1. Shooting Schedule
Day 3
Date and Time Wednesday 25th April 2018
Section of
Location
I am going to places such as Camden, Covent Garden, Brick Lane
and South Bank. At all of these places I plan to get as many varied
shots as possible so I have a lot of footage to play around witb to
create the best possible music video that I can make.
People
Involved
The music video includes myself and two other people.
Equipment
needed
An IPhone Camera
Problems and
Solutions
The weather could be an issue. If it is bad weather then we may
not be able to get the outdoor shots that we want which would be
a drawback. The solution to this problem would be to check the
weather before we come out to give us the best chance of getting
as much footage with the good weather as possible.
Another problem would be if one of the cast not turning up. A
solution for this problem is making sure I ask reliable people to be
in my music video.