SlideShare una empresa de Scribd logo
1 de 4
Descargar para leer sin conexión
List of Acronyms:
DMAIC - Define, Measure, Analyze, Improve, Control
SIPOC - Supplier, Input, Process, Output, Customer
LSS - Lean Six Sigma
R = Q x A Results = Quality of Solution x Acceptance of Solution
RACI - Responsible, Accountable, Consulted, Informed
LSL - Lower Specification Limit
USL - Upper Specification Limit
LCL - Lower Control Limit
UCL - Upper Control Limit
VOC - Voice Of Customer
VOE - Voice Of Employee
VOB - Voice Of Business
VOP - Voice Of Process
CCR - Critical Customer Requirements
QVALITY - Quality, Volume, Administrative Systems, Location, Interrelationships, Time, Yield
KPOV - Key Process Output Variable
KBF - Key Buying Factors
PLT - Process Lead Time = WIP/ER
WIP - Work In Progress
ER - Exit Rate
PCE - Process Cycle Efficiency = VAT/PLT x 100
VAT - Value Add Time
COV - Components Of Variation
ANOVA - Analysis Of Variance
VSM - Value Stream Map
SOP - Standard Operating Procedures
NVA - Non Value Added
VA - Value Added
TIMWOOD - Transportation, Inventory, Motion, Waiting, Overproduction, Over processing,
Defects, Under-utilized People
DPU - Defects Per Unit
DPMO - Defective Parts Per Million
DPO - Defects Per Opportunity
SQL - Sigma Quality Level (Z)
FTY - First Time Yield
RTY - Real Throughput Yield
MSA - Measurement System Analysis
MBB - Master Black Belt
CIC - Continuous Improvement Champion
GB - Green Belt
BB - Black Belt
s - Standard Deviation
µ - Mu, population mean
σ - Sigma, population standard deviation
5S - Sort, Stabalize, Shine, Standardize, Sustain
ADU     Average Daily Units
A/P     Accounts Payable
A/R     Accounts Receivable
AVG     Average
AWU     Average Weekly Units
Bi      Batch Size for Part i
BOH     Balance On-hand
BOM     Bill of Material
BOO     Balance On-Order
BVA     Business Value Add
CAPEX   Capital Expenditures
CEO     Chief Executive Officer
CFM     Continuous Flow Manufacturing
CFO     Chief Financial Officer
COGS    Cost of Goods Sold
COS     Cost of Sales
CRP     Capacity Resource Planning
CT      Cycle Time
CTI     Cycle Time Interval
CTIi    Cycle Time Interval for part i
CV      Coefficient of Variation
DC      Distribution Center
DFM     Design for Manufacturability
DL      Direct Labor
DMDi    Demand for Part i
DSO     Days Sales Outstanding
EDI     Electronic Data Interchange
EOQ     Economic Order Quantity
EP      Economic Profit
ERP     Enterprise Requirements Planning
EVA     Economic Value Add
EXITS   Exit Rate (units/time)
FG      Finished Goods
FPO     Firm Planned Order
GPS     Group Problem Solving
IDL     Indirect Labor
IT      Information Technology
IS      Information Systems
JIT     Just In Time
KSF     Key Success Factors
LT      Lead Time
MCE     Manufacturing Cycle Efficiency
MCT     Manufacturing Cycle Time
MIS     Management Information Systems
MPS     Master Production Schedule
MRO     Maintenance and Repair
MRP     Material Requirements Planning
MRPII   Material Resource Planning
MTBF    Mean Time Between Failure
MTTF    Mean Time To Fail
NOPAT   Net Operating Profit After Tax
NVA     Non-Value Add
OE      Owners Earnings
OEE     Overall Equipment Effectiveness
OF      Order Frequency
OP      Operating Profit
OSHA    Occupation Safety and Health Administration
OTD     On-Time Delivery
PAT     Profit After Tax
Pi      Processing Time per Unit for Part i
PC      Production Control
PD      Product Development
PCE     Process Cycle Efficiency
PCT     Process Cycle Time
PIP     Project in Process
POU     Point of Use
PP&E    Plant Property and Equipment
PPV     Purchase Price Variance
PRi     Production Rate for Part i
QC      Quality Control
R&D     Research and Development
Rb      Rate of the Bottleneck
RCCP    Rough Cut Capacity Planning
RM     Raw Material
ROIC   Return On Invested Capital
RONA   Return on Net Assets
RPS    Replenishment Pull System
s      Standard deviation of a sample
S&OP   Sales and Operations Planning
SG&A   Sales, General and Administrative
SPC    Statistical Process Controls
SKU    Stock Keeping Unit
SL     Service Level
SLOB   Slow and Obsolete Inventory
SS     Safety Stock
SUi    Setup Time for Part i
TPM    Total Productive Maintenance
TPS    Toyota Production System
VA     Value Add
WACC   Weighted Average Cost of Capital
WCT    Workstation Cycle Time
WTT    Workstation Turnover Time
WIP    Work in Process
Yi     Yield for Part i
s      Population Standard Deviation (units/time)

Más contenido relacionado

La actualidad más candente

Capacity requirement planning sure 12mt07ind019
Capacity requirement planning sure 12mt07ind019Capacity requirement planning sure 12mt07ind019
Capacity requirement planning sure 12mt07ind019samjune
 
What is Throughput Time?
What is Throughput Time?What is Throughput Time?
What is Throughput Time?MRPeasy
 
Value Stream Mapping Training - ADDVALUE - Nilesh Arora
Value Stream Mapping Training - ADDVALUE - Nilesh AroraValue Stream Mapping Training - ADDVALUE - Nilesh Arora
Value Stream Mapping Training - ADDVALUE - Nilesh AroraADD VALUE CONSULTING Inc
 
Value Stream Mapping with ConceptDraw PRO
Value Stream Mapping with ConceptDraw PROValue Stream Mapping with ConceptDraw PRO
Value Stream Mapping with ConceptDraw PROAnastasia Krylova
 
Value stream mapping - A Simple Primer
Value stream mapping - A Simple PrimerValue stream mapping - A Simple Primer
Value stream mapping - A Simple PrimerVenkat Srinivasan
 
Demand flow poster slides rick (1)
Demand flow poster slides rick (1)Demand flow poster slides rick (1)
Demand flow poster slides rick (1)rcerceo
 
KITARON Finite Capacity Production Planning system
KITARON Finite Capacity Production Planning systemKITARON Finite Capacity Production Planning system
KITARON Finite Capacity Production Planning systemGeosoft Systems
 
Capacity Requirement Planning
Capacity Requirement PlanningCapacity Requirement Planning
Capacity Requirement Planningsenthil.G
 
Learning to see (VSM)
Learning to see (VSM)Learning to see (VSM)
Learning to see (VSM)Mohamed Effat
 
Creating a value stream map A3
Creating a value stream map A3Creating a value stream map A3
Creating a value stream map A3Peter Karran
 
Operations Scheduling
Operations SchedulingOperations Scheduling
Operations Schedulingsenthil.G
 
460 operations - 4.20
460   operations - 4.20460   operations - 4.20
460 operations - 4.20Kyle Bakken
 
Capacity and availability management (CMMI SVC 1.3 PA) Explained
Capacity and availability management  (CMMI SVC 1.3 PA) ExplainedCapacity and availability management  (CMMI SVC 1.3 PA) Explained
Capacity and availability management (CMMI SVC 1.3 PA) ExplainedVishnuvarthanan Moorthy
 
Part one of project brown field for operational excellencies in scm integert...
Part one of project brown field for operational excellencies in scm  integert...Part one of project brown field for operational excellencies in scm  integert...
Part one of project brown field for operational excellencies in scm integert...LT COLONEL VIKRAM BAKSHI ( RETD)
 

La actualidad más candente (20)

Process Excellence
Process ExcellenceProcess Excellence
Process Excellence
 
Value stream mapping
Value stream mappingValue stream mapping
Value stream mapping
 
Capacity requirement planning sure 12mt07ind019
Capacity requirement planning sure 12mt07ind019Capacity requirement planning sure 12mt07ind019
Capacity requirement planning sure 12mt07ind019
 
What is Throughput Time?
What is Throughput Time?What is Throughput Time?
What is Throughput Time?
 
Tools of lean mfg
Tools of lean mfgTools of lean mfg
Tools of lean mfg
 
Value Stream Mapping Training - ADDVALUE - Nilesh Arora
Value Stream Mapping Training - ADDVALUE - Nilesh AroraValue Stream Mapping Training - ADDVALUE - Nilesh Arora
Value Stream Mapping Training - ADDVALUE - Nilesh Arora
 
Value Stream Mapping (VSM)
Value Stream Mapping (VSM)Value Stream Mapping (VSM)
Value Stream Mapping (VSM)
 
Value Stream Mapping with ConceptDraw PRO
Value Stream Mapping with ConceptDraw PROValue Stream Mapping with ConceptDraw PRO
Value Stream Mapping with ConceptDraw PRO
 
Value stream mapping - A Simple Primer
Value stream mapping - A Simple PrimerValue stream mapping - A Simple Primer
Value stream mapping - A Simple Primer
 
Demand flow poster slides rick (1)
Demand flow poster slides rick (1)Demand flow poster slides rick (1)
Demand flow poster slides rick (1)
 
KITARON Finite Capacity Production Planning system
KITARON Finite Capacity Production Planning systemKITARON Finite Capacity Production Planning system
KITARON Finite Capacity Production Planning system
 
Capacity Requirement Planning
Capacity Requirement PlanningCapacity Requirement Planning
Capacity Requirement Planning
 
Learning to see (VSM)
Learning to see (VSM)Learning to see (VSM)
Learning to see (VSM)
 
Creating a value stream map A3
Creating a value stream map A3Creating a value stream map A3
Creating a value stream map A3
 
Operations Scheduling
Operations SchedulingOperations Scheduling
Operations Scheduling
 
460 operations - 4.20
460   operations - 4.20460   operations - 4.20
460 operations - 4.20
 
Capacity and availability management (CMMI SVC 1.3 PA) Explained
Capacity and availability management  (CMMI SVC 1.3 PA) ExplainedCapacity and availability management  (CMMI SVC 1.3 PA) Explained
Capacity and availability management (CMMI SVC 1.3 PA) Explained
 
Vsm
VsmVsm
Vsm
 
Part one of project brown field for operational excellencies in scm integert...
Part one of project brown field for operational excellencies in scm  integert...Part one of project brown field for operational excellencies in scm  integert...
Part one of project brown field for operational excellencies in scm integert...
 
Inventory and lead time
Inventory and lead timeInventory and lead time
Inventory and lead time
 

Similar a List of acronyms

Data – The New Raw Material for Business
Data – The New Raw Material for BusinessData – The New Raw Material for Business
Data – The New Raw Material for BusinessCapgemini
 
DTS_Standardized Manufacturing (New Template) Rev 4
DTS_Standardized Manufacturing (New Template) Rev 4DTS_Standardized Manufacturing (New Template) Rev 4
DTS_Standardized Manufacturing (New Template) Rev 4Larry Thompson, MfgT.
 
Metrics, KPIs, and Process Insights – Implementing High Performance Manufactu...
Metrics, KPIs, and Process Insights – Implementing High Performance Manufactu...Metrics, KPIs, and Process Insights – Implementing High Performance Manufactu...
Metrics, KPIs, and Process Insights – Implementing High Performance Manufactu...Northwest Analytics
 
lean-simple-solutions
 lean-simple-solutions lean-simple-solutions
lean-simple-solutionssashi prabhu
 
37022309 lean-simple-solutions
37022309 lean-simple-solutions37022309 lean-simple-solutions
37022309 lean-simple-solutionssashi prabhu
 
OrchestratedBEER Brewery Software Product Presentation
OrchestratedBEER Brewery Software Product PresentationOrchestratedBEER Brewery Software Product Presentation
OrchestratedBEER Brewery Software Product PresentationOrchestratedBEER
 
Mrp MRPII Erp Implementation
Mrp MRPII Erp ImplementationMrp MRPII Erp Implementation
Mrp MRPII Erp ImplementationAnand Subramaniam
 
Kanban for Automation - Case Study
Kanban for Automation  - Case StudyKanban for Automation  - Case Study
Kanban for Automation - Case StudyRamkumar Arumugam
 
Candidate Profile DW 2015
Candidate Profile DW 2015Candidate Profile DW 2015
Candidate Profile DW 2015Daryl Wirges
 
Erp introduction
Erp introductionErp introduction
Erp introductionGoa App
 
Operations Management Material Requirements Planning (MRP)
Operations ManagementMaterial Requirements Planning (MRP)Operations ManagementMaterial Requirements Planning (MRP)
Operations Management Material Requirements Planning (MRP)Mostafa Ewees
 
Waste Overview and Benefits
Waste Overview and BenefitsWaste Overview and Benefits
Waste Overview and BenefitsUbersoldat
 
Manufacturing ERP Software
Manufacturing ERP SoftwareManufacturing ERP Software
Manufacturing ERP Softwareeresource erp
 
Demand Driven Production Management from Ecoservity
Demand Driven Production Management from EcoservityDemand Driven Production Management from Ecoservity
Demand Driven Production Management from Ecoservityecoservity
 
Software Estimation
Software EstimationSoftware Estimation
Software EstimationDinesh Singh
 
IAB Nov2006 LaRowe EDS - PLM Overview.pdf
IAB Nov2006 LaRowe EDS - PLM Overview.pdfIAB Nov2006 LaRowe EDS - PLM Overview.pdf
IAB Nov2006 LaRowe EDS - PLM Overview.pdfCristianAndruMilos
 

Similar a List of acronyms (20)

Abbreviation 2
Abbreviation 2Abbreviation 2
Abbreviation 2
 
Data – The New Raw Material for Business
Data – The New Raw Material for BusinessData – The New Raw Material for Business
Data – The New Raw Material for Business
 
Industry_Wheel_Manufacturing.pptx
Industry_Wheel_Manufacturing.pptxIndustry_Wheel_Manufacturing.pptx
Industry_Wheel_Manufacturing.pptx
 
Production module
Production moduleProduction module
Production module
 
DTS_Standardized Manufacturing (New Template) Rev 4
DTS_Standardized Manufacturing (New Template) Rev 4DTS_Standardized Manufacturing (New Template) Rev 4
DTS_Standardized Manufacturing (New Template) Rev 4
 
Metrics, KPIs, and Process Insights – Implementing High Performance Manufactu...
Metrics, KPIs, and Process Insights – Implementing High Performance Manufactu...Metrics, KPIs, and Process Insights – Implementing High Performance Manufactu...
Metrics, KPIs, and Process Insights – Implementing High Performance Manufactu...
 
lean-simple-solutions
 lean-simple-solutions lean-simple-solutions
lean-simple-solutions
 
37022309 lean-simple-solutions
37022309 lean-simple-solutions37022309 lean-simple-solutions
37022309 lean-simple-solutions
 
OrchestratedBEER Brewery Software Product Presentation
OrchestratedBEER Brewery Software Product PresentationOrchestratedBEER Brewery Software Product Presentation
OrchestratedBEER Brewery Software Product Presentation
 
Mrp MRPII Erp Implementation
Mrp MRPII Erp ImplementationMrp MRPII Erp Implementation
Mrp MRPII Erp Implementation
 
BA tool
BA toolBA tool
BA tool
 
Kanban for Automation - Case Study
Kanban for Automation  - Case StudyKanban for Automation  - Case Study
Kanban for Automation - Case Study
 
Candidate Profile DW 2015
Candidate Profile DW 2015Candidate Profile DW 2015
Candidate Profile DW 2015
 
Erp introduction
Erp introductionErp introduction
Erp introduction
 
Operations Management Material Requirements Planning (MRP)
Operations ManagementMaterial Requirements Planning (MRP)Operations ManagementMaterial Requirements Planning (MRP)
Operations Management Material Requirements Planning (MRP)
 
Waste Overview and Benefits
Waste Overview and BenefitsWaste Overview and Benefits
Waste Overview and Benefits
 
Manufacturing ERP Software
Manufacturing ERP SoftwareManufacturing ERP Software
Manufacturing ERP Software
 
Demand Driven Production Management from Ecoservity
Demand Driven Production Management from EcoservityDemand Driven Production Management from Ecoservity
Demand Driven Production Management from Ecoservity
 
Software Estimation
Software EstimationSoftware Estimation
Software Estimation
 
IAB Nov2006 LaRowe EDS - PLM Overview.pdf
IAB Nov2006 LaRowe EDS - PLM Overview.pdfIAB Nov2006 LaRowe EDS - PLM Overview.pdf
IAB Nov2006 LaRowe EDS - PLM Overview.pdf
 

Último

Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon investment
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGpr788182
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NSCROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NSpanmisemningshen123
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...daisycvs
 
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book nowKalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book nowranineha57744
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1kcpayne
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptxnandhinijagan9867
 
Cannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannaBusinessPlans
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Timegargpaaro
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
New 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateNew 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateCannaBusinessPlans
 
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur DubaiUAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubaijaehdlyzca
 
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...pujan9679
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel
 
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAIGetting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAITim Wilson
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Adnet Communications
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...ssuserf63bd7
 

Último (20)

Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NSCROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book nowKalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Cannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 Updated
 
Buy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail AccountsBuy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail Accounts
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
New 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateNew 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck Template
 
WheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond InsightsWheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond Insights
 
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur DubaiUAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
 
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAIGetting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
 

List of acronyms

  • 1. List of Acronyms: DMAIC - Define, Measure, Analyze, Improve, Control SIPOC - Supplier, Input, Process, Output, Customer LSS - Lean Six Sigma R = Q x A Results = Quality of Solution x Acceptance of Solution RACI - Responsible, Accountable, Consulted, Informed LSL - Lower Specification Limit USL - Upper Specification Limit LCL - Lower Control Limit UCL - Upper Control Limit VOC - Voice Of Customer VOE - Voice Of Employee VOB - Voice Of Business VOP - Voice Of Process CCR - Critical Customer Requirements QVALITY - Quality, Volume, Administrative Systems, Location, Interrelationships, Time, Yield KPOV - Key Process Output Variable KBF - Key Buying Factors PLT - Process Lead Time = WIP/ER WIP - Work In Progress ER - Exit Rate PCE - Process Cycle Efficiency = VAT/PLT x 100 VAT - Value Add Time COV - Components Of Variation ANOVA - Analysis Of Variance VSM - Value Stream Map SOP - Standard Operating Procedures NVA - Non Value Added VA - Value Added TIMWOOD - Transportation, Inventory, Motion, Waiting, Overproduction, Over processing, Defects, Under-utilized People DPU - Defects Per Unit DPMO - Defective Parts Per Million DPO - Defects Per Opportunity SQL - Sigma Quality Level (Z) FTY - First Time Yield RTY - Real Throughput Yield MSA - Measurement System Analysis MBB - Master Black Belt CIC - Continuous Improvement Champion GB - Green Belt BB - Black Belt s - Standard Deviation µ - Mu, population mean σ - Sigma, population standard deviation 5S - Sort, Stabalize, Shine, Standardize, Sustain
  • 2. ADU Average Daily Units A/P Accounts Payable A/R Accounts Receivable AVG Average AWU Average Weekly Units Bi Batch Size for Part i BOH Balance On-hand BOM Bill of Material BOO Balance On-Order BVA Business Value Add CAPEX Capital Expenditures CEO Chief Executive Officer CFM Continuous Flow Manufacturing CFO Chief Financial Officer COGS Cost of Goods Sold COS Cost of Sales CRP Capacity Resource Planning CT Cycle Time CTI Cycle Time Interval CTIi Cycle Time Interval for part i CV Coefficient of Variation DC Distribution Center DFM Design for Manufacturability DL Direct Labor DMDi Demand for Part i DSO Days Sales Outstanding EDI Electronic Data Interchange EOQ Economic Order Quantity EP Economic Profit ERP Enterprise Requirements Planning EVA Economic Value Add EXITS Exit Rate (units/time) FG Finished Goods FPO Firm Planned Order GPS Group Problem Solving IDL Indirect Labor IT Information Technology
  • 3. IS Information Systems JIT Just In Time KSF Key Success Factors LT Lead Time MCE Manufacturing Cycle Efficiency MCT Manufacturing Cycle Time MIS Management Information Systems MPS Master Production Schedule MRO Maintenance and Repair MRP Material Requirements Planning MRPII Material Resource Planning MTBF Mean Time Between Failure MTTF Mean Time To Fail NOPAT Net Operating Profit After Tax NVA Non-Value Add OE Owners Earnings OEE Overall Equipment Effectiveness OF Order Frequency OP Operating Profit OSHA Occupation Safety and Health Administration OTD On-Time Delivery PAT Profit After Tax Pi Processing Time per Unit for Part i PC Production Control PD Product Development PCE Process Cycle Efficiency PCT Process Cycle Time PIP Project in Process POU Point of Use PP&E Plant Property and Equipment PPV Purchase Price Variance PRi Production Rate for Part i QC Quality Control R&D Research and Development Rb Rate of the Bottleneck RCCP Rough Cut Capacity Planning
  • 4. RM Raw Material ROIC Return On Invested Capital RONA Return on Net Assets RPS Replenishment Pull System s Standard deviation of a sample S&OP Sales and Operations Planning SG&A Sales, General and Administrative SPC Statistical Process Controls SKU Stock Keeping Unit SL Service Level SLOB Slow and Obsolete Inventory SS Safety Stock SUi Setup Time for Part i TPM Total Productive Maintenance TPS Toyota Production System VA Value Add WACC Weighted Average Cost of Capital WCT Workstation Cycle Time WTT Workstation Turnover Time WIP Work in Process Yi Yield for Part i s Population Standard Deviation (units/time)