SlideShare una empresa de Scribd logo
1 de 18
AN LCIF SUPPORTED PROJECT
TOTAL GRANTS RECEIVED - $96000
 Located in the heart of Siliguri
 Land Area – 6480 sq. feets (9 Kotthas)
 Constructed Area – 3 floors approx.
  1400 sq. feet per floor
 Own Blood Donor Van
YEAR           TOTAL ISSUE
2004-05 (2 months)      120
     2005-06            1440
     2006-07            1962
     2007-08            2491
     2008-09            3726
     2009-10            4238
     2010-11            6349
     2011-12           11418
2012-13 (6 months)      8577
   Blood is issued on exchange basis.
   Donations Camps are organized regularly.
   Voluntary donors are given donor card valid
    for one year. This card can be exchanged for
    blood.
   How ever testing fees are charged in all cases
    except for the very poor who are given free or
    at a subsidized rate.
   Break even point – We reached the break
    even point issuing only whole blood at 500
    units.

   Since the operation of component unit
    started we are in surplus.
   Contact the local Directorate of Drug Control
    for minimum requirements.
   Area required – 100 sq. mtrs for Whole Blood
    and additional 50 sq. mtrs. for component
    facility.
   8 rooms out of which 5 should be air
    conditioned.
   Appointment of staff as required under the
    Drugs and Cosmetics Act.
   For only whole blood – approx. 20-25 lacs
    (excluding cost of infrastructure) depending
    upon the number and make of the
    equipments.

   For Blood Component unit -        additional
    approx. 30-35 lacs.
   Obtaining initial License is a long and
    cumbersome process.
   Sourcing technical staff is very difficult in
    small places and the salaries are very high.
   It is a very sensitive Project.
   Once a reputation of quality and service is
    established it becomes self sufficient very
    soon.
   It is a great PR for any Club.

Más contenido relacionado

Más de lionsleaders

Más de lionsleaders (20)

Ppt for webinar on 12th december
Ppt for webinar on 12th decemberPpt for webinar on 12th december
Ppt for webinar on 12th december
 
Lions engagement with diabetes programs in india
Lions engagement with diabetes programs in indiaLions engagement with diabetes programs in india
Lions engagement with diabetes programs in india
 
Simple ways to build our brand
Simple ways to build our brandSimple ways to build our brand
Simple ways to build our brand
 
Way to quality (sight first conclave)
Way to quality (sight first conclave)Way to quality (sight first conclave)
Way to quality (sight first conclave)
 
Sight first anup zimba
Sight first anup zimbaSight first anup zimba
Sight first anup zimba
 
Understanding ot protocols devyesh shah
Understanding ot protocols  devyesh shahUnderstanding ot protocols  devyesh shah
Understanding ot protocols devyesh shah
 
Sf conclave sai lions-patna
Sf conclave sai lions-patnaSf conclave sai lions-patna
Sf conclave sai lions-patna
 
Managing human resources dr.rajesh saini
Managing human resources dr.rajesh sainiManaging human resources dr.rajesh saini
Managing human resources dr.rajesh saini
 
Journey so far & horizon beyond dr.mariotti
Journey so far & horizon beyond dr.mariottiJourney so far & horizon beyond dr.mariotti
Journey so far & horizon beyond dr.mariotti
 
Lion sight first conclave madhavan
Lion sight first conclave madhavanLion sight first conclave madhavan
Lion sight first conclave madhavan
 
Jamalpu rquality eye_care_ in lions eye hospitals
Jamalpu rquality eye_care_ in lions eye  hospitalsJamalpu rquality eye_care_ in lions eye  hospitals
Jamalpu rquality eye_care_ in lions eye hospitals
 
Effective inventory management dr.s.c.shetty
Effective inventory management  dr.s.c.shettyEffective inventory management  dr.s.c.shetty
Effective inventory management dr.s.c.shetty
 
Cost management in charitable eye hospital dr.kuldeep dole
Cost management in charitable eye hospital  dr.kuldeep doleCost management in charitable eye hospital  dr.kuldeep dole
Cost management in charitable eye hospital dr.kuldeep dole
 
Building diabetes program in our facilities
Building diabetes program in our facilitiesBuilding diabetes program in our facilities
Building diabetes program in our facilities
 
Balancing income vs expenses
Balancing income vs expensesBalancing income vs expenses
Balancing income vs expenses
 
A little endeavour from ranaghat (sight first conclave)
A little endeavour from   ranaghat (sight first conclave)A little endeavour from   ranaghat (sight first conclave)
A little endeavour from ranaghat (sight first conclave)
 
Excellence
ExcellenceExcellence
Excellence
 
Engaging women & families in the future of lions
Engaging women & families in the future of lionsEngaging women & families in the future of lions
Engaging women & families in the future of lions
 
Email etiquette
Email etiquette Email etiquette
Email etiquette
 
Energize club-excellence-process
Energize club-excellence-processEnergize club-excellence-process
Energize club-excellence-process
 

Siliguri terai lions blood bank project

  • 1. AN LCIF SUPPORTED PROJECT TOTAL GRANTS RECEIVED - $96000
  • 2.  Located in the heart of Siliguri  Land Area – 6480 sq. feets (9 Kotthas)  Constructed Area – 3 floors approx. 1400 sq. feet per floor  Own Blood Donor Van
  • 3.
  • 4.
  • 5.
  • 6.
  • 7.
  • 8.
  • 9.
  • 10.
  • 11.
  • 12.
  • 13. YEAR TOTAL ISSUE 2004-05 (2 months) 120 2005-06 1440 2006-07 1962 2007-08 2491 2008-09 3726 2009-10 4238 2010-11 6349 2011-12 11418 2012-13 (6 months) 8577
  • 14. Blood is issued on exchange basis.  Donations Camps are organized regularly.  Voluntary donors are given donor card valid for one year. This card can be exchanged for blood.  How ever testing fees are charged in all cases except for the very poor who are given free or at a subsidized rate.
  • 15. Break even point – We reached the break even point issuing only whole blood at 500 units.  Since the operation of component unit started we are in surplus.
  • 16. Contact the local Directorate of Drug Control for minimum requirements.  Area required – 100 sq. mtrs for Whole Blood and additional 50 sq. mtrs. for component facility.  8 rooms out of which 5 should be air conditioned.  Appointment of staff as required under the Drugs and Cosmetics Act.
  • 17. For only whole blood – approx. 20-25 lacs (excluding cost of infrastructure) depending upon the number and make of the equipments.  For Blood Component unit - additional approx. 30-35 lacs.
  • 18. Obtaining initial License is a long and cumbersome process.  Sourcing technical staff is very difficult in small places and the salaries are very high.  It is a very sensitive Project.  Once a reputation of quality and service is established it becomes self sufficient very soon.  It is a great PR for any Club.