SlideShare una empresa de Scribd logo
1 de 44
“Upon the subject of education, and not presuming to dictate any plan or system respecting it,
I can only say that I view it as the most important subject which we as a people may be engaged in.”
A B R A H A M L I N C O L N
2013 – 2014
EDUCATION BUDGET
TABLE OF CONTENTS
BOARD OF EDUCATION
William Kraut, Chair
Jody Dietch, Vice Chair
Debra Marino, Secretary
Jeff Cap
Amy Criscuolo
Keith Marquis
Scott Massey
Robert Ricciardi
Diane Brown
Susan Riccio
ADMINISTRATIVE TEAM
Lynn K. McMullin, Superintendent
Colleen Murray, Director of Curriculum &
Principal, Mary L. Tracy School
Kai Graves, Director of Special Services
Kevin McNabola, Business Administrator
Michael Luzzi, Director of Facilities
Eric Carbone, Principal, Peck Place School
Michael Gray, Principal, Race Brook School
Stephen Bergin, Turkey Hill School
SUPERINTENDENT’S
LETTER OF TRANSMITTAL
Dear Members of the Orange Community,
I am pleased to present to the Board of Finance and the wider community a healthy and responsible budget for the
upcoming 2013 – 2014 school year. The main objective of this spending plan is, of course, to maintain a high-quality
education for our students, one that is rich in opportunities for their academic, social, and personal success and
accessible to them through safe and nurturing environments. I continue to be disappointed that the current economic
climate, which coupled with a devastating hurricane and an even more devastating tragedy in Newtown, has caused
so much local hardship. We kept that in mind as the Board of Education, Administrative Team, and I worked through
so many financial decisions. This budget is responsive to our children’s educational and safety needs, to the demands
of a 21st Century skill-set, to our investment in our buildings and infrastructure, to the staff and their ongoing
professional development, as well as to the constraints of these difficult times. Thus, the budget for the 2013-2014
year is $18,350,055, which represents an increase of 3.3%
The 2013-2014 budget moves the district forward in several key areas of growth: technology, security, and
professional development. It meets the unfunded mandates associated with the new educator evaluation
requirements. In addition, we negotiated four contracts in the past six months, and this budget meets all of those
contractual obligations. At the same time, this budget recognizes factors such as lower enrollments and opportunities
for savings in utilities and service contracts. Implicit in the reductions we have outlined is a restructuring of our
programs, instruction, and support services. The conversations have been deep and meaningful, and the leadership
team and Board of Education are confident in the course of action presented here.
“It‟s our investments in education that pay the best interest.”
It should be noted that we faced two significant realities. The first was that, with the previous year’s reductions in
staffing and the consolidating of two positions at the Central Office level, we had already trimmed the personnel
budget close to the bone. This year two additional positions were reduced; but there remain few line items to cut. The
second is that the previous five year’s budgets had been responsible to the economic crises, with increases of only 0 –
1%; and as a result, many important updates to the curriculum, buildings, and systems have been unfavorably
neglected. We are a turning point now, and merely meeting our contractual increases and paying our bills cannot be
our only goals for the future when our town’s prestige and property values are inextricably linked to the quality of our
schools. It is easy to be a visionary leader when economic times are abundantly good, but true vision fosters a
commitment to investing in education especially when times are difficult.
So, what are those investments? First, we have maintained the smaller class sizes that have become the hallmark of
this district, acknowledging they are smaller than is typical in other communities. Second, we have supported
technological investments which will bring the district closer to the one-to-one ratio needed for the Smarter Balance
testing in 2015 and closer to the 21st century instructional models which engage students in skills and understandings
they will soon need for their world of work, not ours. Third, we have included a sum of money earmarked for the
additional security projects we may uncover as more information comes to us from those who, in the wake of Sandy
Hook, are engaged in the study of new prevention measures! Finally, we have included the professional development
we will need to implement the unfunded state-mandated teacher and administrator evaluation plans and the
changeover to the Common Core Standards in Language Arts.
Respectfully submitted,
Lynn K. McMullin
Superintendent of Schools
“Education is more than a luxury; it is a responsibility that society owes to itself.”
The Orange Elementary School District recognizes
that the education of each child is the shared
responsibility of every member of our
community.
Our goal is to inspire and empower each student to
achieve academic excellence, embrace social
and individual responsibility, and lead with
integrity. We believe all individuals should be
valued and treated with respect.
OUR MISSION
WE ARE COMMITED TO:
• Providing powerful academic challenges
• Respecting individual and community values
• Nurturing personal growth
• Taking pride in our children and celebrating their
successes
• Promoting school and community spirit
• Enhancing lifelong learning through technology
• Believing all children deserve a childhood
• Creatively, confidently building the future
Together we will make a difference.
TWO CORE BELIEFS …
IN PRESENTING THIS BUDGET
That merely meeting our contractual increases and paying
our bills cannot be our only goals for the future when our
town’s prestige and property values are inextricably linked
to the quality of our schools and our own futures are
inextricably linked to the preparation of our students.
That it is easy to be a visionary leader when economic
times are abundantly good; but true vision, and true
courage, fosters a commitment to investing in education
especially when times are difficult. If I can foster that
vision and commitment, I will have succeeded.
CONTENT AREA
2006
% of Grade 6 at
GOAL
2011
% of Grade 6 at
GOAL
2012
% of Grade 6 at
GOAL
MATH 78.2% 93.4% 92.4%
READING 79.7% 91.2% 91.2%
WRITING 77.8% 87.1% 87.2%
2012 – 2013 SUCCESS STORIES:
ACADEMICS
Over the past five to six years, test scores have improved. Below you can
see scores at Goal. In 2012, we began tracking the Advanced band: 60%
scored Adv. In Math, 41% SCORED Adv. In Reading, and 46% scored Adv. In
Writing.
YEAR
MATHEMATICS
DRG B Rank
READING
DRG B Rank
WRITING
DRG B Rank
2006 12th of 21 18th of 21 17th of 21
2011 3rd of 21 6th of 21 4th of 21
2012 4th of 21 1st of 21 8th of 21
2012 – 2013 SUCCESS STORIES: ACADEMICS
A renewed focus on differentiating for students at the upper Advanced band
should maintain and strengthen Orange‟s position at the top of our DRG.
However, teachers in Orange have maintained their focus on meaningful,
rigorous project-based learning, as well. A new Math curriculum has a
strong problem-solving component.
Grade 3
2008 2009 2010 2011 2012
Reading 62.4% 70.5% 80.9% 71.7% 75.9%
Writing 80.5% 72.9% 79.3% 72.5% 75.3%
Math 78.8% 84.3% 86.0% 86.1% 81.3%
Grade 4
2008 2009 2010 2011 2012
Reading 71.4% 78.1% 78.7% 87.0% 79.5%
Writing 83.3% 76.3% 80.5% 91.4% 83.3%
Math 80.8% 85.8% 89.5% 90.3% 85.3%
Longitudinal Improvements in % of students at Goal or
above.
2012 – 2013 SUCCESS STORIES: ACADEMICS
Grade 5
2008 2009 2010 2011 2012
Reading 75% 88.8% 83.1% 75.8% 92.2%
Writing 82.2% 91.2% 89.1% 86.7% 87.1%
Math 83.2% 91% 91.6% 92.9% 92.4%
Science -- 69% 76% 81% 89.8%
Grade 6
2008 2009 2010 2011 2012
Reading 78.8% 88.8% 92.3% 91.2% 91.2%
Writing 77.9% 87.7% 88.7% 87.2% 87.2%
Math 81.5% 90.4% 95.9% 93.4% 92.4%
Longitudinal Improvements in % of students at Goal or
above.
2012 – 2013 SUCCESS STORIES: ACADEMICS
Grade 5 (in 2012)
2010
3rd grade
2011
4th grade
2012
5th grade
% change
Reading -- 80.9% 87% 92.2% +11.4
Writing -- 79.3% 91.4% 87.1% +7.8
Math -- 86% 90.3% 92.4% +6.4
Grade 6 (in 2012)
2009
3rd grade
2010
4th grade
2011
5th grade
2012
6th grade
% change
Reading 70.5% 78.7% 75.8% 92.2% +21.7
Writing 72.9% 80.5% 86.7% 87.2% +14.3
Math 84.2% 89.5% 92.9% 92.4% +8.2
Growth over time: Achievement at Goal or above, same cohort
2012 – 2013 SUCCESS STORIES: ACADEMICS
2012 – 2013 SUCCESS STORIES: COMMUNICATIONS
• Implementation of a new webpage at oess.org.
o Improved first impression and created focus on children
o All previous content was reformatted and moved to new site
o New content was added
o Up-to-date, trustworthy calendar
o Regularly updated district news
o Added „news bite‟ pop-ups
o Virtual backpack for each school
o RSS-feed
o „Search‟ feature
o SlideShare reports
o Superintendent‟s Blog
2012 – 2013 SUCCESS STORIES: COMMUNICATIONS
• Implementation of a new webpage at oess.org.
August 2012 - March 10, 2013
• 75,500 visits to the site
• 22,000 unique visits
• 96% view in English
• #of pages per visit: 4.4
• Peaks:
o First day of school: 3,350 visits
o Hurricane Sandy: 4,400 visits
o February snow storm: 4,300
SlideShare: 3,368 views
“Security Presentation” = 108 views in February –
March
2012 – 2013 SUCCESS STORIES: COMMUNICATIONS
• Conducted satisfaction surveys of
parents, staff, and students in Grade
2, 4, and 6
o Strategic Planning Committee
developed a 3-year plan
o Administrative Team analyzed
results
o Schools set improvement goals
• Special Education conducted
satisfaction survey and reported on
results
• Implementation of the new math curriculum, Math Expressions
• Built capacity for adoption of the Common Core Standards in
Language Arts and Math
• Expansion of Accelerated Reader to Peck Place and Race Brook
• Implementation of Dreambox Math
(Scientifically Researched-Based Intervention – SRBI)
• Multiple pilots of additional math tools
• Implementation of Lexia (SRBI)
2012 – 2013 SUCCESS STORIES: CURRICULUM
2012 – 2013 SUCCESS STORIES: CURRICULUM
• Development of Common Assessments in Specials (Art, Music, PE,
Library, WL)
• Implemented „Student Success Plans‟ using Naviance in Grade 6
• Provided TEAM workshops to support new teachers
• Expanded ELL program to meet needs (18 to 41 students)
• Developed a standards-based report card in PowerSchool for fall 2013
2012 – 2013 SUCCESS STORIES: CURRICULUM
• Supported Math
Expressions with
on-line parent
resources
• Provided on-line
student and
teacher resources
• Expanded the Instrumental Music Program to include more
students, more grades, more performances
• Implementation of Positive Behavioral Interventions and
Supports at Race Brook and Turkey Hill
• Piloting the SBAC Test at Peck Place and Race Brook
• Administered the NEAP Test at Race Brook (randomly
selected)
2012 – 2013 SUCCESS STORIES: PROGRAMS
• Wrote a new Teacher Evaluation
Plan to meet state mandate
• Established a full-time, two-person Technology Department
• Inventoried equipment and developed a short-term and long-term
replacement and maintenance plan
• Recycled outdated equipment
2012 – 2013 SUCCESS STORIES: TECHNOLOGY
• Installed 2 COWS (Computers-on-
Wheels) per school
• Installed iPad cart at MLT
• Began the implementation of
PowerSchool for August 2013
• Negotiated a contract for increased bandwidth for fiber-optics
• Completed a printer analysis of 168 devices; developed a plan to
save $18,000 which was reinvested into better technology
• Upgraded the email system from antiquated undersized system to
a free cloud-based solution
• Upgraded the wireless and wired networks
• Supported Security Plan with state-of-the art technologies
o ID badges, card readers, visitor management, cameras
2012 – 2013 SUCCESS STORIES: TECHNOLOGY
• Prepared five key facilities projects for Bond Package
• Planned a responsible and comprehensive Security Plan for
Bond Package
• Secured and recovered from two significant weather events
• Restored Mary L. Tracy meeting room
• Secured Natural Gas hook-ups for Turkey Hill and Race Brook
• Implemented removal of unsafe appliances from classrooms
(safety/energy savings)
2012 – 2013 SUCCESS STORIES: FACILITIES
• Replaced main stage curtains
at Turkey Hill
2012 – 2013 SUCCESS STORIES: FINANCIAL
• Negotiated four contracts: custodial, cafeteria,
teacher, paraprofessionals
• Negotiated gas energy savings of $18,000
• Completed RFPs and ED-049 Application for
Bonded Projects; ongoing bond application work
• Implemented 0-based budgeting, consolidated
budget lines, allocated expenses to proper
accounts
• Implemented energy-conservation projects with UI
(interior and exterior lighting)
THE 2013 – 2014 BUDGET
…meeting our contractual increases and paying our bills cannot
be our only goals for the future
… it’s easy when times are abundantly good; but takes courage
when times are difficult.
This Budget:
• 0-Based Budgeting
• Maintains the smaller class sizes = hallmark of the community
• Supports technological investments = bring us closer to 1:1 needed for
SBAC and 21st century instructional models
• Meets the unfunded mandates of TEVAL
• Meets our contractual obligations
• Modestly addresses changes in school security
2013-2014 GOAL #1: TECHNOLOGY
• Implementation of PowerSchool, new student information
system with a Parent Portal
• Secure district servers in locked, air-conditioned racks
• Replace desk-top printers with multi-function copiers
• Create an automated, searchable, on-
line BOE Policy Manual
• Improve connectivity among schools
• Additional laptops for student use
• Replace old CRT monitors with LCD
monitors (significant energy savings)
2013-2014 GOAL #2: EDUCATIONAL PROGRAMS
• Meet mandate for 18-hour „calibration training; and 7-hour
„qualification testing‟ for supervisors for Teacher Evaluation
Plan (TEVAL)
• Implement Language Arts Common Core Standards
• Provide curriculum and meet the
requirements for services in a
burgeoning ELL program (18 students
in 2011 to 41 students in 2012)
• Provide security monitors for all
afterschool activities and programs
DISTRICT CLASS SIZES OVER TIME
These three charts show DRG A and DRG B data from the October 1, 2010, Strategic School Profiles (SSP), the last published reports available.
This projection assumes none of these other districts increased their class sizes over the past three years. To the data, "Orange 2013" was
added based on the projected 2013 Class Sizes. As evidenced, class sizes have not risen over time.
Sorted smallest to largest by Grade K Sorted smallest to largest by Grade 2 Sorted smallest to largest by Grade 5
2013- 2014 PROJECTED CLASS SIZE: MLT
School Projected Population Projected Class Size
District Total 1198
Mary L. Tracy –
Kindergarten / Pre-K
146 (8)
24 Pre-K (2)
Current Actual = 154 / 19
Prediction = 126 / 25
15/16 (K)
12 (pre-K)
Race Brook
Current Actual = 374
Prediction = 373
Turkey Hill
Current Actual = 321
Prediction = 302
Peck Place
Current Actual = 383
Prediction = 372
2013- 2014 PROJECTED CLASS SIZE: RBS
School Projected Population Projected Class Size
District Total 1198
Mary L. Tracy Kindergarten 126 / 25 Pre-K
Race Brook 373
Grade 1 56 (3) 18/19
Grade 2 51 (3) 17
Grade 3 58 (3) 19/20
Grade 4 70 (4) 17/18
Grade 5 64 (4) 16
Grade 6 74 (4) 18/19
Turkey Hill 302
Peck Place 372
Reduction of one position
2013- 2014 PROJECTED CLASS SIZE: THS
School Projected Population Projected Class Size
District Total 1198
Mary L. Tracy Kindergarten 126 / 25 Pre-K
Race Brook 373
Turkey Hill 302
Grade 1 46 (3) 15/16
Grade 2 50 (3) 16/17
Grade 3 45 (3) 15
Grade 4 52 (3) 17/18
Grade 5 59 (3) 19/20
Grade 6 50 (3) 16/17
Peck Place 372
2013- 2014 PROJECTED CLASS SIZE: PPS
School Projected Population
Projected Class
Size
District Total 1198
Mary L. Tracy Kindergarten 126 / 25 Pre-K
Race Brook 373
Turkey Hill 302
Peck Place 377
Grade 1 58 (3) 19/20
Grade 2 59 (3) 19/20
Grade 3 59 (3) 19/20
Grade 4 74 (4) 18
Grade 5 53 (3) 17/18
Grade 6 69 (4) 17/18
Reduction of one position
ADDITIONS OVER 12 - 13 BUDGET
• 1.75% -- Overall contractual increase, OTL
• $125,000 – Employee Benefits
• $16,500 – Transportation
• $90,000 – Special Education
o $10,000 – Expand Lexia to SE students
o $40,000 – Special Education services, based
on IEPs and tuition increases
o $26,000 – Contractual increases
ADDITIONS OVER 12 - 13 BUDGET
• $52,200 -- School Security Monitors
• 2:00 – 9:00 p.m.
• all schools
• partially off-set by 21st Century
• $12,000 -- Reinstate CABE Membership and
set-up on-line BOE policy service
• $72,000 -- .5 ELL Teacher; .16 Language Arts
Curriculum Specialist at MLT; .70 Band
Teacher
• $23,000 -- 2 Reading Aides moved into BOE
operating budget from grant
ADDITIONS OVER 12 - 13 BUDGET
• $35,000 – PowerSchool, additional Lexia seats, Dreambox,
TEVAL software
• $20,000 – iPad learning labs at three* elementary schools
(*funded, along with SmartBoards, at MLT through pre-K tuitions)
• $20,000 – Security upgrades; technology, software, equipment
• $7,000 – Expand Special Education summer school to include
1.5 hours in both reading and math (vs. either/or)
DECREASES FROM 12 - 13 BUDGET
• - $93,000 – 2.0 classroom teachers; Peck
Place and Race Brook
• - $20,000 -- .5 World Language teacher
• - $12,000 – Curriculum Budget: testing, LA
implemented without purchase
• - $73,200 –Substitute costs (new PD model)
• - $47,000 – Heat (conversion to gas)
• $0 – 1.5 FTE: one SE paraprofessional at
each school will be re-trained in ESL
(reduction /addition)
BUDGET SUMMARY
2011 – 2012
Expended
Actual
2012 – 2013
Approved
2013 – 2014
Proposed
% Increase
Administration
(Security Monitors, CABE)
$468,682 $486,660 $566,288 + 16.4%
Curriculum
(*re-org of positions)
$170,381 $349,075* $337,293 - 3.4%
Classroom Teacher
Salaries
(1.75% contractual increase)
$6,234,016 $6,364,736 $6,388,781 + 0.4%
All Other Instruction
(salaries, iPad labs,
technology)
$1,302,819 $1,579,177 $1,760,636 + 11.4%
Special Education $3,666,182 $3,178,328 $3,267,725 + 2.8%
Transportation $694,324 $735,607 $752,094 + 2.2%
Building Operations $982,840 $1,011,432 $1,004,398 - 0.7%
Plant Maintenance $450,472 $447,882 $470,882 + 5.1%
Employee Benefits $3,450,241 $3,499,907 $3,624,943 + 3.6%
SUMMARY OF TOTAL REQUEST
 2011 - 2012 Expended Budget:
$17,478,076
 2012-2013 Approved Budget:
$17,766,888
 2013-2014 Proposed Budget:
$18,250,055
 Difference: $483,167
 Difference in percent: + 2.7%
THIS YEAR's BUDGET:
Orange's proposed increase for this
year is 2.7%, 58th among 75 districts.
The average proposed increase was
4.0%. The high was 8.3%
(Colchester). The low was .7%
(Woodbridge).
The average adopted increase this
year -- among the 51 districts who
have adopted budgets -- is 3.7%.
The high is 8.3% (East Haddam, the
BOE increased .9% over the
proposed). The low is .5% (Redding).
Top ½ of the chart
Bottom ½ of the chart
Average % Over Last TWO years:
Over the past two years, the
average increase among districts is
2.8%.
The high is East Haddam at 6.4%
average. The low is Region #1 at
.3%.
If adopted, Orange's average over
the two years will be 1.9% (based
on 1% last year, 2.7 % this year).
This would rank 41st among the 51
schools with adopted budgets thus
far.
0.0%
1.0%
2.0%
3.0%
4.0%
5.0%
6.0%
7.0%
8.0%
9.0%
Colchester
Middletown
NorthStonington
Newtown
Canterbury
Wethersfield
Danbury
EastHampton
Ellington
Westport
Southington
RockyHill
NewMilford
Coventry
Darien
Monroe
OldSaybrook
EastHaven
Portland
Guilford
EastLyme
Stratford
Cheshire
Bethany
Plainfield
Oxford
Branford
NewFairfield
Orange
Farmington
Seymour
Plainville
Simsbury
Regional#01
Redding
Weston
Windham
DRG B
Orange
2013 – 2014 PROPOSED BUDGET
INCREASES
2-YEAR AVERAGE INCREASE (WITH 2.7% APPROVED)
0.0%
1.0%
2.0%
3.0%
4.0%
5.0%
6.0%
7.0%
EastHaddam
EastHartford
Ellington
Newington
Darien
Ansonia
Danbury
RockyHill
EastHaven
BethelPublic
NewCanaan
Brookfield
Southington
Coventry
Colchester
Fairfield
Manchester
Newtown
Tolland
Canterbury
Guilford
SouthWindsor
Westport
Ridgefield
Cheshire
Shelton
Somers
Salem
Branford
Farmington
Enfield
Woodbridge
Trumbull
Bethany
Seymour
Madison
Milford
Avon
EastLyme
Orange
Regional#06
Putnam
Windsor
Simsbury
Easton
Weston
Oxford
Plainville
Redding
Regional
DRG B
Orange
CONCLUSIONS
• The 2.7% increase requested this year is well
within the bottom half of reporting districts.
• This 2.7% follows a five-year pattern of 1.0% of
below increases:
• This budget finally goes beyond meeting
contractual increases and paying the bills.
• Other districts are taking that „leap of faith‟ and
investing in education this year.
% Year
0.9 2009-10
1.0 2010-11
0.6 2011-12
1.0 2012-13
2.7 2013-14
1.2 5 years

Más contenido relacionado

La actualidad más candente

BizWorld_Electronic_Annual_Report_2013_2014
BizWorld_Electronic_Annual_Report_2013_2014BizWorld_Electronic_Annual_Report_2013_2014
BizWorld_Electronic_Annual_Report_2013_2014
Elizabeth de Renzy
 
Bishop auckland college - study programmes
Bishop auckland college - study programmesBishop auckland college - study programmes
Bishop auckland college - study programmes
Association of Colleges
 
Damien puljicimplications for teaching and learning
Damien puljicimplications for teaching and learningDamien puljicimplications for teaching and learning
Damien puljicimplications for teaching and learning
damienpuljic
 
Implications of the changes to the 14 19 curriculum
Implications of the changes to the 14 19 curriculumImplications of the changes to the 14 19 curriculum
Implications of the changes to the 14 19 curriculum
Munnas Ahmed
 

La actualidad más candente (19)

OECD School Resources Review Colombia 2018
OECD School Resources Review Colombia 2018OECD School Resources Review Colombia 2018
OECD School Resources Review Colombia 2018
 
Learning approaches for the 21st century
Learning approaches for the 21st century Learning approaches for the 21st century
Learning approaches for the 21st century
 
Mega-University
Mega-UniversityMega-University
Mega-University
 
The future of teacher and school leader recruitment
The future of teacher and school leader recruitmentThe future of teacher and school leader recruitment
The future of teacher and school leader recruitment
 
International School Recruitment in a Post-Covid-19 World
International School Recruitment in a Post-Covid-19 WorldInternational School Recruitment in a Post-Covid-19 World
International School Recruitment in a Post-Covid-19 World
 
BizWorld_Electronic_Annual_Report_2013_2014
BizWorld_Electronic_Annual_Report_2013_2014BizWorld_Electronic_Annual_Report_2013_2014
BizWorld_Electronic_Annual_Report_2013_2014
 
The COVID-19 legacy: What does the future hold for international schools?
The COVID-19 legacy: What does the future hold for international schools?The COVID-19 legacy: What does the future hold for international schools?
The COVID-19 legacy: What does the future hold for international schools?
 
Career academy review 2011 2012
Career academy review 2011 2012Career academy review 2011 2012
Career academy review 2011 2012
 
Bishop auckland college - study programmes
Bishop auckland college - study programmesBishop auckland college - study programmes
Bishop auckland college - study programmes
 
Edu policy outlook bp jan 2015
Edu policy outlook bp jan 2015Edu policy outlook bp jan 2015
Edu policy outlook bp jan 2015
 
Remarkable schools in indonesia2021
Remarkable schools in indonesia2021Remarkable schools in indonesia2021
Remarkable schools in indonesia2021
 
Southeast Asia Regional Programme Forum 2021: Breakout session “Reskilling an...
Southeast Asia Regional Programme Forum 2021: Breakout session “Reskilling an...Southeast Asia Regional Programme Forum 2021: Breakout session “Reskilling an...
Southeast Asia Regional Programme Forum 2021: Breakout session “Reskilling an...
 
Four educational trends for the new decade
Four educational trends for the new decadeFour educational trends for the new decade
Four educational trends for the new decade
 
Damien puljicimplications for teaching and learning
Damien puljicimplications for teaching and learningDamien puljicimplications for teaching and learning
Damien puljicimplications for teaching and learning
 
Reviews of National Policies for Education - Netherlands 2016
Reviews of National Policies for Education -  Netherlands 2016Reviews of National Policies for Education -  Netherlands 2016
Reviews of National Policies for Education - Netherlands 2016
 
Arab region-rankings-2021-report
Arab region-rankings-2021-reportArab region-rankings-2021-report
Arab region-rankings-2021-report
 
Implications of the changes to the 14 19 curriculum
Implications of the changes to the 14 19 curriculumImplications of the changes to the 14 19 curriculum
Implications of the changes to the 14 19 curriculum
 
Career guidance and employer engagement
Career guidance and employer engagementCareer guidance and employer engagement
Career guidance and employer engagement
 
Sustainability and the SDGs to become part of the Primary and Secondary Schoo...
Sustainability and the SDGs to become part of the Primary and Secondary Schoo...Sustainability and the SDGs to become part of the Primary and Secondary Schoo...
Sustainability and the SDGs to become part of the Primary and Secondary Schoo...
 

Destacado (7)

2014.2015. Final Education Budget 3.1%
2014.2015. Final Education Budget 3.1%2014.2015. Final Education Budget 3.1%
2014.2015. Final Education Budget 3.1%
 
Race Brook School 2014 Annual Report
Race Brook School 2014 Annual ReportRace Brook School 2014 Annual Report
Race Brook School 2014 Annual Report
 
Peck Place School Annual Report 2014
Peck Place School Annual Report 2014Peck Place School Annual Report 2014
Peck Place School Annual Report 2014
 
Superintendent's December Report to the BOE
Superintendent's December Report to the BOESuperintendent's December Report to the BOE
Superintendent's December Report to the BOE
 
11.10.2014 - Veteran's Day
11.10.2014  - Veteran's Day11.10.2014  - Veteran's Day
11.10.2014 - Veteran's Day
 
Nigerian states budget analysis
Nigerian states budget analysisNigerian states budget analysis
Nigerian states budget analysis
 
Empirical analysis of nigeria budget
Empirical analysis of nigeria budgetEmpirical analysis of nigeria budget
Empirical analysis of nigeria budget
 

Similar a 2013-2014 Proposed Education Budget

Blueprint for reform in education
Blueprint for reform in educationBlueprint for reform in education
Blueprint for reform in education
AngelitaDDill
 
BCIT Strat Plan 2014 - 19
BCIT Strat Plan 2014 - 19BCIT Strat Plan 2014 - 19
BCIT Strat Plan 2014 - 19
Bruce Denis
 
PUSD Charter Renewal Summary - Final
PUSD Charter Renewal Summary - FinalPUSD Charter Renewal Summary - Final
PUSD Charter Renewal Summary - Final
Michael Ettner
 
COE 2015 Annual Report (Rough Draft)
COE 2015 Annual Report (Rough Draft)COE 2015 Annual Report (Rough Draft)
COE 2015 Annual Report (Rough Draft)
Elijah Kleinsmith
 
Copy of zenia lowe personal vision statement
Copy of zenia lowe   personal vision statementCopy of zenia lowe   personal vision statement
Copy of zenia lowe personal vision statement
zlowe
 
FactBook_2013-14-2
FactBook_2013-14-2FactBook_2013-14-2
FactBook_2013-14-2
Carl Yuan
 
Proposal hubspot
Proposal hubspotProposal hubspot
Proposal hubspot
swardsworth
 
Bus student handbook 2223.pdf
Bus student handbook 2223.pdfBus student handbook 2223.pdf
Bus student handbook 2223.pdf
Mark Kor
 
Academic Program mid year 2014-15 Report_201505041342287256
Academic Program mid year 2014-15 Report_201505041342287256Academic Program mid year 2014-15 Report_201505041342287256
Academic Program mid year 2014-15 Report_201505041342287256
Dante Romero
 

Similar a 2013-2014 Proposed Education Budget (20)

Blueprint for reform in education
Blueprint for reform in educationBlueprint for reform in education
Blueprint for reform in education
 
BCIT Strat Plan 2014 - 19
BCIT Strat Plan 2014 - 19BCIT Strat Plan 2014 - 19
BCIT Strat Plan 2014 - 19
 
PUSD Charter Renewal Summary - Final
PUSD Charter Renewal Summary - FinalPUSD Charter Renewal Summary - Final
PUSD Charter Renewal Summary - Final
 
Canada's Most Trusted Schools in 2023.pdf
Canada's Most Trusted Schools in 2023.pdfCanada's Most Trusted Schools in 2023.pdf
Canada's Most Trusted Schools in 2023.pdf
 
Reach Capital - Higher Ed Impact Report 2023.pdf
Reach Capital - Higher Ed Impact Report 2023.pdfReach Capital - Higher Ed Impact Report 2023.pdf
Reach Capital - Higher Ed Impact Report 2023.pdf
 
009 11 01 London Presentation Deckfor Academic Fiscal Solvency
009 11 01 London Presentation Deckfor Academic Fiscal Solvency009 11 01 London Presentation Deckfor Academic Fiscal Solvency
009 11 01 London Presentation Deckfor Academic Fiscal Solvency
 
COE 2015 Annual Report (Rough Draft)
COE 2015 Annual Report (Rough Draft)COE 2015 Annual Report (Rough Draft)
COE 2015 Annual Report (Rough Draft)
 
Copy of zenia lowe personal vision statement
Copy of zenia lowe   personal vision statementCopy of zenia lowe   personal vision statement
Copy of zenia lowe personal vision statement
 
Nv Presentation Reynolds 5.2
Nv Presentation Reynolds 5.2Nv Presentation Reynolds 5.2
Nv Presentation Reynolds 5.2
 
FactBook_2013-14-2
FactBook_2013-14-2FactBook_2013-14-2
FactBook_2013-14-2
 
Proposal hubspot
Proposal hubspotProposal hubspot
Proposal hubspot
 
Bus student handbook 2223.pdf
Bus student handbook 2223.pdfBus student handbook 2223.pdf
Bus student handbook 2223.pdf
 
Bus student handbook 2223.pdf
Bus student handbook 2223.pdfBus student handbook 2223.pdf
Bus student handbook 2223.pdf
 
EXCEL Playbook_Bookmarked (2).pdf
EXCEL Playbook_Bookmarked (2).pdfEXCEL Playbook_Bookmarked (2).pdf
EXCEL Playbook_Bookmarked (2).pdf
 
Stakeholder strategic update webinar - higher education
Stakeholder strategic update webinar - higher educationStakeholder strategic update webinar - higher education
Stakeholder strategic update webinar - higher education
 
2015 - 2016 Budget Presentation to Boards
2015 - 2016 Budget Presentation to Boards2015 - 2016 Budget Presentation to Boards
2015 - 2016 Budget Presentation to Boards
 
Keynote: Professionalism and Goverance
Keynote: Professionalism and GoveranceKeynote: Professionalism and Goverance
Keynote: Professionalism and Goverance
 
Cca dpc presentation- REVISED
Cca dpc presentation- REVISEDCca dpc presentation- REVISED
Cca dpc presentation- REVISED
 
Academic Program mid year 2014-15 Report_201505041342287256
Academic Program mid year 2014-15 Report_201505041342287256Academic Program mid year 2014-15 Report_201505041342287256
Academic Program mid year 2014-15 Report_201505041342287256
 
Leading Towards Equity & Student Agency
Leading Towards Equity & Student AgencyLeading Towards Equity & Student Agency
Leading Towards Equity & Student Agency
 

Más de Lynn McMullin

Más de Lynn McMullin (20)

October Superintendent's Report to Orange BOE
October Superintendent's Report to Orange BOEOctober Superintendent's Report to Orange BOE
October Superintendent's Report to Orange BOE
 
9.8.2014 School's Opening
9.8.2014  School's Opening9.8.2014  School's Opening
9.8.2014 School's Opening
 
2014's New Teachers
2014's New Teachers2014's New Teachers
2014's New Teachers
 
August 2014 Superintendent's Report
August 2014 Superintendent's Report August 2014 Superintendent's Report
August 2014 Superintendent's Report
 
Healthy Lifestyles Presentation to BOE: August 2014
Healthy Lifestyles Presentation to BOE: August 2014Healthy Lifestyles Presentation to BOE: August 2014
Healthy Lifestyles Presentation to BOE: August 2014
 
Superintendet's Report to BOE July 14, 2014
Superintendet's Report to BOE July 14, 2014Superintendet's Report to BOE July 14, 2014
Superintendet's Report to BOE July 14, 2014
 
Mary L. Tracy Kindergarten Annual Report: June 9, 2014
Mary L. Tracy Kindergarten Annual Report: June 9, 2014Mary L. Tracy Kindergarten Annual Report: June 9, 2014
Mary L. Tracy Kindergarten Annual Report: June 9, 2014
 
2014 Healthy Lifestyles Committee Report and Proposals
2014 Healthy Lifestyles Committee Report and Proposals2014 Healthy Lifestyles Committee Report and Proposals
2014 Healthy Lifestyles Committee Report and Proposals
 
ELA Proposed Curriculum Adoption: Journeys
ELA Proposed Curriculum Adoption: JourneysELA Proposed Curriculum Adoption: Journeys
ELA Proposed Curriculum Adoption: Journeys
 
Superintendent's Report May.12.2014
Superintendent's Report May.12.2014Superintendent's Report May.12.2014
Superintendent's Report May.12.2014
 
First Lego League Presentation 4.7.2014
First Lego League Presentation 4.7.2014First Lego League Presentation 4.7.2014
First Lego League Presentation 4.7.2014
 
April Superintendent's Report to the Board of Education
April Superintendent's Report to the Board of EducationApril Superintendent's Report to the Board of Education
April Superintendent's Report to the Board of Education
 
Turkey Hill Annual Report to the Board of Education
Turkey Hill Annual Report to the Board of EducationTurkey Hill Annual Report to the Board of Education
Turkey Hill Annual Report to the Board of Education
 
Turkey Hill 2014 Grade 6 DARE Video
Turkey Hill 2014 Grade 6 DARE VideoTurkey Hill 2014 Grade 6 DARE Video
Turkey Hill 2014 Grade 6 DARE Video
 
2014 Race Brook DARE Graduation Presentation
2014 Race Brook DARE Graduation Presentation2014 Race Brook DARE Graduation Presentation
2014 Race Brook DARE Graduation Presentation
 
Peck Place Dare Graduation
Peck Place Dare GraduationPeck Place Dare Graduation
Peck Place Dare Graduation
 
Special Services February 2014 Annual Report to the BOE
Special Services February 2014 Annual Report to the BOESpecial Services February 2014 Annual Report to the BOE
Special Services February 2014 Annual Report to the BOE
 
January 2014 Superintendent's Board Report
January 2014 Superintendent's Board ReportJanuary 2014 Superintendent's Board Report
January 2014 Superintendent's Board Report
 
Superintendent's February 2014 Report to Orange CT Board
Superintendent's February 2014 Report to Orange CT BoardSuperintendent's February 2014 Report to Orange CT Board
Superintendent's February 2014 Report to Orange CT Board
 
Race Brook School Annual Report 2013 2014
Race Brook School Annual Report 2013 2014Race Brook School Annual Report 2013 2014
Race Brook School Annual Report 2013 2014
 

Último

Último (20)

Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the Classroom
 
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptx
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptx
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
Plant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxPlant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptx
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 

2013-2014 Proposed Education Budget

  • 1. “Upon the subject of education, and not presuming to dictate any plan or system respecting it, I can only say that I view it as the most important subject which we as a people may be engaged in.” A B R A H A M L I N C O L N 2013 – 2014 EDUCATION BUDGET
  • 3. BOARD OF EDUCATION William Kraut, Chair Jody Dietch, Vice Chair Debra Marino, Secretary Jeff Cap Amy Criscuolo Keith Marquis Scott Massey Robert Ricciardi Diane Brown Susan Riccio
  • 4. ADMINISTRATIVE TEAM Lynn K. McMullin, Superintendent Colleen Murray, Director of Curriculum & Principal, Mary L. Tracy School Kai Graves, Director of Special Services Kevin McNabola, Business Administrator Michael Luzzi, Director of Facilities Eric Carbone, Principal, Peck Place School Michael Gray, Principal, Race Brook School Stephen Bergin, Turkey Hill School
  • 5. SUPERINTENDENT’S LETTER OF TRANSMITTAL Dear Members of the Orange Community, I am pleased to present to the Board of Finance and the wider community a healthy and responsible budget for the upcoming 2013 – 2014 school year. The main objective of this spending plan is, of course, to maintain a high-quality education for our students, one that is rich in opportunities for their academic, social, and personal success and accessible to them through safe and nurturing environments. I continue to be disappointed that the current economic climate, which coupled with a devastating hurricane and an even more devastating tragedy in Newtown, has caused so much local hardship. We kept that in mind as the Board of Education, Administrative Team, and I worked through so many financial decisions. This budget is responsive to our children’s educational and safety needs, to the demands of a 21st Century skill-set, to our investment in our buildings and infrastructure, to the staff and their ongoing professional development, as well as to the constraints of these difficult times. Thus, the budget for the 2013-2014 year is $18,350,055, which represents an increase of 3.3% The 2013-2014 budget moves the district forward in several key areas of growth: technology, security, and professional development. It meets the unfunded mandates associated with the new educator evaluation requirements. In addition, we negotiated four contracts in the past six months, and this budget meets all of those contractual obligations. At the same time, this budget recognizes factors such as lower enrollments and opportunities for savings in utilities and service contracts. Implicit in the reductions we have outlined is a restructuring of our programs, instruction, and support services. The conversations have been deep and meaningful, and the leadership team and Board of Education are confident in the course of action presented here. “It‟s our investments in education that pay the best interest.”
  • 6. It should be noted that we faced two significant realities. The first was that, with the previous year’s reductions in staffing and the consolidating of two positions at the Central Office level, we had already trimmed the personnel budget close to the bone. This year two additional positions were reduced; but there remain few line items to cut. The second is that the previous five year’s budgets had been responsible to the economic crises, with increases of only 0 – 1%; and as a result, many important updates to the curriculum, buildings, and systems have been unfavorably neglected. We are a turning point now, and merely meeting our contractual increases and paying our bills cannot be our only goals for the future when our town’s prestige and property values are inextricably linked to the quality of our schools. It is easy to be a visionary leader when economic times are abundantly good, but true vision fosters a commitment to investing in education especially when times are difficult. So, what are those investments? First, we have maintained the smaller class sizes that have become the hallmark of this district, acknowledging they are smaller than is typical in other communities. Second, we have supported technological investments which will bring the district closer to the one-to-one ratio needed for the Smarter Balance testing in 2015 and closer to the 21st century instructional models which engage students in skills and understandings they will soon need for their world of work, not ours. Third, we have included a sum of money earmarked for the additional security projects we may uncover as more information comes to us from those who, in the wake of Sandy Hook, are engaged in the study of new prevention measures! Finally, we have included the professional development we will need to implement the unfunded state-mandated teacher and administrator evaluation plans and the changeover to the Common Core Standards in Language Arts. Respectfully submitted, Lynn K. McMullin Superintendent of Schools “Education is more than a luxury; it is a responsibility that society owes to itself.”
  • 7. The Orange Elementary School District recognizes that the education of each child is the shared responsibility of every member of our community. Our goal is to inspire and empower each student to achieve academic excellence, embrace social and individual responsibility, and lead with integrity. We believe all individuals should be valued and treated with respect. OUR MISSION
  • 8. WE ARE COMMITED TO: • Providing powerful academic challenges • Respecting individual and community values • Nurturing personal growth • Taking pride in our children and celebrating their successes • Promoting school and community spirit • Enhancing lifelong learning through technology • Believing all children deserve a childhood • Creatively, confidently building the future Together we will make a difference.
  • 9. TWO CORE BELIEFS … IN PRESENTING THIS BUDGET That merely meeting our contractual increases and paying our bills cannot be our only goals for the future when our town’s prestige and property values are inextricably linked to the quality of our schools and our own futures are inextricably linked to the preparation of our students. That it is easy to be a visionary leader when economic times are abundantly good; but true vision, and true courage, fosters a commitment to investing in education especially when times are difficult. If I can foster that vision and commitment, I will have succeeded.
  • 10. CONTENT AREA 2006 % of Grade 6 at GOAL 2011 % of Grade 6 at GOAL 2012 % of Grade 6 at GOAL MATH 78.2% 93.4% 92.4% READING 79.7% 91.2% 91.2% WRITING 77.8% 87.1% 87.2% 2012 – 2013 SUCCESS STORIES: ACADEMICS Over the past five to six years, test scores have improved. Below you can see scores at Goal. In 2012, we began tracking the Advanced band: 60% scored Adv. In Math, 41% SCORED Adv. In Reading, and 46% scored Adv. In Writing.
  • 11. YEAR MATHEMATICS DRG B Rank READING DRG B Rank WRITING DRG B Rank 2006 12th of 21 18th of 21 17th of 21 2011 3rd of 21 6th of 21 4th of 21 2012 4th of 21 1st of 21 8th of 21 2012 – 2013 SUCCESS STORIES: ACADEMICS A renewed focus on differentiating for students at the upper Advanced band should maintain and strengthen Orange‟s position at the top of our DRG. However, teachers in Orange have maintained their focus on meaningful, rigorous project-based learning, as well. A new Math curriculum has a strong problem-solving component.
  • 12. Grade 3 2008 2009 2010 2011 2012 Reading 62.4% 70.5% 80.9% 71.7% 75.9% Writing 80.5% 72.9% 79.3% 72.5% 75.3% Math 78.8% 84.3% 86.0% 86.1% 81.3% Grade 4 2008 2009 2010 2011 2012 Reading 71.4% 78.1% 78.7% 87.0% 79.5% Writing 83.3% 76.3% 80.5% 91.4% 83.3% Math 80.8% 85.8% 89.5% 90.3% 85.3% Longitudinal Improvements in % of students at Goal or above. 2012 – 2013 SUCCESS STORIES: ACADEMICS
  • 13. Grade 5 2008 2009 2010 2011 2012 Reading 75% 88.8% 83.1% 75.8% 92.2% Writing 82.2% 91.2% 89.1% 86.7% 87.1% Math 83.2% 91% 91.6% 92.9% 92.4% Science -- 69% 76% 81% 89.8% Grade 6 2008 2009 2010 2011 2012 Reading 78.8% 88.8% 92.3% 91.2% 91.2% Writing 77.9% 87.7% 88.7% 87.2% 87.2% Math 81.5% 90.4% 95.9% 93.4% 92.4% Longitudinal Improvements in % of students at Goal or above. 2012 – 2013 SUCCESS STORIES: ACADEMICS
  • 14. Grade 5 (in 2012) 2010 3rd grade 2011 4th grade 2012 5th grade % change Reading -- 80.9% 87% 92.2% +11.4 Writing -- 79.3% 91.4% 87.1% +7.8 Math -- 86% 90.3% 92.4% +6.4 Grade 6 (in 2012) 2009 3rd grade 2010 4th grade 2011 5th grade 2012 6th grade % change Reading 70.5% 78.7% 75.8% 92.2% +21.7 Writing 72.9% 80.5% 86.7% 87.2% +14.3 Math 84.2% 89.5% 92.9% 92.4% +8.2 Growth over time: Achievement at Goal or above, same cohort 2012 – 2013 SUCCESS STORIES: ACADEMICS
  • 15. 2012 – 2013 SUCCESS STORIES: COMMUNICATIONS • Implementation of a new webpage at oess.org. o Improved first impression and created focus on children o All previous content was reformatted and moved to new site o New content was added o Up-to-date, trustworthy calendar o Regularly updated district news o Added „news bite‟ pop-ups o Virtual backpack for each school o RSS-feed o „Search‟ feature o SlideShare reports o Superintendent‟s Blog
  • 16. 2012 – 2013 SUCCESS STORIES: COMMUNICATIONS • Implementation of a new webpage at oess.org. August 2012 - March 10, 2013 • 75,500 visits to the site • 22,000 unique visits • 96% view in English • #of pages per visit: 4.4 • Peaks: o First day of school: 3,350 visits o Hurricane Sandy: 4,400 visits o February snow storm: 4,300 SlideShare: 3,368 views “Security Presentation” = 108 views in February – March
  • 17. 2012 – 2013 SUCCESS STORIES: COMMUNICATIONS • Conducted satisfaction surveys of parents, staff, and students in Grade 2, 4, and 6 o Strategic Planning Committee developed a 3-year plan o Administrative Team analyzed results o Schools set improvement goals • Special Education conducted satisfaction survey and reported on results
  • 18. • Implementation of the new math curriculum, Math Expressions • Built capacity for adoption of the Common Core Standards in Language Arts and Math • Expansion of Accelerated Reader to Peck Place and Race Brook • Implementation of Dreambox Math (Scientifically Researched-Based Intervention – SRBI) • Multiple pilots of additional math tools • Implementation of Lexia (SRBI) 2012 – 2013 SUCCESS STORIES: CURRICULUM
  • 19. 2012 – 2013 SUCCESS STORIES: CURRICULUM • Development of Common Assessments in Specials (Art, Music, PE, Library, WL) • Implemented „Student Success Plans‟ using Naviance in Grade 6 • Provided TEAM workshops to support new teachers • Expanded ELL program to meet needs (18 to 41 students) • Developed a standards-based report card in PowerSchool for fall 2013
  • 20. 2012 – 2013 SUCCESS STORIES: CURRICULUM • Supported Math Expressions with on-line parent resources • Provided on-line student and teacher resources
  • 21. • Expanded the Instrumental Music Program to include more students, more grades, more performances • Implementation of Positive Behavioral Interventions and Supports at Race Brook and Turkey Hill • Piloting the SBAC Test at Peck Place and Race Brook • Administered the NEAP Test at Race Brook (randomly selected) 2012 – 2013 SUCCESS STORIES: PROGRAMS • Wrote a new Teacher Evaluation Plan to meet state mandate
  • 22. • Established a full-time, two-person Technology Department • Inventoried equipment and developed a short-term and long-term replacement and maintenance plan • Recycled outdated equipment 2012 – 2013 SUCCESS STORIES: TECHNOLOGY • Installed 2 COWS (Computers-on- Wheels) per school • Installed iPad cart at MLT • Began the implementation of PowerSchool for August 2013
  • 23. • Negotiated a contract for increased bandwidth for fiber-optics • Completed a printer analysis of 168 devices; developed a plan to save $18,000 which was reinvested into better technology • Upgraded the email system from antiquated undersized system to a free cloud-based solution • Upgraded the wireless and wired networks • Supported Security Plan with state-of-the art technologies o ID badges, card readers, visitor management, cameras 2012 – 2013 SUCCESS STORIES: TECHNOLOGY
  • 24. • Prepared five key facilities projects for Bond Package • Planned a responsible and comprehensive Security Plan for Bond Package • Secured and recovered from two significant weather events • Restored Mary L. Tracy meeting room • Secured Natural Gas hook-ups for Turkey Hill and Race Brook • Implemented removal of unsafe appliances from classrooms (safety/energy savings) 2012 – 2013 SUCCESS STORIES: FACILITIES • Replaced main stage curtains at Turkey Hill
  • 25. 2012 – 2013 SUCCESS STORIES: FINANCIAL • Negotiated four contracts: custodial, cafeteria, teacher, paraprofessionals • Negotiated gas energy savings of $18,000 • Completed RFPs and ED-049 Application for Bonded Projects; ongoing bond application work • Implemented 0-based budgeting, consolidated budget lines, allocated expenses to proper accounts • Implemented energy-conservation projects with UI (interior and exterior lighting)
  • 26. THE 2013 – 2014 BUDGET …meeting our contractual increases and paying our bills cannot be our only goals for the future … it’s easy when times are abundantly good; but takes courage when times are difficult. This Budget: • 0-Based Budgeting • Maintains the smaller class sizes = hallmark of the community • Supports technological investments = bring us closer to 1:1 needed for SBAC and 21st century instructional models • Meets the unfunded mandates of TEVAL • Meets our contractual obligations • Modestly addresses changes in school security
  • 27. 2013-2014 GOAL #1: TECHNOLOGY • Implementation of PowerSchool, new student information system with a Parent Portal • Secure district servers in locked, air-conditioned racks • Replace desk-top printers with multi-function copiers • Create an automated, searchable, on- line BOE Policy Manual • Improve connectivity among schools • Additional laptops for student use • Replace old CRT monitors with LCD monitors (significant energy savings)
  • 28. 2013-2014 GOAL #2: EDUCATIONAL PROGRAMS • Meet mandate for 18-hour „calibration training; and 7-hour „qualification testing‟ for supervisors for Teacher Evaluation Plan (TEVAL) • Implement Language Arts Common Core Standards • Provide curriculum and meet the requirements for services in a burgeoning ELL program (18 students in 2011 to 41 students in 2012) • Provide security monitors for all afterschool activities and programs
  • 29. DISTRICT CLASS SIZES OVER TIME These three charts show DRG A and DRG B data from the October 1, 2010, Strategic School Profiles (SSP), the last published reports available. This projection assumes none of these other districts increased their class sizes over the past three years. To the data, "Orange 2013" was added based on the projected 2013 Class Sizes. As evidenced, class sizes have not risen over time. Sorted smallest to largest by Grade K Sorted smallest to largest by Grade 2 Sorted smallest to largest by Grade 5
  • 30. 2013- 2014 PROJECTED CLASS SIZE: MLT School Projected Population Projected Class Size District Total 1198 Mary L. Tracy – Kindergarten / Pre-K 146 (8) 24 Pre-K (2) Current Actual = 154 / 19 Prediction = 126 / 25 15/16 (K) 12 (pre-K) Race Brook Current Actual = 374 Prediction = 373 Turkey Hill Current Actual = 321 Prediction = 302 Peck Place Current Actual = 383 Prediction = 372
  • 31. 2013- 2014 PROJECTED CLASS SIZE: RBS School Projected Population Projected Class Size District Total 1198 Mary L. Tracy Kindergarten 126 / 25 Pre-K Race Brook 373 Grade 1 56 (3) 18/19 Grade 2 51 (3) 17 Grade 3 58 (3) 19/20 Grade 4 70 (4) 17/18 Grade 5 64 (4) 16 Grade 6 74 (4) 18/19 Turkey Hill 302 Peck Place 372 Reduction of one position
  • 32. 2013- 2014 PROJECTED CLASS SIZE: THS School Projected Population Projected Class Size District Total 1198 Mary L. Tracy Kindergarten 126 / 25 Pre-K Race Brook 373 Turkey Hill 302 Grade 1 46 (3) 15/16 Grade 2 50 (3) 16/17 Grade 3 45 (3) 15 Grade 4 52 (3) 17/18 Grade 5 59 (3) 19/20 Grade 6 50 (3) 16/17 Peck Place 372
  • 33. 2013- 2014 PROJECTED CLASS SIZE: PPS School Projected Population Projected Class Size District Total 1198 Mary L. Tracy Kindergarten 126 / 25 Pre-K Race Brook 373 Turkey Hill 302 Peck Place 377 Grade 1 58 (3) 19/20 Grade 2 59 (3) 19/20 Grade 3 59 (3) 19/20 Grade 4 74 (4) 18 Grade 5 53 (3) 17/18 Grade 6 69 (4) 17/18 Reduction of one position
  • 34. ADDITIONS OVER 12 - 13 BUDGET • 1.75% -- Overall contractual increase, OTL • $125,000 – Employee Benefits • $16,500 – Transportation • $90,000 – Special Education o $10,000 – Expand Lexia to SE students o $40,000 – Special Education services, based on IEPs and tuition increases o $26,000 – Contractual increases
  • 35. ADDITIONS OVER 12 - 13 BUDGET • $52,200 -- School Security Monitors • 2:00 – 9:00 p.m. • all schools • partially off-set by 21st Century • $12,000 -- Reinstate CABE Membership and set-up on-line BOE policy service • $72,000 -- .5 ELL Teacher; .16 Language Arts Curriculum Specialist at MLT; .70 Band Teacher • $23,000 -- 2 Reading Aides moved into BOE operating budget from grant
  • 36. ADDITIONS OVER 12 - 13 BUDGET • $35,000 – PowerSchool, additional Lexia seats, Dreambox, TEVAL software • $20,000 – iPad learning labs at three* elementary schools (*funded, along with SmartBoards, at MLT through pre-K tuitions) • $20,000 – Security upgrades; technology, software, equipment • $7,000 – Expand Special Education summer school to include 1.5 hours in both reading and math (vs. either/or)
  • 37. DECREASES FROM 12 - 13 BUDGET • - $93,000 – 2.0 classroom teachers; Peck Place and Race Brook • - $20,000 -- .5 World Language teacher • - $12,000 – Curriculum Budget: testing, LA implemented without purchase • - $73,200 –Substitute costs (new PD model) • - $47,000 – Heat (conversion to gas) • $0 – 1.5 FTE: one SE paraprofessional at each school will be re-trained in ESL (reduction /addition)
  • 38. BUDGET SUMMARY 2011 – 2012 Expended Actual 2012 – 2013 Approved 2013 – 2014 Proposed % Increase Administration (Security Monitors, CABE) $468,682 $486,660 $566,288 + 16.4% Curriculum (*re-org of positions) $170,381 $349,075* $337,293 - 3.4% Classroom Teacher Salaries (1.75% contractual increase) $6,234,016 $6,364,736 $6,388,781 + 0.4% All Other Instruction (salaries, iPad labs, technology) $1,302,819 $1,579,177 $1,760,636 + 11.4% Special Education $3,666,182 $3,178,328 $3,267,725 + 2.8% Transportation $694,324 $735,607 $752,094 + 2.2% Building Operations $982,840 $1,011,432 $1,004,398 - 0.7% Plant Maintenance $450,472 $447,882 $470,882 + 5.1% Employee Benefits $3,450,241 $3,499,907 $3,624,943 + 3.6%
  • 39. SUMMARY OF TOTAL REQUEST  2011 - 2012 Expended Budget: $17,478,076  2012-2013 Approved Budget: $17,766,888  2013-2014 Proposed Budget: $18,250,055  Difference: $483,167  Difference in percent: + 2.7%
  • 40. THIS YEAR's BUDGET: Orange's proposed increase for this year is 2.7%, 58th among 75 districts. The average proposed increase was 4.0%. The high was 8.3% (Colchester). The low was .7% (Woodbridge). The average adopted increase this year -- among the 51 districts who have adopted budgets -- is 3.7%. The high is 8.3% (East Haddam, the BOE increased .9% over the proposed). The low is .5% (Redding). Top ½ of the chart
  • 41. Bottom ½ of the chart Average % Over Last TWO years: Over the past two years, the average increase among districts is 2.8%. The high is East Haddam at 6.4% average. The low is Region #1 at .3%. If adopted, Orange's average over the two years will be 1.9% (based on 1% last year, 2.7 % this year). This would rank 41st among the 51 schools with adopted budgets thus far.
  • 43. 2-YEAR AVERAGE INCREASE (WITH 2.7% APPROVED) 0.0% 1.0% 2.0% 3.0% 4.0% 5.0% 6.0% 7.0% EastHaddam EastHartford Ellington Newington Darien Ansonia Danbury RockyHill EastHaven BethelPublic NewCanaan Brookfield Southington Coventry Colchester Fairfield Manchester Newtown Tolland Canterbury Guilford SouthWindsor Westport Ridgefield Cheshire Shelton Somers Salem Branford Farmington Enfield Woodbridge Trumbull Bethany Seymour Madison Milford Avon EastLyme Orange Regional#06 Putnam Windsor Simsbury Easton Weston Oxford Plainville Redding Regional DRG B Orange
  • 44. CONCLUSIONS • The 2.7% increase requested this year is well within the bottom half of reporting districts. • This 2.7% follows a five-year pattern of 1.0% of below increases: • This budget finally goes beyond meeting contractual increases and paying the bills. • Other districts are taking that „leap of faith‟ and investing in education this year. % Year 0.9 2009-10 1.0 2010-11 0.6 2011-12 1.0 2012-13 2.7 2013-14 1.2 5 years