Technical Report - Building Structural Assessment Rehabilitation.pdf
1. Technical Report
(To investigate the structural condition of the commercial bank building at the intersection of the pool)
Alpha Engineering Company Engineering
Consultant Office Accredited Structural
Laboratories
Beneficiary: Commercial Bank
Issue/ 615
Implementing agency (examination and evaluation): Al-Waha Tower Company for Trade and General Contracting / the consulting engineering cadre and the cadres
of the approved structural laboratory
Date of preparation of the report: Sunday, 2021-JUNE-20
Total project duration:
Four months (120 working days) only.
Project location: Baghdad Governorate, near the intersection of Al-Masbah - Al-Arasat
Project name: Construction investigation project - repair - and reinforcement for the building of the Commercial Bank in Eastern Karada
(not yet approved)
Estimated project cost:
Representative of the implementing agency for the restoration: SOLUTIONS ENGINEERING ALPHA
Responsible for the restoration (constructive): SOLUTIONS ENGINEERING ALPHA
Kamal Abdel Hamid, representative of the beneficiary: Eng.
Date/06/20/2021
Machine Translated by Google
2. Alpha Engineering Company Engineering
Consultant Office Accredited Structural
Laboratories
Asserted Structural Laboratory Sampling Collecting, Assesment,
Issue/ 615
3. Technical documents for the initial structural checks (from the entity carrying out the structural checks - the engineering consulting office).
Drawing
3. Detailed structural calculations (Calculations Verification & Modeling Design Structural) were prepared (for a period of no less
than two weeks (14 working days).
Structural Design shop drawings with full detailing) 4
For two weeks (14 working days).
2. Technical documents of the structural restoration project (from the executing agency for the initial restoration - Alfa Company) Workshop Repearing
Drawings
Three weeks (21 working days).
1. Technical documents of the project (from the designer - Al-Wathiq Engineering Consulting Office) Workshop Orginal
2. A work plan for the field trials of the building (Testing & Sampling Assessments Structural) was implemented for a period of no less than
Required documents: (for the purpose of completing the examination and evaluation requirements)
1. Initial visits to the building site for the purpose of conducting an investigation field for a period of no less than five working days.
Date/06/20/2021
Documented site visits:
& Testing Results
Machine Translated by Google
3. (Building Basement)
3
Neighboring by select stations
The second phase
final processing.
Other locations within the building for the purpose
of requirements
To Be Approved by
Alpha Engineering Company Engineering
Consultant Office Accredited Structural
Laboratories
T
Inspection of building foundations and basement
Complementary check-ups
Conducting checks on the basement floor for
implementation (columns, bridges, and the roof
5
Work plan and project schedule:
Electing other points for the purpose of
conducting new examinations based on the report
approved.
to select spaces
Obtained from the second stage
Station Total . Local elevations
Examination of the implemented treatments
(for the water-damaged site) by the company
Third week
To Be Approved by
stats
Consulting Engineering
6 Inspection of buildings adjacent to the site
Inspection of building foundations and basement
Al-Hasiri basis.
For concrete strength checks
For the purpose of completing the examination and inspection requirements, a three-stage work method (ProJECT PHASE THREE) has been adopted.
Examination of the external surfaces of the
implementation site (second floor).
Other sites inside the building for the purpose
of checking for cracks (vertical and horizontal)
due to damage from water and precipitation
rooftop
For a period not exceeding three weeks (21 working days), as shown in the following table:
Inspection and inspection of the basement of
the implementation (columns, bridges, and roof).
To Be Approved by
Permeable antennas and water tanks
1st stage
To Be Approved by
To Be Approved by
second week
Consulting Engineering
Issue/ 615
Inspection of the external surfaces of the
implementation site (second floor).
(Building Basement)
Measurements
Depending on the results
Inspection of the site affected by
groundwater and the time limitation of the origin
uneven.
third level
2
Consulting Engineering
wind loading on Arial (there is
first week
Consulting Engineering
Consulting Engineering
Investigation
7
Date/06/20/2021
1
4
Additional checking of the field weight
measurements on the roof of the building by
means of synchronous height-determination stations
primacy
and previously implemented processes.
Additional checking of the height of the buildings
Machine Translated by Google
4. Synchronized
Actual local via satellite
Consulting Engineering
real-time
To Be Approved by
Issue/ 615
Consulting Engineering
Additional check for lateral deflections
actual
TESTS
9
SELECTIVE STRUCTURAL
Alpha Engineering Company
Engineering Consultant Office
Accredited Structural Laboratories
To Be Approved by
Measuring
displacement
Antenna, satellite dishes,
elevations
Actual satellite (GPS .)
Subsequent structural examinations
10
Measurements
(
Station
GPS Station actual
by altitude stations
Measuring
Consulting Engineering
Date/06/20/2021
To Be Approved by
Measuring the heights of the building during the
additional construction operations to ensure
regular precipitation of the supporting soil.
lateral
TESTS
Additional checking of the height of the
building by means of height-fixing stations
real-time
Station
ADDITIONAL STRUCTURAL
)and water tanks
8
Measurement of the lateral deflections built during
the additional construction operations and its
exposure to wind loads to ensure that no significant
variation occurs during implementation.
Selected structural examinations
Machine Translated by Google
5. Date/06/20/2021
For field examination work similar to the current project
Quality control ( for on-site inspections and repairs ):
Alpha Engineering Company Engineering
Consultant Office Accredited Structural
Laboratories
2 Appendix No. 2 photos
All engineering tests were carried out in laboratories officially registered with the Iraqi Ministry of Planning and Development Cooperation and under the direct
supervision of our consulting engineering staff (with specializations: Structural Engineering, Foundation Engineering, Water Resources Engineering, Structural
Materials Engineering and Project Management Engineering), which includes the following works:
. 3. Annex No. 3 Detailed construction plans for the project.
attachments:
1. Field inspection and initial examination. 2.
Studying the project’s engineering documents (supplied by the designer - Al-Wathiq Engineering Consulting Office). 3. Conducting and implementing
a program of on-site inspections of the building (Annex No. 1) and direct supervision during implementation. 4. Completing
engineering studies (for the purpose of analyzing test results) and providing the necessary engineering treatments. 5. Direct
engineering supervision on the implementation of repairs (for the purpose of ensuring the quality of implementation and its compliance with technical specifications).
Issue/ 615
1. Annex No. 1 on-site examination program for the implementation of the project.
Machine Translated by Google
6. On-site inspection program for the implementation of the project (according to the American Standard ACI 201)
Supplement No. (1)
ASTM.C42
indicator
Non
Examination name
Content of holes, density of concrete and components
2
4
Alpha Engineering Company
Engineering Consultant Office
Accredited Structural Laboratories
Test Type
ASTM C-597
B
Concrete compressive and
B
ACI318-08, ASTM
Destructive
Determining the ability of concrete to active rust (as a result
of its exposure to heat):
Determination of the thickness of the concrete cover of the
rebar (as a result of spalling by heat):
ASTM
Destructive
Practice of petrographic
Test Name And
concrete mix:
Non
Test to identify loses in concrete
concrete reinforcement.
tensile strength
concrete
Electrical potential
cover.
A
Non
Destructive
Inspection type Standard No.
1
Destructive
& Non
examination of hardened
Ultrasonic measuring
3
Code Reference Number
Destructive
Issue/ 615
Test Description
Determining the condition of surface cracks in concrete,
using mechanical movement indication devices:
Pachometer survey for
Modulus of rupture test
ASTM C-856
measuring equipment
Examination type
Extraction and testing of concrete core samples to determine
A
Destructive
No.
equipment
Test to identify active corrosive in
Destructive
cover.
Date/06/20/2021
Extraction and testing of concrete core samples to determine
the compressive and tensile strength of concrete:
Determining the state of internal cracks in
concrete, using ultrasound devices:
determination of concrete
ACI 318.08, BS1881,
Mechanical movement
ASTM
Machine Translated by Google
7. Alpha Engineering Company
Engineering Consultant Office
Accredited Structural Laboratories
Destructive
Determination of the content of chloride ions in concrete (for the
purpose of determining the durability of concrete due to aging):
Destructive
Pictures showing the on-site field examinations of the project:
ACI 222, ACI318-08
Destructive
Supplement No. (2)
concrete 5
6
Chloride ions content in
According to ASTM.
Date/06/20/2021
Additional tests if needed.
Issue/ 615
& Non
Other tests determined when needed
Machine Translated by Google
8. Supplement No. (2)
Alpha Engineering Company
Engineering Consultant Office
Accredited Structural Laboratories
Date/06/20/2021
Pictures showing the on-site field examinations of the project:
Issue/ 615
Machine Translated by Google
9. Alpha Engineering Company
Engineering Consultant Office
Accredited Structural Laboratories
Issue/ 615
Pictures showing the on-site field examinations of the project:
Date/06/20/2021
Supplement No. (2)
Machine Translated by Google
11. Supplement No. -3-
Pictures of the reality of the building - third
Issue/ 615
Date/06/20/2021
Alpha Engineering Company
Engineering Consultant Office
Accredited Structural Laboratories
Machine Translated by Google
12. Supplement No. -3-
Issue/ 615 Alpha Engineering Company
Engineering Consultant Office
Accredited Structural Laboratories
Pictures of the reality of the building - three floors
Date/06/20/2021
Machine Translated by Google
13. Alpha Engineering Company
Engineering Consultant Office
Accredited Structural Laboratories
Issue/ 615
Date/06/20/2021
Annex No. 3 - Pictures of the current situation of the building - three floors
Machine Translated by Google
14. Annex No. 3 - Pictures of the current situation of the building - third
Alpha Engineering Company
Engineering Consultant Office
Accredited Structural Laboratories
Date/06/20/2021
Issue/ 615
Machine Translated by Google
15. Alpha Engineering Company
Engineering Consultant Office
Accredited Structural Laboratories
Issue/ 615
Pictures of the reality of the building - three floors
Date/06/20/2021
Supplement No. -3-
Machine Translated by Google
16. Supplement No. -3-
Alpha Engineering Company
Engineering Consultant Office
Accredited Structural Laboratories
Date/06/20/2021
Pictures of the reality of the building - three floors
Issue/ 615
Machine Translated by Google
17. Date/06/20/2021
20-06-2021
Abstract
Alpha Engineering Company Engineering
Consultant Office Accredited Structural
Laboratories
End of Technical Report
After checking the results of the structural tests and engineering calculations for the additional weights (adding two floors), it was found that the structure is
structurally sound. In order to increase the safety factor of the structure, it was decided to add structural reinforcement to the columns and thresholds on the ground
floors and basement (and as indicated in the attached construction plans (25-21 page).) The reinforcement also includes Making cross braces (page - bracing steel cross .)
with respect....
20) to ensure achieving the highest safety and efficiency coefficients to resist seismic loads and side winds.
Issue/ 615
Engineering office representative