Excavations
Excavation Hazards ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
How to Control the excavation Risks ,[object Object],[object Object],Before any Excavation  job,  Get the Excavation permit
Cave in ,[object Object]
Collapse of spoil soil
Requirements to prevent Cave in ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Sloping
Shoring
Cave-in Hazard This excavation has inadequate  support posts and egress access Inadequate protective system
Inadequate Protective System  This worker is in a trench with no protective system, that is not sloped or benched and has no means of egress
Underground services Digging   into underground services can lead to: • fires and explosions   from ruptured gas pipes; • contamination   of fresh water supplies; • flooding   from ruptured water and sewerage pipes; • soil contamination   from burst fuel pipes; • loss of communication   and electric power services; and • electrocution  due to cutting  of Electrical cable .
Preventing damage to cables and pipes Dig trial holes to confirm the position of   cables and pipes . Dig along-side the line of the cable or pipe, not directly above. Have an   observer   to guide the operator. Use  shovels and spades   to make the final exposure. Avoid using: • picks   or   forks ; • jack hammers   near plastic pipes and electric cables; and • explosives   within 30 metres of  a gas pipe.
Falling into Excavation Set up  barriers or barricades around the edges of the excavation. Place  warning signs to warn people of the excavation. Divert  traffic away from the excavation area Install  flashing amber lights for night-time warning.
Protection from Vehicles ,[object Object],[object Object],[object Object],[object Object],[object Object]
Hazardous Conditions The weight and vibrations of the crane make this a very hazardous condition.  They should not be working under this crane.
Water is Hazardous ,[object Object],Note that these workers are not wearing hardhats to protect them from materials falling into the trench
Water = Cave-in Hazard These workers must be protected from cave-in.  Note the water in the bottom of the trench.  This is a very hazardous condition!
Hazardous Atmosphere ,[object Object],[object Object],[object Object],[object Object]
Means of Egress ,[object Object],This ladder does not meet the requirements of the standard The ladder should extend 3 feet  above the excavation
Access and Egress These two ladders which are lashed together are not an adequate means of egress The ladder should extend 3 feet  above the top of the  excavation
Inspections of Excavations ,[object Object],[object Object],[object Object],[object Object]
Inspections of Excavations ,[object Object],[object Object],[object Object]
Site Evaluation Planning ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Competent Person   ,[object Object],[object Object],[object Object],[object Object],[object Object],Notice:  Supervisor must always present on Site to Supervise the safe running of Excavation Job, He should not leave the Site
Summary ,[object Object],[object Object],[object Object],[object Object]

Más contenido relacionado

La actualidad más candente

Erection of scaffolding
Erection of scaffoldingErection of scaffolding
Erection of scaffoldingSAKET AGRAWAL
 
Construction Excavation Health and Safety Toolbox Talk
Construction Excavation Health and Safety Toolbox TalkConstruction Excavation Health and Safety Toolbox Talk
Construction Excavation Health and Safety Toolbox TalkInfinite Safety Ltd
 
working at height
working at heightworking at height
working at heightJYOTHISHKT
 
SCAFFOLDING Safety Training
SCAFFOLDING Safety TrainingSCAFFOLDING Safety Training
SCAFFOLDING Safety TrainingWilliam York
 
Dropped Object prevention Campaign (1).pptx
Dropped Object prevention Campaign (1).pptxDropped Object prevention Campaign (1).pptx
Dropped Object prevention Campaign (1).pptxssuser926916
 
Risk assessment for testing & commissioning of cranes
Risk assessment for  testing & commissioning of cranesRisk assessment for  testing & commissioning of cranes
Risk assessment for testing & commissioning of cranesAzmeel Contracting Company
 
Presentation working at height
Presentation working at heightPresentation working at height
Presentation working at heightsankarnagar
 
Excavation & Trenching Safety
Excavation & Trenching Safety Excavation & Trenching Safety
Excavation & Trenching Safety Reliance
 
Crane Safety Training Presentation
Crane Safety Training PresentationCrane Safety Training Presentation
Crane Safety Training PresentationFAIZ FAREED
 
8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templatesDwarika Bhushan Sharma
 
Liftingproedure
LiftingproedureLiftingproedure
LiftingproedureZhai Rull
 
Working at-height
Working at-height Working at-height
Working at-height Reliance
 

La actualidad más candente (20)

Erection of scaffolding
Erection of scaffoldingErection of scaffolding
Erection of scaffolding
 
Construction Excavation Health and Safety Toolbox Talk
Construction Excavation Health and Safety Toolbox TalkConstruction Excavation Health and Safety Toolbox Talk
Construction Excavation Health and Safety Toolbox Talk
 
Hot Works Safety Training
Hot Works Safety TrainingHot Works Safety Training
Hot Works Safety Training
 
Construction Safety Training
Construction Safety TrainingConstruction Safety Training
Construction Safety Training
 
Work At Height
Work At HeightWork At Height
Work At Height
 
working at height
working at heightworking at height
working at height
 
SCAFFOLDING Safety Training
SCAFFOLDING Safety TrainingSCAFFOLDING Safety Training
SCAFFOLDING Safety Training
 
MEWP TRAINING.pptx
MEWP TRAINING.pptxMEWP TRAINING.pptx
MEWP TRAINING.pptx
 
Dropped Object prevention Campaign (1).pptx
Dropped Object prevention Campaign (1).pptxDropped Object prevention Campaign (1).pptx
Dropped Object prevention Campaign (1).pptx
 
Haad height aware - eng
Haad   height aware - engHaad   height aware - eng
Haad height aware - eng
 
Working at height slides
Working at height slidesWorking at height slides
Working at height slides
 
Risk assessment for testing & commissioning of cranes
Risk assessment for  testing & commissioning of cranesRisk assessment for  testing & commissioning of cranes
Risk assessment for testing & commissioning of cranes
 
Presentation working at height
Presentation working at heightPresentation working at height
Presentation working at height
 
Excavation & Trenching Safety
Excavation & Trenching Safety Excavation & Trenching Safety
Excavation & Trenching Safety
 
Crane Safety Training Presentation
Crane Safety Training PresentationCrane Safety Training Presentation
Crane Safety Training Presentation
 
8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates
 
Rigging and lifting
Rigging and liftingRigging and lifting
Rigging and lifting
 
Liftingproedure
LiftingproedureLiftingproedure
Liftingproedure
 
Fall Protection by Osha
Fall Protection by Osha Fall Protection by Osha
Fall Protection by Osha
 
Working at-height
Working at-height Working at-height
Working at-height
 

Destacado

Excavation and-trenching safety 03
Excavation and-trenching safety 03Excavation and-trenching safety 03
Excavation and-trenching safety 03vppradeepkumar
 
Safety in various construction operations –
Safety in various construction operations –Safety in various construction operations –
Safety in various construction operations –Nayana 54321
 
Ce2026 traffic engineering and management notes
Ce2026 traffic engineering and management notesCe2026 traffic engineering and management notes
Ce2026 traffic engineering and management notesNayana 54321
 
Blindfold chess training
Blindfold chess trainingBlindfold chess training
Blindfold chess trainingPaul Omongos
 
excavation equipment used for construction
excavation equipment used for constructionexcavation equipment used for construction
excavation equipment used for constructionAlbin P Sunny
 
Construction equipments
Construction equipmentsConstruction equipments
Construction equipmentsAshish Parihar
 

Destacado (6)

Excavation and-trenching safety 03
Excavation and-trenching safety 03Excavation and-trenching safety 03
Excavation and-trenching safety 03
 
Safety in various construction operations –
Safety in various construction operations –Safety in various construction operations –
Safety in various construction operations –
 
Ce2026 traffic engineering and management notes
Ce2026 traffic engineering and management notesCe2026 traffic engineering and management notes
Ce2026 traffic engineering and management notes
 
Blindfold chess training
Blindfold chess trainingBlindfold chess training
Blindfold chess training
 
excavation equipment used for construction
excavation equipment used for constructionexcavation equipment used for construction
excavation equipment used for construction
 
Construction equipments
Construction equipmentsConstruction equipments
Construction equipments
 

Similar a NGI-Excavation Hazards

Excavations
ExcavationsExcavations
ExcavationsFFSafety
 
Excavations c
Excavations cExcavations c
Excavations cjcpdrz
 
Safety in excavation
Safety in excavationSafety in excavation
Safety in excavationDukeRamirez1
 
Trenching Safety Training by State of Georgia
Trenching Safety Training by State of GeorgiaTrenching Safety Training by State of Georgia
Trenching Safety Training by State of GeorgiaAtlantic Training, LLC.
 
Task Risk Worksheet Rev1.pdf
Task Risk Worksheet Rev1.pdfTask Risk Worksheet Rev1.pdf
Task Risk Worksheet Rev1.pdfIsmailMydeen3
 
Confined space – hazards –risk –control measures
Confined space – hazards –risk –control measuresConfined space – hazards –risk –control measures
Confined space – hazards –risk –control measuresAnand Prakash
 
Hazard identification and risk analysis in mining industry
Hazard identification and risk analysis in mining industryHazard identification and risk analysis in mining industry
Hazard identification and risk analysis in mining industrygopal karmakar
 
Excavation & trenching
Excavation & trenchingExcavation & trenching
Excavation & trenchingWaseem1212
 
Excavation and Trenching.pptx
Excavation and Trenching.pptxExcavation and Trenching.pptx
Excavation and Trenching.pptxGanraj2
 
Enclosed space entry procedures
Enclosed space entry proceduresEnclosed space entry procedures
Enclosed space entry proceduresViktor Bily
 
12 trenching and excavation safety
12 trenching and excavation safety12 trenching and excavation safety
12 trenching and excavation safetyCervelliere Limited
 

Similar a NGI-Excavation Hazards (20)

Excavations
ExcavationsExcavations
Excavations
 
Excavation & Trench Safety by NUCA
Excavation & Trench Safety by NUCAExcavation & Trench Safety by NUCA
Excavation & Trench Safety by NUCA
 
Excavation safety
Excavation safetyExcavation safety
Excavation safety
 
Ch. 03 Excuvation.PPT
Ch. 03 Excuvation.PPTCh. 03 Excuvation.PPT
Ch. 03 Excuvation.PPT
 
Excavations c
Excavations cExcavations c
Excavations c
 
3. excavations2
3. excavations23. excavations2
3. excavations2
 
Excavations by Summit Staffing Inc
Excavations by Summit Staffing IncExcavations by Summit Staffing Inc
Excavations by Summit Staffing Inc
 
Excavation Safety Training by OSHAX.Org
Excavation Safety Training by OSHAX.OrgExcavation Safety Training by OSHAX.Org
Excavation Safety Training by OSHAX.Org
 
Safety in excavation
Safety in excavationSafety in excavation
Safety in excavation
 
EXCAVATION SLIDE.pptx
EXCAVATION SLIDE.pptxEXCAVATION SLIDE.pptx
EXCAVATION SLIDE.pptx
 
Trenching Safety Training by State of Georgia
Trenching Safety Training by State of GeorgiaTrenching Safety Training by State of Georgia
Trenching Safety Training by State of Georgia
 
Task Risk Worksheet Rev1.pdf
Task Risk Worksheet Rev1.pdfTask Risk Worksheet Rev1.pdf
Task Risk Worksheet Rev1.pdf
 
Confined space – hazards –risk –control measures
Confined space – hazards –risk –control measuresConfined space – hazards –risk –control measures
Confined space – hazards –risk –control measures
 
Hazard identification and risk analysis in mining industry
Hazard identification and risk analysis in mining industryHazard identification and risk analysis in mining industry
Hazard identification and risk analysis in mining industry
 
Excavation.ppt
Excavation.pptExcavation.ppt
Excavation.ppt
 
Excavation Hazards
Excavation HazardsExcavation Hazards
Excavation Hazards
 
Excavation & trenching
Excavation & trenchingExcavation & trenching
Excavation & trenching
 
Excavation and Trenching.pptx
Excavation and Trenching.pptxExcavation and Trenching.pptx
Excavation and Trenching.pptx
 
Enclosed space entry procedures
Enclosed space entry proceduresEnclosed space entry procedures
Enclosed space entry procedures
 
12 trenching and excavation safety
12 trenching and excavation safety12 trenching and excavation safety
12 trenching and excavation safety
 

Más de lifecombo

NGI-Welding & Cutting-Part 03
NGI-Welding & Cutting-Part 03NGI-Welding & Cutting-Part 03
NGI-Welding & Cutting-Part 03lifecombo
 
NGI-Welding & Cutting-Part 02
NGI-Welding & Cutting-Part 02NGI-Welding & Cutting-Part 02
NGI-Welding & Cutting-Part 02lifecombo
 
NGI-Welding & Cutting-Part 01
NGI-Welding & Cutting-Part 01NGI-Welding & Cutting-Part 01
NGI-Welding & Cutting-Part 01lifecombo
 
NGI-PPE-Part 02
NGI-PPE-Part 02NGI-PPE-Part 02
NGI-PPE-Part 02lifecombo
 
NGI-PPE-Part 01
NGI-PPE-Part 01NGI-PPE-Part 01
NGI-PPE-Part 01lifecombo
 
NGI-Cranes-Part 04
NGI-Cranes-Part 04NGI-Cranes-Part 04
NGI-Cranes-Part 04lifecombo
 
NGI-Cranes-Part 03
NGI-Cranes-Part 03NGI-Cranes-Part 03
NGI-Cranes-Part 03lifecombo
 
NGI-Cranes-Part 02
NGI-Cranes-Part 02NGI-Cranes-Part 02
NGI-Cranes-Part 02lifecombo
 
NGI-Cranes-Part 01
NGI-Cranes-Part 01NGI-Cranes-Part 01
NGI-Cranes-Part 01lifecombo
 
NGI-Risk Assessment
NGI-Risk AssessmentNGI-Risk Assessment
NGI-Risk Assessmentlifecombo
 
NGI-Incident Reporting
NGI-Incident ReportingNGI-Incident Reporting
NGI-Incident Reportinglifecombo
 
NGI-Cause Tree Analysis
NGI-Cause Tree AnalysisNGI-Cause Tree Analysis
NGI-Cause Tree Analysislifecombo
 
NGI-Confined Spaces
NGI-Confined SpacesNGI-Confined Spaces
NGI-Confined Spaceslifecombo
 
NGI-Radiation Awareness
NGI-Radiation AwarenessNGI-Radiation Awareness
NGI-Radiation Awarenesslifecombo
 
NGI-Chemical Handling
NGI-Chemical HandlingNGI-Chemical Handling
NGI-Chemical Handlinglifecombo
 
NGI-Tool Box Meeting
NGI-Tool Box MeetingNGI-Tool Box Meeting
NGI-Tool Box Meetinglifecombo
 
NGI-Manual Handling
NGI-Manual HandlingNGI-Manual Handling
NGI-Manual Handlinglifecombo
 
NGI-Defensive Driving
NGI-Defensive DrivingNGI-Defensive Driving
NGI-Defensive Drivinglifecombo
 
NGI-H2S Awareness
NGI-H2S AwarenessNGI-H2S Awareness
NGI-H2S Awarenesslifecombo
 
NGI-Basic First Aid
NGI-Basic First AidNGI-Basic First Aid
NGI-Basic First Aidlifecombo
 

Más de lifecombo (20)

NGI-Welding & Cutting-Part 03
NGI-Welding & Cutting-Part 03NGI-Welding & Cutting-Part 03
NGI-Welding & Cutting-Part 03
 
NGI-Welding & Cutting-Part 02
NGI-Welding & Cutting-Part 02NGI-Welding & Cutting-Part 02
NGI-Welding & Cutting-Part 02
 
NGI-Welding & Cutting-Part 01
NGI-Welding & Cutting-Part 01NGI-Welding & Cutting-Part 01
NGI-Welding & Cutting-Part 01
 
NGI-PPE-Part 02
NGI-PPE-Part 02NGI-PPE-Part 02
NGI-PPE-Part 02
 
NGI-PPE-Part 01
NGI-PPE-Part 01NGI-PPE-Part 01
NGI-PPE-Part 01
 
NGI-Cranes-Part 04
NGI-Cranes-Part 04NGI-Cranes-Part 04
NGI-Cranes-Part 04
 
NGI-Cranes-Part 03
NGI-Cranes-Part 03NGI-Cranes-Part 03
NGI-Cranes-Part 03
 
NGI-Cranes-Part 02
NGI-Cranes-Part 02NGI-Cranes-Part 02
NGI-Cranes-Part 02
 
NGI-Cranes-Part 01
NGI-Cranes-Part 01NGI-Cranes-Part 01
NGI-Cranes-Part 01
 
NGI-Risk Assessment
NGI-Risk AssessmentNGI-Risk Assessment
NGI-Risk Assessment
 
NGI-Incident Reporting
NGI-Incident ReportingNGI-Incident Reporting
NGI-Incident Reporting
 
NGI-Cause Tree Analysis
NGI-Cause Tree AnalysisNGI-Cause Tree Analysis
NGI-Cause Tree Analysis
 
NGI-Confined Spaces
NGI-Confined SpacesNGI-Confined Spaces
NGI-Confined Spaces
 
NGI-Radiation Awareness
NGI-Radiation AwarenessNGI-Radiation Awareness
NGI-Radiation Awareness
 
NGI-Chemical Handling
NGI-Chemical HandlingNGI-Chemical Handling
NGI-Chemical Handling
 
NGI-Tool Box Meeting
NGI-Tool Box MeetingNGI-Tool Box Meeting
NGI-Tool Box Meeting
 
NGI-Manual Handling
NGI-Manual HandlingNGI-Manual Handling
NGI-Manual Handling
 
NGI-Defensive Driving
NGI-Defensive DrivingNGI-Defensive Driving
NGI-Defensive Driving
 
NGI-H2S Awareness
NGI-H2S AwarenessNGI-H2S Awareness
NGI-H2S Awareness
 
NGI-Basic First Aid
NGI-Basic First AidNGI-Basic First Aid
NGI-Basic First Aid
 

Último

BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts ServiceVip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Serviceankitnayak356677
 
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptxBanana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptxgeorgebrinton95
 
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCRsoniya singh
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in managementchhavia330
 
Pitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deckPitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deckHajeJanKamps
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewasmakika9823
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...lizamodels9
 

Último (20)

BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts ServiceVip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
 
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptxBanana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptx
 
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in management
 
Pitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deckPitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deck
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
 
KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
 

NGI-Excavation Hazards

  • 2.
  • 3.
  • 4.
  • 6.
  • 9. Cave-in Hazard This excavation has inadequate support posts and egress access Inadequate protective system
  • 10. Inadequate Protective System This worker is in a trench with no protective system, that is not sloped or benched and has no means of egress
  • 11. Underground services Digging into underground services can lead to: • fires and explosions from ruptured gas pipes; • contamination of fresh water supplies; • flooding from ruptured water and sewerage pipes; • soil contamination from burst fuel pipes; • loss of communication and electric power services; and • electrocution due to cutting of Electrical cable .
  • 12. Preventing damage to cables and pipes Dig trial holes to confirm the position of cables and pipes . Dig along-side the line of the cable or pipe, not directly above. Have an observer to guide the operator. Use shovels and spades to make the final exposure. Avoid using: • picks or forks ; • jack hammers near plastic pipes and electric cables; and • explosives within 30 metres of a gas pipe.
  • 13. Falling into Excavation Set up barriers or barricades around the edges of the excavation. Place warning signs to warn people of the excavation. Divert traffic away from the excavation area Install flashing amber lights for night-time warning.
  • 14.
  • 15. Hazardous Conditions The weight and vibrations of the crane make this a very hazardous condition. They should not be working under this crane.
  • 16.
  • 17. Water = Cave-in Hazard These workers must be protected from cave-in. Note the water in the bottom of the trench. This is a very hazardous condition!
  • 18.
  • 19.
  • 20. Access and Egress These two ladders which are lashed together are not an adequate means of egress The ladder should extend 3 feet above the top of the excavation
  • 21.
  • 22.
  • 23.
  • 24.
  • 25.

Notas del editor

  1. 1926 Subpart P ‑ Excavations This presentation is designed to assist trainers conducting OSHA 10-hour Construction Industry outreach training for workers. Since workers are the target audience, this presentation emphasizes hazard identification, avoidance, and control – not standards. No attempt has been made to treat the topic exhaustively. It is essential that trainers tailor their presentations to the needs and understanding of their audience. This presentation is not a substitute for any of the provisions of the Occupational Safety and Health Act of 1970 or for any standards issued by the U.S. Department of Labor. Mention of trade names, commercial products, or organizations does not imply endorsement by the U.S. Department of Labor.
  2. Instructor note: OSHA Standard Exemptions: House foundation/basement excavations (including those that become trenches by definition when formwork, foundations, or walls are constructed) are exempt from the OSHA standard. The specific information regarding the interpretation of this exemption may be found on the OSHA public web site. Reference 29 CFR 1926.652. The exemption specifies height and width for the excavation, impact of water and environmental conditions, soil and equipment factors, and operation of heavy equipment in the vicinity.
  3. Several factors come into play when developing a total “protective system”. The design of of the system itself, how materials and equipment are handled in and around the excavation, and installation and removal of protective system components.
  4. Reference 1926.652, 1926.652(b), 1926.652(c) Benching -- excavating the sides of an excavation to form one or a series of horizontal levels or steps, usually with vertical or near-vertical surfaces between levels. Shoring or shielding is used when the location or depth of the cut makes sloping back to the maximum allowable slope impractical. There are two basic types of shoring, timber and aluminum hydraulic. Trench boxes (shielding) are different from shoring because instead of supporting the trench face, they are mostly serve to protect workers from cave-ins. The excavated area between the outside of the trench box and the face of the trench should be as small as possible. The space between the trench box and the excavation side may be backfilled (or other means may be used) to prevent lateral movement of the box. Shields may not be subjected to loads exceeding those which the system was designed to withstand. Trench boxes may be used in combination with sloping and benching.
  5. Reference 1926.652, 1926.652(b), 1926.652(c) Benching -- excavating the sides of an excavation to form one or a series of horizontal levels or steps, usually with vertical or near-vertical surfaces between levels. Shoring or shielding is used when the location or depth of the cut makes sloping back to the maximum allowable slope impractical. There are two basic types of shoring, timber and aluminum hydraulic. Trench boxes (shielding) are different from shoring because instead of supporting the trench face, they are mostly serve to protect workers from cave-ins. The excavated area between the outside of the trench box and the face of the trench should be as small as possible. The space between the trench box and the excavation side may be backfilled (or other means may be used) to prevent lateral movement of the box. Shields may not be subjected to loads exceeding those which the system was designed to withstand. Trench boxes may be used in combination with sloping and benching.
  6. Reference 1926.652(a) and 1926.652(c)(1) Designs for aluminum hydraulic shoring shall be in accordance with paragraph (c)(2), but if manufacturer's tabulated data cannot be utilized, designs shall be in accordance with appendix D. Employees exposed to potential cave-ins must be protected by sloping or benching the sides of the excavation, by supporting the sides of the excavation, or by placing a shield between the side of the excavation and the work area. 1926 Subpart P Appendix D Aluminum Hydraulic Shoring for Trenches Contains information that can be used when aluminum hydraulic shoring is provided as a method of protection against cave-ins in trenches that are not more than 20 feet deep.
  7. Reference 1926.652(a) and (b) and (c)
  8. Reference 1926.651(f) Warning system for mobile equipment When mobile equipment is operated adjacent to an excavation, or when such equipment is required to approach the edge of an excavation, and the operator does not have a clear and direct view of the edge of the excavation, a warning system shall be utilized such as barricades, hand or mechanical signals, or stop logs. If possible, the grade should be away from the excavation.
  9. In addition to the unprotected trench, a cave-in hazard is increased by machinery which gets too close. Even normal vehicular traffic, such as that along an adjacent interstate or road through an industrial part may impact an excavation. The vibrations from continuous or heavy traffic may undermine the soil and cause a cave-in.
  10. 1926.651(h) Employees shall not work in excavations in which there is accumulated water, or in excavations in which water is accumulating, unless adequate precautions have been taken to protect employees against the hazards posed by water accumulation. The precautions necessary to protect employees adequately vary with each situation, but could include special support or shield systems to protect from cave-ins, water removal to control the level of accumulating water, or use of a safety harness and lifeline. If water is controlled or prevented from accumulating by the use of water removal equipment, the water removal equipment and operations shall be monitored by a competent person to ensure proper operation. If excavation work interrupts the natural drainage of surface water (such as streams), diversion ditches, dikes, or other suitable means shall be used to prevent surface water from entering the excavation and to provide adequate drainage of the area adjacent to the excavation.
  11. Must also test where oxygen deficiency or a hazardous atmosphere could reasonably be expected to exist, before an employee enters the excavation. If hazardous conditions exist, controls such as proper respiratory protection or ventilation must be provided. Also, controls used to reduce atmospheric contaminants to acceptable levels must be tested regularly. Where adverse atmospheric conditions may exist or develop in an excavation, the employer also must provide and ensure that emergency rescue equipment, (e.g., breathing apparatus, a safety harness and line, basket stretcher, etc.) is readily available. This equipment must be attended when used. Employees shall not be permitted to work in hazardous and/or toxic atmospheres. Such atmospheres include those with: -- less than 19.5% oxygen, -- a combustible gas concentration greater than 20% of the lower flammable limit, and, -- concentrations of hazardous substance that exceed those specified in the Threshold Limit Values for airborne contaminants established by the ACGIH.
  12. Reference 1926.651(c(1) Structural ramps - Structural ramps that are used solely by employees as a means of access or egress from excavations shall be designed by a competent person. Structural ramps used for access or egress of equipment shall be designed by a competent person qualified in structural design, and shall be constructed in accordance with the design. - Ramps and runways constructed of two or more structural members shall have the structural members connected together to prevent displacement. - Structural members used for ramps and runways shall be of uniform thickness. - Cleats or other appropriate means used to connect runway structural members shall be attached to the bottom of the runway or shall be attached in a manner to prevent tripping. - Structural ramps used in lieu of steps shall be provided with cleats or other surface treatments o the top surface to prevent slipping.
  13. Reference 1926.651(c) and 1926.1053 (ladder)
  14. Reference 1926.651(k) Daily inspections of excavations, the adjacent areas, and protective systems shall be made by a competent person for evidence of a situation that could result in possible cave-ins, indications of failure of protective systems, hazardous atmospheres, or other hazardous conditions. An inspection shall be conducted by the competent person prior to the start of work and as needed throughout the shift. Inspections shall also be made after every rainstorm or other hazard increasing occurrence. These inspections are only required when employee exposure can be reasonably anticipated.
  15. Reference 1926.651(k) (2) Where the competent person finds evidence of a situation that could result in a possible cave-in, indications of failure of protective systems, hazardous atmospheres, or other hazardous conditions, exposed employees shall be removed from the hazardous area until the necessary precautions have been taken to ensure their safety.
  16. The following concerns must be addressed by a competent person: Evaluate soil conditions [1926 Subpart P Appendix A] and select appropriate protective systems [1926 Subpart P Appendix F]. Construct protective systems in accordance with the standard requirements [1926.652]. Preplan; contact utilities (gas, electric) to locate underground lines, plan for traffic control if necessary, determine proximity to structures that could affect choice of protective system. Test for low oxygen , hazardous fumes and toxic gases, especially when gasoline engine-driven equipment is running, or the dirt has been contaminated by leaking lines or storage tanks. Insure adequate ventilation or respiratory protection if necessary. Provide safe access into and out of the excavation. Provide appropriate protections if water accumulation is a problem. Inspect the site daily at the start of each shift, following a rainstorm, or after any other hazard-increasing event. Keep excavations open the minimum amount of time needed to complete operations. Surface crossing of trenches should not be made unless absolutely necessary. However, if necessary, they are only permitted under the following conditions: -- Vehicle crossings must be designed by and installed under the supervision of a registered professional engineer. -- Walkways or bridges must: -- have a minimum clear width of 20 inches, -- be fitted with standard rails, and -- extend a minimum of 24 inches past the surface edge of the trench.
  17. Reference 1926.650(b) "Competent person" One who is capable of identifying existing and predictable hazards in the surroundings, or working conditions which are unsanitary, hazardous, or dangerous to employees, and who has authorization to take prompt corrective measures to eliminate them. Preamble Page 45909 – “Competent Person” The term is used throughout existing subpart P, but was not defined within the subpart, and there were no references to the existing definition in subpart C, in the proposal, OSHA added the definition to subpart P to help those using the standard.