18. Project Flow Chart Quotation Approval & P.O. Design & Engineering Design Check & Revision Design Approval Mold Construction Mold Testing & Refinement Mold Approval Final Mold Test Part Samples DELIVERY
19. Mold Manufacturing Lead Time Reference Complex Mold General Mold Mold Tonnage Project Finished Time 1 TON 7-8 Weeks 3 TON 8-10 Weeks 5 TON 12-14 Weeks Mold Tonnage Project Finished Time 1 TON 8-9 Weeks 3 TON 10-11 Weeks 5 TON 14-16 Weeks
29. Wire Cutting Machines Qty. Origin Machining Centers Qty. Origin ShenZhen Factory Equipment List CHARMILLES ROBOFIL380 1 Switzerland SuSanGuang 7725 2 China HuaFang 7732 1 China HuaFang 7740 2 China HuaFang 7750 1 China YSG-614 Precision Grinding Machine 4 Japan M7312H Automatic Surface Grinding Machine 5 China Okamoto OGM-250UEXB Cylindrical Grinder 1 Japan (Purchased 2006)
30. Mold Fitting Machines Qty. Origin ShenZhen Factory Equipment List AQUAmate LS-120t 1 Hong Kong (Purchased 2005) AQUAmate LS-200t 1 Hong Kong (Purchased 2006)
31.
32.
33. Zhuhai Factory with Advanced Automated Flexible Manufacturing System Completely automated logistics, storage, and manufacturing system
34. New Machines Coming in December, 2009 Machines Qty. Origin DEPO HC 2012 (3 simultaneous & 1 adjustable axis) 1 German Gantry EAGLE 500 (EDM) 1 German OPS-ingersoll Gantry EAGLE 1200 (EDM) 1 German OPS-ingersoll HSC-machine SPEEDHAWK 550 (5-Axis's CNC) 1 German OPS-ingersoll HSC-machine SPEEDHAWK 750 (5-Axis's CNC) 2 German OPS-ingersoll DEPO Mill2012 (5 axis) 1 German DEPO HF2012 (5 simultaneous & 2 adjustable axis) 1 German DEPO VC3016 (5 simultaneous & 1 adjustable axis) 1 German DEPO VF3016 (5-Axis's CNC) 1 German