3. Overview of NTPC
NTPC was set up in the central sector in the
1975.
NTPC has installed capacity of 41,184 MW. It
plans to be a 75,000 MW company by 2017.
Today NTPC contributes more than 3 / 5th of
the total power generation in India
4. Overview of NTPC
*Total Capacity of NTPC is 41,184MW
No. of Plants Capacity
NTPC OWNED
Coal 16 31855
Gas 7 3955
Renewable - 10
Total 23 35820
OWNED BY JVs
Coal & Gas 7 5364
TOTAL 30 41,184
5. Initiatives
• The company sets aside up to 0.5% of the
profits for R&D.
• Roadmap developed for adopting Clean
Development
• The welfare of project affected the local
population around NTPC projects are taken
care of through well drawn Rehabilitation and
Resettlement policies.
• All stations of NTPC are ISO 14001 certified.
7. Overview of BTPS
BTPS MEETS MORE THAN 24% OF DELHI’S ELECTRICITY
CONSUMPTION
INSTALLED CAPACITY 720 MW
DERATED CAPACITY 705 MW
(3x95 + 2x210MW)
OWNED BY GOVT. OF INDIA, MINISTRY OF POWER
BEING MANAGED BY NTPC FOR THE LAST 26 YEARS SINCE 1st
APRIL 1978
8. NTPC Badarpur
BTPS was conceived in 1965 to meet the
growing electricity demand of Northern
Region.
The site construction activities started in
1968.
The plant became operational with the
commissioning of its first unit on 26th July
1973, 2nd unit in ;74 , 3rd unit in ’75 , 4th
unit in ’78 & 5th unit in ’81.
9.
10.
11. BASIC THERMAL POWER PLANT
There are 3 main units:
1. Steam Generator (Boiler)
2. Steam Turbine
3. Electric Generator
13. OPERATION AND MAINTAINANCE
This control & instrumentation is the brain of the plant because from the
relays to transmitters followed by the electronic computation chipsets and
recorders and lastly the controlling circuitry, all fall under this.
A View of Control Room at BTPS