SlideShare una empresa de Scribd logo
1 de 39
A PRESENTATION ON GREEN BUILDING
ASSESSMENT SYSTEMS
PREPARED BY:
ANAMI BOHARA (69003)
DIPINTI DARLAMI (69011)
SIMA CHAND (69046)
SURAKSHA BHANDARI (69049)
GREEN BUILDING
Both a structure
and the using of
processes that
are
environmentally
responsible and
resource
efficient
throughout a
building’s life
cycle.
• Structure design
• Energy efficiency
• Water efficiency
• Material efficiency
• Waste and toxic reduction
FUNDAMENTAL PRINCIPLES OF GREEN BUILDING
COMMON OBJECTIVES OF GREEN BUILDING
• Efficiently using energy, water and other resources
• Protecting occupant health and improving employee productivity
• Reducing waste, pollution and environmental degradation
ENVIRONMENTAL
BENEFITS
ECONOMIC BENEFITS SOCIAL BENEFITS
Enhance and protect
bio diversity and
ecosystem
Reduce operating
cost
Enhance occupant
health and comfort
Improve air and water
quality
Improve occupant
productivity
Improve indoor air
quality
Reduce water
streams
Enhance asset value
and profits
Minimize strain on
local utility
infrastructure
Conserve and restore
natural resources
Optimize life cycle
economic
performance
Improve overall
quality of life
Social
Development
Economic
Growth
Environmental
protection
SUSTAINABILITY
DEMERITS
• Efficient Technologies
• Easier Maintenance
• Return On Investment
• Improved Indoor Air Quality
• Energy Efficiency
• Water Efficiency
• Waste Reduction
• Temperature Moderation
• Water Conservation
• Economical Construction For Poor
• Healthier Lifestyles and Recreation
• Improved Health
• Initial Cost Is High
• Availability Of Materials
• Need More Time To
Construct
• Need Skilled Worker
MERITS
Impacts of
buildings
alone on
resources
First launched in 1990
BREEAM- WORLD’S FIRST BUILDING ASSESMENT SYSTEM
• Inspires developers and creators to excel, innovate and make effective use
of resources.
• Focus on sustainable value and efficiency
• BREEAM certified developments attract property investments and
generates sustainable environments that enhance the well-being of
the people who live and work in them
BREEAM in numbers
worldwide
552,968 Certificates
2,254,176 Registered Buildings
77Countries
WORKING CRITERIA
BREEAM New Construction
BREEAM International New
Construction
BREEAM In-Use
BREEAM Refurbishment
BREEAM Communities Types of buildings assessed
Rating system
CREDITS ALLOCATION
Minimum Standards
PROCESS
Innovation Credits
Awarded for either complying with pre-
defined BREEAM issue exemplary level
requirements, through the appointment
of a BREEAM Accredited Professional
or Suitably Qualified Assessor or
process approved as ‘innovative’.
Fees
On top of the BREEAM assessor fees
for the time allowance, BRE certification
fees must be paid. Currently these are
around £1,230. Additional fees apply for
BREEAM Other Buildings.
Timeframe
From three months to three years
depending on the type of building, type
of assessment, project programme and
how quickly the required documentation
is provided by the project team to the
BREEAM Assessor.
CERTIFICATION
PWC'SLONDON OFFICE
• Client: PwC
• Architect: TP Bennett
• Project manager: Turner &
Townsend
• M&E engineer / BREEAM
assessor: ChapmanBDSP
• Structural engineer: Arup
• Contractor: Overbur
• Location: London, near Tower Bridge in
central London
• BREEAM score of 96.31 %
• The first BREEAM “outstanding” rating
KEYFACTS
•Stage: Post-Construction
•BREEAM version: BREEAM 2008 Offices
• 40,000m2 total floor area
• Ground floor below the station
• floor 1 to 9 above with structure, services and lifts
passing through Charing Cross station.
OLDBUILDING
• Entrance particularly depressing. “ heavy,
monolithic and dark with a fountain that stank of
chlorine.”
• Removal of fountain
• Vertical circulation difficult
• hidden away stairwells
• overused lifts
REFURBISHMENT
 inserting an open stair in the south atrium
 Two scenic lifts inserted into the north atrium
 plenty of breakout spaces, meeting rooms and quiet spaces for
uninterrupted work.
REFURBISHMENT TWO HALVES 5-9 FLOOR FIRST
 The ninth floor breaks the orthogonal open-plan office mould.
 Light through the glazed, barrel-vaulted roof
NATURAL LIGHT
 cellular offices swept away, leaving large, uncluttered floorplates open to the atriums, allowing natural light to flood in
SUSTAINABILITY FEATURES
LANDSCAPING
 hard and soft landscaping work
 break-out areas to be created on each of the terraces
 emphasis on the use of recycled materials
CONTRIBUTE EIGHT POINTS
 installation of new paving, recycled composite
decking, bed construction using recycled plastic boards
• level two a stainless steel wire living wall, with
climbing plants established in pots at the base.
• level eight, installed two large galvanised and
powder-coated frames to support pots filled with soil
and pre-grown ivy.
 Level ten ,micro-habitat , encourages
specific bird species such as the Black
Redstart, the Linnet, and the House
Sparrow.
 Level seven, provides foraging and breeding for birds,
and attracts bees, butterflies, hover flies and other
invertebrates.
 1300 square metres of roof space dedicated to
support threatened and protected species of birds
and invertebrates.
INNOVATION CREDITS
• a biofuel powered tri-generation unit that
provides heat, cooling and power.
• bump the building up from an EPC “B” to an “A”
CONTRIBUTE 15 POINTS
• powered by biodiesel made from waste
vegetable oil
• waste oil from central London's restaurants
• huge amount of savings with particulates,
carbon, Sulphur dioxide
• 1,040kW of electricity
• 800kW of cooling
• 20% of the building’s heat
requirement.
• COLLECT
• FILTER
• REFINE
• thermal panels in More London are used to provide hot
water for the washrooms.
• active chill beam system, which is a very
efficient way of, of passing chilled water
throughout the building and enabling us to cool
the occupants in a very sustainable way.
Utility bill saving of £250,000 a year, but PwC forecasts more: electricity (-221%); gas (-11%); and water (-33%).
• Today building emits 40% less carbon than one typical of its size; and 20% of heat and 60%
of its energy needs are produced on-site.
• The refurbishment is expected to pay for itself in less than four years
• PwC's 2017 targets to reduce carbon emissions by 50% and energy use by 25%.
ONE
ANGEL
SQUAR
E, UK
• Co-operative Group’s new 15 storey headquarters
• BREEAM Version: BREEAM Offices 2008
• Stage: Final Post-Construction
• Score: 95.16%
• BREEAM rating: Outstanding
Architects: 3D Reid
Location: Miller Street, Manchester, UK
Area: 328000.0 ft2
Project Year: 2012
Client: The Co-operative Group
Project manager: Gardiner & Theobald
Structural and M&E engineer: Buro Happold
Contractor: BAM
INTRODUCTION
• Fully glazed double skin façade minimize heating and
cooling loads
• Summer- Ventilation: Louvres at top open to allow the
warmed air trapped between its inner and outer skins
to rise up and out of the building
• Winter- Insulation: Louvres close so the facade can
form an insulated blanket around the building
KEY FEATURES
• 15 Storey atrium- floods the building’s interior with light
• Light reflected by the exposed white painted concrete
coffered floors, reducing required artificial lighting from 550
to 300 lux.
• Used building information modelling (BIM) to create
building before construction to prevent unnecessary
wastage of materials and time
South facing to
maximize solar gain
300,000 sq ft
exposed concrete,
which acts as a
thermal sponge
Site orientation
Floor plans
Top floor plan
ORIENTATION AND FLOOR PLANS
• Low energy LED lighting & IT equipments
• Greywater and rainwater recycling systems for
toilet flushing
• High efficiency passenger and service lifts
SUSTAINABILITY FEATURES
• Earth tubes to bring in cool air via a heat exchanger
• Waste energy -> absorption chiller -> cools the building
• Heat recovery from the IT systems -> heats the building
• Combined Heat and Power (CHP) plant fuelled by waste
cooking oil and rapeseed oil produced on own farm
• Electrical car charging points
Color changing lights with daylight
sensors- sense & measure natural
light, triggering the fixtures to only
emit as much light as necessary,
increasing energy savings and
sustainability
READY FOR GLOBAL WARMING!
Future-proofed against forecast 2050
temperatures – a predicted 5% percent
increase in temperatures & 30% more
rainfall in winter
• On the external outer skin, additional £120,000
for a bronze anodised rather than powder-coated
finish Lifetime guarantee of reduced
maintenance costs.
• Digital storage policy reduced the amount of
paper the business used.
• Same amount of paper as before -> Additional 4
stories needed for storage alone. No longer paper
mail delivered to the building
• Energy Plus Building(EPB)-
produces more energy than
imports
• £110 million investment
£ 142 million lease for 25
(2013)
80 PERCENT FEWER CARBON EMISSIONS
50% LESS ENERGY CONSUMPTION
30% REDUCTION IN OPERATING COSTS
SAVES £500,000 PER ANNUM
COMPARISONOF DIFFERENT RATINGSYSTEMS
START THINKING GREEN!!
Singapore green school
School of art and design, Singapore
Homes at Iceland
ACROS Fukuoka Foundation Building, Japan
BIBLIOGRAPHY
• http://www.breeam.com/
• http://www.ukbuildingcompliance.co.uk/environmental-assessments-and-surveys/breeam-
assessments.aspx
• http://www.ruukki.com/b2b/support/environmental-certification-system/breeam-credits
• http://pwc.blogs.com/press_room/2010/03/first-uk-outstanding-environmental-rating-for-
an-office-building-achieved-by-new-pwc-london-site.html
• http://www.pwc.co.uk/who-we-are/corporate-sustainability/7morelondon.html
• http://www.building.co.uk/pwcs-london-office-highest-breeam-rated-building-
ever/5064009.article#
• http://www.bam.co.uk/how-we-do-it/case-study/1-angel-square
• http://www.archdaily.com/337430/1-angel-square-3d-reid
• http://www.ilikearchitecture.net/2013/04/one-angel-square-3dreid/
• http://www.buro247.my/culture/art-and-design/ten-green-buildings-around-the-world-you-
need-to-s.html
• https://www.wbdg.org/resources/green-building-standards-and-certification-systems
• www.slideshare.net
THANK YOU! 

Más contenido relacionado

La actualidad más candente

La actualidad más candente (20)

Green rating systems
Green rating systemsGreen rating systems
Green rating systems
 
IGBC
IGBCIGBC
IGBC
 
BREEAM: past, present and future
BREEAM: past, present and futureBREEAM: past, present and future
BREEAM: past, present and future
 
GRIHA
GRIHAGRIHA
GRIHA
 
LEED
LEEDLEED
LEED
 
Breeam
BreeamBreeam
Breeam
 
Green building delhi case study
Green building delhi case studyGreen building delhi case study
Green building delhi case study
 
Green Buildings
Green BuildingsGreen Buildings
Green Buildings
 
International Building rating systems
International Building  rating systemsInternational Building  rating systems
International Building rating systems
 
Sustainable building in India
Sustainable building in India  Sustainable building in India
Sustainable building in India
 
Case Study: Sustainable Mixed-Use Development in Historic Urban Areas
Case Study: Sustainable Mixed-Use Development in Historic Urban AreasCase Study: Sustainable Mixed-Use Development in Historic Urban Areas
Case Study: Sustainable Mixed-Use Development in Historic Urban Areas
 
Green Building Rating LEED
Green Building Rating LEEDGreen Building Rating LEED
Green Building Rating LEED
 
INDIRA PARYAVARAN BHAVAN- Case study/ Net Zero Energy Building/ Sustainable B...
INDIRA PARYAVARAN BHAVAN- Case study/ Net Zero Energy Building/ Sustainable B...INDIRA PARYAVARAN BHAVAN- Case study/ Net Zero Energy Building/ Sustainable B...
INDIRA PARYAVARAN BHAVAN- Case study/ Net Zero Energy Building/ Sustainable B...
 
IGBC RATING SYSTEM
IGBC RATING SYSTEMIGBC RATING SYSTEM
IGBC RATING SYSTEM
 
INFOSYS GREEN BUILDING
INFOSYS GREEN BUILDINGINFOSYS GREEN BUILDING
INFOSYS GREEN BUILDING
 
GRIHA RATING SYSTEM
GRIHA RATING SYSTEMGRIHA RATING SYSTEM
GRIHA RATING SYSTEM
 
Sustainable building design
Sustainable building designSustainable building design
Sustainable building design
 
GRIHA RATING SYSTEM
GRIHA RATING SYSTEMGRIHA RATING SYSTEM
GRIHA RATING SYSTEM
 
Sustainable architecture
Sustainable architectureSustainable architecture
Sustainable architecture
 
Green Architecture
Green ArchitectureGreen Architecture
Green Architecture
 

Destacado

Brundtland report and more
Brundtland report and moreBrundtland report and more
Brundtland report and moreJuanjoGrasa
 
Ecological Footprint
Ecological FootprintEcological Footprint
Ecological Footprintgregorygolz
 
Task 1 - Ecological Footprint - 10 Practical Ways Presentation.
Task 1 - Ecological Footprint - 10 Practical Ways Presentation.Task 1 - Ecological Footprint - 10 Practical Ways Presentation.
Task 1 - Ecological Footprint - 10 Practical Ways Presentation.Xihai Luo
 
Measurements of trends
Measurements of trendsMeasurements of trends
Measurements of trendsKuriakose T D
 
Sustainability Power Point
Sustainability Power PointSustainability Power Point
Sustainability Power PointHowardLitwak
 
Ecological foot print
Ecological foot printEcological foot print
Ecological foot printDipo Elegbs
 
Biogeochemical Cycles: Natural Cycles of Elements
Biogeochemical Cycles: Natural Cycles of ElementsBiogeochemical Cycles: Natural Cycles of Elements
Biogeochemical Cycles: Natural Cycles of ElementsMichael Payne
 
Foodchain foodweb and ecological cycle
Foodchain foodweb and ecological cycleFoodchain foodweb and ecological cycle
Foodchain foodweb and ecological cycleCU UNIVERSITY
 
Indira paryavaran bhawan and griha
Indira paryavaran bhawan and grihaIndira paryavaran bhawan and griha
Indira paryavaran bhawan and grihaAnchal Garg
 
Sustainable development brundtland report, ppp, equity
Sustainable development  brundtland report, ppp, equitySustainable development  brundtland report, ppp, equity
Sustainable development brundtland report, ppp, equityMegha Majoe
 
Sustainability environment
Sustainability environmentSustainability environment
Sustainability environmentNurma Suri
 
Environmental Issues and Sustainability
Environmental Issues and SustainabilityEnvironmental Issues and Sustainability
Environmental Issues and Sustainabilityguestffe27a
 
An Introduction to the LEED Rating Systems
An Introduction to the LEED Rating SystemsAn Introduction to the LEED Rating Systems
An Introduction to the LEED Rating SystemsAllison Beer
 
Urban Heat Island Effect
Urban Heat Island EffectUrban Heat Island Effect
Urban Heat Island Effectsurf_mia079
 

Destacado (20)

Brundtland report
Brundtland reportBrundtland report
Brundtland report
 
Our common future - The Brundtland Commission Report.
Our common future - The Brundtland Commission Report.Our common future - The Brundtland Commission Report.
Our common future - The Brundtland Commission Report.
 
Green buildings
Green buildingsGreen buildings
Green buildings
 
Brundtland report and more
Brundtland report and moreBrundtland report and more
Brundtland report and more
 
Brundtland report
Brundtland reportBrundtland report
Brundtland report
 
Ecological Footprint
Ecological FootprintEcological Footprint
Ecological Footprint
 
Task 1 - Ecological Footprint - 10 Practical Ways Presentation.
Task 1 - Ecological Footprint - 10 Practical Ways Presentation.Task 1 - Ecological Footprint - 10 Practical Ways Presentation.
Task 1 - Ecological Footprint - 10 Practical Ways Presentation.
 
Measurements of trends
Measurements of trendsMeasurements of trends
Measurements of trends
 
Sustainability Power Point
Sustainability Power PointSustainability Power Point
Sustainability Power Point
 
Ecological foot print
Ecological foot printEcological foot print
Ecological foot print
 
Environment and sustainability
Environment and sustainabilityEnvironment and sustainability
Environment and sustainability
 
Biogeochemical Cycles: Natural Cycles of Elements
Biogeochemical Cycles: Natural Cycles of ElementsBiogeochemical Cycles: Natural Cycles of Elements
Biogeochemical Cycles: Natural Cycles of Elements
 
Foodchain foodweb and ecological cycle
Foodchain foodweb and ecological cycleFoodchain foodweb and ecological cycle
Foodchain foodweb and ecological cycle
 
BREEAM
BREEAMBREEAM
BREEAM
 
Indira paryavaran bhawan and griha
Indira paryavaran bhawan and grihaIndira paryavaran bhawan and griha
Indira paryavaran bhawan and griha
 
Sustainable development brundtland report, ppp, equity
Sustainable development  brundtland report, ppp, equitySustainable development  brundtland report, ppp, equity
Sustainable development brundtland report, ppp, equity
 
Sustainability environment
Sustainability environmentSustainability environment
Sustainability environment
 
Environmental Issues and Sustainability
Environmental Issues and SustainabilityEnvironmental Issues and Sustainability
Environmental Issues and Sustainability
 
An Introduction to the LEED Rating Systems
An Introduction to the LEED Rating SystemsAn Introduction to the LEED Rating Systems
An Introduction to the LEED Rating Systems
 
Urban Heat Island Effect
Urban Heat Island EffectUrban Heat Island Effect
Urban Heat Island Effect
 

Similar a BREEAM

greenbuildingppt-161123093000.pdf
greenbuildingppt-161123093000.pdfgreenbuildingppt-161123093000.pdf
greenbuildingppt-161123093000.pdfSurangaNG1
 
Green building ppt
Green building pptGreen building ppt
Green building pptSudeep Mitra
 
IAED 342-Research Presentation
IAED 342-Research PresentationIAED 342-Research Presentation
IAED 342-Research PresentationSerra's Art Studio
 
eea desktop case study.pdf
eea desktop case study.pdfeea desktop case study.pdf
eea desktop case study.pdfDarshanReddy49
 
Osquareteck_GREEN PROJECT
Osquareteck_GREEN PROJECTOsquareteck_GREEN PROJECT
Osquareteck_GREEN PROJECTAnthony Osibajo
 
Getting Real About Building Performance - Dr Judit Kimpian
Getting Real About Building Performance - Dr Judit KimpianGetting Real About Building Performance - Dr Judit Kimpian
Getting Real About Building Performance - Dr Judit KimpianThe NBS
 
LEED_NC and LEED_EB
LEED_NC and LEED_EBLEED_NC and LEED_EB
LEED_NC and LEED_EBArn Akbarieh
 
Willbrook greenbiz5
Willbrook greenbiz5Willbrook greenbiz5
Willbrook greenbiz5RevistaBiz
 
BCI Equinox 2022 - CLB Kien Truc Xanh - Ms PhanThuHang - EN
BCI Equinox 2022 - CLB Kien Truc Xanh - Ms PhanThuHang - ENBCI Equinox 2022 - CLB Kien Truc Xanh - Ms PhanThuHang - EN
BCI Equinox 2022 - CLB Kien Truc Xanh - Ms PhanThuHang - ENARDOR
 
Benefits of green buildings
Benefits of green buildingsBenefits of green buildings
Benefits of green buildingsKarthik Shapur
 
Itc green center gurgaon A2sheet
Itc green center gurgaon A2sheetItc green center gurgaon A2sheet
Itc green center gurgaon A2sheetrohit singh
 
NAGEEB (National Action for Green Energy Efficient Buildings) meeting UK 2016...
NAGEEB (National Action for Green Energy Efficient Buildings) meeting UK 2016...NAGEEB (National Action for Green Energy Efficient Buildings) meeting UK 2016...
NAGEEB (National Action for Green Energy Efficient Buildings) meeting UK 2016...Bernard Ammoun
 
Graded unit Civil engineering Presentation
Graded unit Civil engineering PresentationGraded unit Civil engineering Presentation
Graded unit Civil engineering PresentationTehmas Saeed
 
Konsep ee green building bea hvac final
Konsep ee green building bea hvac finalKonsep ee green building bea hvac final
Konsep ee green building bea hvac finalSolehudin Solehudin
 
Design2Occupancy Services LLP Company Profile
Design2Occupancy Services LLP Company ProfileDesign2Occupancy Services LLP Company Profile
Design2Occupancy Services LLP Company ProfileAyush Maheshwari
 
Life cycle cost-efficient near zero-energy construction
Life cycle cost-efficient near zero-energy constructionLife cycle cost-efficient near zero-energy construction
Life cycle cost-efficient near zero-energy constructionRuukki
 
Blake Lapthorn's green breakfast with guest speaker Keeran Jugdoyal, Faithful...
Blake Lapthorn's green breakfast with guest speaker Keeran Jugdoyal, Faithful...Blake Lapthorn's green breakfast with guest speaker Keeran Jugdoyal, Faithful...
Blake Lapthorn's green breakfast with guest speaker Keeran Jugdoyal, Faithful...Blake Morgan
 
Green building concepts and good building practices
Green building concepts and good building practicesGreen building concepts and good building practices
Green building concepts and good building practicesManohar Tatwawadi
 

Similar a BREEAM (20)

greenbuildingppt-161123093000.pdf
greenbuildingppt-161123093000.pdfgreenbuildingppt-161123093000.pdf
greenbuildingppt-161123093000.pdf
 
Green building ppt
Green building pptGreen building ppt
Green building ppt
 
IAED 342-Research Presentation
IAED 342-Research PresentationIAED 342-Research Presentation
IAED 342-Research Presentation
 
eea desktop case study.pdf
eea desktop case study.pdfeea desktop case study.pdf
eea desktop case study.pdf
 
Osquareteck_GREEN PROJECT
Osquareteck_GREEN PROJECTOsquareteck_GREEN PROJECT
Osquareteck_GREEN PROJECT
 
Getting Real About Building Performance - Dr Judit Kimpian
Getting Real About Building Performance - Dr Judit KimpianGetting Real About Building Performance - Dr Judit Kimpian
Getting Real About Building Performance - Dr Judit Kimpian
 
LEED_NC and LEED_EB
LEED_NC and LEED_EBLEED_NC and LEED_EB
LEED_NC and LEED_EB
 
Willbrook greenbiz5
Willbrook greenbiz5Willbrook greenbiz5
Willbrook greenbiz5
 
BCI Equinox 2022 - CLB Kien Truc Xanh - Ms PhanThuHang - EN
BCI Equinox 2022 - CLB Kien Truc Xanh - Ms PhanThuHang - ENBCI Equinox 2022 - CLB Kien Truc Xanh - Ms PhanThuHang - EN
BCI Equinox 2022 - CLB Kien Truc Xanh - Ms PhanThuHang - EN
 
Benefits of green buildings
Benefits of green buildingsBenefits of green buildings
Benefits of green buildings
 
Itc green center gurgaon A2sheet
Itc green center gurgaon A2sheetItc green center gurgaon A2sheet
Itc green center gurgaon A2sheet
 
NAGEEB (National Action for Green Energy Efficient Buildings) meeting UK 2016...
NAGEEB (National Action for Green Energy Efficient Buildings) meeting UK 2016...NAGEEB (National Action for Green Energy Efficient Buildings) meeting UK 2016...
NAGEEB (National Action for Green Energy Efficient Buildings) meeting UK 2016...
 
Graded unit Civil engineering Presentation
Graded unit Civil engineering PresentationGraded unit Civil engineering Presentation
Graded unit Civil engineering Presentation
 
Konsep ee green building bea hvac final
Konsep ee green building bea hvac finalKonsep ee green building bea hvac final
Konsep ee green building bea hvac final
 
Design2Occupancy Services LLP Company Profile
Design2Occupancy Services LLP Company ProfileDesign2Occupancy Services LLP Company Profile
Design2Occupancy Services LLP Company Profile
 
C25 wg1 dimitrios_bikas
C25 wg1 dimitrios_bikasC25 wg1 dimitrios_bikas
C25 wg1 dimitrios_bikas
 
Case study
Case studyCase study
Case study
 
Life cycle cost-efficient near zero-energy construction
Life cycle cost-efficient near zero-energy constructionLife cycle cost-efficient near zero-energy construction
Life cycle cost-efficient near zero-energy construction
 
Blake Lapthorn's green breakfast with guest speaker Keeran Jugdoyal, Faithful...
Blake Lapthorn's green breakfast with guest speaker Keeran Jugdoyal, Faithful...Blake Lapthorn's green breakfast with guest speaker Keeran Jugdoyal, Faithful...
Blake Lapthorn's green breakfast with guest speaker Keeran Jugdoyal, Faithful...
 
Green building concepts and good building practices
Green building concepts and good building practicesGreen building concepts and good building practices
Green building concepts and good building practices
 

Más de misschand

Portal and Cantilever Beam Method
Portal and Cantilever Beam MethodPortal and Cantilever Beam Method
Portal and Cantilever Beam Methodmisschand
 
Mayadevi Temple- Lumbini, Nepal
Mayadevi Temple- Lumbini, NepalMayadevi Temple- Lumbini, Nepal
Mayadevi Temple- Lumbini, Nepalmisschand
 
Hearst Tower
Hearst TowerHearst Tower
Hearst Towermisschand
 
Introversion
IntroversionIntroversion
Introversionmisschand
 
Waterfront development
Waterfront developmentWaterfront development
Waterfront developmentmisschand
 
Riverfront development
Riverfront developmentRiverfront development
Riverfront developmentmisschand
 
Norman Foster
Norman FosterNorman Foster
Norman Fostermisschand
 
Roman amphitheatres
Roman amphitheatresRoman amphitheatres
Roman amphitheatresmisschand
 

Más de misschand (11)

Portal and Cantilever Beam Method
Portal and Cantilever Beam MethodPortal and Cantilever Beam Method
Portal and Cantilever Beam Method
 
Mayadevi Temple- Lumbini, Nepal
Mayadevi Temple- Lumbini, NepalMayadevi Temple- Lumbini, Nepal
Mayadevi Temple- Lumbini, Nepal
 
Hearst Tower
Hearst TowerHearst Tower
Hearst Tower
 
The Gherkin
The GherkinThe Gherkin
The Gherkin
 
The Shard
The ShardThe Shard
The Shard
 
CASBEE
CASBEECASBEE
CASBEE
 
Introversion
IntroversionIntroversion
Introversion
 
Waterfront development
Waterfront developmentWaterfront development
Waterfront development
 
Riverfront development
Riverfront developmentRiverfront development
Riverfront development
 
Norman Foster
Norman FosterNorman Foster
Norman Foster
 
Roman amphitheatres
Roman amphitheatresRoman amphitheatres
Roman amphitheatres
 

Último

Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01KreezheaRecto
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spaintimesproduction05
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLManishPatel169454
 

Último (20)

Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spain
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 

BREEAM

  • 1. A PRESENTATION ON GREEN BUILDING ASSESSMENT SYSTEMS PREPARED BY: ANAMI BOHARA (69003) DIPINTI DARLAMI (69011) SIMA CHAND (69046) SURAKSHA BHANDARI (69049)
  • 2. GREEN BUILDING Both a structure and the using of processes that are environmentally responsible and resource efficient throughout a building’s life cycle.
  • 3. • Structure design • Energy efficiency • Water efficiency • Material efficiency • Waste and toxic reduction FUNDAMENTAL PRINCIPLES OF GREEN BUILDING COMMON OBJECTIVES OF GREEN BUILDING • Efficiently using energy, water and other resources • Protecting occupant health and improving employee productivity • Reducing waste, pollution and environmental degradation
  • 4. ENVIRONMENTAL BENEFITS ECONOMIC BENEFITS SOCIAL BENEFITS Enhance and protect bio diversity and ecosystem Reduce operating cost Enhance occupant health and comfort Improve air and water quality Improve occupant productivity Improve indoor air quality Reduce water streams Enhance asset value and profits Minimize strain on local utility infrastructure Conserve and restore natural resources Optimize life cycle economic performance Improve overall quality of life Social Development Economic Growth Environmental protection SUSTAINABILITY
  • 5. DEMERITS • Efficient Technologies • Easier Maintenance • Return On Investment • Improved Indoor Air Quality • Energy Efficiency • Water Efficiency • Waste Reduction • Temperature Moderation • Water Conservation • Economical Construction For Poor • Healthier Lifestyles and Recreation • Improved Health • Initial Cost Is High • Availability Of Materials • Need More Time To Construct • Need Skilled Worker MERITS
  • 7.
  • 8. First launched in 1990 BREEAM- WORLD’S FIRST BUILDING ASSESMENT SYSTEM • Inspires developers and creators to excel, innovate and make effective use of resources. • Focus on sustainable value and efficiency • BREEAM certified developments attract property investments and generates sustainable environments that enhance the well-being of the people who live and work in them BREEAM in numbers worldwide 552,968 Certificates 2,254,176 Registered Buildings 77Countries WORKING CRITERIA
  • 9. BREEAM New Construction BREEAM International New Construction BREEAM In-Use BREEAM Refurbishment BREEAM Communities Types of buildings assessed Rating system
  • 12. PROCESS Innovation Credits Awarded for either complying with pre- defined BREEAM issue exemplary level requirements, through the appointment of a BREEAM Accredited Professional or Suitably Qualified Assessor or process approved as ‘innovative’. Fees On top of the BREEAM assessor fees for the time allowance, BRE certification fees must be paid. Currently these are around £1,230. Additional fees apply for BREEAM Other Buildings. Timeframe From three months to three years depending on the type of building, type of assessment, project programme and how quickly the required documentation is provided by the project team to the BREEAM Assessor.
  • 14. PWC'SLONDON OFFICE • Client: PwC • Architect: TP Bennett • Project manager: Turner & Townsend • M&E engineer / BREEAM assessor: ChapmanBDSP • Structural engineer: Arup • Contractor: Overbur • Location: London, near Tower Bridge in central London • BREEAM score of 96.31 % • The first BREEAM “outstanding” rating
  • 15. KEYFACTS •Stage: Post-Construction •BREEAM version: BREEAM 2008 Offices • 40,000m2 total floor area • Ground floor below the station • floor 1 to 9 above with structure, services and lifts passing through Charing Cross station.
  • 16. OLDBUILDING • Entrance particularly depressing. “ heavy, monolithic and dark with a fountain that stank of chlorine.” • Removal of fountain • Vertical circulation difficult • hidden away stairwells • overused lifts REFURBISHMENT  inserting an open stair in the south atrium  Two scenic lifts inserted into the north atrium  plenty of breakout spaces, meeting rooms and quiet spaces for uninterrupted work. REFURBISHMENT TWO HALVES 5-9 FLOOR FIRST  The ninth floor breaks the orthogonal open-plan office mould.  Light through the glazed, barrel-vaulted roof
  • 17. NATURAL LIGHT  cellular offices swept away, leaving large, uncluttered floorplates open to the atriums, allowing natural light to flood in
  • 18. SUSTAINABILITY FEATURES LANDSCAPING  hard and soft landscaping work  break-out areas to be created on each of the terraces  emphasis on the use of recycled materials CONTRIBUTE EIGHT POINTS  installation of new paving, recycled composite decking, bed construction using recycled plastic boards • level two a stainless steel wire living wall, with climbing plants established in pots at the base. • level eight, installed two large galvanised and powder-coated frames to support pots filled with soil and pre-grown ivy.
  • 19.  Level ten ,micro-habitat , encourages specific bird species such as the Black Redstart, the Linnet, and the House Sparrow.  Level seven, provides foraging and breeding for birds, and attracts bees, butterflies, hover flies and other invertebrates.  1300 square metres of roof space dedicated to support threatened and protected species of birds and invertebrates.
  • 20. INNOVATION CREDITS • a biofuel powered tri-generation unit that provides heat, cooling and power. • bump the building up from an EPC “B” to an “A” CONTRIBUTE 15 POINTS • powered by biodiesel made from waste vegetable oil • waste oil from central London's restaurants • huge amount of savings with particulates, carbon, Sulphur dioxide
  • 21. • 1,040kW of electricity • 800kW of cooling • 20% of the building’s heat requirement. • COLLECT • FILTER • REFINE
  • 22. • thermal panels in More London are used to provide hot water for the washrooms. • active chill beam system, which is a very efficient way of, of passing chilled water throughout the building and enabling us to cool the occupants in a very sustainable way.
  • 23. Utility bill saving of £250,000 a year, but PwC forecasts more: electricity (-221%); gas (-11%); and water (-33%). • Today building emits 40% less carbon than one typical of its size; and 20% of heat and 60% of its energy needs are produced on-site. • The refurbishment is expected to pay for itself in less than four years • PwC's 2017 targets to reduce carbon emissions by 50% and energy use by 25%.
  • 25. • Co-operative Group’s new 15 storey headquarters • BREEAM Version: BREEAM Offices 2008 • Stage: Final Post-Construction • Score: 95.16% • BREEAM rating: Outstanding Architects: 3D Reid Location: Miller Street, Manchester, UK Area: 328000.0 ft2 Project Year: 2012 Client: The Co-operative Group Project manager: Gardiner & Theobald Structural and M&E engineer: Buro Happold Contractor: BAM INTRODUCTION
  • 26. • Fully glazed double skin façade minimize heating and cooling loads • Summer- Ventilation: Louvres at top open to allow the warmed air trapped between its inner and outer skins to rise up and out of the building • Winter- Insulation: Louvres close so the facade can form an insulated blanket around the building KEY FEATURES • 15 Storey atrium- floods the building’s interior with light • Light reflected by the exposed white painted concrete coffered floors, reducing required artificial lighting from 550 to 300 lux. • Used building information modelling (BIM) to create building before construction to prevent unnecessary wastage of materials and time
  • 27. South facing to maximize solar gain 300,000 sq ft exposed concrete, which acts as a thermal sponge
  • 28. Site orientation Floor plans Top floor plan ORIENTATION AND FLOOR PLANS
  • 29. • Low energy LED lighting & IT equipments • Greywater and rainwater recycling systems for toilet flushing • High efficiency passenger and service lifts SUSTAINABILITY FEATURES • Earth tubes to bring in cool air via a heat exchanger • Waste energy -> absorption chiller -> cools the building • Heat recovery from the IT systems -> heats the building • Combined Heat and Power (CHP) plant fuelled by waste cooking oil and rapeseed oil produced on own farm • Electrical car charging points
  • 30.
  • 31. Color changing lights with daylight sensors- sense & measure natural light, triggering the fixtures to only emit as much light as necessary, increasing energy savings and sustainability
  • 32.
  • 33. READY FOR GLOBAL WARMING! Future-proofed against forecast 2050 temperatures – a predicted 5% percent increase in temperatures & 30% more rainfall in winter • On the external outer skin, additional £120,000 for a bronze anodised rather than powder-coated finish Lifetime guarantee of reduced maintenance costs. • Digital storage policy reduced the amount of paper the business used. • Same amount of paper as before -> Additional 4 stories needed for storage alone. No longer paper mail delivered to the building
  • 34. • Energy Plus Building(EPB)- produces more energy than imports • £110 million investment £ 142 million lease for 25 (2013) 80 PERCENT FEWER CARBON EMISSIONS 50% LESS ENERGY CONSUMPTION 30% REDUCTION IN OPERATING COSTS SAVES £500,000 PER ANNUM
  • 36.
  • 37.
  • 38. START THINKING GREEN!! Singapore green school School of art and design, Singapore Homes at Iceland ACROS Fukuoka Foundation Building, Japan
  • 39. BIBLIOGRAPHY • http://www.breeam.com/ • http://www.ukbuildingcompliance.co.uk/environmental-assessments-and-surveys/breeam- assessments.aspx • http://www.ruukki.com/b2b/support/environmental-certification-system/breeam-credits • http://pwc.blogs.com/press_room/2010/03/first-uk-outstanding-environmental-rating-for- an-office-building-achieved-by-new-pwc-london-site.html • http://www.pwc.co.uk/who-we-are/corporate-sustainability/7morelondon.html • http://www.building.co.uk/pwcs-london-office-highest-breeam-rated-building- ever/5064009.article# • http://www.bam.co.uk/how-we-do-it/case-study/1-angel-square • http://www.archdaily.com/337430/1-angel-square-3d-reid • http://www.ilikearchitecture.net/2013/04/one-angel-square-3dreid/ • http://www.buro247.my/culture/art-and-design/ten-green-buildings-around-the-world-you- need-to-s.html • https://www.wbdg.org/resources/green-building-standards-and-certification-systems • www.slideshare.net THANK YOU! 