by pollutants Increased food production Drowning Involuntary displacement Transportation HIV/Aids Heart disease Traffic injury Noise and induced stress Energy Indoor air pollution Electromagnetic radiation Community displacement Source: Birley, 2000
  • 24. FACTORS AFFECTING ECONOMIC IMPACTS • Duration of construction and operation • Workforce requirements for each period • Skill requirements (local availability) • Earning • Raw material and other input purchases • Capital investment • Outputs • The characteristics of the local economy 24
  • 25. FACTORS AFFECTING FISCAL IMPACTS • Size of investment and workforce requirements • Capacity of existing service delivery and infrastructure systems • Local/regional tax or other revenue raising processes • Demographic changes arising from project requirements 25
  • 26. 26 Impact Prediction • Impact prediction is a way of ‘mapping’ the environmental consequences of the significant aspects of the project and its alternatives. Environmental impact can never be predicted with absolute certainty and this is all the more reason to consider all possible factors and take all possible precautions for reducing the degree of uncertainty.
  • 27. 27 Here’s a example that we can consider for what we need to predict in regards to different criteria during a planning phase of transportation project • Air • changes in ambient levels and ground level concentrations due to total emissions from point, line and area sources • effects on soils, materials, vegetation, and human health • Noise • changes in ambient levels due to noise generated from equipment and movement of vehicles • effect on fauna and human health • Water • availability to competing users • changes in quality • sediment transport • ingress of saline water ·
  • 28. 28 • Land • Changes in land use and drainage pattern • Changes in land quality including effects of waste disposal • Changes in shoreline/riverbank and their stability • Biological • Deforestation/tree-cutting and shrinkage of animal habitat. • Impact on fauna and flora (including aquatic species if any) due to contaminants/pollutants • Impact on rare and endangered species, endemic species, and migratory path/route of animals. • Impact on breeding and nesting grounds • Socio-economic • Impact on the local community including demographic changes. • Impact on economic status • Impact on human health. • Impact of increased traffic
  • 29. MAIN ENVIRONMENTAL PROBLEMS COMMONLY ASSOCIATED WITH RURAL ROADS PROJECTS. • Encroachment into precious ecological resources, including forests and swamps. • Encroachment into historical areas and cultural monuments. • Impairment of fisheries, aquatic ecology and other beneficial water uses, due t changes in surface hydrology. • Erosion and silt runoff from exposed areas, which may also cause impairment of • Downstream water quality and damage to land values. • Dust nuisances caused by both the road usage and during construction.
  • 30. CONCLUSION Environmental Impact Assessment (EIA) OF TRANSPORTATION PROJECTS study is a time-consuming process because it has a large number of dependent and independent variables which have to be taken into account (e.g. land use, land price, population density, socio- economic level, road accessibility, railway accessibility, air quality, ground water quality, noise level, biological content, historical value, archeological and visual importance), which also have different consequences. Traditionally, environmental data was collected to test hypotheses and simulate environmental systems using in situ (field) methodology