SlideShare una empresa de Scribd logo
1 de 21
By: Mohamed Ahmed Said-Aamin
Student at Puntland State university
Email: caawiye254@gmail.com
Tell: +252907719668
 Objectives
 Definition of project and project management
 Characteristics of Project
 Constraints of project Management
 Nine Areas of project Management
 Project Life cycle
 Project phase
 Evaluation and Assessment
After end the lesson, you should able to:
 Define concept of project Management
 Identify stage of project life cycle
 Examine project assessment and evaluation
 A project is a temporary endeavor designed
to produce a unique product, service or result
with a defined beginning and end (usually
time-constrained, and often constrained by
funding or deliverables) undertaken to meet
unique goals and objectives, typically to bring
about beneficial change or added value.
 Project Management: is the application of
knowledge, skills, tools, and techniques to
project activities to meet project
requirements. Project Management is
accomplished through the use of the
processes such as: initiating, planning,
executing, controlling and closing.
 Objective: Each and every project needs to be guided
to achieve an objective or a set of objectives. It
ceases to exist when the objective is achieved.
 Life Span: A project has beginning and end. It cannot
continue forever.
 Constraints: A project has a schedule. It operates
within the constraints of time, cost and quality. Every
project requires certain investment of resources.
 Unique: Every project is unique. No two projects are
exactly similar.
 System: All projects need to undergo a system of
inputs-process - Outputs.
 Life Cycle: Every project will have its own phase-
based cycle.
 Teamwork: A project has many participants. It
requires teamwork under the leadership of the
Project Manager
 Organization Structure: A project is a temporary
organization. A project usually has its own
budget and management.
 Planning and Control System: A project requires
information, planning and control system. The
actual performance is compared with the planned
targets.
 Collection of Activities: A project is a collection of
activities that are linked together to constitute a
system.
They are nine knowledge areas
 Project scope
 Project time
 Project cost
 Project quality
 Project Human resource
 Project Communications
 Project risk
 Project procurement
 Project integration
Time
Cost
Quality
Scope
 Develop phase- initial phase, preparing
project charter
 Concept phase- project planning
 Execute phase- includes implementation,
conducting project activities
 Finish phase- conclusion of the project and
closing of project
 Initiation involves starting up the project, by documenting
a business case, feasibility study, and terms of reference,
appointing the team and setting up a Project Office.
 Planning involves setting out the roadmap for the project
by creating the following plans: project plan, resource
plan, financial plan, quality plan, acceptance plan and
communications plan.
 Execution involves building the deliverables and
controlling the project delivery, scope, costs, quality, risks
and issues.
 Monitoring and Evaluation: this is monitoring the
achievements of project objectives and goals
 Closure involves winding-down the project by releasing
staff, handing over deliverables to the customer and
completing a post implementation review.
Stages in project
cycle
Potential NGO’s Involvement
Project Identification
 Provide advice/information on local conditions
 Participate in environmental and social
assessment
 Organize consultations with
beneficiaries/Affected parties
 Transmit expressed needs/priorities of local
communities to project staff.
 Act as a source, model or sponsor of project
ideas implement pilot project.
Project design
 Consult to the government, to local
communities
 Assist in promoting a participatory approach to
project design
 Channel information to local population
Financing
 Co-financier( in money or in kind) of a project
component
 Source of funds for activities complementary to the
proposed donor- financed project.
Implementation
 Project contractor or manager( for delivery of service,
training, constrauction)
 Promote community participation in project activities
 Financial intermediary role
 Supplier of technical knowledge to local beneficiary
 Advisor to local communities on how to take advantage of
project-financed goods or service
 Implement of complementary activities
Monitoring and evaluation  NGO contracted to monitor project progress or evaluate
project results
 Facilitate participatory monitoring and evaluation
 Project selection methods help guide an
organizations decisions and weight them against
alternative projects. As a project manager or owner,
you will inevitably have to make decisions regarding
which projects to implement. As a team, you will
need to carefully analyze all of these contributing
factors (i.e: the goals of the organization, customer
requirements, timeframes, budget, urgency,
scheduling, etc..)
 Evidently, there are many stages that precedes this
critical one, all amounting to these decisions: Which
projects should we undertake? How do we
decide? These are very important questions to
explore, for the answers will ultimately influence the
project’s outcome.
What is a community involvement program?
 A community involvement program is a process in which
community participation is used to improve major decisions
during the planning, development and operational stages of a
housing project. A good community involvement program
contributes to the best possible development and operating
decisions.
Who is responsible for community involvement?
 Success will involve early identification of someone in your
organization who has responsibility for the community
involvement program. The amount of time required in this role
will vary according to the size and scope of the project. Smaller
projects may require only a few hours per week during planning
and construction stages, while larger or contentious projects
may require one or more days per week.
How do I develop a community involvement program?
 Based on good practice and the experiences of developers of
housing for homeless projects, HUA recommends 6 steps for
your community involvement program. See page 2 (over) for a
description of these steps.
Assessment
How Will I know if/When I have addressed the
Problem/Issue?
Assessment concept
 What is being learned?
 What is the Impact being made by instruction?
 What is working?
 What is not working?
Assessment – The systematic determination of the
results of an effort or intervention.
Rationale: Allows for the continuous improvement
of project components.
How Will I know how well I have addressed the
Problem/Issue?
Evaluation concept
 How well is the project working?
 How do you know that
 Value is/has being added?
 How valid are the
 Assessment measures?
 How effective are the
 Intervention strategies?
Assessment and Evaluation.
 Why? – A Requirement for “Accountability
 What? – Evidence that “Expectations have
been met”
 When? – Continuously to “Monitor Progress”
and at Designated Intervals to Ascertain
Success.
 How? – Varies, “Aligned with Needs”
 Evaluation is a systematic determination of a
subject's merit, worth and significance, using
criteria governed by a set of standards. It can
assist an organization, program, project or any
other intervention or initiative to assess any aim,
realisable concept/proposal, or any alternative,
to help in decision-making; or to ascertain the
degree of achievement or value in regard to the
aim and objectives and results of any such action
that has been completed. The primary purpose of
evaluation, in addition to gaining insight into
prior or existing initiatives, is to enable reflection
and assist in the identification of future change
 Selecting an evaluation type provides direction for your evaluation.
It helps keep the evaluation process focused on its main purpose
and determines the evaluation questions that should be answered
and the data that should be collected. The most common types of
evaluation are: formative, process, and summative.
 Formative evaluation is an ongoing evaluation that starts early in a
project. It assesses the nature of the project, the needs the project
addresses, and the progress and implementation of the project. It
can identify major gaps in the project’s content and operational
aspects (i.e., what was done and how) and suggest ways to
improve them.
 Process evaluation is used to monitor activities to make sure a
project is being implemented and completed as designed and on
time. It can be complementary to formative evaluation. Although
formative evaluation has a larger scope than process evaluation,
there are many similarities between them: both focus on the
effectiveness and the operational aspect of a project; both start at
a very early stage of a project and can be performed by internal
staff; and both require a strong monitoring mechanism to track
operational activities and to collect information related to the
process.
 Summative evaluation is an overall assessment of
the project’s effectiveness and achievements. It
reveals whether the project did what it was
designed to do. It provides information for future
planning and decisions and usually is completed
when the project is over. This type of evaluation
usually does not directly affect the current
project, but it helps stakeholders decide the
future of this or similar projects. To provide
adequate information, a summative evaluation
requires a set of well-defined goals and
objectives for the project and a plan that keeps
the focus of evaluation on the end-results.

Más contenido relacionado

La actualidad más candente

Results Based Monitoring and Evaluation
Results Based Monitoring and EvaluationResults Based Monitoring and Evaluation
Results Based Monitoring and EvaluationMadhawa Waidyaratna
 
Ngo project management
Ngo project managementNgo project management
Ngo project managementahmed hassan
 
Basics of Monitoring & Evaluation
Basics of Monitoring & EvaluationBasics of Monitoring & Evaluation
Basics of Monitoring & EvaluationFida Karim 🇵🇰
 
community organization
community organizationcommunity organization
community organizationShastry Rahman
 
Resource Mobilization Process/strategy
Resource Mobilization Process/strategyResource Mobilization Process/strategy
Resource Mobilization Process/strategyCharles Cotter, PhD
 
M& e slide share
M& e   slide shareM& e   slide share
M& e slide shareSelf
 
7 M&E: Indicators
7 M&E: Indicators7 M&E: Indicators
7 M&E: IndicatorsTony
 
Programme planning skills and basis
Programme planning skills and basisProgramme planning skills and basis
Programme planning skills and basisChetan Sharma
 
Importance of M&E
Importance of M&EImportance of M&E
Importance of M&Eclearsateam
 
Community participation
Community participationCommunity participation
Community participationShastry Rahman
 
Monitoring and Evaluation of Plan
Monitoring and Evaluation of PlanMonitoring and Evaluation of Plan
Monitoring and Evaluation of PlanRuth Senorin
 
Presentation Training on Result Based Management (RBM) for M&E Staff
Presentation Training on Result Based Management (RBM) for M&E StaffPresentation Training on Result Based Management (RBM) for M&E Staff
Presentation Training on Result Based Management (RBM) for M&E StaffFida Karim 🇵🇰
 
Planning at national level
Planning at national levelPlanning at national level
Planning at national levelgaya3lavanya92
 

La actualidad más candente (20)

Results Based Monitoring and Evaluation
Results Based Monitoring and EvaluationResults Based Monitoring and Evaluation
Results Based Monitoring and Evaluation
 
Ngo project management
Ngo project managementNgo project management
Ngo project management
 
Basics of Monitoring & Evaluation
Basics of Monitoring & EvaluationBasics of Monitoring & Evaluation
Basics of Monitoring & Evaluation
 
community organization
community organizationcommunity organization
community organization
 
Project formulation and management
Project formulation and managementProject formulation and management
Project formulation and management
 
Resource Mobilization Process/strategy
Resource Mobilization Process/strategyResource Mobilization Process/strategy
Resource Mobilization Process/strategy
 
Logical framework
Logical frameworkLogical framework
Logical framework
 
Resource mobilization
Resource mobilizationResource mobilization
Resource mobilization
 
M& e slide share
M& e   slide shareM& e   slide share
M& e slide share
 
Monitoring and Evaluation
Monitoring and EvaluationMonitoring and Evaluation
Monitoring and Evaluation
 
7 M&E: Indicators
7 M&E: Indicators7 M&E: Indicators
7 M&E: Indicators
 
Programme planning skills and basis
Programme planning skills and basisProgramme planning skills and basis
Programme planning skills and basis
 
Importance of M&E
Importance of M&EImportance of M&E
Importance of M&E
 
Logical framework analysis
Logical framework analysisLogical framework analysis
Logical framework analysis
 
Community participation
Community participationCommunity participation
Community participation
 
Project cycle
Project cycleProject cycle
Project cycle
 
Monitoring and Evaluation of Plan
Monitoring and Evaluation of PlanMonitoring and Evaluation of Plan
Monitoring and Evaluation of Plan
 
Presentation Training on Result Based Management (RBM) for M&E Staff
Presentation Training on Result Based Management (RBM) for M&E StaffPresentation Training on Result Based Management (RBM) for M&E Staff
Presentation Training on Result Based Management (RBM) for M&E Staff
 
Micro planning process
Micro planning processMicro planning process
Micro planning process
 
Planning at national level
Planning at national levelPlanning at national level
Planning at national level
 

Similar a Ngo’s project management

Project monitoring-evaluation-sr-1223744598885201-9
Project monitoring-evaluation-sr-1223744598885201-9Project monitoring-evaluation-sr-1223744598885201-9
Project monitoring-evaluation-sr-1223744598885201-9Harinder Goel
 
Project management
Project managementProject management
Project managementBiswa Prusty
 
Definations for Learning 24 July 2022 [Autosaved].pptx
Definations for Learning 24 July 2022 [Autosaved].pptxDefinations for Learning 24 July 2022 [Autosaved].pptx
Definations for Learning 24 July 2022 [Autosaved].pptxInayatUllah780749
 
Project planning.pptx
Project planning.pptxProject planning.pptx
Project planning.pptxHarsimratDeo1
 
Project planning.pptx
Project planning.pptxProject planning.pptx
Project planning.pptxHarsimratDeo1
 
Project Management How To
Project Management How ToProject Management How To
Project Management How Tokellyfrey
 
Objectives of Project evaluation
Objectives of Project evaluationObjectives of Project evaluation
Objectives of Project evaluationRobina Nasir
 
Final Class Presentation on Project Audit and Closure.ppt
Final Class Presentation on Project Audit and Closure.pptFinal Class Presentation on Project Audit and Closure.ppt
Final Class Presentation on Project Audit and Closure.pptGeorgeKabongah2
 
BPP Training on Project Management - Day 1
BPP Training on Project Management - Day 1BPP Training on Project Management - Day 1
BPP Training on Project Management - Day 1Imoh Etuk
 
Program or project management process report
Program or project management process report Program or project management process report
Program or project management process report Danes Ganancial
 
ACCA Chapter 12 and 13_ Accounting & Finance
ACCA Chapter 12 and 13_ Accounting & FinanceACCA Chapter 12 and 13_ Accounting & Finance
ACCA Chapter 12 and 13_ Accounting & Financescribdpebbly302
 
Construction Management in Developing Countries, Lecture 10
Construction Management in Developing Countries, Lecture 10Construction Management in Developing Countries, Lecture 10
Construction Management in Developing Countries, Lecture 10Hari Krishna Shrestha
 
Collaborative 2 ingrid margarita and sandra
Collaborative 2 ingrid margarita and sandraCollaborative 2 ingrid margarita and sandra
Collaborative 2 ingrid margarita and sandraSandra Guevara
 

Similar a Ngo’s project management (20)

Project monitoring-evaluation-sr-1223744598885201-9
Project monitoring-evaluation-sr-1223744598885201-9Project monitoring-evaluation-sr-1223744598885201-9
Project monitoring-evaluation-sr-1223744598885201-9
 
A2011214171642 1
A2011214171642 1A2011214171642 1
A2011214171642 1
 
PME- CH 1.pptx
PME- CH 1.pptxPME- CH 1.pptx
PME- CH 1.pptx
 
Project management
Project managementProject management
Project management
 
Definations for Learning 24 July 2022 [Autosaved].pptx
Definations for Learning 24 July 2022 [Autosaved].pptxDefinations for Learning 24 July 2022 [Autosaved].pptx
Definations for Learning 24 July 2022 [Autosaved].pptx
 
Project management
Project managementProject management
Project management
 
M&E.ppt
M&E.pptM&E.ppt
M&E.ppt
 
Project planning.pptx
Project planning.pptxProject planning.pptx
Project planning.pptx
 
Project planning.pptx
Project planning.pptxProject planning.pptx
Project planning.pptx
 
unit-3.pptx
unit-3.pptxunit-3.pptx
unit-3.pptx
 
Project Management How To
Project Management How ToProject Management How To
Project Management How To
 
Assignment
Assignment Assignment
Assignment
 
Objectives of Project evaluation
Objectives of Project evaluationObjectives of Project evaluation
Objectives of Project evaluation
 
Final Class Presentation on Project Audit and Closure.ppt
Final Class Presentation on Project Audit and Closure.pptFinal Class Presentation on Project Audit and Closure.ppt
Final Class Presentation on Project Audit and Closure.ppt
 
BPP Training on Project Management - Day 1
BPP Training on Project Management - Day 1BPP Training on Project Management - Day 1
BPP Training on Project Management - Day 1
 
Program or project management process report
Program or project management process report Program or project management process report
Program or project management process report
 
ACCA Chapter 12 and 13_ Accounting & Finance
ACCA Chapter 12 and 13_ Accounting & FinanceACCA Chapter 12 and 13_ Accounting & Finance
ACCA Chapter 12 and 13_ Accounting & Finance
 
Construction Management in Developing Countries, Lecture 10
Construction Management in Developing Countries, Lecture 10Construction Management in Developing Countries, Lecture 10
Construction Management in Developing Countries, Lecture 10
 
UNIT-1.pptx
UNIT-1.pptxUNIT-1.pptx
UNIT-1.pptx
 
Collaborative 2 ingrid margarita and sandra
Collaborative 2 ingrid margarita and sandraCollaborative 2 ingrid margarita and sandra
Collaborative 2 ingrid margarita and sandra
 

Último

Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime SiliguriSiliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siligurimeghakumariji156
 
How Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptxHow Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptxAaron Stannard
 
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot ModelGautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot ModelNitya salvi
 
Information Technology Project Management, Revised 7th edition test bank.docx
Information Technology Project Management, Revised 7th edition test bank.docxInformation Technology Project Management, Revised 7th edition test bank.docx
Information Technology Project Management, Revised 7th edition test bank.docxssuserf63bd7
 
internship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamrainternship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamraAllTops
 
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professionalW.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professionalWilliam (Bill) H. Bender, FCSI
 
Marketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docxMarketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docxssuserf63bd7
 
Safety T fire missions army field Artillery
Safety T fire missions army field ArtillerySafety T fire missions army field Artillery
Safety T fire missions army field ArtilleryKennethSwanberg
 
Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentNimot Muili
 
The Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard BrownThe Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard BrownSandaliGurusinghe2
 
International Ocean Transportation p.pdf
International Ocean Transportation p.pdfInternational Ocean Transportation p.pdf
International Ocean Transportation p.pdfAlejandromexEspino
 
digital Human resource management presentation.pdf
digital Human resource management presentation.pdfdigital Human resource management presentation.pdf
digital Human resource management presentation.pdfArtiSrivastava23
 
Persuasive and Communication is the art of negotiation.
Persuasive and Communication is the art of negotiation.Persuasive and Communication is the art of negotiation.
Persuasive and Communication is the art of negotiation.aruny7087
 

Último (14)

Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime SiliguriSiliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
 
How Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptxHow Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptx
 
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot ModelGautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
Information Technology Project Management, Revised 7th edition test bank.docx
Information Technology Project Management, Revised 7th edition test bank.docxInformation Technology Project Management, Revised 7th edition test bank.docx
Information Technology Project Management, Revised 7th edition test bank.docx
 
internship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamrainternship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamra
 
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professionalW.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
 
Marketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docxMarketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docx
 
Safety T fire missions army field Artillery
Safety T fire missions army field ArtillerySafety T fire missions army field Artillery
Safety T fire missions army field Artillery
 
Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable development
 
The Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard BrownThe Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard Brown
 
International Ocean Transportation p.pdf
International Ocean Transportation p.pdfInternational Ocean Transportation p.pdf
International Ocean Transportation p.pdf
 
digital Human resource management presentation.pdf
digital Human resource management presentation.pdfdigital Human resource management presentation.pdf
digital Human resource management presentation.pdf
 
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTECAbortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
 
Persuasive and Communication is the art of negotiation.
Persuasive and Communication is the art of negotiation.Persuasive and Communication is the art of negotiation.
Persuasive and Communication is the art of negotiation.
 

Ngo’s project management

  • 1. By: Mohamed Ahmed Said-Aamin Student at Puntland State university Email: caawiye254@gmail.com Tell: +252907719668
  • 2.  Objectives  Definition of project and project management  Characteristics of Project  Constraints of project Management  Nine Areas of project Management  Project Life cycle  Project phase  Evaluation and Assessment
  • 3. After end the lesson, you should able to:  Define concept of project Management  Identify stage of project life cycle  Examine project assessment and evaluation
  • 4.  A project is a temporary endeavor designed to produce a unique product, service or result with a defined beginning and end (usually time-constrained, and often constrained by funding or deliverables) undertaken to meet unique goals and objectives, typically to bring about beneficial change or added value.
  • 5.  Project Management: is the application of knowledge, skills, tools, and techniques to project activities to meet project requirements. Project Management is accomplished through the use of the processes such as: initiating, planning, executing, controlling and closing.
  • 6.  Objective: Each and every project needs to be guided to achieve an objective or a set of objectives. It ceases to exist when the objective is achieved.  Life Span: A project has beginning and end. It cannot continue forever.  Constraints: A project has a schedule. It operates within the constraints of time, cost and quality. Every project requires certain investment of resources.  Unique: Every project is unique. No two projects are exactly similar.  System: All projects need to undergo a system of inputs-process - Outputs.  Life Cycle: Every project will have its own phase- based cycle.
  • 7.  Teamwork: A project has many participants. It requires teamwork under the leadership of the Project Manager  Organization Structure: A project is a temporary organization. A project usually has its own budget and management.  Planning and Control System: A project requires information, planning and control system. The actual performance is compared with the planned targets.  Collection of Activities: A project is a collection of activities that are linked together to constitute a system.
  • 8. They are nine knowledge areas  Project scope  Project time  Project cost  Project quality  Project Human resource  Project Communications  Project risk  Project procurement  Project integration
  • 10.  Develop phase- initial phase, preparing project charter  Concept phase- project planning  Execute phase- includes implementation, conducting project activities  Finish phase- conclusion of the project and closing of project
  • 11.  Initiation involves starting up the project, by documenting a business case, feasibility study, and terms of reference, appointing the team and setting up a Project Office.  Planning involves setting out the roadmap for the project by creating the following plans: project plan, resource plan, financial plan, quality plan, acceptance plan and communications plan.  Execution involves building the deliverables and controlling the project delivery, scope, costs, quality, risks and issues.  Monitoring and Evaluation: this is monitoring the achievements of project objectives and goals  Closure involves winding-down the project by releasing staff, handing over deliverables to the customer and completing a post implementation review.
  • 12. Stages in project cycle Potential NGO’s Involvement Project Identification  Provide advice/information on local conditions  Participate in environmental and social assessment  Organize consultations with beneficiaries/Affected parties  Transmit expressed needs/priorities of local communities to project staff.  Act as a source, model or sponsor of project ideas implement pilot project. Project design  Consult to the government, to local communities  Assist in promoting a participatory approach to project design  Channel information to local population
  • 13. Financing  Co-financier( in money or in kind) of a project component  Source of funds for activities complementary to the proposed donor- financed project. Implementation  Project contractor or manager( for delivery of service, training, constrauction)  Promote community participation in project activities  Financial intermediary role  Supplier of technical knowledge to local beneficiary  Advisor to local communities on how to take advantage of project-financed goods or service  Implement of complementary activities Monitoring and evaluation  NGO contracted to monitor project progress or evaluate project results  Facilitate participatory monitoring and evaluation
  • 14.  Project selection methods help guide an organizations decisions and weight them against alternative projects. As a project manager or owner, you will inevitably have to make decisions regarding which projects to implement. As a team, you will need to carefully analyze all of these contributing factors (i.e: the goals of the organization, customer requirements, timeframes, budget, urgency, scheduling, etc..)  Evidently, there are many stages that precedes this critical one, all amounting to these decisions: Which projects should we undertake? How do we decide? These are very important questions to explore, for the answers will ultimately influence the project’s outcome.
  • 15. What is a community involvement program?  A community involvement program is a process in which community participation is used to improve major decisions during the planning, development and operational stages of a housing project. A good community involvement program contributes to the best possible development and operating decisions. Who is responsible for community involvement?  Success will involve early identification of someone in your organization who has responsibility for the community involvement program. The amount of time required in this role will vary according to the size and scope of the project. Smaller projects may require only a few hours per week during planning and construction stages, while larger or contentious projects may require one or more days per week. How do I develop a community involvement program?  Based on good practice and the experiences of developers of housing for homeless projects, HUA recommends 6 steps for your community involvement program. See page 2 (over) for a description of these steps.
  • 16. Assessment How Will I know if/When I have addressed the Problem/Issue? Assessment concept  What is being learned?  What is the Impact being made by instruction?  What is working?  What is not working? Assessment – The systematic determination of the results of an effort or intervention. Rationale: Allows for the continuous improvement of project components.
  • 17. How Will I know how well I have addressed the Problem/Issue? Evaluation concept  How well is the project working?  How do you know that  Value is/has being added?  How valid are the  Assessment measures?  How effective are the  Intervention strategies?
  • 18. Assessment and Evaluation.  Why? – A Requirement for “Accountability  What? – Evidence that “Expectations have been met”  When? – Continuously to “Monitor Progress” and at Designated Intervals to Ascertain Success.  How? – Varies, “Aligned with Needs”
  • 19.  Evaluation is a systematic determination of a subject's merit, worth and significance, using criteria governed by a set of standards. It can assist an organization, program, project or any other intervention or initiative to assess any aim, realisable concept/proposal, or any alternative, to help in decision-making; or to ascertain the degree of achievement or value in regard to the aim and objectives and results of any such action that has been completed. The primary purpose of evaluation, in addition to gaining insight into prior or existing initiatives, is to enable reflection and assist in the identification of future change
  • 20.  Selecting an evaluation type provides direction for your evaluation. It helps keep the evaluation process focused on its main purpose and determines the evaluation questions that should be answered and the data that should be collected. The most common types of evaluation are: formative, process, and summative.  Formative evaluation is an ongoing evaluation that starts early in a project. It assesses the nature of the project, the needs the project addresses, and the progress and implementation of the project. It can identify major gaps in the project’s content and operational aspects (i.e., what was done and how) and suggest ways to improve them.  Process evaluation is used to monitor activities to make sure a project is being implemented and completed as designed and on time. It can be complementary to formative evaluation. Although formative evaluation has a larger scope than process evaluation, there are many similarities between them: both focus on the effectiveness and the operational aspect of a project; both start at a very early stage of a project and can be performed by internal staff; and both require a strong monitoring mechanism to track operational activities and to collect information related to the process.
  • 21.  Summative evaluation is an overall assessment of the project’s effectiveness and achievements. It reveals whether the project did what it was designed to do. It provides information for future planning and decisions and usually is completed when the project is over. This type of evaluation usually does not directly affect the current project, but it helps stakeholders decide the future of this or similar projects. To provide adequate information, a summative evaluation requires a set of well-defined goals and objectives for the project and a plan that keeps the focus of evaluation on the end-results.