HONG KONG MASS TRANSIT RAILWAY
             A SUCCESS STORY
                       PRESENTED
                          BY

                 Ir Thomas S K LAI
                CEng, MICE, MIStructE, MHKIE
                Chairman HKIE UK CHAPTER




                                                       1
75th ANNIVERSARY OF THE HONG KONG POLYTECHNIC UNIVERSITY   ©
BIRTH & GROWTH OF

HONG KONG MASS TRANSIT RAILWAY

UP TO DATE



                             2
BEAUTIFUL HONG KONG




                      3
HONG KONG



• LOCATED AT THE PEARL RIVER
  ESTUARY ON THE SOUTHERN
  COAST OF CHINA




                               4
VICTORIA HARBOUR
                   5
August 2003                   77




              HARBOUR FRONT
                                   6
STAR FERRY




August 2003                66



                                7
CHALLENGING BIRTH




                    8
CULTURAL REVOLUTION


• In 1966 – CULTURAL REVOLUTION
  RAGING IN CHINA
• SPILLED OVER TO HONG KONG
• FARE INCREASE IN STAR FERRY
• RIOTS
• SERIOUS DISRUPTION
  TO PUBLIC TRANSPORT

                                  9
CULTURAL REVOLUTION




   HONG KONG IN

        CRISIS




                      10
CULTURAL REVOLUTION


       HONG KONG IN
          CRISIS

          危       机
•     Danger      Opportunity



                                11
PLB




     PLB




PUBLIC LIGHT BUS
                   12
PLB



• AVAILABLE - FREQUENT SERVICE

• CONVENIENT - PASSENGERS HOP ON
  AND OFF ANYWHERE ALONG ROUTE

• PREMIUM FOR SERVICE

• POPULAR WITH PASSENGERS
                                   13
HONG KONG GOVERNMENT

•VIABILITY OF UNDERGROUND RAILWAY SYSTEM


•CONFIRMED BY CONSULTANT‟S FEASIBILITY STUDY


•1975 - MASS TRANSIT PROVISIONAL AUTHORITY


•1976 - MASS TRANSIT RAILWAY CORPORATION


                  MTRC
                                               14
MTRC



THE MASS TRANIST RAILWAY
ORDINANCE




                           15
MTRC


• WHOLLY GOVERNMENT
  OWNED ENTERPRISE




     HUTCHINSON HOUSE - RENTED
                                 16
              OFFICES
MTRC

• MANDATED TO BUILD AND
  OPERATE AN UNDERGROUND
  RAILWAY SYSTEM

• ON PRUDENT COMMERCIAL
  PRINCIPLES

• HAVING REGARD TO THE
  REASONABLE REQUIREMENTS OF
  THE PUBLIC TRANSPORT SYSTEM
  OF HONG KONG
                                17
MTRC


HONG KONG GOVERNMENT PUTS IN
INITIAL EQUITY (HK$ 800 M)

MTRC BORROWS REST IN OPEN MONEY
MARKET




                                  18
PREFERRED SYSTEM




                   19
INITIAL SYSTEM

LETTER OF INTENT SIGNED WITH JAPANESE
  CONSORTIUM FOR THE INITIAL SYSTEM
 (20 km) AS A SINGLE DESIGN & BUILD CONTRACT




                                               20
INITIAL SYSTEM



OIL CRISIS


CONSORTIUM WITHDREW




                           21
MODIFIED INITIAL SYSTEM


MIS
(15.6 km)
25 CIVIL & 10 E&M
DESIGN AND BUILD
 CONTRACTS




                                      22
MIS

GOVERNMENT SET UP MASS
TRANSIT ADVISER (MTA) TO:

• CO-ORDINATE BETWEEN MTRC &
  GOVERNMENT DEPARTMENTS

• FACILITATE TIMELY POLICY MAKING
  & ISSUE RESOLUTION

                                23
MIS


DIFFERENT LEVEL OF COMMITTEES & WORKING
  GROUPS:

• GOVERNMENT / MTR LIAISON COMMITTEE

• GOVERNMENT / MTR PUBLICITY COMMITTEE

• METRO PUBLIC RELATIONS POLICY GROUP



                                          24
MIS

•   LAND ACQUISITION CO-ORDINATION COMMITTEE (LACC)

•   STATION AND TRANSPORT INTEGRATION COMMITTEE
    (STIC)

•   SAFETY AND SECURITY CO-ORDINATION COMMITTEE
    (SSCC)

•   TRAFFIC MAMAGEMENT GROUP (TMG)

•   UTILITIES CO-ORDINATION GROUP (UCG)



                                                      25
INSPECTORATE OF RAILWAY
             (UK)



• APPOINTED BY GOVERNMENT AS
  ADVISER ON RAILWAY SAFETY

• PROVIDES INPUT DURING DESIGN

• INSPECTS RAILWAY SYSTEM

• RECOMMENDS OPENING
                                 26
MIS

IMPORTANCE OF PUBLIC RELATIONS


• OBSERVATION WINDOWS ON HOARDINGS


• GROWING FOR YOU




                                 27
MIS

IMPORTANCE OF PUBLIC RELATIONS


• CEREMONIES OF COMMENCEMENT

 & COMPLETION OF WORKS




                                 28
MIS

IMPORTANCE OF PUBLIC RELATIONS


PARTICIPANTS (STAKEHOLDERS) INCLUDE:

  CORPORATION REPRESENTATIVES
  CONTRACTORS
  CONSULTANTS
  GOVERNMENT OFFICIALS
  LEGISLATORS
  DISTRICT COUNCILLORS
  LOCAL DIGNITARIES
                                   29
MIS

IMPORTANCE OF PUBLIC RELATIONS


• TEAM BUILDING

• PUBLICISING PROGRESS OF WORKS




                                 30
MIS



WORK STARTED

• NOVEMBER
  1975



            GROUNDBREAKING CEREMONY
        BY CHAIRMAN SIR NORMAN THOMPSON
                                          31
                  AT KWUN TONG
MIS



• FIRST CHAIRMAN – SIR NORMAN THOMPSON

 DIRECT ACCESS TO THE GOVERNOR
 SIMPLE & CLEAR MESSAGES


• PROJECT MANAGER – HONG KONG &
  SHANGHAI BANK HQ BUILDING


                                   32
MIS


FIRST M.D. – PROF TONY RIDLEY

M.D. – LONDON UNDERGROUND
MAJOR IMPROVEMENT TO THE SYSTEM

CO-M.D. - EUROTUNNEL

PROFESSOR – IMPERIAL COLLEGE LONDON

ICE PRESIDENT


                                      33
MIS



• GENERAL PUBLIC

 – EXCITEMENT

 – EXPECTATION

 – DETERMINATION
                       34
MIS



• GENERAL PUBLIC

 HIGH DEGREE OF TOLERENCE
      &
 CO-OPERATION




                            35
MIS

PROJECT MANAGEMENT APPROACH:

• QUICK DECISION-MAKING

• REGULAR MONITORING OF EFFECT OF
  CHANGES ON BUDGET & PROGRAMME

• APPROPRIATE DELEGATION OF AUTHORITY

• SHARE RISKS & BENEFITS WITH
  CONTRACTORS
                                    36
MIS

• BASED ON PROVEN TECHNOLOGY

• PROJECT MOTTO:


   IF IT IS ESSENTIAL,
     GET ON WITH IT.

   IF IT IS DESIRABLE,
     FORGET IT.
                               37
MIS

            GOVERNMENT




COMMUNITY                      MTRC

            UNITY IN PURPOSE

                                      38
MIS



GROUND CONDITIONS

 ALLUVIAL DEPOSITS

 GRANITE (VARYING DEGREE OF
  DECOMPOSITION)

 HARD ROCK
                               39
MIS




STATION WALL CONSTRUCTION
                            40
MIS




STATION CONSTRUCTION
                       41
MIS




INSITU HORSESHOE TUNNEL
                          42
MIS




PRECAST CONCRETE TUNNEL
         LINING
                          43
MIS




SGI TUNNEL LINING
                    44
MIS




NGAU TAU KOK STATION &
       VIADUCT
                         45
MIS




KOWLOON BAY DEPOT
                    46
MIS




ADMIRALTY STATION
   EXCAVATION
                    47
MIS




IMMERSED TUBE CASTING
                        48
MIS




IMT
      49
MIS

• FROM KWUN TONG TO CENTRAL
 KWUN TONG TO SHEK KIP MEI
 – OPERATIONAL ON 1 OCTOBER 1979




                                   50
MIS

• FROM KWUN TONG TO CENTRAL
 KWUN TONG TO TSIM SHA TSUI
 – OPERATIONAL ON 31 DECEMBER 1979




                                     51
MIS

• FROM KWUN TONG TO CENTRAL
 KWUN TONG TO CENTRAL
 – OPENED BY PRINCESS ALEXANDRA
   ON 12 FEBRUARY 1980




                                  52
MIS

• FROM KWUN TONG TO CENTRAL

 ON TIME AND WITHIN BUDGET




                              53
MIS



ESTIMATED COST IN 1975               HK$ B
(INCL. 7% p.a. ESCALATION TO 1980)   5.8

CONSTRUCTION COST                    5.6


INCL. INTEREST AND FINANCE COST S    7.3




                                             54
MIS


• NO SMOKING

• NO EATING

• NO DRINKING

• NO MUSIC/RADIO

                      55
MIS

• CLEAN

• QUIET

• EFFICIENT

• RELIABLE

                          DAVID BAARACLOUGH
• AIR-CONDITIONED
                      FORMER OPERATIONS DIRECTOR
                                              56
MIS




SUCCESS


          57
GROWTH




         58
FIRST HEADQUARTERS BUILDING
                              59
TSUEN WAN LINE




BUILDING UP THE
COMPANY




                          ERIC BLACK

                          SECOND MD
                                       60
TSUEN WAN LINE




                 61
TWL



• ENGINEER‟S DESIGN

• CONTRACTOR‟S ALTERNATIVE
  PROPOSALS CONSIDERED &
  ADOPTED

               TSUEN WAN DEPOT
                       &
       LUK YEUNG SUN CHUEN DEVELOPMENT
                                         62
TWL


• SET UP STRONG IN-HOUSE
  PROFESSIONAL PROJECT
  MANAGEMENT TEAM

• HANDS-ON STYLE



                    LAI KING TO KWAI FONG
                         CROSS-OVER
                                            63
TWL

• PROJECT TEAM RESPONSIBLE FOR:

   FEASIBLITY STUDY
   PROPOSAL TO GOVERNMENT
   SPECIFICATION
   APPOINTMENT OF CONSULTANTS
   TENDERING
   CONTRACT AWARD
   DESIGN MANAGEMENT
   CONSTRUCTION MANAGEMENT
   TESTING & COMMISSIONING
   HANDOVER TO OPERATIONS
                                  64
TWL



• TSUEN WAN LINE
 – TSUEN WAN
   TO CENTRAL


 – OPERATIONAL
   10 May 1982
   (AHEAD OF PROGRAMME)

                          65
TWL
ESTIMATED COST IN 1978              HK$ B
(INCL. ESCALATION TO 1982)          4.1

 CONTRACT COSTS              3.7

 CORPORATION COST
 CONSULATANTS‟ FEES
 LAND ACQUISITION
 COMPENSATION                0.7

 FINAL CONSTRUCTION COST            3.9

 INCL. INTEREST AND FINANCE COSTS   5.3

                                            66
ISL




      67
ISL



• ISLAND LINE

  – CHAI WAN TO
    ADMIRALTY
    31 MAY 1985

  – CHAI WAN TO
    SHEUNG WAN
    23 MAY 1986

                        68
ISL

ESTIMATED TOTAL COSTS           HK$ B
AT 1986 PRICES                  10.9
(EXCL. INTEREST AND FINANCE
COSTS)

FINAL COST                          10.0

INCL. INTEREST &                    11.9
FINANCE COSTS
                                                 WILLIAM GREIG

                                           FORMER PROJECTS DIRECTOR


                                                                 69
MORE CHALLENGING TIME




                        70
ISL

• CHAIRMAN & CEO :
  SIR WILFRID NEWTON
 STRENGTHENED CORPORATION‟S FINANCE
 LAID SOUND FOUNDATION FOR FUTURE
  GROWTH
 RE-ORGANISED HONG KONG STOCK
  EXCHANGE AFTER MARKET COLLAPSE

 BOARD MEMBER OF HONG KONG &
  SHANGHAI BANKING CORPORATION (HSBC)
 HON. FELLOW - HKIE
 CHAIRMAN – LONDON TRANSPORT
  OVERSAW JUBILEE LINE EXTENSION
                                        71
  CONSTRUCTION
MTR

ARRIVAL & GROWTH OF MTR

COINCIDE WITH :

TRANSFORMATION OF HONG KONG

FROM REGIONAL CITY

TO INTERNATIONAL FINANCIAL CENTRE

                                    72
HONG KONG LEASE


• 99-YEAR LEASE EXPIRES ON 1 JULY 1997

• GOVERNMENT DEPENDS ON SALE OF
  LAND LEASES FOR REVENUE

• NEEDS TO KNOW ITS FUTURE

• NEGOTIATION BETWEEN LONDON &
  BEIJING

                                     73
HONG KONG LEASE



BRITISH PRIME MINISTER
VISITED BEIJING

OFFERED TO EXCHANGE
SOVEREIGNTY FOR
ADMINSTRATION




                           MARGARET THATCHER



                                           74
HONG KONG LEASE




OFFER REJECTED BY CHINA

                          75
HONG KONG LEASE


BUT AGREED TO:

• SET UP JOINT LIAISON COMMITTEE (JLC)

• CONTINUE NEGOTIATION

• MAINTAIN STABILITY & PROSPERITY OF
  HONG KONG

                                       76
HONG KONG LEASE



• NEGOTIATION NOT GOING WELL

• UNCERTAINTY




                               77
HONG KONG LEASE

• JITTERY & GLOOMY

• INVESTMENTS PUT ON HOLD

• STOCK MARKET CRASH

• PROPERTY BUBBLE BURST

                            78
HONG KONG LEASE


HONG KONG DOLLAR PLUNGES

FROM AROUND HK$ 6 = US$ 1
       TO
OVER HK$ 9 = US$ 1



                            79
HONG KONG LEASE



PEOPLE RUSH TO SUPERMARKET
TO BUY :

RICE




                             80
HONG KONG LEASE



PEOPLE RUSH TO SUPERMARKET
TO BUY :

RICE &

BABY‟S POWDERED MILK

                             81
HONG KONG LEASE



• CURRENCY PEG

 HK$ 7.8 = US$ 1




                            82
HONG KONG LEASE



• CALM THE CITY

• STOP PANIC




                            83
HONG KONG LEASE




• IN 1984 BRITAIN & CHINA SIGNED
  JOINT DECLARATION ON FUTURE OF
  HONG KONG

• CHINA TO REGAIN FULL SOVEREIGNTY
  ON 1 JULY 1997
  August 2003                     85



                                       84
HONG KONG LEASE

PROMISE TO HONG KONG PEOPLE

• HONG KONG PEOPLE GOVERN HONG
  KONG

• WITH HIGH DEGREE OF AUTONOMY

• ONE COUNTRY TWO SYSTEMS

• NO CHANGE FOR 50 YEARS
                                 85
HONG KONG LEASE

•ENSHRINED IN    •LODGED WITH
 BASIC LAW        UNITED NATIONS




                               86
HONG KONG LEASE


• CURRENCY PEG

 HK$ 7.8 = US$ 1

• REMAINS TO THIS DAY




                            87
MTRC


• BORROWING IN US$

• REVENUE IN HK$

• ADVERSE IMPACT BY
  HIGH INTEREST RATE (12%)
  DEVALUATION

                             88
MTRC

                          • HONG KONG
                             GOVERNMENT TO
                             INCREASE EQUITY
                            (HK$ 2.5 B ISSUED, 2.5 B
                             ON CALL )

                          • SHIFT BORROWING TO BE
                            HK$ DENOMINATED

      ROGER MOSS

FORMER FINANCE DIRECTOR
                                                       89
MTRC


SECURED CREDIT RATING FROM
• MOODY
• S&P

ROAD SHOW TO TAP INTERNATIONAL BOND MARKET
• YANKEE BOND
• SAMURAI BOND




                                        90
MTRC


IN NO POSITION TO FINANCE NEW
EXTENSIONS ON ITS OWN




        EXECUTIVE COMMITTEE




                                91
MTRC



• IN NO POSITION TO FINANCE NEW
  EXTENSIONS ON ITS OWN




                                  92
EASTERN HARBOUR CROSSING




                           93
EHC


• Build Own Transfer PROJECT BY OTHERS

• LINKING KWUN TONG TO QUARRY BAY

• THIRD CROSS HARBOUR TUNNEL
  CARRYING ROAD AND RAILWAY

• RAIL PORTION LEASED TO MTRC
          EASTERN HARBOUR CROSSING
                  ENTRANCE
                                         94
EHC
MTRC PAYS SEMI-ANNUAL INSTALMENTS FOR
18½ YEARS TOTALLING            HK$ 2.6 B

OTHER CAPITAL INVESTMENT
INCL. ROLLING STOCKS               0.365 B




                 WILLIAM DONALD

               FORMER OPERATIONS
                                             95
                   DIRECTOR
EHC



OPENED ON 1 OCTOBER 1989




      PRINCE CHARLES SPEAKING TO
              THOMAS LAI
                                   96
AFTER JOINT DECLARATION



• UNCERTAINTY REMOVED

• CONFIDENCE RETURNED




                              LIPPO CENTRE
                                        97
KAI TAK AIRPORT




CHECKERBOARD IN SIGHT
                        98
KAI TAK AIRPORT




STEADY AS SHE GOES
                     99
KAI TAK AIRPORT




DO YOUR WINDOW SHOPPING
    BEFORE YOU LAND
                          100
KAI TAK AIRPORT




SEE....I LAND IT ON THE ROOF
                               101
KAI TAK AIRPORT




HARD RIGHT TURN AND DIVE
                           102
KAI TAK AIRPORT




  BUT LANDING ON THE
RUNWAY...... IS NOT ALWAYS
                             103
           EASY
KAI TAK AIRPORT




SOMETIMES.... ENDED UP IN THE
          WATER
                                104
AIRPORT CORE PROJECTS




RELOCATE AIRPORT FROM KAI TAK TO CHEK LAP KOK

                                           105
AIRPORT CORE PROJECTS



• APPROVED BY BEIJING
  & LONDON




                             106
AIRPORT CORE PROJECTS



• OBJECTIVES:

 – TO STIMULATE ECONOMY
 – TO FACILITATE FUTURE GROWTH
 – TO ELIMINATE AVIATION HAZARD

 – TO BE COMPLETED IN TIME FOR
   HANDOVER
                                  107
ACP



• AIRPORT AT CHEK LAP KOK

• TSING MA BRIDGE

• LANTAU & AIRPORT RAILWAY

                             108
ACP



•   KAP SHUI MUN BRIDGE
•   TING KAU BRIDGE
•   HIGHWAYS
•   RECLAMATIONS
•   THIRD CROSS HARBOUR ROAD
    TUNNEL (WESTERN HARBOUR CROSSING)
                                        109
ACP



• HK$ 127 BILLION     £ 10 BILLION




                                     110
ACP



CHINA‟S CONCERN:

• ROSE GARDEN PROJECT

• EMPTY TREASURY

• HIGH DEBT
                        111
ACP

AGREEMENT REACHED TO:

• LEAVE HK$ 25 B MIN. IN TREASURY

• CAP GOVERNMENT BORROWING
  AT HK$ 5 B UNLESS AGREED
  OTHERWISE

• CAP ANNUAL LAND SALE
  NO MORE THAN 50 ha /year
                                    112
ACP
ESSENTIAL TO HAVE CHINA‟S AGREEMENT AND SUPPORT
  TO ASSURE INVESTORS

WRANGLING OVER FINANCIAL DATA DELAYED PROJECT
  START




              HAMISH MATHERS
                                                  113
             FORMER CHAIRMAN
ACP




 JACK SO CHAK KWONG

FORMER CHAIRMAN & CEO
                        114
ACP
                   AT TIME OF HANDOVER
                   ON 30 JUNE/1 JULY 1997




    CHINESE PRESIDENT ARRIVED           LAST BRITISH GOVERNOR LEFT
    BY PLANE
    AT THE NEW AIRPORT                  ON ROYAL YACHT BRITANNIA




    JIANG JI MEN                                     LORD PATTEN



                                                               115
•
ACP

PROJECT COMPLETED IN 1998




              Ir DOUGLAS OAKERVEE

            PROJECT DIRECTOR HKIA
      FORMER MTR PROJECT MANAGER
                    ICE PRESIDENT
                                    116
HONG KONG INTERNATIONAL
       AIRPORT
                          117
TSING MA BRIDGE
  (ROAD + RAIL)
                  118
LANTAU & AIRPORT LINE




                        119
LAL

AIRPORT EXPRESS LINE
(AEL)



AIRPORT – HONG KONG

23 MINUTES JOURNEY

IN-TOWN-CHECK-IN

                       120
LAL


TUNG CHUNG LINE
(ON SHARED TRACK WITH AEL)


TUNG CHUNG - HONG KONG
COMMUTER LINE

ALSO PROVIDES RELIEF
TO NATHAN ROAD CONGESTION


                             121
LAL



FINANCIAL SUPPORT AGREEMENT (FSA)
WITH GOVERNMENT

• HK$ 23.7 B ADDITIONAL EQUITY BY
  GOVERNMENT
• 62 ha LAND FOR DEVELOPMENT
• DEFERRAL OF DIVIDENDS UNTIL 2001
• REVENUE DEFICIENCY PAYMENTS
  (80% FOR NO MORE THAN 2 YEARS
   IF DELAYED BY OTHERS)

                                     122
ACP


EXTENSIVE APPLICATION OF
VALUE ENGINEERING

INTRODUCE PARTNERING




                                RUSSELL BLACK

                           FORMER PROJECTS DIRECTOR

                                                      123
TUNG CHUNG LINE




NO MORE SLIDING SEATS
                        124
AIRPORT EXPRESS

• SPACIOUS SEATING

• PLEASANT AMBIENCE

• BUSINESS CLASS
  COMFORT

 FROM PLANE,
 THROUGH TRAIN,
 TO HOTEL          AEL TRAIN
                                125
LAL
TCL
OPERATIONAL ON 22 JUNE 1998
AEL
OPERATIONAL ON 6 JULY 1998




                              126
LAL

                                   HK$ B

PROJECT COST                        35.1
(INCLUDING CAPITALISED INTEREST)

FINANCED BY:

EQUITY                              23.7
DEBT                                11.4



                                      127
CONSOLIDATION




                128
TSEUNG KWAN O LINE




                     129
TKL



• TSEUNG KWUN O LINE

 – COMMUTER LINE

 – FROM PO LAM TO NORTH POINT

 – OPERATIONAL ON 17 AUGUST 2002
                                   130
TKL



I st JULY – 1997
ASIAN FINANCIAL CRISIS

MAJOR REVIEW OF THE
PROJECT

                         131
TKL



INITIAL CAPITAL COST ESTIMATE     HK$ B
INCL. CAPITALISED INTEREST        30.5

FINAL COST                        16.0




               HANG HAU STATION
                                         132
TKL




NORTH POINT CAVERN
                     133
DISNEYLAND RESORT LINE




                         134
DRL
• DISNEYLAND RESORT
  LINE

 – FROM SUNNY BAY TO
   DISNEYLAND

 – FULLY AUTOMATIC
   OPERATION

 – OPERATIONAL ON
  12 SEPTEMBER 2005

                          135
ASIAWORLD-EXPO STATION




                         136
ASIAWORLD-EXPO STATION

AIR STATION –
ASIAWORLD-EXPO

OPERATIONAL ON
20 DECEMBER 2005




                               137
NGONG PING 360




                 138
NGONG PING 360




                 139
NGONG PING 360




                 140
NGONG PING 360




AIRPORT ISLAND STATION                    TUNG CHUNG TERMINAL
                                                          141
NGONG PING 360



• MATERIAL DELIVERY

 – HELICOPTERS
 – MULES




                        142
NGONG PING 360

SCHEDULED OPENING        24 JUNE 2006
OPERATIONAL              18 SEPT 2006
OFFICIAL OPENING          9 NOV 2006




                                  143
NGONG PING 360

OPERATION SUSPENDED     11 JUNE 2007
OPERATION RESUMED        31 DEC 2007
SUBSIDIARY COMPANY SET UP TO
MANAGE & OPERATE THE SYSTEM




                                  144
SUCCESS PROFILERATING




                        145
MTRC


 PROJECT MANAGEMENT

 RAILWAY OPERATION

 FINANCIAL EXPERTISE


 TRAINING & DEVELOPMENT

 PROPERTY

 AUTOMATIC FARE COLLECTION


                               146
MTRC

• INVEST HEAVILY IN STAFF TRAINING &
  DEVELOPMENT

• CORE VALUES :

 CUSTOMER SERVICE

 RESPECT FOR THE INDIVIDUAL

 ON TIME AND WITHIN BUDGET
                                       147
MTRC



PROVIDES PROFESSIONAL
TRAINING SERVICES TO
OTHER RAILWAYS IN:

– MAINLAND CHINA
                                         PHILP GAFFNEY
                                  FORMER OPERATIONS DIRECTOR
– SOUTHEAST ASIA
                                  LEN TURK
                   FORMER LEGAL DIRECTOR &
                       COMPANY SECRETARY

                               PATRICK MAULE
                   FORMER PERSONNEL DIRECTOR
                                                        148
PROPERTY DEVELOPMENT
               & MANAGEMENT
MAJOR GOVERNMENT POLICY ISSUES

       TRANSPORT                 HOUSING




                                           149
PROPERTY DEVELOPMENT
          & MANAGEMENT


• GOVERNMENT ALLOCATE LAND AT
  FULL MARKET VALUE ALONG THE
  RAILWAY FOR DEVELOPMENT




                                150
PROPERTY DEVELOPMENT
              & MANAGEMENT

• MAJOR & REPUTABLE
  PROPERTY DEVELOPER
  AND MANAGER IN
  TOWN

• JOINT VENTURES

  –   RESIDENTIAL
  –   RETAIL
  –   OFFICES
  –   HOTEL                      151
PROPERTY DEVELOPMENT
          & MANAGEMENT



• SUBSTANTIAL CONTRIBUTION
  TOWARDS COST OF RAILWAY

• CAPTURED PASSENGERS
  (FORMING PART OF 2.4 M DAILY
  RIDERSHIP)


                                 152
PROPERTY DEVELOPMENT
         & MANAGEMENT


 PROCEEDS FROM DEVELOPMENTS
 HELP TO:

• KEEP FARES AT REASONABLE
  LEVEL

• MAINTAIN & EXTEND RAIL
  NETWORK
                             153
PROPERTY DEVELOPMENT
    & MANAGEMENT




                       154
PROPERTY DEVELOPMENT
    & MANAGEMENT




      TELFORD GARDEN
                       155
PROPERTY DEVELOPMENT
    & MANAGEMENT




        PARK VIEW
                       156
PROPERTY DEVELOPMENT
    & MANAGEMENT




     CENTRAL STATION RETAIL
                              157
PROPERTY DEVELOPMENT
    & MANAGEMENT




       TELFORD PLAZA
                       158
PROPERTY DEVELOPMENT
    & MANAGEMENT




      MARITIME SQUARE
                        159
PROPERTY DEVELOPMENT
    & MANAGEMENT




         ELEMENTS      160
2 INTERNATIONAL FINANCE CENTRE




                2IFC
                                 161
UNION SQUARE




               162
INTERNATIONAL COMMERCE CENTRE



• 118 FLOORS

• 490 METRES HIGH

• THIRD TALLEST
  BUILDING IN THE
  WORLD
                 ICC
                                 163
ICC




ICC
      164
GATEWAY TOWERS




                 165
CHINA – BEIJING



• PROPERTY OPEARATIONS
         & MANAGEMENT




              GINZA MALL
                             166
PROPERTY DEVELOPMENT
           & MANAGEMENT

AS AT END 2011:
Investment properties
Hong Kong: 12 shopping malls + 18 floors at 2 IFC
   Shops             226,622 sq.m )
   Offices            41,000 sq.m ) 279,424 sq.m
   Other use          11,202 sq.m )
Mainland China: Ginza Mall
   Shops              18,398 sq.m
Managed properties:
• 86,162 residential units in Hong Kong
                                                    167
• 744,214 sq.m commercial properties in Hong Kong
AUTOMATIC FARE COLLECTION

•   ELECTRO-MAGNETIC CARD

•   STORED VALUE CARD

•   CONTACTLESS SMART CARD




                    ROB NOBLE
        FORMER MARKETING & PLANNINGDIRECTOR   168
AUTOMATIC FARE COLLECTION


ELECTRO-MAGNETIC CARD

•   PLASTIC
•   RE-USABLE
•   NO LITTER
•   ISSUED BY MACHINE / HAND
•   FIXED VALUE
•   ELECTRO-MAGNETIC
•   SINGLE JOURNEY




                                     169
MIS
• NO SMOKING

• NO EATING

• NO DRINKING

• NO MUSIC/RADIO

• NO TICKET FLICKING   170
AUTOMATIC FARE COLLECTION

STORED VALUE
•   PLASTIC
•   RE-USABLE
•   NO LITTER
•   ISSUED BY MACHINE / HAND
•   FIXED VALUE
•   ELECTRO-MAGNETIC
•   MULTIPLE JOURNEYS
•   UNRESTRICTED LAST JOURNEY
•   ADVANCE REVENUE COLLECTION
•   REDUCTION IN CASH HANDLING


                                     171
AFC
OCTOPUS CONTACTLESS SMART CARD

•   PLASTIC
•   ISSUED BY MACHINE / HAND
•   RE-USABLE
•   NO LITTER
•   MULTIPLE JOURNEYS
•   ADVANCE REVENUE
•   RADIO FREQUENCY IDENTIFICATION (RFID)
•   NO CONTACT AT TURNSTILE
•   TOP UP VALUE
•   FURTHER REDUCTION IN CASH HANDLING
•   ACCEPTED BY BUSINESS PARTNERS

                                            172
OCTOPUS CONTACTLESS SMART CARD



• RELIABLE TICKETING

• LABOUR SAVING

• DATA FOR:

  OPERATIONAL PLANNIN INCLUDING PRICING



                                          173
OCTOPUS CONTACTLESS SMART CARD


• FORERUNNER OF:

• EZ-LINK – SINGAPORE
• OYSTER CARD – LONDON
• EASYCARD - TAIPEI



                                  174
OCTOPUS CONTACTLESS SMART CARD



OTHER USES:

 PUBLIC TRANSPORTS
 CAR PARKS
 ACCESS CONTROL TO BUILDINGS
 CONFIRMATION OF STUDENTS‟
  ATTENDANCE AT SCHOOL



                                    175
OCTOPUS CONTACTLESS
                SMART CARD


AS AT END OF JUNE 2012

• 12.1 MILLION DAILY TRANSACTIONS

• HK$ 123.9 MILLION PER DAY

• ADOPTED BY OVER 5000 SERVICE PROVIDERS




                                           176
MTR CORPORATION


AN OUTSTANDINGLY SUCCESSFUL
         ENTERPRISE




                              177
MTR CORPORATION LTD



LISTED ON THE HONG KONG
EXCHANGE

ON 5 OCTOBER 2000




                           178
MERGER WITH KCRC




                   179
MERGER



• HONG KONG GOVERNMENT ANNOUNCED
  MERGER PROPOSAL BETWEEN MTRCL & KCRC
  ON 11 APRIL 2006




                                     180
MERGER



• KCRC

• ORIGINALLY A GOVERNMENT DEPARTMENT
• TURNED INTO A WHOLLY GOVERNMENT
  OWNED PUBLIC CORPORATION
• CHARGED TO OPERATE AND DEVELOP
  DOMESTIC, CROSS-BOUNDARY AND INTERCITY
  RAILWAY SERVICES
• IN A PRUDENT COMMERCIAL MANNER
                                      181
MERGER


KCRC

• OPERATES:
  – EAST RAIL
  – WEST RAIL
  – LIGHT RAIL
  – INTERCITY TO
    GUANGZHOU
  – FREIGHT TO
    INTERIOR OF
    MAINLAND CHINA

                          182
MERGER


KCRC



• PROPERTY DEVELOPMENT
      &
  MANAGEMENT



                         183
MERGER
•    HONG KONG GOVERNMENT ANNOUNCED MERGER
     PROPOSAL BETWEEN MTRCL & KCRC ON 11 APRIL 2006

•    MTRCL SIGNED MEMORANDUM OF UNDERSTANDING
     (MOU) WITH HK GOVERNMENT




             MICHAEL TIEN            DR RAYMOND CH'IEN

    FORMER CHAIRMAN KCRC             CHAIRMAN MTRCL


                                                         184
MERGER

MOU PROVIDES FOR:

•   REDUCED FARE
•   ABOLITION OF SECOND BOARDING CHARGE
•   FURTHER DISCOUNTS FOR MEDIUM & LONG DISTANCE
    JOURNEYS
•   INTRODUCTION OF AN OBJECTIVE, TRANSPARENT &
    PREDICTABLE FARE ADJUSTMENT MECHANISM (FAM)
•   FULLY INTEGRATED INTERCHANGE STATIONS FOR
    SHATIN TO CENTRAL LINK
•   IMPROVEMENT ON EXISTING INTERCHANGE
    ARRANGEMENTS IN THE SHORT TERM
•   PROVISION OF SEAMLESS INTERCHANGE
    ARRANGEMENTS WITH FUTURE EXTENSIONS

                                                   185
MERGER



MOU PROVIDES FOR

•   JOB SECURITY FOR ALL FRONTLINE STAFF




                                           186
MERGER



DEAL TERMS

•   PROVIDE A BALANCED PACKAGE FAIR TO ALL
    STAKEHOLDERS




                                             187
MERGER

DEAL TERMS

•   ACQUISITION OF RENEWABLE OPERATIONAL RIGHT OF
    KCR FOR 50 YEARS
     – UPFRONT PAYMENT OF HK$4.25 BILLION FOR SERVICE
       CONCESSION AND TO PURCHASE CERTAIN RAIL ASSETS
     – HK$7.79 BILLION FOR A PROPERTY PACKAGE
     – FIXED ANNUAL PAYMENT OF HK$750 MILLION
     – VARIABLE ANNUAL PAYMENT BASED ON REVENUES
       GENERATED FROM KCR‟S RAIL AND RAIL-RELATED
       OPERATIONS
•   EXPECTED TO BE EPS & NPV ACCRETIVE FOR MTRCL


                                                   188
MERGER



MEET THE GOVERNMENT‟S FIVE PARAMETERS

1. ADOPTION OF A MORE OBJECTIVE AND TRANSPARENT
   FAM
2. ABOLITION OF THE SECOND BOARDING CHARGE &
   REVIEW FARE STRUCTURE TO REDUCE FARES
3. EARLY RESOLUTION OF INTERCHANGE ARRANGEMENTS
   FOR RAIL PROJECTS UNDER PLANNING, NOTABLY THE
   SHATIN TO CENTRAL LINK
4. ENSURE JOB SECURITY FOR FRONTLINE STAFF
5. PROVISION OF SEAMLESS INTERCHANGE
   ARRANGEMENTS IN THE LONG TERM

                                               189
MERGER



BENEFITS

•   SYNERGY
•   ECONOMIES OF SCALE
•   COST EFFICIENCY
•   INTEGRATED RAIL SYSTEM




                             190
MERGER

TRANSITION - ONE YEAR OR MORE

SHARE PRICE JUMPED 5.3%
 (FROM HK$19 TO 20)

RAIL MERGER BILL APPROVED BY LegCo
 on 8 JUNE 2007

OUTLOOK - BRIGHT
                                     191
MERGED



• COMPLETED ON
  2 DECEMBER
  2007



• 香港鐵路有限公司
       ONE COMPANY ONE TEAM
                              192
MERGED




         193
MERGED

•   211 Km ROUTE LENGTH
•   82 STATIONS
•   9 COMMUTER LINES
•   AIRPORT EXPRESS
•   LIGHT RAIL
•   DISNEYLAND RESORT LINE
•   FEEDER BUS SERVICE
•   CABLE CAR
•   INTERCITY PASSENGER SERVICE
•   INTERCITY FREIGHT SERVICE
•   3 MILLION DAILY PASSENGERS
                                  194
MERGED

ONE COMPANY ONE TEAM




 STAFF INTEGRATION              W ILLIAM CHAN

                       FORMER HUMAN RESOURCES DIRECTOR
                                                   195
MTR CORPORATION LTD




GROWTH MOMENTUM




                      196
MTRCL

EXPANSION

NEW VISION :

• TO BE A WORLD CLASS ENTERPRISE
• GROWING IN HONG KONG & BEYOND
• FOCUSING ON RAIL, PROPERTY &
  RELATED BUSINESS

                                   197
MTRCL



• NEW MISSION :

• EXCELLENT VALUE FOR CUSTOMERS
• OPPORTUNITIES FOR STAFF
• DEVELOP RAILWAY NETWORK AS
  BACKBONE OF PUBLIC TRANSPORT IN
  HONG KONG
• GROW IN MAINLAND CHINA & CAPTURE
  OPPORTUNITIES IN EUROPE
                                     198
MTRCL



• NEW CORE VALUES :

EXCELLENT SERVICE
VALUE CREATION
MUTUAL RESPECT
ENTERPRISING SPIRIT

                       199
HONG KONG BUSINESS

HONG KONG INTERNATIONAL AIRPORT



SUBCONTRACT FOR AUTOMATED PEOPLE
  MOVER MIDFIELD CONCOURSE EXTENSION
  PROJECT

  RESPONSIBLE FOR DESIGN,
  PROCUREMENT, INSTALLATION, TESTING &
  COMMISSIONING OF SEVERAL RAILWAY
  SYSTEMS


                                         200
MACAO BUSINESS



MACAO GOVERNMENT

MOU SIGNED FOR LIGHT RAIL
 PROJECT CONSULTANCY




                            201
DUBAI




        202
DUBAI




METRO & AIRPORT LINES
                        203
DUBAI

CONSULTANCY

TO REVIEW DESIGN PROPOSALS IN
 RESPECT OF :

OPERATION &
MAINTENANCE


          VIADUCT CONSTRUCTION
                                 204
DUBAI

CONSULTANCY

MOU SIGNED TO ASSIST TO DEVELOP A
 MASS URBAN TRANSPORT SYSTEM,
 PROVIDING HIGH QUALITY TRANSPORT
 SERVICES




                                    205
INDIA



Delhi Airport Metro
 Express Line
 (AMEL)

• Major engineering &
  project management
  contract
                        206
UK BUSINESS




    BIDS
              207
UK BUSINESS

      LORO         (MTR/LAING )



FRANCHISE TO OPERATE

LONDON ORBITAL RAILWAY
(with over 1090 trains a day)

  FROM 11 NOVEMBER 2007
  FOR 7 YEARS

  WITH OPTION FOR 2 FURTHER YEARS    SUCCESS

                                               208
UK BUSINESS

LOROL      (MTR/DEUTSCHE BAHN)

ACTION ON DAY ONE

• OYSTER TICKETING SYSTEM

• NEW TICKETING MACHINES

• STATIONS GATED

                                 209
UK BUSINESS

               (MTR/DEUTSCHE BAHN)

• IMPROVEMENT IN:

  1.   SERVICE OPERATION
  2.   PUNCTUALITY
  3.   SAFETY
  4.   SECURITY

• TICKETLESS TRAVEL DOWN

• REVENUE UP
                                     210
UK BUSINESS

                (MTR/DEUTSCHE BAHN)


PROGRAMME FOR:

•   CUSTOMER SERVICE TRAINING
•   STATION CLEANING AND REPAIR
•   STATION REFURBISHEMENT
•   STATION REMODELLING
•   NEW EXTENSIONS


                                      211
UK BUSINESS




• “….so gradually all suburban rail services in London
  can be brought up to the standard of London
  Overground.”

Ken Livingstone
Mayor of London



                                                     212
UK BUSINESS

“London Overground has become a shining example
 of how franchises can be run. With the network soon
 to orbit our city, the London Overground's next five
 years are sure to take the service to new heights.
 Congratulations to all those
 workers whose hard graft has
 made this a success story.”

Boris Johnson
Mayor of London


                                                   213
UK BUSINESS

                (MTR/DEUTSCHE BAHN)

9TH LONDON TRANSPORT AWARDS

 LONDON TRANSPORT OPERATOR OF THE YEAR
  (SECOND YEAR IN A ROW)

2012 METRORAIL AWARDS LONDON

 WORLD‟S MOST IMPROVEED METRO



                                          214
UK BUSINESS


SHORT-LISTED TO BID FOR:

 ESSEX THAMESIDE FRANCHISE
 (LONDON FENCHURCH STREET – TILBURY- SOUTHEND)
 SEPTEMBER 2012

 THAMESLINK FRANCHISE
 (BEDFORD – GATWICK - BRIGHTON)
 FEBRUARY 2013




                                                 215
EUROPE BUSINESS

STOCKHOLM UNDERGROUND

TOOK OVER OPERATION 2 NOVEMBER 2009
(FOR 8 YEARS MINIMUM)




                                      216
AUSTRALIA BUSINESS



METRO TRAINS MELBOURNE

TOOK OVER OPERATION ON 30 NOVEMBER 2009
(FOR INITIAL PERIOD OF 8 YEARS)




                                          217
AUSTRALIA BUSINESS



UNITED GROUP LTD.

SUBCONTRACT TO SUPPORT ITS ROLLING STOCK
MAINTENANCE WORKS IN NEW SOUTH WALES




                                           218
CHINA BUSINESS




                 219
CHINA BUSINESS



SHANGHAI

TOGETHER WITH ITS JOINT VENTURE PARTNER,
  APPOINTED AS:

 OWNER‟S REPRESENTATIVE TO PROJECT MANAGE
  DESIGN AND CONSTRUCTION OF LINE 9

 OWNER‟S ADVISOR OF LINE 8 & LINE 11


                                             220
CHINA BUSINESS

BEIJING LINE 4
 – INITIALLED IN FEBRUARY 2005
 – COMPANY FORMED IN JANUARY 2006
 – AGREEMENT SIGNED ON 12 APRIL 2006




                                221
CHINA BUSINESS

BEIJING LINE 4
– PPP
– 30-YEAR CONCESSION AGREEMENT WITH BEIJING
  MUNICIPAL GOVERNMENT
– FOR INVESTMENT, CONSTRUCTION & OPERATION
OPENED 28 SEPTEMBER 2009



DAXING LINE
OPENED 30 DECEMBER 2010



                                              222
CHINA BUSINESS



SHENZHEN LINE 4
– 30-YEAR BOT PROJECT
– CONCESSION AGREEMENT WITH
  SHENZHEN MUNICIPAL GOVERNMENT
– „RAIL + PROPERTY‟
– INITIALLED IN MAY 2005
– PHASE 1 TAKEN OVER 01 JULY 2010
– PHASE 2 OPENED 16 JUNE 2011




                                    223
CHINA BUSINESS



HANGZHOU LINE 1
– J.V. AGREEMENT WITH SUBSIDARY
  OF HANGZHOU METRO GROUP (PPP)
– INVEST & OPERATE LINE 1 FOR 25
  YEARS
– RESPONBLE FOR E&M SYSYTEMS
  & ROLLING STOCK
– SINGED IN JULY 2012
– OPERATIONAL ON 24 NOVEMBER
  2012


                                   224
BUSINESS OUTSIDE HONG KONG


COMPANY                                          SHARE
BEIJING MTR CORPORATION LTD. (BJMTR)             49%
MTR CORPORATION ( SHENZHEN) LTD. (SZMTR)         100%
METRO TRAINS MELBOURNE PTY. LTD. (MTM)           60%
MTR STOCKHOLM AB (MTRS)                          100%
TUNNELBANAN TEKNIK STOCKHOLM AB (TBT)            50%
LONDON OVERGROUND RAIL OPERATIONS LTD. (LOROL)   50%
MTR HANGZHOU LINE 1 INVESTMENT CO. LTD.          100%




                                                        225
CURRENT EXTENSION PROJECTS




                             226
HONG KONG GOVERNMENT
                INFRASTRUCTURE INVESTMENT



•   2007-2008 POLICY ADDRESS
    ANNOUNCES TEN MAJOR
    INFRASTRUCTURE PROJECTS

•   ANNUAL EXPENDITURE OF
    HK$ 50 BILLION (£ 4 BILLION)
    IN COMING YEARS




                                            227
HONG KONG GOVERNMENT
INFRASTRUCTURE INVESTMENT




                            228
HONG KONG GOVERNMENT
       INFRASTRUCTURE INVESTMENT
•     Transport Infrastructure
1.    South Island MTR Line
2.    The Sha Tin to Central MTR Link
3.    The Tuen Mun Western Bypass and Tuen Mun-Chek Lap Kok
      Link

•     Cross-boundary Infrastructure Projects
4.    The Guangzhou-Shenzhen-HK Express Rail Link
5.    HK-Shenzhen Airport Co-operation
6.    HK-Zhuhai-Macao Bridge
7.    HK-Shenzhen Joint Development of the Lok Ma Chau Loop

•     New Urban Development Areas
8.    West Kowloon Cultural District
9.    Kai Tak Development Plan
10.   New Development Areas (NDAs)                            229
RAILWAY EXTENSIONS




                     230
RAILWAY EXTENSIONS




       XRL           231
RAILWAY EXTENSIONS




       WIL           232
RAILWAY EXTENSIONS




       KTE           233
RAILWAY EXTENSIONS




                     JAY WALDER
                     CEO
                         TC CHIEW
                PROJECTS DIRECTOR

       SCL                        234
RAILWAY EXTENSIONS



           FULLY AUTOMATIC OPERATION




                                 235
       SIL(E)
RAILWAY EXTENSIONS

EXTENSION   PROJECT FUNDING
XRL         SERVICE CONCESSION
            (GOVERNMENT CAPITAL + MTRCL OPERATIONS)
WIL         CAPITAL GRANT
KTE         RAIL + PROPERTY
SCL         SERVICE CONCESSION
SIL(E)      RAIL + PROPERTY




                                                      236
RAILWAY EXTENSIONS




RAILWAY DEVELOPMENT STRATEGY 2000
                                    237
             (UPDATE)
RAILWAY BUILDING




                   238
RAILWAY BUILDING



FEASIBILITY

IDENTIFY TRANSPORT NEEDS
FEASIBILITY STUDY
PROPOSAL TO GOVERNMENT
ROUTE PROTECTION




                            239
RAILWAY BUILDING



PRE-CONTRACT

 PREPARATION OF CONTRACT DOCUMENTS
     DESIGN STANDARDS MANUAL
     MATERIALS & WORKMANSHIP SPECIFICATION
     CONDITIONS OF CONTRACT
     BILLS OF QUANTITIES
 APPOINTMENT OF CONSULTANTS
 TENDERING
 CONTRACT AWARD

                                          240
RAILWAY BUILDING




CONSTRUCTION

DESIGN MANAGEMENT
CONSTRUCTION MANAGEMENT
PROTECTION OF ADJACENT PROPERTIES
TESTING & COMMISSIONING
APPROVAL BY RAILWAY INSPECTORATE
HANDOVER TO OPERATIONS

                                 241
SYSTEM IMPROVEMENT
         &
    PROTECTION




                     242
LISTENING CORPORATION



IN SERVICE
 IMPROVEMENTS:
     NEW INTEGRATED ENTRANCES
     ENTRANCE UPGRADE
     FACILITIES FOR THE PHYSICALLY IMPAIRED
     RETROFITS - PLATFORM SIDE DOORS
     KIOSKS
     NEW SINGNALLING SYSTEM
 CONDITION MONITORING
 MAINTENANCE
 RAILWAY PROTECTION
                                               243
IN SERVICE

INTEGRATED ENTRANCE




                      244
IN SERVICE
OLD ENTRANCE




NEW ENTRANCE
               245
IN SERVICE

 KIOSKS




             246
IN SERVICE

CHAIRLIFT & TACTILE ROUTES




                             247
IN SERVICE

   PSD




             248
IN SERVICE

    SIGNALLING




SOURCE - BOMBARDIER
IN SERVICE

RAILWAY PROTECTION




                     250
MTRCL




      A STORY
         OF
OUTSTANDING SUCCESS
                              251
    KOWLOON BAY HQ BUILDING
MTRCL


• PROFITABLE
    HK$B
    16
                   14.2
    14
                           Turnover
    12
                    10.7
    10
                           Operating profit
    8               8.6    before depreciation
                           (after property
    6                      development profit)
                           Net profit excluding
    4                      investment property
                           revaluation
    2

    0




                                                  252
MTRCL




        253
MTRCL




        254
MTRCL
 CONSOLIDATED P & L A/C
(YEAR ENDED 31 December 2011)               HK$ M


• REVENUE                                   33,423
• PROFIT ON PROPERTY DEVELOPMENTS            4,900
• OPERATING PROFIT BEFORE DEPRECIATION      17,038

• NET PROFIT ATTRIBUTABLE TO SHAREHOLDERS   14,716




                                              255
MTRCL



AS AT END 2011:

PATRONAGE ( million)

Yearly                 1,644

Daily                      4.7


                               256
MTRCL


        HONG KONG PEOPLE


ENGINEERS               MTR STAFF




     HAVE REASON TO BE PROUD

                                257
IN THE EYES
    of the
    BBC

19 APRIL 2006   258
RECAP




        259
STORY OF THE HKMTR




                     260
STORY OF THE HKMTR

STORY OF HONG KONG IN THE
FINAL DECADES OF LAST CENTURY




                                261
STORY OF THE HKMTR

STORY OF HONG KONG IN THE
FINAL DECADES OF LAST CENTURY

STORY OF 23 YEARS OF MY LIFE




                                262
This presentation is dedicated to :


        All my friends

Especially those of the MTR


                                      263
This presentation is dedicated to :
                    and to:


     The Hong Kong Technical College
(now The Hong Kong Polytechnic University)


For helping me to lay the foundation for
         my engineering career
                                             264
265

Más contenido relacionado

Destacado

Destacado (17)

Vibrant Gujarat - Food & Agro Sector Profile
Vibrant Gujarat - Food & Agro Sector ProfileVibrant Gujarat - Food & Agro Sector Profile
Vibrant Gujarat - Food & Agro Sector Profile
 
MTR PRESENTATION
MTR PRESENTATIONMTR PRESENTATION
MTR PRESENTATION
 
ready to eat products (case study)
ready to eat products (case study)ready to eat products (case study)
ready to eat products (case study)
 
Final bm1 ppt
Final bm1 pptFinal bm1 ppt
Final bm1 ppt
 
Final ppt
Final pptFinal ppt
Final ppt
 
Mba marketing
Mba marketingMba marketing
Mba marketing
 
Agro and Food Processing Sector
Agro and Food Processing SectorAgro and Food Processing Sector
Agro and Food Processing Sector
 
Ford project final
Ford project finalFord project final
Ford project final
 
instant food
instant foodinstant food
instant food
 
Strategic analysis on britannia
Strategic analysis on britanniaStrategic analysis on britannia
Strategic analysis on britannia
 
Project on maggi
Project on maggiProject on maggi
Project on maggi
 
Britannia ppt in Operations
Britannia ppt in OperationsBritannia ppt in Operations
Britannia ppt in Operations
 
Britannia ppt
Britannia   pptBritannia   ppt
Britannia ppt
 
Britannia Industries
Britannia IndustriesBritannia Industries
Britannia Industries
 
Britannia industry
Britannia industry Britannia industry
Britannia industry
 
Kissan jam
Kissan jamKissan jam
Kissan jam
 
Slideshare Project
Slideshare ProjectSlideshare Project
Slideshare Project
 

Similar a Mtr a success story 20.11.2012 staff v3

Advent Portfolio - Presentation - 2022.pptx
Advent Portfolio - Presentation - 2022.pptxAdvent Portfolio - Presentation - 2022.pptx
Advent Portfolio - Presentation - 2022.pptxShyamPrasadThiraviam
 
28 Pavement Design.ppt
28 Pavement Design.ppt28 Pavement Design.ppt
28 Pavement Design.pptolga429184
 
Community liason-group-presentation-10-02-2015
Community liason-group-presentation-10-02-2015Community liason-group-presentation-10-02-2015
Community liason-group-presentation-10-02-2015Auckland Transport
 
presentation on M.H.A.D.A. housing
presentation on M.H.A.D.A. housingpresentation on M.H.A.D.A. housing
presentation on M.H.A.D.A. housingSoumitra Smart
 
Integrated transport - investing in Auckland's future
Integrated transport - investing in Auckland's futureIntegrated transport - investing in Auckland's future
Integrated transport - investing in Auckland's futureAuckland Transport
 
Mount Dennis Mobility Hub Update and Station Design Review
Mount Dennis Mobility Hub Update and Station Design ReviewMount Dennis Mobility Hub Update and Station Design Review
Mount Dennis Mobility Hub Update and Station Design ReviewCrosstown TO
 
Analyst presentation: Crossrail and our international tunnelling expertise - ...
Analyst presentation: Crossrail and our international tunnelling expertise - ...Analyst presentation: Crossrail and our international tunnelling expertise - ...
Analyst presentation: Crossrail and our international tunnelling expertise - ...Atkins
 
high performance concrete
high performance concretehigh performance concrete
high performance concretebeerappa143
 
Avenue Station Open House - May 2017
Avenue Station Open House - May 2017Avenue Station Open House - May 2017
Avenue Station Open House - May 2017Crosstown TO
 
Reconstruction Of Veterans Lane Revised Mayhew
Reconstruction Of Veterans Lane Revised MayhewReconstruction Of Veterans Lane Revised Mayhew
Reconstruction Of Veterans Lane Revised Mayhewmayhew50
 
July 24, 2013 City Council Freeway Aesthetic Concepts Presentation
July 24, 2013 City Council Freeway Aesthetic Concepts PresentationJuly 24, 2013 City Council Freeway Aesthetic Concepts Presentation
July 24, 2013 City Council Freeway Aesthetic Concepts PresentationCity of Corona
 
lmrc presentation
lmrc presentationlmrc presentation
lmrc presentationATUL SHUKLA
 
Central Open House (Chaplin Station to Leaside Station) - spring 2018
Central Open House (Chaplin Station to Leaside Station) - spring 2018Central Open House (Chaplin Station to Leaside Station) - spring 2018
Central Open House (Chaplin Station to Leaside Station) - spring 2018Crosstown TO
 
Laird Station Open House - April 2017
Laird Station Open House - April 2017Laird Station Open House - April 2017
Laird Station Open House - April 2017Crosstown TO
 
Gabions in civil engineering ppt presentation
Gabions in civil engineering  ppt presentationGabions in civil engineering  ppt presentation
Gabions in civil engineering ppt presentationBnkvvnnnjn
 
Integrated Geophysical Approach for Rapid & Cost Effective Site Investigation...
Integrated Geophysical Approach for Rapid & Cost Effective Site Investigation...Integrated Geophysical Approach for Rapid & Cost Effective Site Investigation...
Integrated Geophysical Approach for Rapid & Cost Effective Site Investigation...IEI GSC
 
PALOMA_ROMERO, MCH2023, México
PALOMA_ROMERO, MCH2023, MéxicoPALOMA_ROMERO, MCH2023, México
PALOMA_ROMERO, MCH2023, MéxicoMCH
 
Karachi npp siting a violation
Karachi npp siting  a violationKarachi npp siting  a violation
Karachi npp siting a violationakhtar ali
 
Aricle in Irish Trucker Magazine
Aricle in Irish Trucker MagazineAricle in Irish Trucker Magazine
Aricle in Irish Trucker MagazineTony O Neill
 

Similar a Mtr a success story 20.11.2012 staff v3 (20)

Advent Portfolio - Presentation - 2022.pptx
Advent Portfolio - Presentation - 2022.pptxAdvent Portfolio - Presentation - 2022.pptx
Advent Portfolio - Presentation - 2022.pptx
 
28 Pavement Design.ppt
28 Pavement Design.ppt28 Pavement Design.ppt
28 Pavement Design.ppt
 
Community liason-group-presentation-10-02-2015
Community liason-group-presentation-10-02-2015Community liason-group-presentation-10-02-2015
Community liason-group-presentation-10-02-2015
 
presentation on M.H.A.D.A. housing
presentation on M.H.A.D.A. housingpresentation on M.H.A.D.A. housing
presentation on M.H.A.D.A. housing
 
Integrated transport - investing in Auckland's future
Integrated transport - investing in Auckland's futureIntegrated transport - investing in Auckland's future
Integrated transport - investing in Auckland's future
 
Mount Dennis Mobility Hub Update and Station Design Review
Mount Dennis Mobility Hub Update and Station Design ReviewMount Dennis Mobility Hub Update and Station Design Review
Mount Dennis Mobility Hub Update and Station Design Review
 
Analyst presentation: Crossrail and our international tunnelling expertise - ...
Analyst presentation: Crossrail and our international tunnelling expertise - ...Analyst presentation: Crossrail and our international tunnelling expertise - ...
Analyst presentation: Crossrail and our international tunnelling expertise - ...
 
high performance concrete
high performance concretehigh performance concrete
high performance concrete
 
Avenue Station Open House - May 2017
Avenue Station Open House - May 2017Avenue Station Open House - May 2017
Avenue Station Open House - May 2017
 
Reconstruction Of Veterans Lane Revised Mayhew
Reconstruction Of Veterans Lane Revised MayhewReconstruction Of Veterans Lane Revised Mayhew
Reconstruction Of Veterans Lane Revised Mayhew
 
July 24, 2013 City Council Freeway Aesthetic Concepts Presentation
July 24, 2013 City Council Freeway Aesthetic Concepts PresentationJuly 24, 2013 City Council Freeway Aesthetic Concepts Presentation
July 24, 2013 City Council Freeway Aesthetic Concepts Presentation
 
lmrc presentation
lmrc presentationlmrc presentation
lmrc presentation
 
Public Private Partnership
Public Private PartnershipPublic Private Partnership
Public Private Partnership
 
Central Open House (Chaplin Station to Leaside Station) - spring 2018
Central Open House (Chaplin Station to Leaside Station) - spring 2018Central Open House (Chaplin Station to Leaside Station) - spring 2018
Central Open House (Chaplin Station to Leaside Station) - spring 2018
 
Laird Station Open House - April 2017
Laird Station Open House - April 2017Laird Station Open House - April 2017
Laird Station Open House - April 2017
 
Gabions in civil engineering ppt presentation
Gabions in civil engineering  ppt presentationGabions in civil engineering  ppt presentation
Gabions in civil engineering ppt presentation
 
Integrated Geophysical Approach for Rapid & Cost Effective Site Investigation...
Integrated Geophysical Approach for Rapid & Cost Effective Site Investigation...Integrated Geophysical Approach for Rapid & Cost Effective Site Investigation...
Integrated Geophysical Approach for Rapid & Cost Effective Site Investigation...
 
PALOMA_ROMERO, MCH2023, México
PALOMA_ROMERO, MCH2023, MéxicoPALOMA_ROMERO, MCH2023, México
PALOMA_ROMERO, MCH2023, México
 
Karachi npp siting a violation
Karachi npp siting  a violationKarachi npp siting  a violation
Karachi npp siting a violation
 
Aricle in Irish Trucker Magazine
Aricle in Irish Trucker MagazineAricle in Irish Trucker Magazine
Aricle in Irish Trucker Magazine
 

Más de laitsk

Hkie uk chapter hk land-of_opportunities_icl.10.03.2014
Hkie uk chapter   hk land-of_opportunities_icl.10.03.2014Hkie uk chapter   hk land-of_opportunities_icl.10.03.2014
Hkie uk chapter hk land-of_opportunities_icl.10.03.2014laitsk
 
Chinese language
Chinese languageChinese language
Chinese languagelaitsk
 
Chinese language
Chinese languageChinese language
Chinese languagelaitsk
 
Jts.vts memories
Jts.vts   memoriesJts.vts   memories
Jts.vts memorieslaitsk
 
Jts.vts memories
Jts.vts   memoriesJts.vts   memories
Jts.vts memorieslaitsk
 
Hktc memories of old hong kong technical college buildings v1
Hktc   memories of old hong kong technical college buildings v1Hktc   memories of old hong kong technical college buildings v1
Hktc memories of old hong kong technical college buildings v1laitsk
 
Hktc memories of old hong kong technical college buildings v1
Hktc   memories of old hong kong technical college buildings v1Hktc   memories of old hong kong technical college buildings v1
Hktc memories of old hong kong technical college buildings v1laitsk
 
Memories of old hong kong technical college buildings
Memories of old hong kong technical college buildingsMemories of old hong kong technical college buildings
Memories of old hong kong technical college buildingslaitsk
 

Más de laitsk (8)

Hkie uk chapter hk land-of_opportunities_icl.10.03.2014
Hkie uk chapter   hk land-of_opportunities_icl.10.03.2014Hkie uk chapter   hk land-of_opportunities_icl.10.03.2014
Hkie uk chapter hk land-of_opportunities_icl.10.03.2014
 
Chinese language
Chinese languageChinese language
Chinese language
 
Chinese language
Chinese languageChinese language
Chinese language
 
Jts.vts memories
Jts.vts   memoriesJts.vts   memories
Jts.vts memories
 
Jts.vts memories
Jts.vts   memoriesJts.vts   memories
Jts.vts memories
 
Hktc memories of old hong kong technical college buildings v1
Hktc   memories of old hong kong technical college buildings v1Hktc   memories of old hong kong technical college buildings v1
Hktc memories of old hong kong technical college buildings v1
 
Hktc memories of old hong kong technical college buildings v1
Hktc   memories of old hong kong technical college buildings v1Hktc   memories of old hong kong technical college buildings v1
Hktc memories of old hong kong technical college buildings v1
 
Memories of old hong kong technical college buildings
Memories of old hong kong technical college buildingsMemories of old hong kong technical college buildings
Memories of old hong kong technical college buildings
 

Mtr a success story 20.11.2012 staff v3

  • 1. 0
  • 2. HONG KONG MASS TRANSIT RAILWAY A SUCCESS STORY PRESENTED BY Ir Thomas S K LAI CEng, MICE, MIStructE, MHKIE Chairman HKIE UK CHAPTER 1 75th ANNIVERSARY OF THE HONG KONG POLYTECHNIC UNIVERSITY ©
  • 3. BIRTH & GROWTH OF HONG KONG MASS TRANSIT RAILWAY UP TO DATE 2
  • 5. HONG KONG • LOCATED AT THE PEARL RIVER ESTUARY ON THE SOUTHERN COAST OF CHINA 4
  • 7. August 2003 77 HARBOUR FRONT 6
  • 10. CULTURAL REVOLUTION • In 1966 – CULTURAL REVOLUTION RAGING IN CHINA • SPILLED OVER TO HONG KONG • FARE INCREASE IN STAR FERRY • RIOTS • SERIOUS DISRUPTION TO PUBLIC TRANSPORT 9
  • 11. CULTURAL REVOLUTION HONG KONG IN CRISIS 10
  • 12. CULTURAL REVOLUTION HONG KONG IN CRISIS 危 机 • Danger Opportunity 11
  • 13. PLB PLB PUBLIC LIGHT BUS 12
  • 14. PLB • AVAILABLE - FREQUENT SERVICE • CONVENIENT - PASSENGERS HOP ON AND OFF ANYWHERE ALONG ROUTE • PREMIUM FOR SERVICE • POPULAR WITH PASSENGERS 13
  • 15. HONG KONG GOVERNMENT •VIABILITY OF UNDERGROUND RAILWAY SYSTEM •CONFIRMED BY CONSULTANT‟S FEASIBILITY STUDY •1975 - MASS TRANSIT PROVISIONAL AUTHORITY •1976 - MASS TRANSIT RAILWAY CORPORATION MTRC 14
  • 16. MTRC THE MASS TRANIST RAILWAY ORDINANCE 15
  • 17. MTRC • WHOLLY GOVERNMENT OWNED ENTERPRISE HUTCHINSON HOUSE - RENTED 16 OFFICES
  • 18. MTRC • MANDATED TO BUILD AND OPERATE AN UNDERGROUND RAILWAY SYSTEM • ON PRUDENT COMMERCIAL PRINCIPLES • HAVING REGARD TO THE REASONABLE REQUIREMENTS OF THE PUBLIC TRANSPORT SYSTEM OF HONG KONG 17
  • 19. MTRC HONG KONG GOVERNMENT PUTS IN INITIAL EQUITY (HK$ 800 M) MTRC BORROWS REST IN OPEN MONEY MARKET 18
  • 21. INITIAL SYSTEM LETTER OF INTENT SIGNED WITH JAPANESE CONSORTIUM FOR THE INITIAL SYSTEM (20 km) AS A SINGLE DESIGN & BUILD CONTRACT 20
  • 23. MODIFIED INITIAL SYSTEM MIS (15.6 km) 25 CIVIL & 10 E&M DESIGN AND BUILD CONTRACTS 22
  • 24. MIS GOVERNMENT SET UP MASS TRANSIT ADVISER (MTA) TO: • CO-ORDINATE BETWEEN MTRC & GOVERNMENT DEPARTMENTS • FACILITATE TIMELY POLICY MAKING & ISSUE RESOLUTION 23
  • 25. MIS DIFFERENT LEVEL OF COMMITTEES & WORKING GROUPS: • GOVERNMENT / MTR LIAISON COMMITTEE • GOVERNMENT / MTR PUBLICITY COMMITTEE • METRO PUBLIC RELATIONS POLICY GROUP 24
  • 26. MIS • LAND ACQUISITION CO-ORDINATION COMMITTEE (LACC) • STATION AND TRANSPORT INTEGRATION COMMITTEE (STIC) • SAFETY AND SECURITY CO-ORDINATION COMMITTEE (SSCC) • TRAFFIC MAMAGEMENT GROUP (TMG) • UTILITIES CO-ORDINATION GROUP (UCG) 25
  • 27. INSPECTORATE OF RAILWAY (UK) • APPOINTED BY GOVERNMENT AS ADVISER ON RAILWAY SAFETY • PROVIDES INPUT DURING DESIGN • INSPECTS RAILWAY SYSTEM • RECOMMENDS OPENING 26
  • 28. MIS IMPORTANCE OF PUBLIC RELATIONS • OBSERVATION WINDOWS ON HOARDINGS • GROWING FOR YOU 27
  • 29. MIS IMPORTANCE OF PUBLIC RELATIONS • CEREMONIES OF COMMENCEMENT & COMPLETION OF WORKS 28
  • 30. MIS IMPORTANCE OF PUBLIC RELATIONS PARTICIPANTS (STAKEHOLDERS) INCLUDE: CORPORATION REPRESENTATIVES CONTRACTORS CONSULTANTS GOVERNMENT OFFICIALS LEGISLATORS DISTRICT COUNCILLORS LOCAL DIGNITARIES 29
  • 31. MIS IMPORTANCE OF PUBLIC RELATIONS • TEAM BUILDING • PUBLICISING PROGRESS OF WORKS 30
  • 32. MIS WORK STARTED • NOVEMBER 1975 GROUNDBREAKING CEREMONY BY CHAIRMAN SIR NORMAN THOMPSON 31 AT KWUN TONG
  • 33. MIS • FIRST CHAIRMAN – SIR NORMAN THOMPSON  DIRECT ACCESS TO THE GOVERNOR  SIMPLE & CLEAR MESSAGES • PROJECT MANAGER – HONG KONG & SHANGHAI BANK HQ BUILDING 32
  • 34. MIS FIRST M.D. – PROF TONY RIDLEY M.D. – LONDON UNDERGROUND MAJOR IMPROVEMENT TO THE SYSTEM CO-M.D. - EUROTUNNEL PROFESSOR – IMPERIAL COLLEGE LONDON ICE PRESIDENT 33
  • 35. MIS • GENERAL PUBLIC – EXCITEMENT – EXPECTATION – DETERMINATION 34
  • 36. MIS • GENERAL PUBLIC HIGH DEGREE OF TOLERENCE & CO-OPERATION 35
  • 37. MIS PROJECT MANAGEMENT APPROACH: • QUICK DECISION-MAKING • REGULAR MONITORING OF EFFECT OF CHANGES ON BUDGET & PROGRAMME • APPROPRIATE DELEGATION OF AUTHORITY • SHARE RISKS & BENEFITS WITH CONTRACTORS 36
  • 38. MIS • BASED ON PROVEN TECHNOLOGY • PROJECT MOTTO: IF IT IS ESSENTIAL, GET ON WITH IT. IF IT IS DESIRABLE, FORGET IT. 37
  • 39. MIS GOVERNMENT COMMUNITY MTRC UNITY IN PURPOSE 38
  • 40. MIS GROUND CONDITIONS  ALLUVIAL DEPOSITS  GRANITE (VARYING DEGREE OF DECOMPOSITION)  HARD ROCK 39
  • 46. MIS NGAU TAU KOK STATION & VIADUCT 45
  • 48. MIS ADMIRALTY STATION EXCAVATION 47
  • 50. MIS IMT 49
  • 51. MIS • FROM KWUN TONG TO CENTRAL KWUN TONG TO SHEK KIP MEI – OPERATIONAL ON 1 OCTOBER 1979 50
  • 52. MIS • FROM KWUN TONG TO CENTRAL KWUN TONG TO TSIM SHA TSUI – OPERATIONAL ON 31 DECEMBER 1979 51
  • 53. MIS • FROM KWUN TONG TO CENTRAL KWUN TONG TO CENTRAL – OPENED BY PRINCESS ALEXANDRA ON 12 FEBRUARY 1980 52
  • 54. MIS • FROM KWUN TONG TO CENTRAL ON TIME AND WITHIN BUDGET 53
  • 55. MIS ESTIMATED COST IN 1975 HK$ B (INCL. 7% p.a. ESCALATION TO 1980) 5.8 CONSTRUCTION COST 5.6 INCL. INTEREST AND FINANCE COST S 7.3 54
  • 56. MIS • NO SMOKING • NO EATING • NO DRINKING • NO MUSIC/RADIO 55
  • 57. MIS • CLEAN • QUIET • EFFICIENT • RELIABLE DAVID BAARACLOUGH • AIR-CONDITIONED FORMER OPERATIONS DIRECTOR 56
  • 59. GROWTH 58
  • 61. TSUEN WAN LINE BUILDING UP THE COMPANY ERIC BLACK SECOND MD 60
  • 63. TWL • ENGINEER‟S DESIGN • CONTRACTOR‟S ALTERNATIVE PROPOSALS CONSIDERED & ADOPTED TSUEN WAN DEPOT & LUK YEUNG SUN CHUEN DEVELOPMENT 62
  • 64. TWL • SET UP STRONG IN-HOUSE PROFESSIONAL PROJECT MANAGEMENT TEAM • HANDS-ON STYLE LAI KING TO KWAI FONG CROSS-OVER 63
  • 65. TWL • PROJECT TEAM RESPONSIBLE FOR:  FEASIBLITY STUDY  PROPOSAL TO GOVERNMENT  SPECIFICATION  APPOINTMENT OF CONSULTANTS  TENDERING  CONTRACT AWARD  DESIGN MANAGEMENT  CONSTRUCTION MANAGEMENT  TESTING & COMMISSIONING  HANDOVER TO OPERATIONS 64
  • 66. TWL • TSUEN WAN LINE – TSUEN WAN TO CENTRAL – OPERATIONAL 10 May 1982 (AHEAD OF PROGRAMME) 65
  • 67. TWL ESTIMATED COST IN 1978 HK$ B (INCL. ESCALATION TO 1982) 4.1 CONTRACT COSTS 3.7 CORPORATION COST CONSULATANTS‟ FEES LAND ACQUISITION COMPENSATION 0.7 FINAL CONSTRUCTION COST 3.9 INCL. INTEREST AND FINANCE COSTS 5.3 66
  • 68. ISL 67
  • 69. ISL • ISLAND LINE – CHAI WAN TO ADMIRALTY 31 MAY 1985 – CHAI WAN TO SHEUNG WAN 23 MAY 1986 68
  • 70. ISL ESTIMATED TOTAL COSTS HK$ B AT 1986 PRICES 10.9 (EXCL. INTEREST AND FINANCE COSTS) FINAL COST 10.0 INCL. INTEREST & 11.9 FINANCE COSTS WILLIAM GREIG FORMER PROJECTS DIRECTOR 69
  • 72. ISL • CHAIRMAN & CEO : SIR WILFRID NEWTON  STRENGTHENED CORPORATION‟S FINANCE  LAID SOUND FOUNDATION FOR FUTURE GROWTH  RE-ORGANISED HONG KONG STOCK EXCHANGE AFTER MARKET COLLAPSE  BOARD MEMBER OF HONG KONG & SHANGHAI BANKING CORPORATION (HSBC)  HON. FELLOW - HKIE  CHAIRMAN – LONDON TRANSPORT OVERSAW JUBILEE LINE EXTENSION 71 CONSTRUCTION
  • 73. MTR ARRIVAL & GROWTH OF MTR COINCIDE WITH : TRANSFORMATION OF HONG KONG FROM REGIONAL CITY TO INTERNATIONAL FINANCIAL CENTRE 72
  • 74. HONG KONG LEASE • 99-YEAR LEASE EXPIRES ON 1 JULY 1997 • GOVERNMENT DEPENDS ON SALE OF LAND LEASES FOR REVENUE • NEEDS TO KNOW ITS FUTURE • NEGOTIATION BETWEEN LONDON & BEIJING 73
  • 75. HONG KONG LEASE BRITISH PRIME MINISTER VISITED BEIJING OFFERED TO EXCHANGE SOVEREIGNTY FOR ADMINSTRATION MARGARET THATCHER 74
  • 76. HONG KONG LEASE OFFER REJECTED BY CHINA 75
  • 77. HONG KONG LEASE BUT AGREED TO: • SET UP JOINT LIAISON COMMITTEE (JLC) • CONTINUE NEGOTIATION • MAINTAIN STABILITY & PROSPERITY OF HONG KONG 76
  • 78. HONG KONG LEASE • NEGOTIATION NOT GOING WELL • UNCERTAINTY 77
  • 79. HONG KONG LEASE • JITTERY & GLOOMY • INVESTMENTS PUT ON HOLD • STOCK MARKET CRASH • PROPERTY BUBBLE BURST 78
  • 80. HONG KONG LEASE HONG KONG DOLLAR PLUNGES FROM AROUND HK$ 6 = US$ 1 TO OVER HK$ 9 = US$ 1 79
  • 81. HONG KONG LEASE PEOPLE RUSH TO SUPERMARKET TO BUY : RICE 80
  • 82. HONG KONG LEASE PEOPLE RUSH TO SUPERMARKET TO BUY : RICE & BABY‟S POWDERED MILK 81
  • 83. HONG KONG LEASE • CURRENCY PEG HK$ 7.8 = US$ 1 82
  • 84. HONG KONG LEASE • CALM THE CITY • STOP PANIC 83
  • 85. HONG KONG LEASE • IN 1984 BRITAIN & CHINA SIGNED JOINT DECLARATION ON FUTURE OF HONG KONG • CHINA TO REGAIN FULL SOVEREIGNTY ON 1 JULY 1997 August 2003 85 84
  • 86. HONG KONG LEASE PROMISE TO HONG KONG PEOPLE • HONG KONG PEOPLE GOVERN HONG KONG • WITH HIGH DEGREE OF AUTONOMY • ONE COUNTRY TWO SYSTEMS • NO CHANGE FOR 50 YEARS 85
  • 87. HONG KONG LEASE •ENSHRINED IN •LODGED WITH BASIC LAW UNITED NATIONS 86
  • 88. HONG KONG LEASE • CURRENCY PEG HK$ 7.8 = US$ 1 • REMAINS TO THIS DAY 87
  • 89. MTRC • BORROWING IN US$ • REVENUE IN HK$ • ADVERSE IMPACT BY HIGH INTEREST RATE (12%) DEVALUATION 88
  • 90. MTRC • HONG KONG GOVERNMENT TO INCREASE EQUITY (HK$ 2.5 B ISSUED, 2.5 B ON CALL ) • SHIFT BORROWING TO BE HK$ DENOMINATED ROGER MOSS FORMER FINANCE DIRECTOR 89
  • 91. MTRC SECURED CREDIT RATING FROM • MOODY • S&P ROAD SHOW TO TAP INTERNATIONAL BOND MARKET • YANKEE BOND • SAMURAI BOND 90
  • 92. MTRC IN NO POSITION TO FINANCE NEW EXTENSIONS ON ITS OWN EXECUTIVE COMMITTEE 91
  • 93. MTRC • IN NO POSITION TO FINANCE NEW EXTENSIONS ON ITS OWN 92
  • 95. EHC • Build Own Transfer PROJECT BY OTHERS • LINKING KWUN TONG TO QUARRY BAY • THIRD CROSS HARBOUR TUNNEL CARRYING ROAD AND RAILWAY • RAIL PORTION LEASED TO MTRC EASTERN HARBOUR CROSSING ENTRANCE 94
  • 96. EHC MTRC PAYS SEMI-ANNUAL INSTALMENTS FOR 18½ YEARS TOTALLING HK$ 2.6 B OTHER CAPITAL INVESTMENT INCL. ROLLING STOCKS 0.365 B WILLIAM DONALD FORMER OPERATIONS 95 DIRECTOR
  • 97. EHC OPENED ON 1 OCTOBER 1989 PRINCE CHARLES SPEAKING TO THOMAS LAI 96
  • 98. AFTER JOINT DECLARATION • UNCERTAINTY REMOVED • CONFIDENCE RETURNED LIPPO CENTRE 97
  • 100. KAI TAK AIRPORT STEADY AS SHE GOES 99
  • 101. KAI TAK AIRPORT DO YOUR WINDOW SHOPPING BEFORE YOU LAND 100
  • 102. KAI TAK AIRPORT SEE....I LAND IT ON THE ROOF 101
  • 103. KAI TAK AIRPORT HARD RIGHT TURN AND DIVE 102
  • 104. KAI TAK AIRPORT BUT LANDING ON THE RUNWAY...... IS NOT ALWAYS 103 EASY
  • 105. KAI TAK AIRPORT SOMETIMES.... ENDED UP IN THE WATER 104
  • 106. AIRPORT CORE PROJECTS RELOCATE AIRPORT FROM KAI TAK TO CHEK LAP KOK 105
  • 107. AIRPORT CORE PROJECTS • APPROVED BY BEIJING & LONDON 106
  • 108. AIRPORT CORE PROJECTS • OBJECTIVES: – TO STIMULATE ECONOMY – TO FACILITATE FUTURE GROWTH – TO ELIMINATE AVIATION HAZARD – TO BE COMPLETED IN TIME FOR HANDOVER 107
  • 109. ACP • AIRPORT AT CHEK LAP KOK • TSING MA BRIDGE • LANTAU & AIRPORT RAILWAY 108
  • 110. ACP • KAP SHUI MUN BRIDGE • TING KAU BRIDGE • HIGHWAYS • RECLAMATIONS • THIRD CROSS HARBOUR ROAD TUNNEL (WESTERN HARBOUR CROSSING) 109
  • 111. ACP • HK$ 127 BILLION £ 10 BILLION 110
  • 112. ACP CHINA‟S CONCERN: • ROSE GARDEN PROJECT • EMPTY TREASURY • HIGH DEBT 111
  • 113. ACP AGREEMENT REACHED TO: • LEAVE HK$ 25 B MIN. IN TREASURY • CAP GOVERNMENT BORROWING AT HK$ 5 B UNLESS AGREED OTHERWISE • CAP ANNUAL LAND SALE NO MORE THAN 50 ha /year 112
  • 114. ACP ESSENTIAL TO HAVE CHINA‟S AGREEMENT AND SUPPORT TO ASSURE INVESTORS WRANGLING OVER FINANCIAL DATA DELAYED PROJECT START HAMISH MATHERS 113 FORMER CHAIRMAN
  • 115. ACP JACK SO CHAK KWONG FORMER CHAIRMAN & CEO 114
  • 116. ACP AT TIME OF HANDOVER ON 30 JUNE/1 JULY 1997 CHINESE PRESIDENT ARRIVED LAST BRITISH GOVERNOR LEFT BY PLANE AT THE NEW AIRPORT ON ROYAL YACHT BRITANNIA JIANG JI MEN LORD PATTEN 115 •
  • 117. ACP PROJECT COMPLETED IN 1998 Ir DOUGLAS OAKERVEE PROJECT DIRECTOR HKIA FORMER MTR PROJECT MANAGER ICE PRESIDENT 116
  • 118. HONG KONG INTERNATIONAL AIRPORT 117
  • 119. TSING MA BRIDGE (ROAD + RAIL) 118
  • 120. LANTAU & AIRPORT LINE 119
  • 121. LAL AIRPORT EXPRESS LINE (AEL) AIRPORT – HONG KONG 23 MINUTES JOURNEY IN-TOWN-CHECK-IN 120
  • 122. LAL TUNG CHUNG LINE (ON SHARED TRACK WITH AEL) TUNG CHUNG - HONG KONG COMMUTER LINE ALSO PROVIDES RELIEF TO NATHAN ROAD CONGESTION 121
  • 123. LAL FINANCIAL SUPPORT AGREEMENT (FSA) WITH GOVERNMENT • HK$ 23.7 B ADDITIONAL EQUITY BY GOVERNMENT • 62 ha LAND FOR DEVELOPMENT • DEFERRAL OF DIVIDENDS UNTIL 2001 • REVENUE DEFICIENCY PAYMENTS (80% FOR NO MORE THAN 2 YEARS IF DELAYED BY OTHERS) 122
  • 124. ACP EXTENSIVE APPLICATION OF VALUE ENGINEERING INTRODUCE PARTNERING RUSSELL BLACK FORMER PROJECTS DIRECTOR 123
  • 125. TUNG CHUNG LINE NO MORE SLIDING SEATS 124
  • 126. AIRPORT EXPRESS • SPACIOUS SEATING • PLEASANT AMBIENCE • BUSINESS CLASS COMFORT FROM PLANE, THROUGH TRAIN, TO HOTEL AEL TRAIN 125
  • 127. LAL TCL OPERATIONAL ON 22 JUNE 1998 AEL OPERATIONAL ON 6 JULY 1998 126
  • 128. LAL HK$ B PROJECT COST 35.1 (INCLUDING CAPITALISED INTEREST) FINANCED BY: EQUITY 23.7 DEBT 11.4 127
  • 130. TSEUNG KWAN O LINE 129
  • 131. TKL • TSEUNG KWUN O LINE – COMMUTER LINE – FROM PO LAM TO NORTH POINT – OPERATIONAL ON 17 AUGUST 2002 130
  • 132. TKL I st JULY – 1997 ASIAN FINANCIAL CRISIS MAJOR REVIEW OF THE PROJECT 131
  • 133. TKL INITIAL CAPITAL COST ESTIMATE HK$ B INCL. CAPITALISED INTEREST 30.5 FINAL COST 16.0 HANG HAU STATION 132
  • 136. DRL • DISNEYLAND RESORT LINE – FROM SUNNY BAY TO DISNEYLAND – FULLY AUTOMATIC OPERATION – OPERATIONAL ON 12 SEPTEMBER 2005 135
  • 138. ASIAWORLD-EXPO STATION AIR STATION – ASIAWORLD-EXPO OPERATIONAL ON 20 DECEMBER 2005 137
  • 142. NGONG PING 360 AIRPORT ISLAND STATION TUNG CHUNG TERMINAL 141
  • 143. NGONG PING 360 • MATERIAL DELIVERY – HELICOPTERS – MULES 142
  • 144. NGONG PING 360 SCHEDULED OPENING 24 JUNE 2006 OPERATIONAL 18 SEPT 2006 OFFICIAL OPENING 9 NOV 2006 143
  • 145. NGONG PING 360 OPERATION SUSPENDED 11 JUNE 2007 OPERATION RESUMED 31 DEC 2007 SUBSIDIARY COMPANY SET UP TO MANAGE & OPERATE THE SYSTEM 144
  • 147. MTRC  PROJECT MANAGEMENT  RAILWAY OPERATION  FINANCIAL EXPERTISE  TRAINING & DEVELOPMENT  PROPERTY  AUTOMATIC FARE COLLECTION 146
  • 148. MTRC • INVEST HEAVILY IN STAFF TRAINING & DEVELOPMENT • CORE VALUES :  CUSTOMER SERVICE  RESPECT FOR THE INDIVIDUAL  ON TIME AND WITHIN BUDGET 147
  • 149. MTRC PROVIDES PROFESSIONAL TRAINING SERVICES TO OTHER RAILWAYS IN: – MAINLAND CHINA PHILP GAFFNEY FORMER OPERATIONS DIRECTOR – SOUTHEAST ASIA LEN TURK FORMER LEGAL DIRECTOR & COMPANY SECRETARY PATRICK MAULE FORMER PERSONNEL DIRECTOR 148
  • 150. PROPERTY DEVELOPMENT & MANAGEMENT MAJOR GOVERNMENT POLICY ISSUES TRANSPORT HOUSING 149
  • 151. PROPERTY DEVELOPMENT & MANAGEMENT • GOVERNMENT ALLOCATE LAND AT FULL MARKET VALUE ALONG THE RAILWAY FOR DEVELOPMENT 150
  • 152. PROPERTY DEVELOPMENT & MANAGEMENT • MAJOR & REPUTABLE PROPERTY DEVELOPER AND MANAGER IN TOWN • JOINT VENTURES – RESIDENTIAL – RETAIL – OFFICES – HOTEL 151
  • 153. PROPERTY DEVELOPMENT & MANAGEMENT • SUBSTANTIAL CONTRIBUTION TOWARDS COST OF RAILWAY • CAPTURED PASSENGERS (FORMING PART OF 2.4 M DAILY RIDERSHIP) 152
  • 154. PROPERTY DEVELOPMENT & MANAGEMENT PROCEEDS FROM DEVELOPMENTS HELP TO: • KEEP FARES AT REASONABLE LEVEL • MAINTAIN & EXTEND RAIL NETWORK 153
  • 155. PROPERTY DEVELOPMENT & MANAGEMENT 154
  • 156. PROPERTY DEVELOPMENT & MANAGEMENT TELFORD GARDEN 155
  • 157. PROPERTY DEVELOPMENT & MANAGEMENT PARK VIEW 156
  • 158. PROPERTY DEVELOPMENT & MANAGEMENT CENTRAL STATION RETAIL 157
  • 159. PROPERTY DEVELOPMENT & MANAGEMENT TELFORD PLAZA 158
  • 160. PROPERTY DEVELOPMENT & MANAGEMENT MARITIME SQUARE 159
  • 161. PROPERTY DEVELOPMENT & MANAGEMENT ELEMENTS 160
  • 162. 2 INTERNATIONAL FINANCE CENTRE 2IFC 161
  • 163. UNION SQUARE 162
  • 164. INTERNATIONAL COMMERCE CENTRE • 118 FLOORS • 490 METRES HIGH • THIRD TALLEST BUILDING IN THE WORLD ICC 163
  • 165. ICC ICC 164
  • 167. CHINA – BEIJING • PROPERTY OPEARATIONS & MANAGEMENT GINZA MALL 166
  • 168. PROPERTY DEVELOPMENT & MANAGEMENT AS AT END 2011: Investment properties Hong Kong: 12 shopping malls + 18 floors at 2 IFC Shops 226,622 sq.m ) Offices 41,000 sq.m ) 279,424 sq.m Other use 11,202 sq.m ) Mainland China: Ginza Mall Shops 18,398 sq.m Managed properties: • 86,162 residential units in Hong Kong 167 • 744,214 sq.m commercial properties in Hong Kong
  • 169. AUTOMATIC FARE COLLECTION • ELECTRO-MAGNETIC CARD • STORED VALUE CARD • CONTACTLESS SMART CARD ROB NOBLE FORMER MARKETING & PLANNINGDIRECTOR 168
  • 170. AUTOMATIC FARE COLLECTION ELECTRO-MAGNETIC CARD • PLASTIC • RE-USABLE • NO LITTER • ISSUED BY MACHINE / HAND • FIXED VALUE • ELECTRO-MAGNETIC • SINGLE JOURNEY 169
  • 171. MIS • NO SMOKING • NO EATING • NO DRINKING • NO MUSIC/RADIO • NO TICKET FLICKING 170
  • 172. AUTOMATIC FARE COLLECTION STORED VALUE • PLASTIC • RE-USABLE • NO LITTER • ISSUED BY MACHINE / HAND • FIXED VALUE • ELECTRO-MAGNETIC • MULTIPLE JOURNEYS • UNRESTRICTED LAST JOURNEY • ADVANCE REVENUE COLLECTION • REDUCTION IN CASH HANDLING 171
  • 173. AFC OCTOPUS CONTACTLESS SMART CARD • PLASTIC • ISSUED BY MACHINE / HAND • RE-USABLE • NO LITTER • MULTIPLE JOURNEYS • ADVANCE REVENUE • RADIO FREQUENCY IDENTIFICATION (RFID) • NO CONTACT AT TURNSTILE • TOP UP VALUE • FURTHER REDUCTION IN CASH HANDLING • ACCEPTED BY BUSINESS PARTNERS 172
  • 174. OCTOPUS CONTACTLESS SMART CARD • RELIABLE TICKETING • LABOUR SAVING • DATA FOR: OPERATIONAL PLANNIN INCLUDING PRICING 173
  • 175. OCTOPUS CONTACTLESS SMART CARD • FORERUNNER OF: • EZ-LINK – SINGAPORE • OYSTER CARD – LONDON • EASYCARD - TAIPEI 174
  • 176. OCTOPUS CONTACTLESS SMART CARD OTHER USES:  PUBLIC TRANSPORTS  CAR PARKS  ACCESS CONTROL TO BUILDINGS  CONFIRMATION OF STUDENTS‟ ATTENDANCE AT SCHOOL 175
  • 177. OCTOPUS CONTACTLESS SMART CARD AS AT END OF JUNE 2012 • 12.1 MILLION DAILY TRANSACTIONS • HK$ 123.9 MILLION PER DAY • ADOPTED BY OVER 5000 SERVICE PROVIDERS 176
  • 178. MTR CORPORATION AN OUTSTANDINGLY SUCCESSFUL ENTERPRISE 177
  • 179. MTR CORPORATION LTD LISTED ON THE HONG KONG EXCHANGE ON 5 OCTOBER 2000 178
  • 181. MERGER • HONG KONG GOVERNMENT ANNOUNCED MERGER PROPOSAL BETWEEN MTRCL & KCRC ON 11 APRIL 2006 180
  • 182. MERGER • KCRC • ORIGINALLY A GOVERNMENT DEPARTMENT • TURNED INTO A WHOLLY GOVERNMENT OWNED PUBLIC CORPORATION • CHARGED TO OPERATE AND DEVELOP DOMESTIC, CROSS-BOUNDARY AND INTERCITY RAILWAY SERVICES • IN A PRUDENT COMMERCIAL MANNER 181
  • 183. MERGER KCRC • OPERATES: – EAST RAIL – WEST RAIL – LIGHT RAIL – INTERCITY TO GUANGZHOU – FREIGHT TO INTERIOR OF MAINLAND CHINA 182
  • 185. MERGER • HONG KONG GOVERNMENT ANNOUNCED MERGER PROPOSAL BETWEEN MTRCL & KCRC ON 11 APRIL 2006 • MTRCL SIGNED MEMORANDUM OF UNDERSTANDING (MOU) WITH HK GOVERNMENT MICHAEL TIEN DR RAYMOND CH'IEN FORMER CHAIRMAN KCRC CHAIRMAN MTRCL 184
  • 186. MERGER MOU PROVIDES FOR: • REDUCED FARE • ABOLITION OF SECOND BOARDING CHARGE • FURTHER DISCOUNTS FOR MEDIUM & LONG DISTANCE JOURNEYS • INTRODUCTION OF AN OBJECTIVE, TRANSPARENT & PREDICTABLE FARE ADJUSTMENT MECHANISM (FAM) • FULLY INTEGRATED INTERCHANGE STATIONS FOR SHATIN TO CENTRAL LINK • IMPROVEMENT ON EXISTING INTERCHANGE ARRANGEMENTS IN THE SHORT TERM • PROVISION OF SEAMLESS INTERCHANGE ARRANGEMENTS WITH FUTURE EXTENSIONS 185
  • 187. MERGER MOU PROVIDES FOR • JOB SECURITY FOR ALL FRONTLINE STAFF 186
  • 188. MERGER DEAL TERMS • PROVIDE A BALANCED PACKAGE FAIR TO ALL STAKEHOLDERS 187
  • 189. MERGER DEAL TERMS • ACQUISITION OF RENEWABLE OPERATIONAL RIGHT OF KCR FOR 50 YEARS – UPFRONT PAYMENT OF HK$4.25 BILLION FOR SERVICE CONCESSION AND TO PURCHASE CERTAIN RAIL ASSETS – HK$7.79 BILLION FOR A PROPERTY PACKAGE – FIXED ANNUAL PAYMENT OF HK$750 MILLION – VARIABLE ANNUAL PAYMENT BASED ON REVENUES GENERATED FROM KCR‟S RAIL AND RAIL-RELATED OPERATIONS • EXPECTED TO BE EPS & NPV ACCRETIVE FOR MTRCL 188
  • 190. MERGER MEET THE GOVERNMENT‟S FIVE PARAMETERS 1. ADOPTION OF A MORE OBJECTIVE AND TRANSPARENT FAM 2. ABOLITION OF THE SECOND BOARDING CHARGE & REVIEW FARE STRUCTURE TO REDUCE FARES 3. EARLY RESOLUTION OF INTERCHANGE ARRANGEMENTS FOR RAIL PROJECTS UNDER PLANNING, NOTABLY THE SHATIN TO CENTRAL LINK 4. ENSURE JOB SECURITY FOR FRONTLINE STAFF 5. PROVISION OF SEAMLESS INTERCHANGE ARRANGEMENTS IN THE LONG TERM 189
  • 191. MERGER BENEFITS • SYNERGY • ECONOMIES OF SCALE • COST EFFICIENCY • INTEGRATED RAIL SYSTEM 190
  • 192. MERGER TRANSITION - ONE YEAR OR MORE SHARE PRICE JUMPED 5.3% (FROM HK$19 TO 20) RAIL MERGER BILL APPROVED BY LegCo on 8 JUNE 2007 OUTLOOK - BRIGHT 191
  • 193. MERGED • COMPLETED ON 2 DECEMBER 2007 • 香港鐵路有限公司 ONE COMPANY ONE TEAM 192
  • 194. MERGED 193
  • 195. MERGED • 211 Km ROUTE LENGTH • 82 STATIONS • 9 COMMUTER LINES • AIRPORT EXPRESS • LIGHT RAIL • DISNEYLAND RESORT LINE • FEEDER BUS SERVICE • CABLE CAR • INTERCITY PASSENGER SERVICE • INTERCITY FREIGHT SERVICE • 3 MILLION DAILY PASSENGERS 194
  • 196. MERGED ONE COMPANY ONE TEAM STAFF INTEGRATION W ILLIAM CHAN FORMER HUMAN RESOURCES DIRECTOR 195
  • 197. MTR CORPORATION LTD GROWTH MOMENTUM 196
  • 198. MTRCL EXPANSION NEW VISION : • TO BE A WORLD CLASS ENTERPRISE • GROWING IN HONG KONG & BEYOND • FOCUSING ON RAIL, PROPERTY & RELATED BUSINESS 197
  • 199. MTRCL • NEW MISSION : • EXCELLENT VALUE FOR CUSTOMERS • OPPORTUNITIES FOR STAFF • DEVELOP RAILWAY NETWORK AS BACKBONE OF PUBLIC TRANSPORT IN HONG KONG • GROW IN MAINLAND CHINA & CAPTURE OPPORTUNITIES IN EUROPE 198
  • 200. MTRCL • NEW CORE VALUES : EXCELLENT SERVICE VALUE CREATION MUTUAL RESPECT ENTERPRISING SPIRIT 199
  • 201. HONG KONG BUSINESS HONG KONG INTERNATIONAL AIRPORT SUBCONTRACT FOR AUTOMATED PEOPLE MOVER MIDFIELD CONCOURSE EXTENSION PROJECT RESPONSIBLE FOR DESIGN, PROCUREMENT, INSTALLATION, TESTING & COMMISSIONING OF SEVERAL RAILWAY SYSTEMS 200
  • 202. MACAO BUSINESS MACAO GOVERNMENT MOU SIGNED FOR LIGHT RAIL PROJECT CONSULTANCY 201
  • 203. DUBAI 202
  • 204. DUBAI METRO & AIRPORT LINES 203
  • 205. DUBAI CONSULTANCY TO REVIEW DESIGN PROPOSALS IN RESPECT OF : OPERATION & MAINTENANCE VIADUCT CONSTRUCTION 204
  • 206. DUBAI CONSULTANCY MOU SIGNED TO ASSIST TO DEVELOP A MASS URBAN TRANSPORT SYSTEM, PROVIDING HIGH QUALITY TRANSPORT SERVICES 205
  • 207. INDIA Delhi Airport Metro Express Line (AMEL) • Major engineering & project management contract 206
  • 208. UK BUSINESS BIDS 207
  • 209. UK BUSINESS LORO (MTR/LAING ) FRANCHISE TO OPERATE LONDON ORBITAL RAILWAY (with over 1090 trains a day) FROM 11 NOVEMBER 2007 FOR 7 YEARS WITH OPTION FOR 2 FURTHER YEARS SUCCESS 208
  • 210. UK BUSINESS LOROL (MTR/DEUTSCHE BAHN) ACTION ON DAY ONE • OYSTER TICKETING SYSTEM • NEW TICKETING MACHINES • STATIONS GATED 209
  • 211. UK BUSINESS (MTR/DEUTSCHE BAHN) • IMPROVEMENT IN: 1. SERVICE OPERATION 2. PUNCTUALITY 3. SAFETY 4. SECURITY • TICKETLESS TRAVEL DOWN • REVENUE UP 210
  • 212. UK BUSINESS (MTR/DEUTSCHE BAHN) PROGRAMME FOR: • CUSTOMER SERVICE TRAINING • STATION CLEANING AND REPAIR • STATION REFURBISHEMENT • STATION REMODELLING • NEW EXTENSIONS 211
  • 213. UK BUSINESS • “….so gradually all suburban rail services in London can be brought up to the standard of London Overground.” Ken Livingstone Mayor of London 212
  • 214. UK BUSINESS “London Overground has become a shining example of how franchises can be run. With the network soon to orbit our city, the London Overground's next five years are sure to take the service to new heights. Congratulations to all those workers whose hard graft has made this a success story.” Boris Johnson Mayor of London 213
  • 215. UK BUSINESS (MTR/DEUTSCHE BAHN) 9TH LONDON TRANSPORT AWARDS  LONDON TRANSPORT OPERATOR OF THE YEAR (SECOND YEAR IN A ROW) 2012 METRORAIL AWARDS LONDON  WORLD‟S MOST IMPROVEED METRO 214
  • 216. UK BUSINESS SHORT-LISTED TO BID FOR: ESSEX THAMESIDE FRANCHISE (LONDON FENCHURCH STREET – TILBURY- SOUTHEND) SEPTEMBER 2012 THAMESLINK FRANCHISE (BEDFORD – GATWICK - BRIGHTON) FEBRUARY 2013 215
  • 217. EUROPE BUSINESS STOCKHOLM UNDERGROUND TOOK OVER OPERATION 2 NOVEMBER 2009 (FOR 8 YEARS MINIMUM) 216
  • 218. AUSTRALIA BUSINESS METRO TRAINS MELBOURNE TOOK OVER OPERATION ON 30 NOVEMBER 2009 (FOR INITIAL PERIOD OF 8 YEARS) 217
  • 219. AUSTRALIA BUSINESS UNITED GROUP LTD. SUBCONTRACT TO SUPPORT ITS ROLLING STOCK MAINTENANCE WORKS IN NEW SOUTH WALES 218
  • 221. CHINA BUSINESS SHANGHAI TOGETHER WITH ITS JOINT VENTURE PARTNER, APPOINTED AS:  OWNER‟S REPRESENTATIVE TO PROJECT MANAGE DESIGN AND CONSTRUCTION OF LINE 9  OWNER‟S ADVISOR OF LINE 8 & LINE 11 220
  • 222. CHINA BUSINESS BEIJING LINE 4 – INITIALLED IN FEBRUARY 2005 – COMPANY FORMED IN JANUARY 2006 – AGREEMENT SIGNED ON 12 APRIL 2006 221
  • 223. CHINA BUSINESS BEIJING LINE 4 – PPP – 30-YEAR CONCESSION AGREEMENT WITH BEIJING MUNICIPAL GOVERNMENT – FOR INVESTMENT, CONSTRUCTION & OPERATION OPENED 28 SEPTEMBER 2009 DAXING LINE OPENED 30 DECEMBER 2010 222
  • 224. CHINA BUSINESS SHENZHEN LINE 4 – 30-YEAR BOT PROJECT – CONCESSION AGREEMENT WITH SHENZHEN MUNICIPAL GOVERNMENT – „RAIL + PROPERTY‟ – INITIALLED IN MAY 2005 – PHASE 1 TAKEN OVER 01 JULY 2010 – PHASE 2 OPENED 16 JUNE 2011 223
  • 225. CHINA BUSINESS HANGZHOU LINE 1 – J.V. AGREEMENT WITH SUBSIDARY OF HANGZHOU METRO GROUP (PPP) – INVEST & OPERATE LINE 1 FOR 25 YEARS – RESPONBLE FOR E&M SYSYTEMS & ROLLING STOCK – SINGED IN JULY 2012 – OPERATIONAL ON 24 NOVEMBER 2012 224
  • 226. BUSINESS OUTSIDE HONG KONG COMPANY SHARE BEIJING MTR CORPORATION LTD. (BJMTR) 49% MTR CORPORATION ( SHENZHEN) LTD. (SZMTR) 100% METRO TRAINS MELBOURNE PTY. LTD. (MTM) 60% MTR STOCKHOLM AB (MTRS) 100% TUNNELBANAN TEKNIK STOCKHOLM AB (TBT) 50% LONDON OVERGROUND RAIL OPERATIONS LTD. (LOROL) 50% MTR HANGZHOU LINE 1 INVESTMENT CO. LTD. 100% 225
  • 228. HONG KONG GOVERNMENT INFRASTRUCTURE INVESTMENT • 2007-2008 POLICY ADDRESS ANNOUNCES TEN MAJOR INFRASTRUCTURE PROJECTS • ANNUAL EXPENDITURE OF HK$ 50 BILLION (£ 4 BILLION) IN COMING YEARS 227
  • 230. HONG KONG GOVERNMENT INFRASTRUCTURE INVESTMENT • Transport Infrastructure 1. South Island MTR Line 2. The Sha Tin to Central MTR Link 3. The Tuen Mun Western Bypass and Tuen Mun-Chek Lap Kok Link • Cross-boundary Infrastructure Projects 4. The Guangzhou-Shenzhen-HK Express Rail Link 5. HK-Shenzhen Airport Co-operation 6. HK-Zhuhai-Macao Bridge 7. HK-Shenzhen Joint Development of the Lok Ma Chau Loop • New Urban Development Areas 8. West Kowloon Cultural District 9. Kai Tak Development Plan 10. New Development Areas (NDAs) 229
  • 232. RAILWAY EXTENSIONS XRL 231
  • 233. RAILWAY EXTENSIONS WIL 232
  • 234. RAILWAY EXTENSIONS KTE 233
  • 235. RAILWAY EXTENSIONS JAY WALDER CEO TC CHIEW PROJECTS DIRECTOR SCL 234
  • 236. RAILWAY EXTENSIONS FULLY AUTOMATIC OPERATION 235 SIL(E)
  • 237. RAILWAY EXTENSIONS EXTENSION PROJECT FUNDING XRL SERVICE CONCESSION (GOVERNMENT CAPITAL + MTRCL OPERATIONS) WIL CAPITAL GRANT KTE RAIL + PROPERTY SCL SERVICE CONCESSION SIL(E) RAIL + PROPERTY 236
  • 238. RAILWAY EXTENSIONS RAILWAY DEVELOPMENT STRATEGY 2000 237 (UPDATE)
  • 240. RAILWAY BUILDING FEASIBILITY IDENTIFY TRANSPORT NEEDS FEASIBILITY STUDY PROPOSAL TO GOVERNMENT ROUTE PROTECTION 239
  • 241. RAILWAY BUILDING PRE-CONTRACT  PREPARATION OF CONTRACT DOCUMENTS  DESIGN STANDARDS MANUAL  MATERIALS & WORKMANSHIP SPECIFICATION  CONDITIONS OF CONTRACT  BILLS OF QUANTITIES  APPOINTMENT OF CONSULTANTS  TENDERING  CONTRACT AWARD 240
  • 242. RAILWAY BUILDING CONSTRUCTION DESIGN MANAGEMENT CONSTRUCTION MANAGEMENT PROTECTION OF ADJACENT PROPERTIES TESTING & COMMISSIONING APPROVAL BY RAILWAY INSPECTORATE HANDOVER TO OPERATIONS 241
  • 243. SYSTEM IMPROVEMENT & PROTECTION 242
  • 244. LISTENING CORPORATION IN SERVICE  IMPROVEMENTS:  NEW INTEGRATED ENTRANCES  ENTRANCE UPGRADE  FACILITIES FOR THE PHYSICALLY IMPAIRED  RETROFITS - PLATFORM SIDE DOORS  KIOSKS  NEW SINGNALLING SYSTEM  CONDITION MONITORING  MAINTENANCE  RAILWAY PROTECTION 243
  • 248. IN SERVICE CHAIRLIFT & TACTILE ROUTES 247
  • 249. IN SERVICE PSD 248
  • 250. IN SERVICE SIGNALLING SOURCE - BOMBARDIER
  • 252. MTRCL A STORY OF OUTSTANDING SUCCESS 251 KOWLOON BAY HQ BUILDING
  • 253. MTRCL • PROFITABLE HK$B 16 14.2 14 Turnover 12 10.7 10 Operating profit 8 8.6 before depreciation (after property 6 development profit) Net profit excluding 4 investment property revaluation 2 0 252
  • 254. MTRCL 253
  • 255. MTRCL 254
  • 256. MTRCL CONSOLIDATED P & L A/C (YEAR ENDED 31 December 2011) HK$ M • REVENUE 33,423 • PROFIT ON PROPERTY DEVELOPMENTS 4,900 • OPERATING PROFIT BEFORE DEPRECIATION 17,038 • NET PROFIT ATTRIBUTABLE TO SHAREHOLDERS 14,716 255
  • 257. MTRCL AS AT END 2011: PATRONAGE ( million) Yearly 1,644 Daily 4.7 256
  • 258. MTRCL HONG KONG PEOPLE ENGINEERS MTR STAFF HAVE REASON TO BE PROUD 257
  • 259. IN THE EYES of the BBC 19 APRIL 2006 258
  • 260. RECAP 259
  • 261. STORY OF THE HKMTR 260
  • 262. STORY OF THE HKMTR STORY OF HONG KONG IN THE FINAL DECADES OF LAST CENTURY 261
  • 263. STORY OF THE HKMTR STORY OF HONG KONG IN THE FINAL DECADES OF LAST CENTURY STORY OF 23 YEARS OF MY LIFE 262
  • 264. This presentation is dedicated to : All my friends Especially those of the MTR 263
  • 265. This presentation is dedicated to : and to: The Hong Kong Technical College (now The Hong Kong Polytechnic University) For helping me to lay the foundation for my engineering career 264
  • 266. 265