Boiler Protection System and Burner Management System
The Boiler Protection System in combination with the Burner Management System
protects the boiler (including furnace explosion and implosion) from an
unforeseen process fault or an incorrect action at the Distributed Control
System. The BPS / BMS in combination ensures all the necessary interlocks
for a safe start up and shut down of burner equipment. This narrative
contains provisions required for compliance with the NFPA 8501 Standard for
Single Burner Operation.
The Burner Management System is designed to ensure a safe, orderly operating
sequence in the start up and shut down of fuel firing equipment and to
reduce possible errors by following the operating procedure.
In some phases of operation, the BMS shall provide permissive interlocks only to
insure safe start-up of equipment. Once the equipment is in service, the
operator must follow acceptable safe operating practices.
It is essential that all parts of the BMS are in good working order and in service
whenever the burner is in service if the system is to provide the protection
for which it is designed. Regular maintenance and inspection of the system
and its associated hardware is essential for its continued safe operation.
Furnace purge : The purge system assures that the boiler furnace, the
associated air and flue gas paths, machineries like FD, ID and APH and
equipments containing sources of ignition energy like ESP are purged with air
to remove any explosive mixture before ignition. The BPS during the purge
verifies that the air and flue gas paths are open, fuel shut off valves are
closed and no flame is detected.
Master fuel trip : While monitoring the fuel system and the furnace operating
condition, a fault is detected, the BPS shall trip the MFT valve and individual
burners shut off valves, main and ignitor shut off valves, de energise sparks
and other ignition sources. When a MFT is caused by a loss of FD Fan and ID
Fan trip signal, all the air and flue gas passages of the boiler should be
opened to fully opened condition to provide as much Natural draft as
possible. This condition shall be maintained for a 15 minute period. At the
end of this period, fans shall be started to perform a post firing purge.
Flame sensors: Each ignitor and burner is provided with proper flame sensor
(fail safe trip) to continuously monitor the flame presence at any boiler
condition. Each ignitor is equipped with IFM flame proving system using
flame ionisation principle.
BMS Functions
The BMS shall be designed to perform the following functions
Prevent firing unless a satisfactory furnace purge has first been completed
Prohibit start up of the equipment unless certain permissive interlocks have first
been completed
Monitor and Control the correct component sequence during start up and shut
down of the equipment
Conditionally allow the continued operation of the equipment only while certain
safety interlocks remaining satisfied
Provide component condition feed back to the operator and, if so equipped, to the
plant control system and or data loggers
Provide automatic supervision when the equipment is in service and provide
means to make a Master Fuel trip (MFT) should certain unacceptable firing
conditions occur
Execute a MFT up on certain adverse unit operating conditions
National Fire Protection Association
As per NFPA 8501, a common cause of furnace explosions is “Fuel leakage into
an idle furnace and the ignition of the accumulations by a spark or other
source of ignition.”
In order to initiate and complete a satisfactory furnace purge, the operator must
verify that all of the following conditions are satisfied.
All system power supplies on
A minimum of 30% of full load air flow is established
All of the auxiliary air dampers modulating is established.
Ignitor header fuel trip valve is proven closed
No natural draft and waiting time for purge requirement are present
Oil header (MFT) trip valves are proven closed
All flame scanners “No flame”
The drum level is adequate between minimum and maximum of the dangerous
condition.
No Boiler trip command is present
Instrument air header pressure within operating range
A “No master Fuel trip condition” is established
Flame scanners cooling air not very low
Oil header pressure not very low
Furnace pressure is between minimum and maximum
Atomising steam/air pressure not very low
As each of the above conditions is reached, their respective indicator lights shall
illuminate as “PURGE PERMISSIVES” on the operator control console.
Once all of the above conditions are satisfied, the “PURGE AVAILABLE” light shall
illuminate indicating that the START PURGE switch is enabled by the system
logic. Activating the START PURGE control, when the “PURGE AVAILBLE” light
is illuminated, will begin a timed furnace purge cycle as indicated by a
“PURGE IN PROGRESS” light illuminating.
If the operator is starting the boiler from the cold condition or restarting after a
Master Fuel trip event, the procedure outlined in the following paragraphs is
required. If the boiler is recycling or other wise starting from a warm
condition, the MFT circuit will reset automatically and the procedure will skip
directly to the main flame light off sequence.
Provided that the start up permissive remain satisfied, the system shall initiate a
burner start up period timer set for no more than 10 minutes. If the operator
does not initiate a start up within this time, the boiler control system will exit
the “PURGE COMPLETE” condition and the operator must begin again with the
pre purge cycle. If the MFT has been reset, the boiler control system will trip
the MFT when leaving the “PURGE COMPLETE” condition.
Upon completing a satisfactory purge, the operator must press the “RESET MFT”
push button. The boiler control system will indicate that the MFT has been
reset with a steady on “MFT RESET” light. At this point, the boiler control
system is ready to allow the main flame start up sequence.
Main Flame Start-Up Sequence
The main flame start up sequence from the light- off the pilot flame through main
flame light – off is an automated sequence. Once the start up sequence has
begun, only the “BOILER STOP” switch and the “EMERGENCY STOP” will interrupt
the start up sequence. Any interruption of the start up sequence requires a post
fire purge prior to attempting to start the boiler again. To initiate the start up
sequence, the operator activates the “START BOILER” switch.
Failure to meet any of these conditions shall prevent the burner light-off
operation.
To light the pilot flame, the pilot header vent valve shall be closed by the boiler
control system. Then, sequentially, the ignitor transformer is energised, the
pilot gas block valves are open and a 10 second pilot ignition timer starts
counting down. When ignition timer cycle is completed, the ignitor
transformer is de-energised and the pilot flame scanner is checked by the
control system. If the pilot flame is present, the main flame light-off
sequence continues.
If the pilot flame fails, the boiler control system initiates a pilot flame failure
shutdown. Additional attempts of the pilot light-off are permissible provided a
successful pilot light-off are made with in 10 minutes after the furnace
purge.
Note, if the pilot flame continues to fail after several attempts, the boiler should
be inspected to determine the fault and the condition corrected.
Main Flame Light-off
Once the pilot flame is made, the boiler control system opens the header block
valves for the selected fuel. A main flame light-off burner timer begins a 15
second countdown to establish and stabilise the main flame. At 5 seconds
before the time out, the boiler control system closes the pilot block valve and
opens the pilot vent valve. The remaining 5 seconds are used to detect the
main flame. For the typical dual flame scanner design, a main flame failure
shutdown is initiated if both flame scanners return a “no flame” signal to the
burner control system. This will generate a boiler trip, and another furnace
purge will be required. Once the burner is lit, the system is in the NORMAL
RUN CONDITION and combustion controls should be released to modulation
control.
Shutdown
The normal shut down cycle for the boiler shall accomplish the following in the
order listed
- Shut off fuel supply to the main burner
- Interrupt spark and shut off fuel supply to ignitor, if in operation
- Where used, open the oil recirculation valve
- Shut off atomising medium
Boiler Master Fuel Trip
Any of the following conditions shall cause a boiler trip to occur. This results in
the shutdown of all fuel and requires another furnace purge cycle before any
attempt at re-lighting.
- Steam drum very low level
- Steam drum very high level
- Loss of Fans
- Total air flow less than 30%
- Furnace pressure very high
- Furnace pressure very low
- Oil header very low pressure
- Atomising steam very low pressure
- Flame scanner cooling air very low pressure
- Loss of fuels
- Loss of flames
- DCS not available
- Loss of Instrument air
AFBC Boilers with Oil burners for initial heating of the fluid bed
Boiler General Protection
Master Fuel trip condition healthy
- Drum level is not very low
- Drum level is not very high
- ID Fan in service
- FD Fan in service
- Furnace pressure is not very low
- Furnace pressure is not very high
- Bed temperature is not below 650deg.C
- Bed temperature is not above 980deg.C
- Instrument air is within limits
Note: The individual coal feeder will trip, if the corresponding temperature falls
into the logic and start permissive is applicable once the bed temperature is
normalised. Other wise, the MFT will act based on the logic incorporated.
Boiler Purge permissive
- absence of boiler trip conditions
- Oil shut-off valve closed
- Drum at start up level
- Air flow > 30%
- At least one air gas circuit in service
- waiting time for purge requested
- Natural draught not required
Oil Shut-Off Valve condition healthy
- boiler purge completed
- oil header pressure is within limits
- atomising medium is not very low
CFBC Boilers with Oil burners for initial heating of the fluid bed
Boiler air protection
- Fluidised bed temperature <max.2
- Furnace draught >min.2
- Furnace draught <max.2
- Siphon I exit temperature <max.2
- Siphon II exit temperature <max.2
- Drum level >min.2
- Drum level <max.2
- Primary air flow >min.2
Note: Boiler must be tripped if only one bed temperature measurement is
available.
Boiler Oil protection / Preconditions to start hot gas generator
- Boiler air protection OK
- Fluidised bed temperature <min.1
- Primary air flow >min.2
- Fuel oil pressure >6kg/cm2
- Atomising air/steam pressure >7kg/cm2
- HGG out gas temperature <850deg.C
- No flame in HGG
- Differential pressure across HGG >25mmwg
- LPG press >0.4kg/cm2g
Preconditions to start Main Fuel
- Coal bunker level >min
- Boiler air protection OK
- Fluidised bed temperature 20deg.c above ignition temperature
- Fluidised bed temperature <920deg.C
- Coal feeder cut off gate Open
- Coal feeder down stream gate Open
- Drum level >min.2
- Drum level <max.2
Note: min & max depends on OEM recommendations
General Protections
1. Furnace draught <-150 or >100mmwc
2. Drum level (2 out of 3) <-320 or >150mm
3. Bed temperature>940deg.C
4. Drum pressure(4 seconds delay)
5. Siphon ash temperature >450deg.C
6. Root blowers trip
7. Start up time exceeded
When coal feeder are in ON
8. Bed height>1400mmwc or <600mmwc
9. PA pressure to APH(4 seconds delay)>1900mmwc
10. PA flow-total PA flow<14kg/s & both PA flow to HGG 1&2<7kg/s
11. Flue gas pressure before ID Fan <-500mmwc
12. SA pressure to APH > 720mmwc
13. Coal feeder trip on bed temperature>920deg.C or <450deg.C
14. Total air/fuel ratio less than minimum
End notes:
- Pre purge permissive condition checks and furnace purge are to be
initiated by the operator from the BMS
- The total furnace air flow shall not be reduced below the purge rate air
flow. Reducing air flow below the limits will lead to a MFT, and a new
furnace purge will be required
S.V.NAGESH
Head-Technical
Cubex Energy Private Ltd
9962666980

Más contenido relacionado

La actualidad más candente

Unit shutdown procedure operation
Unit shutdown procedure operationUnit shutdown procedure operation
Unit shutdown procedure operationNitin Patel
 
Monitoring Coal mill Performance
Monitoring Coal mill PerformanceMonitoring Coal mill Performance
Monitoring Coal mill PerformanceManohar Tatwawadi
 
Ball & tube mill
Ball & tube millBall & tube mill
Ball & tube millStudy Hub
 
Unit lightup synchronisation &amp; shutdown
Unit lightup synchronisation &amp; shutdownUnit lightup synchronisation &amp; shutdown
Unit lightup synchronisation &amp; shutdownAshvani Shukla
 
Cfbc boiler drive interlock
Cfbc boiler drive interlockCfbc boiler drive interlock
Cfbc boiler drive interlockAshvani Shukla
 
Boiler Loss of Flame Protection- MFT
Boiler Loss of Flame Protection- MFTBoiler Loss of Flame Protection- MFT
Boiler Loss of Flame Protection- MFTTahoor Alam Khan
 
Hp/ lp bypass system for steam turbines
Hp/ lp bypass system for steam turbinesHp/ lp bypass system for steam turbines
Hp/ lp bypass system for steam turbinesBoben Anto Chemmannoor
 
Boi_5_ST-2 Ball and Tube Mill .ppt
Boi_5_ST-2 Ball and Tube Mill  .pptBoi_5_ST-2 Ball and Tube Mill  .ppt
Boi_5_ST-2 Ball and Tube Mill .pptTravelTechnology1
 
Pulverized coal fired boiler startup procedure
Pulverized coal fired boiler startup procedurePulverized coal fired boiler startup procedure
Pulverized coal fired boiler startup procedureAshvani Shukla
 
Thermal Power Plant - Emergency situations
Thermal Power Plant   -   Emergency situations Thermal Power Plant   -   Emergency situations
Thermal Power Plant - Emergency situations Ashish Kumar Jain
 
Furnace Guard Supervisory System (FSSS)
Furnace Guard Supervisory System (FSSS)Furnace Guard Supervisory System (FSSS)
Furnace Guard Supervisory System (FSSS)Jigyasa Singh
 
Steam Turbine Performance in TPS
Steam Turbine Performance in TPSSteam Turbine Performance in TPS
Steam Turbine Performance in TPSManohar Tatwawadi
 

La actualidad más candente (20)

Hplpbp
HplpbpHplpbp
Hplpbp
 
Unit shutdown procedure operation
Unit shutdown procedure operationUnit shutdown procedure operation
Unit shutdown procedure operation
 
Boiler -Emergency Handling
 Boiler -Emergency Handling Boiler -Emergency Handling
Boiler -Emergency Handling
 
Monitoring Coal mill Performance
Monitoring Coal mill PerformanceMonitoring Coal mill Performance
Monitoring Coal mill Performance
 
Unit protection scheme
Unit protection schemeUnit protection scheme
Unit protection scheme
 
Ball & tube mill
Ball & tube millBall & tube mill
Ball & tube mill
 
Unit lightup synchronisation &amp; shutdown
Unit lightup synchronisation &amp; shutdownUnit lightup synchronisation &amp; shutdown
Unit lightup synchronisation &amp; shutdown
 
Cfbc boiler drive interlock
Cfbc boiler drive interlockCfbc boiler drive interlock
Cfbc boiler drive interlock
 
Boiler Loss of Flame Protection- MFT
Boiler Loss of Flame Protection- MFTBoiler Loss of Flame Protection- MFT
Boiler Loss of Flame Protection- MFT
 
Hp/ lp bypass system for steam turbines
Hp/ lp bypass system for steam turbinesHp/ lp bypass system for steam turbines
Hp/ lp bypass system for steam turbines
 
Boi_5_ST-2 Ball and Tube Mill .ppt
Boi_5_ST-2 Ball and Tube Mill  .pptBoi_5_ST-2 Ball and Tube Mill  .ppt
Boi_5_ST-2 Ball and Tube Mill .ppt
 
FURNACE SAFEGUARD SUPERVISORY SYSTEM (FSSS)
FURNACE SAFEGUARD SUPERVISORY SYSTEM (FSSS)FURNACE SAFEGUARD SUPERVISORY SYSTEM (FSSS)
FURNACE SAFEGUARD SUPERVISORY SYSTEM (FSSS)
 
200 mw FSSS
200 mw FSSS200 mw FSSS
200 mw FSSS
 
Pulverized coal fired boiler startup procedure
Pulverized coal fired boiler startup procedurePulverized coal fired boiler startup procedure
Pulverized coal fired boiler startup procedure
 
Boiler Operation
Boiler OperationBoiler Operation
Boiler Operation
 
Thermal Power Plant - Emergency situations
Thermal Power Plant   -   Emergency situations Thermal Power Plant   -   Emergency situations
Thermal Power Plant - Emergency situations
 
Condensate system
Condensate systemCondensate system
Condensate system
 
CMC.pptx
CMC.pptxCMC.pptx
CMC.pptx
 
Furnace Guard Supervisory System (FSSS)
Furnace Guard Supervisory System (FSSS)Furnace Guard Supervisory System (FSSS)
Furnace Guard Supervisory System (FSSS)
 
Steam Turbine Performance in TPS
Steam Turbine Performance in TPSSteam Turbine Performance in TPS
Steam Turbine Performance in TPS
 

Destacado

55419663 burner-management-system
55419663 burner-management-system55419663 burner-management-system
55419663 burner-management-systemMowaten Masry
 
Elite Thermal's Corporate Presentation
Elite Thermal's Corporate PresentationElite Thermal's Corporate Presentation
Elite Thermal's Corporate PresentationAmol Atre
 
Cfbc burner startup sequence
Cfbc burner startup sequenceCfbc burner startup sequence
Cfbc burner startup sequenceAshvani Shukla
 
49539990 burner-management-system
49539990 burner-management-system49539990 burner-management-system
49539990 burner-management-systemMowaten Masry
 
Instrumentation & Control For Thermal Power Plant
Instrumentation & Control For Thermal Power PlantInstrumentation & Control For Thermal Power Plant
Instrumentation & Control For Thermal Power PlantSHIVAJI CHOUDHURY
 
Thermal plant instrumentation and control
Thermal plant instrumentation and controlThermal plant instrumentation and control
Thermal plant instrumentation and controlShilpa Shukla
 
Circulating fluidized bed boiler (cfb boiler) how does it work and its principle
Circulating fluidized bed boiler (cfb boiler) how does it work and its principleCirculating fluidized bed boiler (cfb boiler) how does it work and its principle
Circulating fluidized bed boiler (cfb boiler) how does it work and its principlePichai Chaibamrung
 

Destacado (7)

55419663 burner-management-system
55419663 burner-management-system55419663 burner-management-system
55419663 burner-management-system
 
Elite Thermal's Corporate Presentation
Elite Thermal's Corporate PresentationElite Thermal's Corporate Presentation
Elite Thermal's Corporate Presentation
 
Cfbc burner startup sequence
Cfbc burner startup sequenceCfbc burner startup sequence
Cfbc burner startup sequence
 
49539990 burner-management-system
49539990 burner-management-system49539990 burner-management-system
49539990 burner-management-system
 
Instrumentation & Control For Thermal Power Plant
Instrumentation & Control For Thermal Power PlantInstrumentation & Control For Thermal Power Plant
Instrumentation & Control For Thermal Power Plant
 
Thermal plant instrumentation and control
Thermal plant instrumentation and controlThermal plant instrumentation and control
Thermal plant instrumentation and control
 
Circulating fluidized bed boiler (cfb boiler) how does it work and its principle
Circulating fluidized bed boiler (cfb boiler) how does it work and its principleCirculating fluidized bed boiler (cfb boiler) how does it work and its principle
Circulating fluidized bed boiler (cfb boiler) how does it work and its principle
 

Similar a 89912310 boiler-purge-burner-management-system

Burner Management System ( FSSS).pptx
Burner Management System ( FSSS).pptxBurner Management System ( FSSS).pptx
Burner Management System ( FSSS).pptxManzoorAlam40
 
Burner management-systems-a-technical-discussion-ppt
Burner management-systems-a-technical-discussion-pptBurner management-systems-a-technical-discussion-ppt
Burner management-systems-a-technical-discussion-pptmkpq pasha
 
UNA DISCUSIÓN TÉCNICA ACERCA DEL SISTEMA DE ADMINISTRACIÓN DE QUEMADOR.pptx
UNA DISCUSIÓN TÉCNICA ACERCA DEL SISTEMA DE ADMINISTRACIÓN DE QUEMADOR.pptxUNA DISCUSIÓN TÉCNICA ACERCA DEL SISTEMA DE ADMINISTRACIÓN DE QUEMADOR.pptx
UNA DISCUSIÓN TÉCNICA ACERCA DEL SISTEMA DE ADMINISTRACIÓN DE QUEMADOR.pptxYudarliRodriguez
 
Methods of Flame-Detection.pdf
Methods of Flame-Detection.pdfMethods of Flame-Detection.pdf
Methods of Flame-Detection.pdfssuser2fc67e
 
The Heaters CPF AGADEM FIELD GOUMERI.ppt
The Heaters CPF AGADEM FIELD GOUMERI.pptThe Heaters CPF AGADEM FIELD GOUMERI.ppt
The Heaters CPF AGADEM FIELD GOUMERI.ppthicham benkhelifa
 
Cfbc boiler startup and shutdown
Cfbc boiler startup and shutdownCfbc boiler startup and shutdown
Cfbc boiler startup and shutdownAshvani Shukla
 
94716008 burner-management-system-et-2008
94716008 burner-management-system-et-200894716008 burner-management-system-et-2008
94716008 burner-management-system-et-2008Mowaten Masry
 
Woodpecker training workshop jan'11 presentation
Woodpecker training workshop jan'11 presentationWoodpecker training workshop jan'11 presentation
Woodpecker training workshop jan'11 presentationensightbioenergy
 
All You Need To Know About Furnace Control Boards
All You Need To Know About Furnace Control BoardsAll You Need To Know About Furnace Control Boards
All You Need To Know About Furnace Control BoardsACEHVACPARTS
 
Furnace safegaurd supervisory system logic-1
Furnace safegaurd supervisory system logic-1Furnace safegaurd supervisory system logic-1
Furnace safegaurd supervisory system logic-1Ashvani Shukla
 
Hrsg startup proceudre
Hrsg startup proceudreHrsg startup proceudre
Hrsg startup proceudrekamaraprasad
 
Training on OJT of Boiler Operation00.pdf
Training on OJT of Boiler Operation00.pdfTraining on OJT of Boiler Operation00.pdf
Training on OJT of Boiler Operation00.pdfMadan Karki
 
INTERNSHIP (1).pptx
INTERNSHIP (1).pptxINTERNSHIP (1).pptx
INTERNSHIP (1).pptxGoogles3
 

Similar a 89912310 boiler-purge-burner-management-system (20)

Boiler purge
Boiler purge Boiler purge
Boiler purge
 
BMS
BMSBMS
BMS
 
BMS FSSS.pptx
BMS FSSS.pptxBMS FSSS.pptx
BMS FSSS.pptx
 
Burner Management System ( FSSS).pptx
Burner Management System ( FSSS).pptxBurner Management System ( FSSS).pptx
Burner Management System ( FSSS).pptx
 
Boiler light up & loading
Boiler light up & loadingBoiler light up & loading
Boiler light up & loading
 
Burner management-systems-a-technical-discussion-ppt
Burner management-systems-a-technical-discussion-pptBurner management-systems-a-technical-discussion-ppt
Burner management-systems-a-technical-discussion-ppt
 
UNA DISCUSIÓN TÉCNICA ACERCA DEL SISTEMA DE ADMINISTRACIÓN DE QUEMADOR.pptx
UNA DISCUSIÓN TÉCNICA ACERCA DEL SISTEMA DE ADMINISTRACIÓN DE QUEMADOR.pptxUNA DISCUSIÓN TÉCNICA ACERCA DEL SISTEMA DE ADMINISTRACIÓN DE QUEMADOR.pptx
UNA DISCUSIÓN TÉCNICA ACERCA DEL SISTEMA DE ADMINISTRACIÓN DE QUEMADOR.pptx
 
Kingwei waste oil burner manual
Kingwei waste oil burner manualKingwei waste oil burner manual
Kingwei waste oil burner manual
 
Methods of Flame-Detection.pdf
Methods of Flame-Detection.pdfMethods of Flame-Detection.pdf
Methods of Flame-Detection.pdf
 
The Heaters CPF AGADEM FIELD GOUMERI.ppt
The Heaters CPF AGADEM FIELD GOUMERI.pptThe Heaters CPF AGADEM FIELD GOUMERI.ppt
The Heaters CPF AGADEM FIELD GOUMERI.ppt
 
Lng steam turb.
Lng steam turb.Lng steam turb.
Lng steam turb.
 
Cfbc boiler startup and shutdown
Cfbc boiler startup and shutdownCfbc boiler startup and shutdown
Cfbc boiler startup and shutdown
 
94716008 burner-management-system-et-2008
94716008 burner-management-system-et-200894716008 burner-management-system-et-2008
94716008 burner-management-system-et-2008
 
Woodpecker training workshop jan'11 presentation
Woodpecker training workshop jan'11 presentationWoodpecker training workshop jan'11 presentation
Woodpecker training workshop jan'11 presentation
 
Steam Boiler Sequence Of Operation
Steam Boiler Sequence Of OperationSteam Boiler Sequence Of Operation
Steam Boiler Sequence Of Operation
 
All You Need To Know About Furnace Control Boards
All You Need To Know About Furnace Control BoardsAll You Need To Know About Furnace Control Boards
All You Need To Know About Furnace Control Boards
 
Furnace safegaurd supervisory system logic-1
Furnace safegaurd supervisory system logic-1Furnace safegaurd supervisory system logic-1
Furnace safegaurd supervisory system logic-1
 
Hrsg startup proceudre
Hrsg startup proceudreHrsg startup proceudre
Hrsg startup proceudre
 
Training on OJT of Boiler Operation00.pdf
Training on OJT of Boiler Operation00.pdfTraining on OJT of Boiler Operation00.pdf
Training on OJT of Boiler Operation00.pdf
 
INTERNSHIP (1).pptx
INTERNSHIP (1).pptxINTERNSHIP (1).pptx
INTERNSHIP (1).pptx
 

Más de Mowaten Masry

143673805 1-burner-management-system
143673805 1-burner-management-system143673805 1-burner-management-system
143673805 1-burner-management-systemMowaten Masry
 
114632948 jeres-j-607-burner-management-systems-for-sru-trains
114632948 jeres-j-607-burner-management-systems-for-sru-trains114632948 jeres-j-607-burner-management-systems-for-sru-trains
114632948 jeres-j-607-burner-management-systems-for-sru-trainsMowaten Masry
 
117697637 burner-mgmt-system
117697637 burner-mgmt-system117697637 burner-mgmt-system
117697637 burner-mgmt-systemMowaten Masry
 
49574055 burner-management-system-safety-integrity-level-selection
49574055 burner-management-system-safety-integrity-level-selection49574055 burner-management-system-safety-integrity-level-selection
49574055 burner-management-system-safety-integrity-level-selectionMowaten Masry
 
Manual reset 8327 direct mount push button (m)
Manual reset 8327 direct mount push button (m)Manual reset 8327 direct mount push button (m)
Manual reset 8327 direct mount push button (m)Mowaten Masry
 
Methods of determining_safety_integrity_level
Methods of determining_safety_integrity_levelMethods of determining_safety_integrity_level
Methods of determining_safety_integrity_levelMowaten Masry
 
71364263 voting-logic-sil-calculation
71364263 voting-logic-sil-calculation71364263 voting-logic-sil-calculation
71364263 voting-logic-sil-calculationMowaten Masry
 
96000707 gas-turbine-control
96000707 gas-turbine-control96000707 gas-turbine-control
96000707 gas-turbine-controlMowaten Masry
 
78679939 dvc6000manualinstrucciones
78679939 dvc6000manualinstrucciones78679939 dvc6000manualinstrucciones
78679939 dvc6000manualinstruccionesMowaten Masry
 
Item06 reliability-availability-maintainability-and-safety-programme
Item06 reliability-availability-maintainability-and-safety-programmeItem06 reliability-availability-maintainability-and-safety-programme
Item06 reliability-availability-maintainability-and-safety-programmeMowaten Masry
 
75340982 standards-issued
75340982 standards-issued75340982 standards-issued
75340982 standards-issuedMowaten Masry
 
Safety instrumented systems
Safety instrumented systemsSafety instrumented systems
Safety instrumented systemsMowaten Masry
 
35958867 safety-instrumented-systems
35958867 safety-instrumented-systems35958867 safety-instrumented-systems
35958867 safety-instrumented-systemsMowaten Masry
 

Más de Mowaten Masry (18)

143673805 1-burner-management-system
143673805 1-burner-management-system143673805 1-burner-management-system
143673805 1-burner-management-system
 
An9030
An9030An9030
An9030
 
114632948 jeres-j-607-burner-management-systems-for-sru-trains
114632948 jeres-j-607-burner-management-systems-for-sru-trains114632948 jeres-j-607-burner-management-systems-for-sru-trains
114632948 jeres-j-607-burner-management-systems-for-sru-trains
 
117697637 burner-mgmt-system
117697637 burner-mgmt-system117697637 burner-mgmt-system
117697637 burner-mgmt-system
 
49574055 burner-management-system-safety-integrity-level-selection
49574055 burner-management-system-safety-integrity-level-selection49574055 burner-management-system-safety-integrity-level-selection
49574055 burner-management-system-safety-integrity-level-selection
 
Manual reset 8327 direct mount push button (m)
Manual reset 8327 direct mount push button (m)Manual reset 8327 direct mount push button (m)
Manual reset 8327 direct mount push button (m)
 
Methods of determining_safety_integrity_level
Methods of determining_safety_integrity_levelMethods of determining_safety_integrity_level
Methods of determining_safety_integrity_level
 
44636808 bms
44636808 bms44636808 bms
44636808 bms
 
9fcfd50a69d9647585
9fcfd50a69d96475859fcfd50a69d9647585
9fcfd50a69d9647585
 
71364263 voting-logic-sil-calculation
71364263 voting-logic-sil-calculation71364263 voting-logic-sil-calculation
71364263 voting-logic-sil-calculation
 
96000707 gas-turbine-control
96000707 gas-turbine-control96000707 gas-turbine-control
96000707 gas-turbine-control
 
78679939 dvc6000manualinstrucciones
78679939 dvc6000manualinstrucciones78679939 dvc6000manualinstrucciones
78679939 dvc6000manualinstrucciones
 
Item06 reliability-availability-maintainability-and-safety-programme
Item06 reliability-availability-maintainability-and-safety-programmeItem06 reliability-availability-maintainability-and-safety-programme
Item06 reliability-availability-maintainability-and-safety-programme
 
75340982 standards-issued
75340982 standards-issued75340982 standards-issued
75340982 standards-issued
 
Safety instrumented systems
Safety instrumented systemsSafety instrumented systems
Safety instrumented systems
 
35958867 safety-instrumented-systems
35958867 safety-instrumented-systems35958867 safety-instrumented-systems
35958867 safety-instrumented-systems
 
E04
E04E04
E04
 
Ram s
Ram sRam s
Ram s
 

Último

MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 

Último (20)

MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 

89912310 boiler-purge-burner-management-system

  • 1. Boiler Protection System and Burner Management System The Boiler Protection System in combination with the Burner Management System protects the boiler (including furnace explosion and implosion) from an unforeseen process fault or an incorrect action at the Distributed Control System. The BPS / BMS in combination ensures all the necessary interlocks for a safe start up and shut down of burner equipment. This narrative contains provisions required for compliance with the NFPA 8501 Standard for Single Burner Operation. The Burner Management System is designed to ensure a safe, orderly operating sequence in the start up and shut down of fuel firing equipment and to reduce possible errors by following the operating procedure. In some phases of operation, the BMS shall provide permissive interlocks only to insure safe start-up of equipment. Once the equipment is in service, the operator must follow acceptable safe operating practices. It is essential that all parts of the BMS are in good working order and in service whenever the burner is in service if the system is to provide the protection for which it is designed. Regular maintenance and inspection of the system and its associated hardware is essential for its continued safe operation. Furnace purge : The purge system assures that the boiler furnace, the associated air and flue gas paths, machineries like FD, ID and APH and equipments containing sources of ignition energy like ESP are purged with air to remove any explosive mixture before ignition. The BPS during the purge verifies that the air and flue gas paths are open, fuel shut off valves are closed and no flame is detected. Master fuel trip : While monitoring the fuel system and the furnace operating condition, a fault is detected, the BPS shall trip the MFT valve and individual burners shut off valves, main and ignitor shut off valves, de energise sparks and other ignition sources. When a MFT is caused by a loss of FD Fan and ID Fan trip signal, all the air and flue gas passages of the boiler should be opened to fully opened condition to provide as much Natural draft as possible. This condition shall be maintained for a 15 minute period. At the end of this period, fans shall be started to perform a post firing purge. Flame sensors: Each ignitor and burner is provided with proper flame sensor (fail safe trip) to continuously monitor the flame presence at any boiler condition. Each ignitor is equipped with IFM flame proving system using flame ionisation principle.
  • 2. BMS Functions The BMS shall be designed to perform the following functions Prevent firing unless a satisfactory furnace purge has first been completed Prohibit start up of the equipment unless certain permissive interlocks have first been completed Monitor and Control the correct component sequence during start up and shut down of the equipment Conditionally allow the continued operation of the equipment only while certain safety interlocks remaining satisfied Provide component condition feed back to the operator and, if so equipped, to the plant control system and or data loggers Provide automatic supervision when the equipment is in service and provide means to make a Master Fuel trip (MFT) should certain unacceptable firing conditions occur Execute a MFT up on certain adverse unit operating conditions National Fire Protection Association As per NFPA 8501, a common cause of furnace explosions is “Fuel leakage into an idle furnace and the ignition of the accumulations by a spark or other source of ignition.” In order to initiate and complete a satisfactory furnace purge, the operator must verify that all of the following conditions are satisfied. All system power supplies on A minimum of 30% of full load air flow is established All of the auxiliary air dampers modulating is established. Ignitor header fuel trip valve is proven closed No natural draft and waiting time for purge requirement are present Oil header (MFT) trip valves are proven closed All flame scanners “No flame” The drum level is adequate between minimum and maximum of the dangerous condition. No Boiler trip command is present Instrument air header pressure within operating range A “No master Fuel trip condition” is established Flame scanners cooling air not very low Oil header pressure not very low Furnace pressure is between minimum and maximum Atomising steam/air pressure not very low
  • 3. As each of the above conditions is reached, their respective indicator lights shall illuminate as “PURGE PERMISSIVES” on the operator control console. Once all of the above conditions are satisfied, the “PURGE AVAILABLE” light shall illuminate indicating that the START PURGE switch is enabled by the system logic. Activating the START PURGE control, when the “PURGE AVAILBLE” light is illuminated, will begin a timed furnace purge cycle as indicated by a “PURGE IN PROGRESS” light illuminating. If the operator is starting the boiler from the cold condition or restarting after a Master Fuel trip event, the procedure outlined in the following paragraphs is required. If the boiler is recycling or other wise starting from a warm condition, the MFT circuit will reset automatically and the procedure will skip directly to the main flame light off sequence. Provided that the start up permissive remain satisfied, the system shall initiate a burner start up period timer set for no more than 10 minutes. If the operator does not initiate a start up within this time, the boiler control system will exit the “PURGE COMPLETE” condition and the operator must begin again with the pre purge cycle. If the MFT has been reset, the boiler control system will trip the MFT when leaving the “PURGE COMPLETE” condition. Upon completing a satisfactory purge, the operator must press the “RESET MFT” push button. The boiler control system will indicate that the MFT has been reset with a steady on “MFT RESET” light. At this point, the boiler control system is ready to allow the main flame start up sequence. Main Flame Start-Up Sequence The main flame start up sequence from the light- off the pilot flame through main flame light – off is an automated sequence. Once the start up sequence has begun, only the “BOILER STOP” switch and the “EMERGENCY STOP” will interrupt the start up sequence. Any interruption of the start up sequence requires a post fire purge prior to attempting to start the boiler again. To initiate the start up sequence, the operator activates the “START BOILER” switch. Failure to meet any of these conditions shall prevent the burner light-off operation. To light the pilot flame, the pilot header vent valve shall be closed by the boiler control system. Then, sequentially, the ignitor transformer is energised, the pilot gas block valves are open and a 10 second pilot ignition timer starts counting down. When ignition timer cycle is completed, the ignitor transformer is de-energised and the pilot flame scanner is checked by the control system. If the pilot flame is present, the main flame light-off sequence continues.
  • 4. If the pilot flame fails, the boiler control system initiates a pilot flame failure shutdown. Additional attempts of the pilot light-off are permissible provided a successful pilot light-off are made with in 10 minutes after the furnace purge. Note, if the pilot flame continues to fail after several attempts, the boiler should be inspected to determine the fault and the condition corrected. Main Flame Light-off Once the pilot flame is made, the boiler control system opens the header block valves for the selected fuel. A main flame light-off burner timer begins a 15 second countdown to establish and stabilise the main flame. At 5 seconds before the time out, the boiler control system closes the pilot block valve and opens the pilot vent valve. The remaining 5 seconds are used to detect the main flame. For the typical dual flame scanner design, a main flame failure shutdown is initiated if both flame scanners return a “no flame” signal to the burner control system. This will generate a boiler trip, and another furnace purge will be required. Once the burner is lit, the system is in the NORMAL RUN CONDITION and combustion controls should be released to modulation control. Shutdown The normal shut down cycle for the boiler shall accomplish the following in the order listed - Shut off fuel supply to the main burner - Interrupt spark and shut off fuel supply to ignitor, if in operation - Where used, open the oil recirculation valve - Shut off atomising medium Boiler Master Fuel Trip Any of the following conditions shall cause a boiler trip to occur. This results in the shutdown of all fuel and requires another furnace purge cycle before any attempt at re-lighting. - Steam drum very low level - Steam drum very high level - Loss of Fans - Total air flow less than 30% - Furnace pressure very high - Furnace pressure very low - Oil header very low pressure - Atomising steam very low pressure - Flame scanner cooling air very low pressure
  • 5. - Loss of fuels - Loss of flames - DCS not available - Loss of Instrument air AFBC Boilers with Oil burners for initial heating of the fluid bed Boiler General Protection Master Fuel trip condition healthy - Drum level is not very low - Drum level is not very high - ID Fan in service - FD Fan in service - Furnace pressure is not very low - Furnace pressure is not very high - Bed temperature is not below 650deg.C - Bed temperature is not above 980deg.C - Instrument air is within limits Note: The individual coal feeder will trip, if the corresponding temperature falls into the logic and start permissive is applicable once the bed temperature is normalised. Other wise, the MFT will act based on the logic incorporated. Boiler Purge permissive - absence of boiler trip conditions - Oil shut-off valve closed - Drum at start up level - Air flow > 30% - At least one air gas circuit in service - waiting time for purge requested - Natural draught not required Oil Shut-Off Valve condition healthy - boiler purge completed - oil header pressure is within limits - atomising medium is not very low
  • 6. CFBC Boilers with Oil burners for initial heating of the fluid bed Boiler air protection - Fluidised bed temperature <max.2 - Furnace draught >min.2 - Furnace draught <max.2 - Siphon I exit temperature <max.2 - Siphon II exit temperature <max.2 - Drum level >min.2 - Drum level <max.2 - Primary air flow >min.2 Note: Boiler must be tripped if only one bed temperature measurement is available. Boiler Oil protection / Preconditions to start hot gas generator - Boiler air protection OK - Fluidised bed temperature <min.1 - Primary air flow >min.2 - Fuel oil pressure >6kg/cm2 - Atomising air/steam pressure >7kg/cm2 - HGG out gas temperature <850deg.C - No flame in HGG - Differential pressure across HGG >25mmwg - LPG press >0.4kg/cm2g Preconditions to start Main Fuel - Coal bunker level >min - Boiler air protection OK - Fluidised bed temperature 20deg.c above ignition temperature - Fluidised bed temperature <920deg.C - Coal feeder cut off gate Open - Coal feeder down stream gate Open - Drum level >min.2 - Drum level <max.2 Note: min & max depends on OEM recommendations
  • 7. General Protections 1. Furnace draught <-150 or >100mmwc 2. Drum level (2 out of 3) <-320 or >150mm 3. Bed temperature>940deg.C 4. Drum pressure(4 seconds delay) 5. Siphon ash temperature >450deg.C 6. Root blowers trip 7. Start up time exceeded When coal feeder are in ON 8. Bed height>1400mmwc or <600mmwc 9. PA pressure to APH(4 seconds delay)>1900mmwc 10. PA flow-total PA flow<14kg/s & both PA flow to HGG 1&2<7kg/s 11. Flue gas pressure before ID Fan <-500mmwc 12. SA pressure to APH > 720mmwc 13. Coal feeder trip on bed temperature>920deg.C or <450deg.C 14. Total air/fuel ratio less than minimum End notes: - Pre purge permissive condition checks and furnace purge are to be initiated by the operator from the BMS - The total furnace air flow shall not be reduced below the purge rate air flow. Reducing air flow below the limits will lead to a MFT, and a new furnace purge will be required S.V.NAGESH Head-Technical Cubex Energy Private Ltd 9962666980