Stages for construction


Building

Retaining walls
Subsoil drainage
BUILDING


   Site works and setting out
   Accommodation, storage and security
   Detail building stages
Site works and Setting Out

   Contractors responsibility after being given
    possession and site layout plan and detail
    drawings necessary
   Commencing tasks:-
       Clearing the site
       Setting out the building
       Establishing a datum level
c)
LEVELING
   The land surveyor will
determine the original ground
level for the land and mark a
survey peg for drain, pipes,
cables and main sewerage
treatment plant (MSTP), also
the road complying with the     Land surveyor
Jabatan Pengairan dan           determine the
Saliran (JPS).                       OGL
Clearing the Site
   May involve:-
       Demolition of existing buildings (by experienced
        contractor)
       Grubbing out bushes and tress (by manual or
        mechanical means, or by specialist for the large
        tress)
       Removal of soil to reduce levels following to
        Building Regulation C1 (sterilize the top 300
        mm to contain plant life and decaying
        vegetation)
Topography of
the site and some
common
material on site
Removal of tree trunks
Grubbing of trees, shrubs and roots
Site clearing work carried out
Excavator heaping up top soil
Earthwork
operation
a) SITE BOUNDARY
The surveyor must to determine the site boundary
of the construction area to avoid trespass to the
another construction area.




      The boundary had determine
Setting Out the Site
1.   Establish a base line from which the whole
     of the building can be set out.
        Marked on site clearly so that it can be re-
         established at any time
        Using steel tape (30 meters and not stretchable is
         more suitable)
        Marked each corner with a stout peg
        Check on the right angle and correct lengths
         (advisable using different method)
Typical builder square
Setting out and checking methods
Setting Out the Site
2.   Set up profile board-after the main building
     lines
        Should set up clear of the foundations trench
         positions to locate the trench, foundations and
         walls
        Required at all trench and wall intersections
Typical profile board
Establishing a Datum Level
   All levels in a building are taken from a fixed point
    called a ‘datum’
   Should establish after the setting out and related to
    ordnance benchmark
   An arrow with a horizontal mark above the arrow
   The centerline of the horizontal being the actual
    level indicated on an ordnance survey maps
Sloping Sites
Three methods in reducing levels:-
  1.   Cut and Fill - usual method, the amount of cut
       will equal the amount of fill
  2.   Cut – Advantages of having undisturbed soil
       over the site, but having disadvantages of cost of
       removing the spoil from the site
  3.   Fill – Not to be recommended, deep foundation
       would be needed, the risk of settlement and the
       amount of fill should be limited to 600 mm
Sloping sites
Accommodation, Storage
and Security
Accommodation
   Regulations 1996 (Health, safety and welfare)
   Requirements defers due to numbers of site workers
    and duration of contract
   Staff accommodations usually:-
       Sectional timber huts
       Mobile caravan or cabins
   Facilities provided:-
       First aid, stretcher ambulance, first aid room, shelter and
        clothing, meals room, washing facilities and sanitary
        facilities
Storage
      Type of storage depend on:-
        Durability
        Vulnerability to damage
        Vulnerability to theft

 Examples..
  Cement and plaster (in bag form) – dry store free from
    moist air
  Aggregates and sand – clean firm base, separate
    different materials and grade, watch on moisture content
  Bricks and blocks – stacked in stable piles, covered
    adequately
Security and Protection-fencing
   To defines limit of site and acts as a deterrent to trespasser or
    thief
   To provide a physical barrier or visual barrier
   Should start at the beginning of construction
   Type depend on degree of security, cost, neighborhood and
    duration of contract
   At least 1.8m high
   Minimum number of access and with lockable barrier
   Standard fences – BS 1722
Typical fencing details
Cleft chestnut pale fencing
Chain link fence with concrete posts
Close boarded fence with concrete post
Security and Protection-fencing-
Hoardings
   Close boarded fences of barriers erected adjacent to
    a highway or public footpath
   Prevent unauthorized persons obtaining access to
    site and protect public from dust and noise
   Necessary to obtain written permission from the
    local authority to erect a hoarding (Highways Act
    1980)
Hoardings
   Two forms:-
       Vertical hoardings
           a series of closed boarded panels securely fixed to resist wind
            load and accidental impact load
           Can be free standing or fixed by stays by the external walls of an
            existing building
       Fan hoardings
           To protect persons from falling objects
           Place at a level above the normal traffic height and ensure any
            falling debris is directed back towards the building or scaffold
Typical free standing vertical hoarding
Typical fan hoarding
BUILDING STAGES
Order of construction
 Excavation and timbering
 Foundations
 Concrete floors
 Reinforced concrete frames
 Roofs
 Brickwork
 Internal fixtures and fittings
 Insulation
 Plumbing and wiring

Keeping an eye on things

   If you are managing the project, you have to keep a close eye on the quality of the
    work and pick up problems quickly. For example, if the wrong wall framing is going
    in, it needs to be sorted before the wall linings go up.
   You, the builder or the project manager will need to ensure that:
   Materials are checked off when they arrive to make sure they are what is ordered
    and required.
   Timber is of the specified treatment type and at specified moisture levels.
   The house is set out correctly on the site.
   Plans and specifications are followed.
   Materials are installed to manufacturers’ instructions.
   Finished construction is protected from the weather.
   Even if you are not managing the project, you may well be taking a keen interest in
    progress. If you spot anything that does not look right, bring it up immediately with
    the builder. It would be better to replace a few bricks that are the wrong colour than
    wait until the house is finished before pointing it out. Most things that go wrong are
    simply mistakes which your builder would prefer to know about sooner rather than
    later.
Excavation and Timbering
 Before a foundation can be laid, it is necessary
  to excavate a trench of the required depth and
  width (by hand or mechanical excavator)
Timbering – term used to cover temporary
  supports to the sides of excavations and is
  sometimes called planking and strutting

   Type and amount – depend on the depth, nature
    of subsoil, weather conditions and duration
Typical example of trench excavations
Trench excavation
FOUNDATIONS
   Foundation is the base on which a building rests and its
    purpose is to safely transfer the load of a building to
    suitable subsoil
   Building regulations :-
       Safely sustain and submit to the ground the combined
        dead and imposed loads so as not to imposed any
        settlement or other movement in any part of the building
        or of any adjoining buildings or works
       Be a such a depth, or be so constructed, as to avoid any
        damage by swelling, shrinkage or freezing of the subsoil
       Be capable of resisting attack by deleterious material, such as

Más contenido relacionado

La actualidad más candente

La actualidad más candente (20)

Cofferdams
Cofferdams Cofferdams
Cofferdams
 
Shoring
ShoringShoring
Shoring
 
Stages In Construction
Stages In ConstructionStages In Construction
Stages In Construction
 
Slipform
SlipformSlipform
Slipform
 
Insepction and quality control
Insepction and quality controlInsepction and quality control
Insepction and quality control
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Formwork
FormworkFormwork
Formwork
 
Slipform construction
Slipform constructionSlipform construction
Slipform construction
 
Temporary works
Temporary worksTemporary works
Temporary works
 
Earthwork and excavation
Earthwork  and  excavationEarthwork  and  excavation
Earthwork and excavation
 
Project Execution Plan for High Rise Building
Project Execution Plan for High Rise BuildingProject Execution Plan for High Rise Building
Project Execution Plan for High Rise Building
 
Shoring and underpinning
Shoring and underpinningShoring and underpinning
Shoring and underpinning
 
Prefabrication in construction
Prefabrication in constructionPrefabrication in construction
Prefabrication in construction
 
Construction contract
Construction contract Construction contract
Construction contract
 
Contracts and-tenders
Contracts and-tendersContracts and-tenders
Contracts and-tenders
 
Types of formwork
Types of formworkTypes of formwork
Types of formwork
 
Prefabrication
PrefabricationPrefabrication
Prefabrication
 
PreCast Construction
PreCast ConstructionPreCast Construction
PreCast Construction
 
Site Visit Report
Site Visit ReportSite Visit Report
Site Visit Report
 
Retaining walls
Retaining walls Retaining walls
Retaining walls
 

Destacado (20)

Building construction ppt
Building construction pptBuilding construction ppt
Building construction ppt
 
Building construction
Building constructionBuilding construction
Building construction
 
Substructure
SubstructureSubstructure
Substructure
 
Get Commercial Building Construction Company Auburn by TopRung LLC
Get Commercial Building Construction Company Auburn by TopRung LLC  Get Commercial Building Construction Company Auburn by TopRung LLC
Get Commercial Building Construction Company Auburn by TopRung LLC
 
Construction of substructure
Construction of substructureConstruction of substructure
Construction of substructure
 
Construction tender process
Construction tender processConstruction tender process
Construction tender process
 
Stakeholder management In Construction Industry
Stakeholder management In  Construction IndustryStakeholder management In  Construction Industry
Stakeholder management In Construction Industry
 
Site Possession
Site PossessionSite Possession
Site Possession
 
Design of two way slab
Design of two way slabDesign of two way slab
Design of two way slab
 
ONE WAY SLAB DESIGN
ONE WAY SLAB DESIGNONE WAY SLAB DESIGN
ONE WAY SLAB DESIGN
 
Tender procedure slide
Tender procedure slideTender procedure slide
Tender procedure slide
 
Scaffolding Technique
Scaffolding TechniqueScaffolding Technique
Scaffolding Technique
 
CIVIL ENGINEERING CONSTRUCTIONS MATERIALS
CIVIL ENGINEERING  CONSTRUCTIONS MATERIALS CIVIL ENGINEERING  CONSTRUCTIONS MATERIALS
CIVIL ENGINEERING CONSTRUCTIONS MATERIALS
 
Glass
GlassGlass
Glass
 
Plastic
PlasticPlastic
Plastic
 
Mortars and Plasters
Mortars and PlastersMortars and Plasters
Mortars and Plasters
 
Timber-II
Timber-IITimber-II
Timber-II
 
Insulating material
Insulating materialInsulating material
Insulating material
 
building material
building materialbuilding material
building material
 
Non Ferrous Metal
Non Ferrous MetalNon Ferrous Metal
Non Ferrous Metal
 

Similar a Stages in Construction

advanced constructiion technologies
advanced constructiion technologiesadvanced constructiion technologies
advanced constructiion technologiesMOHANAHARIHARAN R
 
DEMOLITION OF STRUCTURE BY ABHINAV RAWAT
DEMOLITION OF STRUCTURE BY ABHINAV RAWATDEMOLITION OF STRUCTURE BY ABHINAV RAWAT
DEMOLITION OF STRUCTURE BY ABHINAV RAWATAbhinav Rawat
 
GOOD CONSTRUCTION PRACTICE.pptx
GOOD CONSTRUCTION PRACTICE.pptxGOOD CONSTRUCTION PRACTICE.pptx
GOOD CONSTRUCTION PRACTICE.pptxHirenThakkar31
 
Part One What is the difference between dead.pdf
Part One What is the difference between dead.pdfPart One What is the difference between dead.pdf
Part One What is the difference between dead.pdfsdfghj21
 
CPCCBC5018A Apply Structural Principles To The Construction Of Medium Rise.docx
CPCCBC5018A Apply Structural Principles To The Construction Of Medium Rise.docxCPCCBC5018A Apply Structural Principles To The Construction Of Medium Rise.docx
CPCCBC5018A Apply Structural Principles To The Construction Of Medium Rise.docxwrite31
 
Upload a presentation to download Space frame
Upload a presentation to download Space frameUpload a presentation to download Space frame
Upload a presentation to download Space frameBurkaDinka
 
Ch 5 demolition of structures
Ch 5 demolition of structuresCh 5 demolition of structures
Ch 5 demolition of structuresAnkit Patel
 
Protecting your Work - Surface Protection Education from Skudo
Protecting your Work - Surface Protection Education from SkudoProtecting your Work - Surface Protection Education from Skudo
Protecting your Work - Surface Protection Education from Skudoskudousa
 
Building Materials & Construction Module - 3
Building Materials & Construction Module - 3Building Materials & Construction Module - 3
Building Materials & Construction Module - 3Abhilash B L
 
Construction practices and quality control
Construction practices and quality controlConstruction practices and quality control
Construction practices and quality controlSIBENDU SURAJEET JENA
 
Construction Technology Essay Sample Harvard
Construction Technology Essay Sample HarvardConstruction Technology Essay Sample Harvard
Construction Technology Essay Sample HarvardWriters Per Hour
 
REINFORCED CONCRETE PRECAST TWIN WALLS
REINFORCED CONCRETE PRECAST TWIN WALLSREINFORCED CONCRETE PRECAST TWIN WALLS
REINFORCED CONCRETE PRECAST TWIN WALLSGuy Pomphrey
 
Visual Dictionary - Soffit
Visual Dictionary - SoffitVisual Dictionary - Soffit
Visual Dictionary - SoffitSoffit
 
Building construction
Building constructionBuilding construction
Building constructionnhmurad
 
national building code
national building codenational building code
national building codeRuhiya Garg
 

Similar a Stages in Construction (20)

advanced constructiion technologies
advanced constructiion technologiesadvanced constructiion technologies
advanced constructiion technologies
 
DEMOLITION OF STRUCTURE BY ABHINAV RAWAT
DEMOLITION OF STRUCTURE BY ABHINAV RAWATDEMOLITION OF STRUCTURE BY ABHINAV RAWAT
DEMOLITION OF STRUCTURE BY ABHINAV RAWAT
 
sample.pptx
sample.pptxsample.pptx
sample.pptx
 
PPT DEMOLISH.pptx
PPT DEMOLISH.pptxPPT DEMOLISH.pptx
PPT DEMOLISH.pptx
 
GOOD CONSTRUCTION PRACTICE.pptx
GOOD CONSTRUCTION PRACTICE.pptxGOOD CONSTRUCTION PRACTICE.pptx
GOOD CONSTRUCTION PRACTICE.pptx
 
Part 3 ece
Part 3 ecePart 3 ece
Part 3 ece
 
Part One What is the difference between dead.pdf
Part One What is the difference between dead.pdfPart One What is the difference between dead.pdf
Part One What is the difference between dead.pdf
 
CPCCBC5018A Apply Structural Principles To The Construction Of Medium Rise.docx
CPCCBC5018A Apply Structural Principles To The Construction Of Medium Rise.docxCPCCBC5018A Apply Structural Principles To The Construction Of Medium Rise.docx
CPCCBC5018A Apply Structural Principles To The Construction Of Medium Rise.docx
 
Upload a presentation to download Space frame
Upload a presentation to download Space frameUpload a presentation to download Space frame
Upload a presentation to download Space frame
 
Ch 5 demolition of structures
Ch 5 demolition of structuresCh 5 demolition of structures
Ch 5 demolition of structures
 
Protecting your Work - Surface Protection Education from Skudo
Protecting your Work - Surface Protection Education from SkudoProtecting your Work - Surface Protection Education from Skudo
Protecting your Work - Surface Protection Education from Skudo
 
Building Materials & Construction Module - 3
Building Materials & Construction Module - 3Building Materials & Construction Module - 3
Building Materials & Construction Module - 3
 
Construction practices and quality control
Construction practices and quality controlConstruction practices and quality control
Construction practices and quality control
 
Construction Technology Essay Sample Harvard
Construction Technology Essay Sample HarvardConstruction Technology Essay Sample Harvard
Construction Technology Essay Sample Harvard
 
BCT Mod 4 demolition of structure (Updated)
BCT Mod 4 demolition of structure (Updated)BCT Mod 4 demolition of structure (Updated)
BCT Mod 4 demolition of structure (Updated)
 
REINFORCED CONCRETE PRECAST TWIN WALLS
REINFORCED CONCRETE PRECAST TWIN WALLSREINFORCED CONCRETE PRECAST TWIN WALLS
REINFORCED CONCRETE PRECAST TWIN WALLS
 
Visual Dictionary - Soffit
Visual Dictionary - SoffitVisual Dictionary - Soffit
Visual Dictionary - Soffit
 
Building construction
Building constructionBuilding construction
Building construction
 
Fondation
FondationFondation
Fondation
 
national building code
national building codenational building code
national building code
 

Último

Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the ClassroomPooky Knightsmith
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17Celine George
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxRamakrishna Reddy Bijjam
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsMebane Rash
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.christianmathematics
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentationcamerronhm
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and ModificationsMJDuyan
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...Poonam Aher Patil
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptxMaritesTamaniVerdade
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17Celine George
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfDr Vijay Vishwakarma
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfPoh-Sun Goh
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...pradhanghanshyam7136
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsKarakKing
 
Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jisc
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxDr. Ravikiran H M Gowda
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxDr. Sarita Anand
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - Englishneillewis46
 

Último (20)

Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the Classroom
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
 
Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptx
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 

Stages in Construction

  • 2. BUILDING  Site works and setting out  Accommodation, storage and security  Detail building stages
  • 3. Site works and Setting Out  Contractors responsibility after being given possession and site layout plan and detail drawings necessary  Commencing tasks:-  Clearing the site  Setting out the building  Establishing a datum level
  • 4. c) LEVELING The land surveyor will determine the original ground level for the land and mark a survey peg for drain, pipes, cables and main sewerage treatment plant (MSTP), also the road complying with the Land surveyor Jabatan Pengairan dan determine the Saliran (JPS). OGL
  • 5. Clearing the Site  May involve:-  Demolition of existing buildings (by experienced contractor)  Grubbing out bushes and tress (by manual or mechanical means, or by specialist for the large tress)  Removal of soil to reduce levels following to Building Regulation C1 (sterilize the top 300 mm to contain plant life and decaying vegetation)
  • 6. Topography of the site and some common material on site
  • 8. Grubbing of trees, shrubs and roots
  • 9. Site clearing work carried out
  • 12. a) SITE BOUNDARY The surveyor must to determine the site boundary of the construction area to avoid trespass to the another construction area. The boundary had determine
  • 13. Setting Out the Site 1. Establish a base line from which the whole of the building can be set out.  Marked on site clearly so that it can be re- established at any time  Using steel tape (30 meters and not stretchable is more suitable)  Marked each corner with a stout peg  Check on the right angle and correct lengths (advisable using different method)
  • 15. Setting out and checking methods
  • 16.
  • 17. Setting Out the Site 2. Set up profile board-after the main building lines  Should set up clear of the foundations trench positions to locate the trench, foundations and walls  Required at all trench and wall intersections
  • 19. Establishing a Datum Level  All levels in a building are taken from a fixed point called a ‘datum’  Should establish after the setting out and related to ordnance benchmark  An arrow with a horizontal mark above the arrow  The centerline of the horizontal being the actual level indicated on an ordnance survey maps
  • 20. Sloping Sites Three methods in reducing levels:- 1. Cut and Fill - usual method, the amount of cut will equal the amount of fill 2. Cut – Advantages of having undisturbed soil over the site, but having disadvantages of cost of removing the spoil from the site 3. Fill – Not to be recommended, deep foundation would be needed, the risk of settlement and the amount of fill should be limited to 600 mm
  • 23. Accommodation  Regulations 1996 (Health, safety and welfare)  Requirements defers due to numbers of site workers and duration of contract  Staff accommodations usually:-  Sectional timber huts  Mobile caravan or cabins  Facilities provided:-  First aid, stretcher ambulance, first aid room, shelter and clothing, meals room, washing facilities and sanitary facilities
  • 24. Storage  Type of storage depend on:-  Durability  Vulnerability to damage  Vulnerability to theft Examples..  Cement and plaster (in bag form) – dry store free from moist air  Aggregates and sand – clean firm base, separate different materials and grade, watch on moisture content  Bricks and blocks – stacked in stable piles, covered adequately
  • 25. Security and Protection-fencing  To defines limit of site and acts as a deterrent to trespasser or thief  To provide a physical barrier or visual barrier  Should start at the beginning of construction  Type depend on degree of security, cost, neighborhood and duration of contract  At least 1.8m high  Minimum number of access and with lockable barrier  Standard fences – BS 1722
  • 26. Typical fencing details Cleft chestnut pale fencing
  • 27. Chain link fence with concrete posts
  • 28. Close boarded fence with concrete post
  • 29. Security and Protection-fencing- Hoardings  Close boarded fences of barriers erected adjacent to a highway or public footpath  Prevent unauthorized persons obtaining access to site and protect public from dust and noise  Necessary to obtain written permission from the local authority to erect a hoarding (Highways Act 1980)
  • 30. Hoardings  Two forms:-  Vertical hoardings  a series of closed boarded panels securely fixed to resist wind load and accidental impact load  Can be free standing or fixed by stays by the external walls of an existing building  Fan hoardings  To protect persons from falling objects  Place at a level above the normal traffic height and ensure any falling debris is directed back towards the building or scaffold
  • 31. Typical free standing vertical hoarding
  • 33. BUILDING STAGES Order of construction  Excavation and timbering  Foundations  Concrete floors  Reinforced concrete frames  Roofs  Brickwork  Internal fixtures and fittings  Insulation  Plumbing and wiring 
  • 34. Keeping an eye on things  If you are managing the project, you have to keep a close eye on the quality of the work and pick up problems quickly. For example, if the wrong wall framing is going in, it needs to be sorted before the wall linings go up.  You, the builder or the project manager will need to ensure that:  Materials are checked off when they arrive to make sure they are what is ordered and required.  Timber is of the specified treatment type and at specified moisture levels.  The house is set out correctly on the site.  Plans and specifications are followed.  Materials are installed to manufacturers’ instructions.  Finished construction is protected from the weather.  Even if you are not managing the project, you may well be taking a keen interest in progress. If you spot anything that does not look right, bring it up immediately with the builder. It would be better to replace a few bricks that are the wrong colour than wait until the house is finished before pointing it out. Most things that go wrong are simply mistakes which your builder would prefer to know about sooner rather than later.
  • 35. Excavation and Timbering  Before a foundation can be laid, it is necessary to excavate a trench of the required depth and width (by hand or mechanical excavator) Timbering – term used to cover temporary supports to the sides of excavations and is sometimes called planking and strutting  Type and amount – depend on the depth, nature of subsoil, weather conditions and duration
  • 36. Typical example of trench excavations
  • 38. FOUNDATIONS  Foundation is the base on which a building rests and its purpose is to safely transfer the load of a building to suitable subsoil  Building regulations :-  Safely sustain and submit to the ground the combined dead and imposed loads so as not to imposed any settlement or other movement in any part of the building or of any adjoining buildings or works  Be a such a depth, or be so constructed, as to avoid any damage by swelling, shrinkage or freezing of the subsoil  Be capable of resisting attack by deleterious material, such as