1. MD.KHALIQUZZAMAN
Flat no 103, Vaishnavi residency, 16th
Cross,
Neeladri Nagar, Electronic city phase1,
Bangalore 100
Contact: +919742682591
E Mail: md.khaliquzzaman@rediffmail.com D.O.B: 18th Mar’84
Sr. MEP Project Engineer, Electrical Graduate
Real estate, residential, commercial, industrial projects
Having excellent management Skill (Site, Contract, design, Progress, quality, Safety) Seeking challenging
assignments with reputed companies in the field of Construction Industry/Project Management
PROFILE: Sincere, diligent, Goal oriented, disciplined, Positive attitude & focused professional, with 8
years of wide experience in the industry, currently working with Facilities and Building Solution (PMC) as
MEP sr. Project Engineer, MEP In charge at residential Project.
Core Competencies:
Project managementMEPContract ManagementSite managementSchedule managementDesign
ManagementQuality ManagementMaterial managementResource PlanningQSElectrical Engineering
Testing & Commissioning, HT cables, medium voltage switchgears up to 220KV, Transmission line
Transformers and HT MotorsPlanningErection/installationLiasoning of projects with CHIEF ELECTRICAL
InspectorateHVAC System High & Low SideFire Fighting System High & Low SideLV SystemIBMSPA
System
Summary
Served as a Building construction Engineer (Lighting, electrification and Communication system) within
the Project department of Sterling & Wilson Pvt Ltd after completing the Graduate Engineering Program.
While at SIEMENS LIMITED I have exposure to and experience with the Industrial Construction,
maintenance, troubleshooting, testing and construction of transmission and distribution
ELV/LV/MV/HV/EHV system up to 220kv and equipment including lines, circuit breakers, disconnectors,
protection relays and systems, current transformers, potential transformers, distribution transformers up
to 100MVA, underground and overhead cables laying up to 33KV, condition monitoring,PLC and
SCADA systems, Power Plant(ESP ,Boiler and Turbine, Ash Handling Plant).In FABS as a project engineer
my responsibilities are to make coordination between client and contractor, to balance the project for
2. both client and contractor, Plant engineering, material handling and commercial activities, Safety and
quality of Project
Key Projects Handled:
Godrej,Ecity since July 2015
Client: Universal Builder,Banglore
• Currently Handling residential Project in the area of 1457000SqFt in Electronic City, and
construction area 967000 sq ft,Banglore with Universal Builder as MEP In charge. Responsible for all
activities related to MEP services.
Janapriya Nile valley Project Hyderabad June2015-July2015
Client: Janapriya
Handled residential project in the area of 44 Acres of land in Miyapur, and construction area 1.6 million sq ft,Hyderabad
with Janapriya as MEP In charge. Responsible for all activities related to MEP services
GLOBE TECH Project Phase-1 since December’13-June2015
Client: MAPLE Tree Management Services
• Completed IT Park Project at Globe Technology Park, Bangalore with Maple tree India Management services as MEP In
charge. Responsible for all activities related to MEP services.
ABOTT Nutrition March’13-December’13
Client: ABOTT Nutrition
• Completed Food Production area electrical and MEP activities, Schedule management, Contract management, quality
management at Abbott Nutrition India, Jhagaria Gujarat.
Main Intake System for 2x660MW Power Plant, Kawai April’12 - February’13
Client: ADANI Power Rajasthan Limited
• Completed Main Intake system project at Adani Power Rajasthan Limited, Kawai as Site In Charge while in SIEMENS LTD.
400 MW Wind Project, GFL, Rajasthan February’12-March’13
Client: Inox Wind FARM
• Completed 220KV switchyard at 200MW Wind Farm Project in GFL, Dangri, Rajasthan.
1 MW Solar Power Projects, Churu, Rajasthan January’12-February’12
Client: Moser Baer Solar Projects
• Completed 1MW Solar Projects as Site In charge at Moser Baer solar limited, Churu, Rajasthan
KJS Cement Plant, 600TPD, Maihar, M.P. August’11-December’11
Client: KJS Cement
• Completed 6000tpd Cement Plant Project as Site In Charge In KJS Cement Ltd, Maihar, Satna MP.
3. 4x300 MW CPP Power Plants May’09 - July’11
Client: Bharat Aluminum Co. Ltd
• Completed different packages as Site In charge in 1200MW Captive power plant project @ Bharat Aluminum Company
limited.
• Successfully Completed electrical project of GREEN ANODE PLANT -2 at Bharat Aluminum Co Ltd as a Quality cum
Execution In charge consisting of 6 no’s of 2MVA,11/0.433 KV distribution Transformer,1 No’s of 11KV HT Board with
14 panels & HT Cables.
• Completed RCW electrical project at Bharat Aluminum Co Ltd as a Execution cum commissioning In charge and
managing execution and liasioning and quality control of 220 Kw HT motor,1.25MVA Trafo,11kv switch board
• Handled the supervision and installation of extension bays of 220kv switchyard at Bharat Aluminium Company limited in
the year 2009.
• Handled execution and erection of 220kv Double Circuit transmission tower at Bharat Aluminium Company limited in the
year 2009.
• Completed Installation, Testing and commissioning, End termination & st.through termination of 10 runs of 33kv XLPE
HT cable through tunnels and overhead bridges at Bharat Aluminium Company limited in the year 2009.
• Executed erection of 66KV Switchyard at Sejal Glass, Jhagadia, and Gujarat in 2009.
• Executed erection of 66KV switchyard at Kohler India Limited, Jhagadia, and Gujarat In 2008.
• Executed lighting job at Mumbai’s tallest tower The imperial(60 storied) at tardeo, Mumbai in 2008
• Executed Transformer Erection, switchgear Erection & Lighting work in KDAH, Andheri, Mumbai in 2007.
• Executed Dismantling & Erection of 33KV Switch Yard with 2nos of 2.5MVA Transformer at JharGram in West Bengal in
2006.
PROFESSIONAL EXPERIENCE
FABS (Facilities and Building Solution) -PMC since March’13
Senior MEP Project Engineer
• Involved in making quality documents.
• Coordination among main client and contractors to resolve all technical and execution issues.
• Involves creating area layout in line with design consultants and as per customer requirements.
SIEMENS LTD May’09-Feb’13
Site In charge
• Involved in Commissioning, Checklist, Testing report preparation
• Interface with customers and others on a regular basis to provide technical support. Provide project status, technical
reports and presentations to management and customers.
• Work with and/or create schematics, rough sketches, design drawings and documented process.
• Coordinate and lead process/project improvement teams to resolve issues.
STERLING & WILSON PVT LTD Aug’07-May’09
Graduate Trainee Engineer
EDUCATIONAL CREDENTIALS
B.Tech in Electrical Engineering, 2007
4. Guru Nanak Institute Of Technology Kolkata, West Bengal, West Bengal University of Technology
Computer Skills and Software Used
• Design software Experience(AutoCAD)
• Some programming experience (C, )
• Competent with Microsoft office software (word, excel, PowerPoint, access, project, vision, outlook)
Seminar’s and Training attended:
• Attended Seminar Cum training regarding execution and erection of switchyards equipments, cable laying, earthing,
welding technology, anchor fastener techniques, power transformer installation organized by siemens ltd.
• Completed AutoCAD By Sterling & Wilson Pvt Ltd.
Current CTC: (INR).
Expected CTC:
Notice Period: 30 Days.
References
MD.KHALIQUZZAMAN