SlideShare una empresa de Scribd logo
1 de 13
Collapsed Cantilevered Balcony
case study
Case Objective
Each tiny step is significant in a building project, the construction supervisor needs
to perform his duties honestly, have a moral responsibility, and take care to avoid risking
the lives of others.
Case study
• This event occurred in 2004 in Texas City, where a newly completed mansion known as
the central Texas lakeside residence was located.
• The event began when two guests decided to stroll onto the third-floor balcony, which
was around 20 feet above the ground, to enjoy the view of Ink Lake, when the balcony
abruptly collapsed, causing significant injuries to these two visitors.
• The architect should not pay the contractor until the materials and quality of work were completed and
checked.
• There was a contract between the contractor and the architect, and it was their ethical responsibility to check
the work quality, and this error was not supposed to happen. So now we have a case and an argument about
who is at fault because there was no contract between them and the contractor.
Ethical issues
• The contractor ignored the design requirements.
• The site investigation was not carried out by the contractor or the designer.
• When attaching the ledger boards to the building, the contractor favored using less
expensive materials.
Suggested solutions and learned lessons
• Perform the necessary inspections that would have alerted him to the problems and allowed
for repairs to be made.
• Joists that pierce the structure would be one option for increasing safety and strength, since
they would provide the necessary moment capacity at the wall to enable the joists to be
installed.
• Before opening the balcony to the public, it must undergo rigorous testing, including the
application of a load.
• One option would have been for the architect to perform the necessary inspections that would
have alerted him to the problems and allowed for repairs to be made.
• Joists that pierce the structure would be one option for increasing safety and strength, since
they would provide the necessary moment capacity at the wall to enable the joists to be
installed.
• Before opening the balcony to the public, it must undergo rigorous testing, including the
application of a load.
Facts
• Even the original design was unable to be safe since it was built on a relatively modest live load, which
would have caused even the bolts to fail without the installation of joist hangers that penetrated the structure
and provided more strength for the cantilevers beam.
• The design have been checked by the framing contractor.
• The designer should inspect the quality of the job before paying.
• To ensure that the construction is reliable and safe, certain tests have to be conducted.
Consequences
• Two accidental victims nearly died.
• The contracting business was responsible for covering any site-related losses.
• All site losses incurred have to be covered by the contracting business.
Issues Faced
Factual issues:
If the nuts were utilized, will the balcony stay alive?
Conceptual issue:
• what is the meaning of the word SAFE?.
Application issue:
If an accurate description of safety was provided to the designer and the contractor, was
the balcony safe?
Moral issues:
• The architect failed to conduct a quality assessment, which resulted in the balcony
being inadequately maintained by the nails used.
• The contractor did not follow the specifications when performing his job.
Ethical approach
Utilitarian Approach
In the interest of the safety of society, the architect and contractor need to have a proper
conversation before reconsidering the agreement. To verify the caliber of the supplies
and craftsmanship employed, he can evaluate the contractor's decision to fire him.
Without his assurance, the balcony's durability and safety might not be assured.
Respect for person approach
It is the responsibility of both the architect and contractor to take, respect for people
when doing their work, as we can see that both disrespected the safety of the people
and their needs.
Did the characters respect ethical principles?
There was no compliance between the architect and contractor with ASCE's ethical first
canons, state:
“When carrying out their professional responsibilities, engineers must put the safety,
health, and welfare of the general public first and work to adhere to the principles of
sustainable development.”
Code of ethics
According to the ASCE ethical code, which forces the engineer to follow the third canon, they
failed to do so.
"Engineers must only make public statements in an accurate and fair manner."
References
https://www.engineering.com/story/the-balcony-collapse-in-berkeley-california-what-can-
we-learn-from-this
Ferguson, N. (2013, November). Overview of American Society of Mechanical Engineers (ASME).
Retrieved from Inspectioneering: https://inspectioneering.com/tag/asme

Más contenido relacionado

La actualidad más candente

Method statement piping works
Method statement piping worksMethod statement piping works
Method statement piping works
Surya Kant
 
Memorial descritivo pavimentação asfáltica em ruas estruturantes julho 2012
Memorial descritivo pavimentação asfáltica em ruas estruturantes julho 2012Memorial descritivo pavimentação asfáltica em ruas estruturantes julho 2012
Memorial descritivo pavimentação asfáltica em ruas estruturantes julho 2012
OLHO ABERTO PARANÁ
 
Job safety Analysis
Job safety Analysis Job safety Analysis
Job safety Analysis
Deepu Rajan
 
Instrucao tecnica 20
Instrucao tecnica   20Instrucao tecnica   20
Instrucao tecnica 20
cipasap
 
269831351-PIPING-Q-C-AG-UG.pdf
269831351-PIPING-Q-C-AG-UG.pdf269831351-PIPING-Q-C-AG-UG.pdf
269831351-PIPING-Q-C-AG-UG.pdf
moumo1
 

La actualidad más candente (20)

Method statement piping works
Method statement piping worksMethod statement piping works
Method statement piping works
 
Human Factors in Barrier Thinking
Human Factors in Barrier ThinkingHuman Factors in Barrier Thinking
Human Factors in Barrier Thinking
 
Memorial descritivo pavimentação asfáltica em ruas estruturantes julho 2012
Memorial descritivo pavimentação asfáltica em ruas estruturantes julho 2012Memorial descritivo pavimentação asfáltica em ruas estruturantes julho 2012
Memorial descritivo pavimentação asfáltica em ruas estruturantes julho 2012
 
The mexico city explosion of 1984
The mexico city explosion of 1984The mexico city explosion of 1984
The mexico city explosion of 1984
 
Job safety Analysis
Job safety Analysis Job safety Analysis
Job safety Analysis
 
Instrucao tecnica 20
Instrucao tecnica   20Instrucao tecnica   20
Instrucao tecnica 20
 
2 fire risk assessment template risk assessment templates
2 fire risk assessment template risk assessment templates2 fire risk assessment template risk assessment templates
2 fire risk assessment template risk assessment templates
 
Silo safety
Silo safety Silo safety
Silo safety
 
Hazardous Materials by OTIEC
Hazardous Materials by OTIECHazardous Materials by OTIEC
Hazardous Materials by OTIEC
 
Qc piping guide
Qc piping guideQc piping guide
Qc piping guide
 
Confined space
Confined spaceConfined space
Confined space
 
construction site safety and management
construction site safety and managementconstruction site safety and management
construction site safety and management
 
Api 570 course material
Api 570 course materialApi 570 course material
Api 570 course material
 
Safety Management System
Safety Management SystemSafety Management System
Safety Management System
 
Asme b31.3 interpretation
Asme b31.3 interpretationAsme b31.3 interpretation
Asme b31.3 interpretation
 
MODELO Inventário Riscos PGR - REFERENCIAS.docx
MODELO  Inventário Riscos PGR - REFERENCIAS.docxMODELO  Inventário Riscos PGR - REFERENCIAS.docx
MODELO Inventário Riscos PGR - REFERENCIAS.docx
 
Os aux.limpeza e higiene (1) (1)
Os  aux.limpeza e higiene (1) (1)Os  aux.limpeza e higiene (1) (1)
Os aux.limpeza e higiene (1) (1)
 
Treinamento_NR 35 (Marco - 2023).pptx
Treinamento_NR 35 (Marco - 2023).pptxTreinamento_NR 35 (Marco - 2023).pptx
Treinamento_NR 35 (Marco - 2023).pptx
 
269831351-PIPING-Q-C-AG-UG.pdf
269831351-PIPING-Q-C-AG-UG.pdf269831351-PIPING-Q-C-AG-UG.pdf
269831351-PIPING-Q-C-AG-UG.pdf
 
495265750-Hydro-Test-Procedure.docx
495265750-Hydro-Test-Procedure.docx495265750-Hydro-Test-Procedure.docx
495265750-Hydro-Test-Procedure.docx
 

Similar a Presentation10.pptx

No 1 Licensed structural auditor in Mumbai CSR consultant and associates
No 1 Licensed structural auditor in Mumbai CSR consultant and associatesNo 1 Licensed structural auditor in Mumbai CSR consultant and associates
No 1 Licensed structural auditor in Mumbai CSR consultant and associates
CSR Consultant and Associates
 
Engineers in society
Engineers in societyEngineers in society
Engineers in society
Azlin lolin
 

Similar a Presentation10.pptx (20)

Project ppt riverside condo
Project ppt riverside condoProject ppt riverside condo
Project ppt riverside condo
 
Managing claims best practices | 2-10 HBW
Managing claims best practices | 2-10 HBWManaging claims best practices | 2-10 HBW
Managing claims best practices | 2-10 HBW
 
No 1 Licensed structural auditor in Mumbai CSR consultant and associates
No 1 Licensed structural auditor in Mumbai CSR consultant and associatesNo 1 Licensed structural auditor in Mumbai CSR consultant and associates
No 1 Licensed structural auditor in Mumbai CSR consultant and associates
 
INTODUCTION TO CIVIL ENGINEERING
INTODUCTION TO CIVIL ENGINEERINGINTODUCTION TO CIVIL ENGINEERING
INTODUCTION TO CIVIL ENGINEERING
 
Cost effectiveness in qulaity construction
Cost effectiveness in qulaity constructionCost effectiveness in qulaity construction
Cost effectiveness in qulaity construction
 
Ethics in Engineering
Ethics in EngineeringEthics in Engineering
Ethics in Engineering
 
Contractor management sections 5 topics 8& 9
Contractor management sections 5 topics 8& 9Contractor management sections 5 topics 8& 9
Contractor management sections 5 topics 8& 9
 
Engineers in society
Engineers in societyEngineers in society
Engineers in society
 
PROPOSED 4BEDROOM DUPLEX & A ONE BEDROOM SEMI-DETACHED RESIDENTIAL DEVELOMENT...
PROPOSED 4BEDROOM DUPLEX & A ONE BEDROOM SEMI-DETACHED RESIDENTIAL DEVELOMENT...PROPOSED 4BEDROOM DUPLEX & A ONE BEDROOM SEMI-DETACHED RESIDENTIAL DEVELOMENT...
PROPOSED 4BEDROOM DUPLEX & A ONE BEDROOM SEMI-DETACHED RESIDENTIAL DEVELOMENT...
 
Maintenance and repair strategies Question answers
Maintenance and repair strategies Question answersMaintenance and repair strategies Question answers
Maintenance and repair strategies Question answers
 
SERVICEABILITY OF CONCRETE
SERVICEABILITY OF CONCRETESERVICEABILITY OF CONCRETE
SERVICEABILITY OF CONCRETE
 
Hidden Horrors of Shoddy ( Poor Quality) Construction
Hidden Horrors of Shoddy ( Poor Quality) ConstructionHidden Horrors of Shoddy ( Poor Quality) Construction
Hidden Horrors of Shoddy ( Poor Quality) Construction
 
Constructionmethodologyandprojectmanagementreport
ConstructionmethodologyandprojectmanagementreportConstructionmethodologyandprojectmanagementreport
Constructionmethodologyandprojectmanagementreport
 
Jaya supermarket presentation 2011 latest
Jaya supermarket presentation 2011 latestJaya supermarket presentation 2011 latest
Jaya supermarket presentation 2011 latest
 
Concrete Contractors NYC_ The Ultimate Guide to Finding the Best in New York.pdf
Concrete Contractors NYC_ The Ultimate Guide to Finding the Best in New York.pdfConcrete Contractors NYC_ The Ultimate Guide to Finding the Best in New York.pdf
Concrete Contractors NYC_ The Ultimate Guide to Finding the Best in New York.pdf
 
How BricknBolt's Home Designs Differ from Traditional Architectural Styles.pptx
How BricknBolt's Home Designs Differ from Traditional Architectural Styles.pptxHow BricknBolt's Home Designs Differ from Traditional Architectural Styles.pptx
How BricknBolt's Home Designs Differ from Traditional Architectural Styles.pptx
 
The Merits of Structural Steelwork
The Merits of Structural SteelworkThe Merits of Structural Steelwork
The Merits of Structural Steelwork
 
Construction portfolio (manvi)
Construction portfolio (manvi)Construction portfolio (manvi)
Construction portfolio (manvi)
 
Non-Residential PowerPoint
Non-Residential PowerPointNon-Residential PowerPoint
Non-Residential PowerPoint
 
iosh-temporary-works.pdf
iosh-temporary-works.pdfiosh-temporary-works.pdf
iosh-temporary-works.pdf
 

Último

AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
Tonystark477637
 

Último (20)

(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 

Presentation10.pptx

  • 2. Case Objective Each tiny step is significant in a building project, the construction supervisor needs to perform his duties honestly, have a moral responsibility, and take care to avoid risking the lives of others.
  • 3. Case study • This event occurred in 2004 in Texas City, where a newly completed mansion known as the central Texas lakeside residence was located. • The event began when two guests decided to stroll onto the third-floor balcony, which was around 20 feet above the ground, to enjoy the view of Ink Lake, when the balcony abruptly collapsed, causing significant injuries to these two visitors. • The architect should not pay the contractor until the materials and quality of work were completed and checked. • There was a contract between the contractor and the architect, and it was their ethical responsibility to check the work quality, and this error was not supposed to happen. So now we have a case and an argument about who is at fault because there was no contract between them and the contractor.
  • 4. Ethical issues • The contractor ignored the design requirements. • The site investigation was not carried out by the contractor or the designer. • When attaching the ledger boards to the building, the contractor favored using less expensive materials.
  • 5. Suggested solutions and learned lessons • Perform the necessary inspections that would have alerted him to the problems and allowed for repairs to be made. • Joists that pierce the structure would be one option for increasing safety and strength, since they would provide the necessary moment capacity at the wall to enable the joists to be installed. • Before opening the balcony to the public, it must undergo rigorous testing, including the application of a load. • One option would have been for the architect to perform the necessary inspections that would have alerted him to the problems and allowed for repairs to be made. • Joists that pierce the structure would be one option for increasing safety and strength, since they would provide the necessary moment capacity at the wall to enable the joists to be installed. • Before opening the balcony to the public, it must undergo rigorous testing, including the application of a load.
  • 6. Facts • Even the original design was unable to be safe since it was built on a relatively modest live load, which would have caused even the bolts to fail without the installation of joist hangers that penetrated the structure and provided more strength for the cantilevers beam. • The design have been checked by the framing contractor. • The designer should inspect the quality of the job before paying. • To ensure that the construction is reliable and safe, certain tests have to be conducted.
  • 7. Consequences • Two accidental victims nearly died. • The contracting business was responsible for covering any site-related losses. • All site losses incurred have to be covered by the contracting business.
  • 8. Issues Faced Factual issues: If the nuts were utilized, will the balcony stay alive? Conceptual issue: • what is the meaning of the word SAFE?. Application issue: If an accurate description of safety was provided to the designer and the contractor, was the balcony safe?
  • 9. Moral issues: • The architect failed to conduct a quality assessment, which resulted in the balcony being inadequately maintained by the nails used. • The contractor did not follow the specifications when performing his job.
  • 10. Ethical approach Utilitarian Approach In the interest of the safety of society, the architect and contractor need to have a proper conversation before reconsidering the agreement. To verify the caliber of the supplies and craftsmanship employed, he can evaluate the contractor's decision to fire him. Without his assurance, the balcony's durability and safety might not be assured.
  • 11. Respect for person approach It is the responsibility of both the architect and contractor to take, respect for people when doing their work, as we can see that both disrespected the safety of the people and their needs.
  • 12. Did the characters respect ethical principles? There was no compliance between the architect and contractor with ASCE's ethical first canons, state: “When carrying out their professional responsibilities, engineers must put the safety, health, and welfare of the general public first and work to adhere to the principles of sustainable development.” Code of ethics According to the ASCE ethical code, which forces the engineer to follow the third canon, they failed to do so. "Engineers must only make public statements in an accurate and fair manner."
  • 13. References https://www.engineering.com/story/the-balcony-collapse-in-berkeley-california-what-can- we-learn-from-this Ferguson, N. (2013, November). Overview of American Society of Mechanical Engineers (ASME). Retrieved from Inspectioneering: https://inspectioneering.com/tag/asme

Notas del editor

  1. This event occurred in 2004 in Texas City, where a newly completed mansion known as the central Texas lakeside residence was located. The event began when two guests decided to stroll onto the third-floor balcony, which was around 20 feet above the ground, to enjoy the view of Ink Lake, when the balcony abruptly collapsed, causing significant injuries to these two visitors. This balcony was a cantilever balcony that was fastened to the structure with a ledger board and nails rather than bolts as described in the architectural blueprints. The contract said that the architect should not pay the contractor until the materials and quality of work were completed in accordance with the contract, and it did not require the architect to conduct regular site inspections. So now we have a case and an argument about who is at fault because there was a contract between the contractor and the architect, and it was who's ethical responsibility to check the work quality, and this error was not supposed to happen if any reasonable engineer simply did a routine inspection of the work.
  2. One option would have been for the architect to perform the necessary inspections that would have alerted him to the problems and allowed for repairs to be made. The architect may have demanded that the contractor explain why he was using nails instead of bolts, or the contractor could have simply followed the directions and requirements as written in the blueprints. Joists that pierce the structure would be one option for increasing safety and strength, since they would provide the necessary moment capacity at the wall to enable the joists to be installed. Before opening the balcony to the public, it must undergo rigorous testing, including the application of a load. Two lives were in jeopardy because the architect and the contractor failed to do their jobs properly; the architect didn't check the quality of the work, and the contractor didn't follow the instructions in the plans he was given. This case taught us the importance of being trustworthy in our professional endeavors. They also disregarded the first ASCE code of ethics, which states that engineers must prioritize public safety and that engineers should always conduct their jobs properly. The importance of performing thorough site inspections before submitting a project to the owner is another key takeaway. These inspections ensure that the work is safe, and they also verify that the beams, columns, and other structural elements can withstand the anticipated loads, weather, and other challenges.