IT Strategy for MobileMusic
Ensuring business growth through robust IT




Team 1 - Scott Brier - Sanjay Joshi - Cerena Olsen
                 April 9th, 2010
              SUIT Case Competition
Agenda

MM’s current business & IT landscape

Action items to align IT with business objectives

Addition of capacity at data centers

Upgrades in current IT systems

IT governance and service management

Conclusion and Q&A




                                                    2
MM’s current IT landscape does not adequately support its
business strategy


   MM’s Business Strategy                MM’s IT Landscape

    Focus on aggressive growth        “Reactive” approach to growth

      Emphasis on customer            Customer experience affected by
          experience                          IT limitations

  Transition from a “startup” to a         Lack of centralized IT
      managed environment                      management



                 MM must immediately realign its IT
                 priorities to match business priorities

                                                                        3
MM must immediately invest in expanding IT infrastructure,
upgrade systems and introduce IT governance policies

                                            IT Action Items

                                     1
   MM’s Future IT Strategy
                                             Add capacity
   “Proactive” approach to growth
                                     2
     Enable positive customer
           experience                     Upgrade IT systems

       Centralized IT service
                                     3
           management
                                           Manage IT growth
                                         through IT Governance




                                                                 4
Data center capacity should be expanded immediately to roll
out the new service offerings

                                               IT Action Items

                                        1
              MM’s IT Strategy
                                                Add capacity
       “Proactive” approach to growth
                                        2
            Enable positive customer
                  experience                 Upgrade IT systems

              Centralized IT service
                                        3
                  management
                                              Manage IT growth
                                            through IT Governance




Action Item: CAPACITY                                               5
MM needs higher infrastructure capacity to support growing
user base and expand service offerings


            Music
                               100 MB per user

            Games

       Audio Books

      Matchmaking
                                                 For 1 million users  100 Terabytes
                            Service capacity needed at each center = 15 Terabytes




                    With the current “reactive” approach, IT will
                        be unable to support this user base


Action Item: CAPACITY                                                                  6
MM’s existing strategy of adding capacity reactively will lead to
severe capacity bottlenecks by 2012

                                           MM's Infrastructure ability to meet customer demands 2010 - 2020
                                    1000

                                    900
     Data Capacity (in Terabytes)




                                    800                                                              Data needs

                                    700

                                    600

                                    500

                                    400

                                    300

                                    200

                                     100                                                            Data capacity

                                      0
                                            2010   2011   2012   2013   2014   2015   2016   2017    2018   2019    2020



Action Item: CAPACITY                                                                                                      7
Adding capacity first is an important step towards ensuring
business readiness and systems availability


         Enables immediate                                Ensures availability as
          rollout of services                             existing IT systems are
                                                                 upgraded



                                   Advantages


                                   Meeting business
                                 priorities will ensure
                                stakeholder support for
                                  future IT initiatives


Action Item: CAPACITY                                                               8
An upgrade of current IT systems will remove security and
availability problems that impact customer experience

                                               IT Action Items

                                        1
             MM’s IT Strategy
                                                Add capacity
       “Proactive” approach to growth
                                        2
           Enable positive customer
                 experience                  Upgrade IT systems

             Centralized IT service
                                        3
                 management
                                              Manage IT growth
                                            through IT Governance




Action Item: UPGRADE                                                9
Security and systems integration issues directly impact
customer experience and need to be fixed early



                Challenges                           Impact

       Customer data compromise               Customer trust decreases

                                               Customer satisfaction
             System downtime
                                                    decreases

       Systems integration issues           Data inconsistency, downtime


              Investing in security and availability upgrades will
                 save potential losses of $144,500 every year
                                                             See Appendix A




Action Item: UPGRADE                                                          10
Security and availability of the SM/CM are critical to retain
customer trust and loyalty

                         Security                              Availability
              Web Security – Digital
                                                             Database Mirroring for
             Signatures, Secure Socket
                                                                  redundancy
                   Layers (SSls)
             Data Security – Intrusion
                                                              Added infrastructure
                Detectors, Secured
                                                                   capacity
                    Perimeters
        See Appendix H                                                            See Appendix I




                          Higher availability will reduce employee
                           frustration with system inefficiencies
                          -----------------------------------------------
                           Annual average savings over 5 years due to decreased
                                        turnover: $166,000 / yr                      See Appendix A

Action Item: UPGRADE                                                                                  11
Finance and Procurement System should be upgraded from
COBOL to UNIX to resolve integration issues


             Needs               Limited availability      Interfacing issues
       specialized COBOL               due to               with UNIX based
              skills                   COBOL                Logistics System



                                 Migrate Finance
                                and Procurement
                                 System (FP) to
                                     UNIX



                       Streamlined system      Elimination of
                           interaction       specialized skill set


Action Item: UPGRADE                                                            12
MM’s investment in expanding capacity and upgrading IT
systems brings significant advantages at a relatively low cost

  Adding Capacity                              Cost (USD)
  Storage Systems (1 PetaByte)                 $100,000
                                                            Total Upgrade Costs
  Memory Capacity (192 GB)                      $8,000
                                                             $1.33 million USD
  Network Devices (Multiservice router etc.)    $5,000
  Total Infrastructure Cost per Data Center    $113,000
  Total Cost to Add Capacity                   $791,000
                                                             This investment will
                                                             prepare MM for any
                                               Cost (USD)
                                                              future customer &
  Upgrading Current IT Systems
                                                                service growth
  Intrusion Detection Systems                   $10,000

  Web Security Installations                    $10,000

  Database mirroring                            $50,000     Cumulative budget of
  Total Infrastructure Cost per Data Center     $70,000       IT still below 10
  Migration of FP to UNIX from COBOL            $50,000      percent of revenue
  Total Cost to upgrade Systems                $540,000




Recap                                                                               13
Adding capacity and upgrading IT systems can be completed
within five months


                                                              BUSINESS BENEFITS

  Infrastructure
                                                              1   Ability to roll out
  Expansion
                      1 Month                                     new services ASAP


  Security measures                                           2   Secure customer
  implemented
                                                                  data
                                1 Month

  Data Mirroring at                                           3   High system
  all centers                                                     availability
                                          1 Month

  Migration of FP                                                 Elimination of
  system                                                      4
                                                                  architectural
  From COBOL to                                                   inefficiencies
  UNIX                                      3 Months
                                                       Time




Recap                                                                                   14
Support for future growth can be achieved through the use of
centralized IT governance

                                              IT Action Items

                                       1
             MM’s IT Strategy
                                               Add capacity
      “Proactive” approach to growth
                                       2
           Enable positive customer
                 experience                 Upgrade IT systems

             Centralized IT service
                                       3
                 management
                                             Manage IT growth
                                           through IT Governance




Action Item: GOVERNANCE                                            15
An IT Governance Board will improve technology management
and enable business-focused IT service delivery

                                IT Governance Board
                                                         See Appendix E



                     STRUCTURE                          MISSION


                                                       Define and
                          IT Director               document service
                                                         levels

      Business              IT          Corporate   Standardize and
      Partners        Representatives   Partners
                                                     implement IT
                                                        Policies
                                                                      See Appendix G




Action Item: GOVERNANCE                                                                16
Identifying service levels will enable IT to meet MM’s business
needs and also manage internal operations


               Why service levels?

             Maintain communication      Service levels pertinent to MM’s
   1         between IT and business     IT department include:
                    customers
                                          • Percentage of service level
                                            defaults
                                          • Number of review meetings
   2            End user satisfaction       per year
                                          • Percentage of users satisfied
                                            - CSAT
                                          • Number and severity of
           Create internal performance      service breaches
   3          benchmarks and key                                  See Appendix B

             performance indicators



Action Item: GOVERNANCE                                                            17
Standardization of IT management & governance components
will increase operational efficiency and manage growth


             Why standardization?           Components that must be
                                            standardized:

              Increased efficiencies in             Change Management
   1
               processes and systems                                  See Appendix C & D


                                                Test, document, and promote
                                             centralized business continuity plan
         Capitalize economies of scale to
   2         decrease support costs
                                                    Vendor Management
                                                                         See Appendix F



          Provide structure for managed        Hardware & software guidelines
   3
                      growth




Action Item: GOVERNANCE                                                                    18
Creation of the governance board and IT management
processes will begin in conjunction with architecture changes

Infrastructure                                                             Capacity
Expansion                 1 Month

Security measures
implemented
                                    1 Month
Data Mirroring at all
                                                                           Update
centers
                                              1 Month
Migration of FP system
From COBOL to UNIX
                                                3Months
Creation of a
governance board
                                                          1 Month
SLA Creation &                                                             Governance
Process
Continuation of
standardization efforts
                                                                    Time



                                                                                      19
Shifting to a business-focused IT strategy is the first step in
making IT more central in MM’s future corporate strategy

                                              Next Steps

      MM’s IT Strategy                  Continued success depends
                                         on IT leaders frequently
  “Proactive” approach to growth           talking to business

                                       Corporate Board should view
   Ensuring positive customer          IT as more strategic and less
          experience                           as support
      Centralized IT service               IT can increase profit
          management                    through added projects like
                                           Business Intelligence




                                                                       20
Questions?


APPENDIX
Appendix A - Financials
                                                                           2010           2011         2012           2013        2014
     Benefits from Cost Savings

      Reduction in computer crime from added security                  $    144,500 $ 144,500      $ 144,500      $ 144,500   $ 144,500
      Reduction in employee turnover                                   $    150,400 $ 157,920      $ 165,816      $ 174,107   $ 182,812
     Total Savings                                                     $   294,900 $ 302,420       $ 310,316      $ 318,607   $ 327,312

     Adding Capacity
      Storage Systems (1 PetaByte)                                     $     70,000   $   20,000   $   10,000     $      -    $        -
      Memory Capacity (192 GB)                                         $      8,000   $       -    $        -     $      -    $        -
      Network Devices (Multiservice routers etc.)                      $      5,000   $       -    $        -     $      -    $        -
     Total Cost to Add Capacity                                        $    581,000   $   20,000   $   10,000     $      -    $        -

     Upgrading Current IT Systems
      Intrusion Detection Systems                                      $    10,000    $       -    $          -   $      -    $        -
      Web Security Installations                                       $    10,000    $       -    $          -   $      -    $        -
      Database mirroring                                               $    40,000    $   10,000   $          -   $      -    $        -
      Total Infrastructure Cost per Data Center                        $    60,000    $       -    $          -   $      -    $        -
      Migration of FP to UNIX from COBOL                               $    50,000    $       -    $          -   $      -    $        -
     Total Cost to Upgrade Systems                                     $   470,000    $   10,000   $          -   $      -    $        -

     Total Projected Cost                                                  $ 1,051,000 $ 30,000 $ 10,000 $             -      $       -
     Cash Flows                                                            $ (756,100) $ 272,420 $ 300,316 $ 318,607          $ 327,312
     Cumulative Cash Flows                                                 $ (756,100) $ (483,680) $ (183,364) $ 135,243      $ 462,555
                                              Breakeaven Period (in years) $       3.6
                                                                      ROI          22.7%
Assumptions:
Reduction in Turnover assumes 5% growth in employees
Rate for programmer labor approx. $50/hr
5.6% average turnover rate at a cost of $4,000 per employee
Average annual cost of IT crime $289,000                                                                                 Back to Presentation
WACC for Mobile Music is 8%

                                                                                                                                           22
Appendix B - Tiered support Model



                       ISSUE     Issue raised that MM
              MM Vendor        1 vendor
                                 is unable to address or
                                 resolve

                                   Issue still unresolved
                                   Passed to Tier 1 Vendor
                       ISSUE       Complete within 24 hours        Less expensive vendor
                               2    Failure to do so results in:
                                                                   Simplistic Problems
             Tier 1 Vendor          loss of money      v
                                    re-negotiating contract        70 - 80% of Problems


                                   Issue still unresolved
                       ISSUE       Passed to Tier 2 Vendor
                                   Complete within 48 hours        More expensive vendor
             Tier 2 Vendor     3    Failure to do so results in:   Complex Problems
                                    loss of money      v           20 - 30% of Problems
                                    re-negotiating contract
Back to Presentation
                                                                                     Page 23
                                                                                           23
Appendix C – Implementing Change Management

    Initiate              Assess &                                                    Verify /
                                             Build & Test        Implement
    Changes               Approve                                                      Close



                                                Specific
                                            development                           Validation that
Departmental IT                              areas builds                         the change was
                                                               Change put into
 create a RFC             IT Steering          -----------                           successful
                                                               implementation
  (request for            Committee             Quality                              -----------
                                                               and production
   change) &            authorizes RFC       assurance of                           RFC ticket
                                                                  -----------
submit it to the         to be built &          change                                 closed
                                                                Any immediate
  IT Steering                tested            -----------                           -----------
                                                                changes made
  Committee                                   Approve to                          Users notified of
                                                move to                               change
                                           implementation


                               Emergency changes        Cannot wait for       After emergency
         Emergency
                                treated differently     approval before       implementation,
          Changes              then typical changes     implementation       change is reviewed
 Back to Presentation
                                                                                                  24
Appendix D - IT Change Management
                                                                                IT Change Management
                                                                                 Process Overview Flow




                                                                                                                                                              6.0 Emergency
                                                                                                                                                                 Changes


                                                                                                       4.0 Release /
             1.0 Initiate Changes          2.0 Assess / Authorize        3.0 Build & Test                                         5.0 Verification
                                                                                                      Implementation
                                                                                                                                                            Emergency Changes are
                                                                                                                                                            defined as: A change with
                                                                                                                                                            sufficient urgency that it can
                                                                                                                                                            not wait for CAB approval
                                            The requestor and the                                                                                           before implementation
                                                                                                     Technical Engineering
             A changed is initiated with    changed coordinator build                                                           Technical Engineering and
                                                                        Application Development      deploys the approved
             the creation of an             out the Detailed RfC and                                                            appropriate business reps
                                                                        builds and tests the         change to production and                               Emergency Changes follow
             Unqualified RfC within a       the Approval Body                                                                   validate that the change
                                                                        change                       creates any additional                                 a separate, abbreviated
             single tool                    authorizes the change to                                                            was successful
                                                                                                     change documentation                                   process
                                            be built and tested
                                                                        QA evaluates changes
             The Approval Body decides                                  against the Test Plans                                  Technical Engineering
             which Unqualified RfC’s                                                                                                                        Emergency Changes
                                                                                                                                updates system
             need to be investigated                                                                                                                        require testing, an
                                                                        Technical Engineering                                   configuration data
             further.                                                                                                                                       abbreviate Implementation
                                                                        creates the Implementation                                                          Plan, and a Roll-back Plan.
                                                                        Plan and Supporting
                                                                        Documents.                                              The RfC and Problem
                                                                                                                                Tickets are closed and
                                                                                                                                appropriate users are       Detailed Emergency
                                                                        The Approval Body reviews                               notified of change          Change documentation is
                                                                        the Implementation Plan                                                             created post-deployment
                                                                        and Approves the move to
                                                                        production
                                                                                                                                                            The CAB reviews all
                                                                                                                                                            Emergency Changes after
                                                                                                                                                            implementation for
                                                                                                                                                            appropriateness




     Back to Presentation
Source: www.knowledgeleader.com                                                                                                                                                           25
Appendix E - 10 principles of IT governance

            • Actively design governance
            • Know when to redesign
            • Involve senior managers
            • Make Choices
            • Clarify exception handling
            • Provide the right incentives
            • Assign ownership and accountability for
              governance
            • Design governance at multiple organizational
              levels
            • Provide transparency and education
            • Implement common mechanisms

          Back to Presentation
Source: Harvard Business School                              26
Appendix F - Standardization of Vendor Management

                                               Stakeholder’s
                                              Responsibilities
                 These controls
                  must ensure
                satisfactory work         SaaS Service Descriptions
                   while being
               transparent about:
                                             Service Availability



                    Costs
                                    SLA        Service Quality


                                              Transparency &
                                              Communication
                    Risks
                                            Penalties / Rewards

                  Benefits
                                          Termination Conditions



  Back to Presentation
                                                                      27
Appendix G – Implementing IT governance


                                         Identify
                                         External
                                         Trigger


                                                           Classify as
                         Monitor                           Strategic
   Governance Board




                                                             Event
                                         Strategic
                                         Direction                          • Criteria
                                              `                             • Category




                                                      Evaluate
                               Deliver
                                                     and Review

                                                                    • Standards
                                                                    • Criteria
                                                                    • Dependencies
                                                                    • Impact
                                          Advisory                  • Risks
                                          Services



  Back to Presentation
                                                                                         28
Appendix H– Enhancing security at MM


                                  IT Security

 Ensure customer transactions                    Ensure sales data on MM’s
 are secure online                               CM system is secure

           Web Security                                 Data Security




  Secure Socket Layers (SSLs)
                                                 Sales information should be
    ensure confidential data
                                                stored behind stricter firewalls
            transfer

   Digital Signatures provide                    Network intrusion scanners
  third-party authentication in                    detect abnormal traffic
          transactions                           patterns to preempt attacks


  Back to Presentation
                                                                                   29
Appendix I – Data Mirroring

                         All resources are on the same network


                                      Main Server                          Mirror Server
                                  1                                        2


    Client Terminal                                  Asynchronous data
                                                    transfer during non-
                                                         peak hours



                 In case Server 1 is unavailable, its IP is assigned to
                 Server 2, which then starts serving the client terminal



  Back to Presentation
                                                                                           30

Más contenido relacionado

La actualidad más candente

Advocate Consulting - Company Overview
Advocate Consulting - Company OverviewAdvocate Consulting - Company Overview
Advocate Consulting - Company OverviewAdvocate Consulting
 
Data Center Operational Efficiency Roundtable
Data Center Operational Efficiency RoundtableData Center Operational Efficiency Roundtable
Data Center Operational Efficiency RoundtableHerb Hernandez
 
15h00 intel - intel big data for aws summits rev3
15h00   intel - intel big data for aws summits rev315h00   intel - intel big data for aws summits rev3
15h00 intel - intel big data for aws summits rev3infolive
 
Intelligent workload management_opportunities_challenges
Intelligent workload management_opportunities_challengesIntelligent workload management_opportunities_challenges
Intelligent workload management_opportunities_challengesNovell
 
Introduccion a SQL Server Master Data Services
Introduccion a SQL Server Master Data ServicesIntroduccion a SQL Server Master Data Services
Introduccion a SQL Server Master Data ServicesEduardo Castro
 
Cloud
CloudCloud
CloudNone
 
01 im overview high level
01 im overview high level01 im overview high level
01 im overview high levelJames Findlay
 
IBM Business MediaShare 2013
IBM Business MediaShare 2013IBM Business MediaShare 2013
IBM Business MediaShare 2013Lorenzo Monaco
 
STRATEGIC USE OF MIS DRGORAD
STRATEGIC USE OF MIS DRGORADSTRATEGIC USE OF MIS DRGORAD
STRATEGIC USE OF MIS DRGORADDeepak R Gorad
 
Fussion Middleware
Fussion MiddlewareFussion Middleware
Fussion Middlewaredidemtopuz
 
Rubik Open Integration Portal
Rubik Open Integration PortalRubik Open Integration Portal
Rubik Open Integration Portalbob_ark
 
Rubik Solutions - Open Integration Portal
Rubik Solutions - Open Integration PortalRubik Solutions - Open Integration Portal
Rubik Solutions - Open Integration Portalviviankap
 
Sapm messaging deck.pptx v4
Sapm messaging deck.pptx v4Sapm messaging deck.pptx v4
Sapm messaging deck.pptx v4IBM_BSM
 
4. it governance a compass without a map v.2.6 pink elephant
4. it governance a compass without a map v.2.6   pink elephant4. it governance a compass without a map v.2.6   pink elephant
4. it governance a compass without a map v.2.6 pink elephantaventia
 
Ajay dhir - The new CIO leader: Managing in challenging times
Ajay dhir - The new CIO leader: Managing in challenging timesAjay dhir - The new CIO leader: Managing in challenging times
Ajay dhir - The new CIO leader: Managing in challenging timesGlobal Business Events
 
Rubik Open Integration Portal
Rubik Open Integration PortalRubik Open Integration Portal
Rubik Open Integration PortalMarcelSteeg
 

La actualidad más candente (18)

Advocate Consulting - Company Overview
Advocate Consulting - Company OverviewAdvocate Consulting - Company Overview
Advocate Consulting - Company Overview
 
Data Center Operational Efficiency Roundtable
Data Center Operational Efficiency RoundtableData Center Operational Efficiency Roundtable
Data Center Operational Efficiency Roundtable
 
15h00 intel - intel big data for aws summits rev3
15h00   intel - intel big data for aws summits rev315h00   intel - intel big data for aws summits rev3
15h00 intel - intel big data for aws summits rev3
 
Intelligent workload management_opportunities_challenges
Intelligent workload management_opportunities_challengesIntelligent workload management_opportunities_challenges
Intelligent workload management_opportunities_challenges
 
Who moved my BI?
Who moved my BI?Who moved my BI?
Who moved my BI?
 
Introduccion a SQL Server Master Data Services
Introduccion a SQL Server Master Data ServicesIntroduccion a SQL Server Master Data Services
Introduccion a SQL Server Master Data Services
 
Cloud
CloudCloud
Cloud
 
01 im overview high level
01 im overview high level01 im overview high level
01 im overview high level
 
Rawat Ibm Compliance Webinar
Rawat Ibm Compliance WebinarRawat Ibm Compliance Webinar
Rawat Ibm Compliance Webinar
 
IBM Business MediaShare 2013
IBM Business MediaShare 2013IBM Business MediaShare 2013
IBM Business MediaShare 2013
 
STRATEGIC USE OF MIS DRGORAD
STRATEGIC USE OF MIS DRGORADSTRATEGIC USE OF MIS DRGORAD
STRATEGIC USE OF MIS DRGORAD
 
Fussion Middleware
Fussion MiddlewareFussion Middleware
Fussion Middleware
 
Rubik Open Integration Portal
Rubik Open Integration PortalRubik Open Integration Portal
Rubik Open Integration Portal
 
Rubik Solutions - Open Integration Portal
Rubik Solutions - Open Integration PortalRubik Solutions - Open Integration Portal
Rubik Solutions - Open Integration Portal
 
Sapm messaging deck.pptx v4
Sapm messaging deck.pptx v4Sapm messaging deck.pptx v4
Sapm messaging deck.pptx v4
 
4. it governance a compass without a map v.2.6 pink elephant
4. it governance a compass without a map v.2.6   pink elephant4. it governance a compass without a map v.2.6   pink elephant
4. it governance a compass without a map v.2.6 pink elephant
 
Ajay dhir - The new CIO leader: Managing in challenging times
Ajay dhir - The new CIO leader: Managing in challenging timesAjay dhir - The new CIO leader: Managing in challenging times
Ajay dhir - The new CIO leader: Managing in challenging times
 
Rubik Open Integration Portal
Rubik Open Integration PortalRubik Open Integration Portal
Rubik Open Integration Portal
 

Destacado

รางวัลระดับเหรียญทอง ศิลปะ เข้าร่วมงานนิทรรศน์ศิลป์ ศิลปินน้อย สพฐ.
รางวัลระดับเหรียญทอง ศิลปะ เข้าร่วมงานนิทรรศน์ศิลป์ ศิลปินน้อย สพฐ.รางวัลระดับเหรียญทอง ศิลปะ เข้าร่วมงานนิทรรศน์ศิลป์ ศิลปินน้อย สพฐ.
รางวัลระดับเหรียญทอง ศิลปะ เข้าร่วมงานนิทรรศน์ศิลป์ ศิลปินน้อย สพฐ.somdetpittayakom school
 
Kurikulum Ro B By
Kurikulum Ro B ByKurikulum Ro B By
Kurikulum Ro B By200801
 
PERC ReVision 2010 Webinar
PERC ReVision 2010 WebinarPERC ReVision 2010 Webinar
PERC ReVision 2010 WebinarJoshHooper
 
2010 Edelman Trust Barometer - Indonesia
2010 Edelman Trust Barometer - Indonesia2010 Edelman Trust Barometer - Indonesia
2010 Edelman Trust Barometer - IndonesiaEdelman Digital
 
Publishing Technology Exectuive Exchange Dec 2012, R. Petway: Futuristic View...
Publishing Technology Exectuive Exchange Dec 2012, R. Petway: Futuristic View...Publishing Technology Exectuive Exchange Dec 2012, R. Petway: Futuristic View...
Publishing Technology Exectuive Exchange Dec 2012, R. Petway: Futuristic View...Publishing Technology
 
ประกาศรับนักเรียนชั้นมัธยมศึกษาปีที่ 1 และชั้นมัธยมศึกษาปีที่ 4
ประกาศรับนักเรียนชั้นมัธยมศึกษาปีที่ 1 และชั้นมัธยมศึกษาปีที่ 4ประกาศรับนักเรียนชั้นมัธยมศึกษาปีที่ 1 และชั้นมัธยมศึกษาปีที่ 4
ประกาศรับนักเรียนชั้นมัธยมศึกษาปีที่ 1 และชั้นมัธยมศึกษาปีที่ 4somdetpittayakom school
 
Adventures in Silicon Valley (from a Brazilians perspective) - my key learnings
Adventures in Silicon Valley (from a Brazilians perspective) - my key learningsAdventures in Silicon Valley (from a Brazilians perspective) - my key learnings
Adventures in Silicon Valley (from a Brazilians perspective) - my key learningsRudi Leismann
 
《氪周刊:互联网创业必读》(第58期).pdf
《氪周刊:互联网创业必读》(第58期).pdf《氪周刊:互联网创业必读》(第58期).pdf
《氪周刊:互联网创业必读》(第58期).pdfChada Chiu
 
แก้ไข ประกาศรับสมัครลูกจ้างชั่วคราว ตำแหน่ง ครูผู้สอน เจ้าหน้าที่สำนักงานและค...
แก้ไข ประกาศรับสมัครลูกจ้างชั่วคราว ตำแหน่ง ครูผู้สอน เจ้าหน้าที่สำนักงานและค...แก้ไข ประกาศรับสมัครลูกจ้างชั่วคราว ตำแหน่ง ครูผู้สอน เจ้าหน้าที่สำนักงานและค...
แก้ไข ประกาศรับสมัครลูกจ้างชั่วคราว ตำแหน่ง ครูผู้สอน เจ้าหน้าที่สำนักงานและค...somdetpittayakom school
 
Mobile + Social + Video
Mobile + Social + VideoMobile + Social + Video
Mobile + Social + VideoRyan Osborn
 
รางวัลระดับเหรียญทอง ศิลปะ
รางวัลระดับเหรียญทอง ศิลปะรางวัลระดับเหรียญทอง ศิลปะ
รางวัลระดับเหรียญทอง ศิลปะsomdetpittayakom school
 
Media behavior: Towards the Transformation Society
Media behavior: Towards the Transformation SocietyMedia behavior: Towards the Transformation Society
Media behavior: Towards the Transformation SocietyThe Transformation Society
 
Le cerveau humain
Le cerveau humainLe cerveau humain
Le cerveau humainJay Ben
 
Apps4 health building for success 2013may16 - pdf format
Apps4 health   building for success 2013may16 - pdf formatApps4 health   building for success 2013may16 - pdf format
Apps4 health building for success 2013may16 - pdf formatAdam Cole
 
Prez2010 Eng Kgy
Prez2010 Eng KgyPrez2010 Eng Kgy
Prez2010 Eng Kgyasd
 
รับสมัครลูกจ้างชั่วคราว ตำแหน่ง ครูผู้สอน (ภาษาอังกฤษ) เจ้าหน้าที่สำนักงานและ...
รับสมัครลูกจ้างชั่วคราว ตำแหน่ง ครูผู้สอน (ภาษาอังกฤษ) เจ้าหน้าที่สำนักงานและ...รับสมัครลูกจ้างชั่วคราว ตำแหน่ง ครูผู้สอน (ภาษาอังกฤษ) เจ้าหน้าที่สำนักงานและ...
รับสมัครลูกจ้างชั่วคราว ตำแหน่ง ครูผู้สอน (ภาษาอังกฤษ) เจ้าหน้าที่สำนักงานและ...somdetpittayakom school
 

Destacado (20)

รางวัลระดับเหรียญทอง ศิลปะ เข้าร่วมงานนิทรรศน์ศิลป์ ศิลปินน้อย สพฐ.
รางวัลระดับเหรียญทอง ศิลปะ เข้าร่วมงานนิทรรศน์ศิลป์ ศิลปินน้อย สพฐ.รางวัลระดับเหรียญทอง ศิลปะ เข้าร่วมงานนิทรรศน์ศิลป์ ศิลปินน้อย สพฐ.
รางวัลระดับเหรียญทอง ศิลปะ เข้าร่วมงานนิทรรศน์ศิลป์ ศิลปินน้อย สพฐ.
 
LA SUBLEVACION DE LA ESCUADRA
LA SUBLEVACION DE LA ESCUADRALA SUBLEVACION DE LA ESCUADRA
LA SUBLEVACION DE LA ESCUADRA
 
Kurikulum Ro B By
Kurikulum Ro B ByKurikulum Ro B By
Kurikulum Ro B By
 
PERC ReVision 2010 Webinar
PERC ReVision 2010 WebinarPERC ReVision 2010 Webinar
PERC ReVision 2010 Webinar
 
The Hairball of Content
The Hairball of ContentThe Hairball of Content
The Hairball of Content
 
2010 Edelman Trust Barometer - Indonesia
2010 Edelman Trust Barometer - Indonesia2010 Edelman Trust Barometer - Indonesia
2010 Edelman Trust Barometer - Indonesia
 
Publishing Technology Exectuive Exchange Dec 2012, R. Petway: Futuristic View...
Publishing Technology Exectuive Exchange Dec 2012, R. Petway: Futuristic View...Publishing Technology Exectuive Exchange Dec 2012, R. Petway: Futuristic View...
Publishing Technology Exectuive Exchange Dec 2012, R. Petway: Futuristic View...
 
ประกาศรับนักเรียนชั้นมัธยมศึกษาปีที่ 1 และชั้นมัธยมศึกษาปีที่ 4
ประกาศรับนักเรียนชั้นมัธยมศึกษาปีที่ 1 และชั้นมัธยมศึกษาปีที่ 4ประกาศรับนักเรียนชั้นมัธยมศึกษาปีที่ 1 และชั้นมัธยมศึกษาปีที่ 4
ประกาศรับนักเรียนชั้นมัธยมศึกษาปีที่ 1 และชั้นมัธยมศึกษาปีที่ 4
 
Adventures in Silicon Valley (from a Brazilians perspective) - my key learnings
Adventures in Silicon Valley (from a Brazilians perspective) - my key learningsAdventures in Silicon Valley (from a Brazilians perspective) - my key learnings
Adventures in Silicon Valley (from a Brazilians perspective) - my key learnings
 
Giroux
GirouxGiroux
Giroux
 
ใบความรู้ที่ 11
ใบความรู้ที่ 11ใบความรู้ที่ 11
ใบความรู้ที่ 11
 
《氪周刊:互联网创业必读》(第58期).pdf
《氪周刊:互联网创业必读》(第58期).pdf《氪周刊:互联网创业必读》(第58期).pdf
《氪周刊:互联网创业必读》(第58期).pdf
 
แก้ไข ประกาศรับสมัครลูกจ้างชั่วคราว ตำแหน่ง ครูผู้สอน เจ้าหน้าที่สำนักงานและค...
แก้ไข ประกาศรับสมัครลูกจ้างชั่วคราว ตำแหน่ง ครูผู้สอน เจ้าหน้าที่สำนักงานและค...แก้ไข ประกาศรับสมัครลูกจ้างชั่วคราว ตำแหน่ง ครูผู้สอน เจ้าหน้าที่สำนักงานและค...
แก้ไข ประกาศรับสมัครลูกจ้างชั่วคราว ตำแหน่ง ครูผู้สอน เจ้าหน้าที่สำนักงานและค...
 
Mobile + Social + Video
Mobile + Social + VideoMobile + Social + Video
Mobile + Social + Video
 
รางวัลระดับเหรียญทอง ศิลปะ
รางวัลระดับเหรียญทอง ศิลปะรางวัลระดับเหรียญทอง ศิลปะ
รางวัลระดับเหรียญทอง ศิลปะ
 
Media behavior: Towards the Transformation Society
Media behavior: Towards the Transformation SocietyMedia behavior: Towards the Transformation Society
Media behavior: Towards the Transformation Society
 
Le cerveau humain
Le cerveau humainLe cerveau humain
Le cerveau humain
 
Apps4 health building for success 2013may16 - pdf format
Apps4 health   building for success 2013may16 - pdf formatApps4 health   building for success 2013may16 - pdf format
Apps4 health building for success 2013may16 - pdf format
 
Prez2010 Eng Kgy
Prez2010 Eng KgyPrez2010 Eng Kgy
Prez2010 Eng Kgy
 
รับสมัครลูกจ้างชั่วคราว ตำแหน่ง ครูผู้สอน (ภาษาอังกฤษ) เจ้าหน้าที่สำนักงานและ...
รับสมัครลูกจ้างชั่วคราว ตำแหน่ง ครูผู้สอน (ภาษาอังกฤษ) เจ้าหน้าที่สำนักงานและ...รับสมัครลูกจ้างชั่วคราว ตำแหน่ง ครูผู้สอน (ภาษาอังกฤษ) เจ้าหน้าที่สำนักงานและ...
รับสมัครลูกจ้างชั่วคราว ตำแหน่ง ครูผู้สอน (ภาษาอังกฤษ) เจ้าหน้าที่สำนักงานและ...
 

Similar a TAMU Case Competition: IT at Mobile Music

B13 Driving Business Intelligence
B13 Driving Business IntelligenceB13 Driving Business Intelligence
B13 Driving Business IntelligenceJohnRobson
 
IBM Smarter Business 2012 - PureSystems - PureData
IBM Smarter Business 2012 - PureSystems - PureDataIBM Smarter Business 2012 - PureSystems - PureData
IBM Smarter Business 2012 - PureSystems - PureDataIBM Sverige
 
B13 Driving Business Intelligence John Robson
B13 Driving Business Intelligence John RobsonB13 Driving Business Intelligence John Robson
B13 Driving Business Intelligence John RobsonProvoke Solutions
 
Bobby.german
Bobby.germanBobby.german
Bobby.germanNASAPMC
 
Datacraft Asia Strategy For Services 2010
Datacraft Asia Strategy For Services 2010Datacraft Asia Strategy For Services 2010
Datacraft Asia Strategy For Services 2010Joshua Hong
 
Service Availability and Performance Management - PCTY 2011
Service Availability and Performance Management - PCTY 2011Service Availability and Performance Management - PCTY 2011
Service Availability and Performance Management - PCTY 2011IBM Sverige
 
Mike2.0 Information Governance Overview
Mike2.0 Information Governance OverviewMike2.0 Information Governance Overview
Mike2.0 Information Governance Overviewsean.mcclowry
 
Getronics - Governance and the Cloud
Getronics - Governance and the CloudGetronics - Governance and the Cloud
Getronics - Governance and the CloudMaurice Remmé
 
Cloudy forecasts and other trends in information technology
Cloudy forecasts and other trends in information technologyCloudy forecasts and other trends in information technology
Cloudy forecasts and other trends in information technologyAlan McSweeney
 
Estudo Gartner - IT360 ManageEngine
Estudo Gartner -  IT360 ManageEngineEstudo Gartner -  IT360 ManageEngine
Estudo Gartner - IT360 ManageEngineINSPIRIT BRASIL
 
Sales And Marketing Strategies For Sm Es By Ashim Bose Of The Aktion Group
Sales And Marketing Strategies For Sm Es By Ashim Bose Of The Aktion GroupSales And Marketing Strategies For Sm Es By Ashim Bose Of The Aktion Group
Sales And Marketing Strategies For Sm Es By Ashim Bose Of The Aktion GroupNasscom Chennai
 
Top 10 Imperatives for Leading a Successful IT Improvement Program
Top 10 Imperatives for Leading a Successful IT Improvement ProgramTop 10 Imperatives for Leading a Successful IT Improvement Program
Top 10 Imperatives for Leading a Successful IT Improvement ProgramCognizant
 
Information på agendaen
Information på agendaenInformation på agendaen
Information på agendaenIBM Danmark
 
Banking Solutions: Managing Customer Data to Improve Efficiency
Banking Solutions: Managing Customer Data to Improve EfficiencyBanking Solutions: Managing Customer Data to Improve Efficiency
Banking Solutions: Managing Customer Data to Improve EfficiencyIBM Banking
 
Rethink IT. Reinvent Business. - Dharanibalan Gurunathan
Rethink IT. Reinvent Business. - Dharanibalan GurunathanRethink IT. Reinvent Business. - Dharanibalan Gurunathan
Rethink IT. Reinvent Business. - Dharanibalan GurunathanJyothi Satyanathan
 
DB2 for z/OS Update Data Warehousing On System Z
DB2 for z/OS Update Data Warehousing On System ZDB2 for z/OS Update Data Warehousing On System Z
DB2 for z/OS Update Data Warehousing On System ZSurekha Parekh
 
20100430 introduction to business objects data services
20100430 introduction to business objects data services20100430 introduction to business objects data services
20100430 introduction to business objects data servicesJunhyun Song
 

Similar a TAMU Case Competition: IT at Mobile Music (20)

B13 Driving Business Intelligence
B13 Driving Business IntelligenceB13 Driving Business Intelligence
B13 Driving Business Intelligence
 
IBM Smarter Business 2012 - PureSystems - PureData
IBM Smarter Business 2012 - PureSystems - PureDataIBM Smarter Business 2012 - PureSystems - PureData
IBM Smarter Business 2012 - PureSystems - PureData
 
B13 Driving Business Intelligence John Robson
B13 Driving Business Intelligence John RobsonB13 Driving Business Intelligence John Robson
B13 Driving Business Intelligence John Robson
 
Bobby.german
Bobby.germanBobby.german
Bobby.german
 
Lean IT
Lean ITLean IT
Lean IT
 
Datacraft Asia Strategy For Services 2010
Datacraft Asia Strategy For Services 2010Datacraft Asia Strategy For Services 2010
Datacraft Asia Strategy For Services 2010
 
Service Availability and Performance Management - PCTY 2011
Service Availability and Performance Management - PCTY 2011Service Availability and Performance Management - PCTY 2011
Service Availability and Performance Management - PCTY 2011
 
Mike2.0 Information Governance Overview
Mike2.0 Information Governance OverviewMike2.0 Information Governance Overview
Mike2.0 Information Governance Overview
 
Hawaii OIMT presentation
Hawaii OIMT presentationHawaii OIMT presentation
Hawaii OIMT presentation
 
Getronics - Governance and the Cloud
Getronics - Governance and the CloudGetronics - Governance and the Cloud
Getronics - Governance and the Cloud
 
Business process based analytics
Business process based analyticsBusiness process based analytics
Business process based analytics
 
Cloudy forecasts and other trends in information technology
Cloudy forecasts and other trends in information technologyCloudy forecasts and other trends in information technology
Cloudy forecasts and other trends in information technology
 
Estudo Gartner - IT360 ManageEngine
Estudo Gartner -  IT360 ManageEngineEstudo Gartner -  IT360 ManageEngine
Estudo Gartner - IT360 ManageEngine
 
Sales And Marketing Strategies For Sm Es By Ashim Bose Of The Aktion Group
Sales And Marketing Strategies For Sm Es By Ashim Bose Of The Aktion GroupSales And Marketing Strategies For Sm Es By Ashim Bose Of The Aktion Group
Sales And Marketing Strategies For Sm Es By Ashim Bose Of The Aktion Group
 
Top 10 Imperatives for Leading a Successful IT Improvement Program
Top 10 Imperatives for Leading a Successful IT Improvement ProgramTop 10 Imperatives for Leading a Successful IT Improvement Program
Top 10 Imperatives for Leading a Successful IT Improvement Program
 
Information på agendaen
Information på agendaenInformation på agendaen
Information på agendaen
 
Banking Solutions: Managing Customer Data to Improve Efficiency
Banking Solutions: Managing Customer Data to Improve EfficiencyBanking Solutions: Managing Customer Data to Improve Efficiency
Banking Solutions: Managing Customer Data to Improve Efficiency
 
Rethink IT. Reinvent Business. - Dharanibalan Gurunathan
Rethink IT. Reinvent Business. - Dharanibalan GurunathanRethink IT. Reinvent Business. - Dharanibalan Gurunathan
Rethink IT. Reinvent Business. - Dharanibalan Gurunathan
 
DB2 for z/OS Update Data Warehousing On System Z
DB2 for z/OS Update Data Warehousing On System ZDB2 for z/OS Update Data Warehousing On System Z
DB2 for z/OS Update Data Warehousing On System Z
 
20100430 introduction to business objects data services
20100430 introduction to business objects data services20100430 introduction to business objects data services
20100430 introduction to business objects data services
 

TAMU Case Competition: IT at Mobile Music

  • 1. IT Strategy for MobileMusic Ensuring business growth through robust IT Team 1 - Scott Brier - Sanjay Joshi - Cerena Olsen April 9th, 2010 SUIT Case Competition
  • 2. Agenda MM’s current business & IT landscape Action items to align IT with business objectives Addition of capacity at data centers Upgrades in current IT systems IT governance and service management Conclusion and Q&A 2
  • 3. MM’s current IT landscape does not adequately support its business strategy MM’s Business Strategy MM’s IT Landscape Focus on aggressive growth “Reactive” approach to growth Emphasis on customer Customer experience affected by experience IT limitations Transition from a “startup” to a Lack of centralized IT managed environment management MM must immediately realign its IT priorities to match business priorities 3
  • 4. MM must immediately invest in expanding IT infrastructure, upgrade systems and introduce IT governance policies IT Action Items 1 MM’s Future IT Strategy Add capacity “Proactive” approach to growth 2 Enable positive customer experience Upgrade IT systems Centralized IT service 3 management Manage IT growth through IT Governance 4
  • 5. Data center capacity should be expanded immediately to roll out the new service offerings IT Action Items 1 MM’s IT Strategy Add capacity “Proactive” approach to growth 2 Enable positive customer experience Upgrade IT systems Centralized IT service 3 management Manage IT growth through IT Governance Action Item: CAPACITY 5
  • 6. MM needs higher infrastructure capacity to support growing user base and expand service offerings Music 100 MB per user Games Audio Books Matchmaking For 1 million users  100 Terabytes Service capacity needed at each center = 15 Terabytes With the current “reactive” approach, IT will be unable to support this user base Action Item: CAPACITY 6
  • 7. MM’s existing strategy of adding capacity reactively will lead to severe capacity bottlenecks by 2012 MM's Infrastructure ability to meet customer demands 2010 - 2020 1000 900 Data Capacity (in Terabytes) 800 Data needs 700 600 500 400 300 200 100 Data capacity 0 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 Action Item: CAPACITY 7
  • 8. Adding capacity first is an important step towards ensuring business readiness and systems availability Enables immediate Ensures availability as rollout of services existing IT systems are upgraded Advantages Meeting business priorities will ensure stakeholder support for future IT initiatives Action Item: CAPACITY 8
  • 9. An upgrade of current IT systems will remove security and availability problems that impact customer experience IT Action Items 1 MM’s IT Strategy Add capacity “Proactive” approach to growth 2 Enable positive customer experience Upgrade IT systems Centralized IT service 3 management Manage IT growth through IT Governance Action Item: UPGRADE 9
  • 10. Security and systems integration issues directly impact customer experience and need to be fixed early Challenges Impact Customer data compromise Customer trust decreases Customer satisfaction System downtime decreases Systems integration issues Data inconsistency, downtime Investing in security and availability upgrades will save potential losses of $144,500 every year See Appendix A Action Item: UPGRADE 10
  • 11. Security and availability of the SM/CM are critical to retain customer trust and loyalty Security Availability Web Security – Digital Database Mirroring for Signatures, Secure Socket redundancy Layers (SSls) Data Security – Intrusion Added infrastructure Detectors, Secured capacity Perimeters See Appendix H See Appendix I Higher availability will reduce employee frustration with system inefficiencies ----------------------------------------------- Annual average savings over 5 years due to decreased turnover: $166,000 / yr See Appendix A Action Item: UPGRADE 11
  • 12. Finance and Procurement System should be upgraded from COBOL to UNIX to resolve integration issues Needs Limited availability Interfacing issues specialized COBOL due to with UNIX based skills COBOL Logistics System Migrate Finance and Procurement System (FP) to UNIX Streamlined system Elimination of interaction specialized skill set Action Item: UPGRADE 12
  • 13. MM’s investment in expanding capacity and upgrading IT systems brings significant advantages at a relatively low cost Adding Capacity Cost (USD) Storage Systems (1 PetaByte) $100,000 Total Upgrade Costs Memory Capacity (192 GB) $8,000 $1.33 million USD Network Devices (Multiservice router etc.) $5,000 Total Infrastructure Cost per Data Center $113,000 Total Cost to Add Capacity $791,000 This investment will prepare MM for any Cost (USD) future customer & Upgrading Current IT Systems service growth Intrusion Detection Systems $10,000 Web Security Installations $10,000 Database mirroring $50,000 Cumulative budget of Total Infrastructure Cost per Data Center $70,000 IT still below 10 Migration of FP to UNIX from COBOL $50,000 percent of revenue Total Cost to upgrade Systems $540,000 Recap 13
  • 14. Adding capacity and upgrading IT systems can be completed within five months BUSINESS BENEFITS Infrastructure 1 Ability to roll out Expansion 1 Month new services ASAP Security measures 2 Secure customer implemented data 1 Month Data Mirroring at 3 High system all centers availability 1 Month Migration of FP Elimination of system 4 architectural From COBOL to inefficiencies UNIX 3 Months Time Recap 14
  • 15. Support for future growth can be achieved through the use of centralized IT governance IT Action Items 1 MM’s IT Strategy Add capacity “Proactive” approach to growth 2 Enable positive customer experience Upgrade IT systems Centralized IT service 3 management Manage IT growth through IT Governance Action Item: GOVERNANCE 15
  • 16. An IT Governance Board will improve technology management and enable business-focused IT service delivery IT Governance Board See Appendix E STRUCTURE MISSION Define and IT Director document service levels Business IT Corporate Standardize and Partners Representatives Partners implement IT Policies See Appendix G Action Item: GOVERNANCE 16
  • 17. Identifying service levels will enable IT to meet MM’s business needs and also manage internal operations Why service levels? Maintain communication Service levels pertinent to MM’s 1 between IT and business IT department include: customers • Percentage of service level defaults • Number of review meetings 2 End user satisfaction per year • Percentage of users satisfied - CSAT • Number and severity of Create internal performance service breaches 3 benchmarks and key See Appendix B performance indicators Action Item: GOVERNANCE 17
  • 18. Standardization of IT management & governance components will increase operational efficiency and manage growth Why standardization? Components that must be standardized: Increased efficiencies in Change Management 1 processes and systems See Appendix C & D Test, document, and promote centralized business continuity plan Capitalize economies of scale to 2 decrease support costs Vendor Management See Appendix F Provide structure for managed Hardware & software guidelines 3 growth Action Item: GOVERNANCE 18
  • 19. Creation of the governance board and IT management processes will begin in conjunction with architecture changes Infrastructure Capacity Expansion 1 Month Security measures implemented 1 Month Data Mirroring at all Update centers 1 Month Migration of FP system From COBOL to UNIX 3Months Creation of a governance board 1 Month SLA Creation & Governance Process Continuation of standardization efforts Time 19
  • 20. Shifting to a business-focused IT strategy is the first step in making IT more central in MM’s future corporate strategy Next Steps MM’s IT Strategy Continued success depends on IT leaders frequently “Proactive” approach to growth talking to business Corporate Board should view Ensuring positive customer IT as more strategic and less experience as support Centralized IT service IT can increase profit management through added projects like Business Intelligence 20
  • 22. Appendix A - Financials 2010 2011 2012 2013 2014 Benefits from Cost Savings Reduction in computer crime from added security $ 144,500 $ 144,500 $ 144,500 $ 144,500 $ 144,500 Reduction in employee turnover $ 150,400 $ 157,920 $ 165,816 $ 174,107 $ 182,812 Total Savings $ 294,900 $ 302,420 $ 310,316 $ 318,607 $ 327,312 Adding Capacity Storage Systems (1 PetaByte) $ 70,000 $ 20,000 $ 10,000 $ - $ - Memory Capacity (192 GB) $ 8,000 $ - $ - $ - $ - Network Devices (Multiservice routers etc.) $ 5,000 $ - $ - $ - $ - Total Cost to Add Capacity $ 581,000 $ 20,000 $ 10,000 $ - $ - Upgrading Current IT Systems Intrusion Detection Systems $ 10,000 $ - $ - $ - $ - Web Security Installations $ 10,000 $ - $ - $ - $ - Database mirroring $ 40,000 $ 10,000 $ - $ - $ - Total Infrastructure Cost per Data Center $ 60,000 $ - $ - $ - $ - Migration of FP to UNIX from COBOL $ 50,000 $ - $ - $ - $ - Total Cost to Upgrade Systems $ 470,000 $ 10,000 $ - $ - $ - Total Projected Cost $ 1,051,000 $ 30,000 $ 10,000 $ - $ - Cash Flows $ (756,100) $ 272,420 $ 300,316 $ 318,607 $ 327,312 Cumulative Cash Flows $ (756,100) $ (483,680) $ (183,364) $ 135,243 $ 462,555 Breakeaven Period (in years) $ 3.6 ROI 22.7% Assumptions: Reduction in Turnover assumes 5% growth in employees Rate for programmer labor approx. $50/hr 5.6% average turnover rate at a cost of $4,000 per employee Average annual cost of IT crime $289,000 Back to Presentation WACC for Mobile Music is 8% 22
  • 23. Appendix B - Tiered support Model ISSUE Issue raised that MM MM Vendor 1 vendor is unable to address or resolve Issue still unresolved Passed to Tier 1 Vendor ISSUE Complete within 24 hours Less expensive vendor 2 Failure to do so results in: Simplistic Problems Tier 1 Vendor loss of money v re-negotiating contract 70 - 80% of Problems Issue still unresolved ISSUE Passed to Tier 2 Vendor Complete within 48 hours More expensive vendor Tier 2 Vendor 3 Failure to do so results in: Complex Problems loss of money v 20 - 30% of Problems re-negotiating contract Back to Presentation Page 23 23
  • 24. Appendix C – Implementing Change Management Initiate Assess & Verify / Build & Test Implement Changes Approve Close Specific development Validation that Departmental IT areas builds the change was Change put into create a RFC IT Steering ----------- successful implementation (request for Committee Quality ----------- and production change) & authorizes RFC assurance of RFC ticket ----------- submit it to the to be built & change closed Any immediate IT Steering tested ----------- ----------- changes made Committee Approve to Users notified of move to change implementation Emergency changes Cannot wait for After emergency Emergency treated differently approval before implementation, Changes then typical changes implementation change is reviewed Back to Presentation 24
  • 25. Appendix D - IT Change Management IT Change Management Process Overview Flow 6.0 Emergency Changes 4.0 Release / 1.0 Initiate Changes 2.0 Assess / Authorize 3.0 Build & Test 5.0 Verification Implementation Emergency Changes are defined as: A change with sufficient urgency that it can not wait for CAB approval The requestor and the before implementation Technical Engineering A changed is initiated with changed coordinator build Technical Engineering and Application Development deploys the approved the creation of an out the Detailed RfC and appropriate business reps builds and tests the change to production and Emergency Changes follow Unqualified RfC within a the Approval Body validate that the change change creates any additional a separate, abbreviated single tool authorizes the change to was successful change documentation process be built and tested QA evaluates changes The Approval Body decides against the Test Plans Technical Engineering which Unqualified RfC’s Emergency Changes updates system need to be investigated require testing, an Technical Engineering configuration data further. abbreviate Implementation creates the Implementation Plan, and a Roll-back Plan. Plan and Supporting Documents. The RfC and Problem Tickets are closed and appropriate users are Detailed Emergency The Approval Body reviews notified of change Change documentation is the Implementation Plan created post-deployment and Approves the move to production The CAB reviews all Emergency Changes after implementation for appropriateness Back to Presentation Source: www.knowledgeleader.com 25
  • 26. Appendix E - 10 principles of IT governance • Actively design governance • Know when to redesign • Involve senior managers • Make Choices • Clarify exception handling • Provide the right incentives • Assign ownership and accountability for governance • Design governance at multiple organizational levels • Provide transparency and education • Implement common mechanisms Back to Presentation Source: Harvard Business School 26
  • 27. Appendix F - Standardization of Vendor Management Stakeholder’s Responsibilities These controls must ensure satisfactory work SaaS Service Descriptions while being transparent about: Service Availability Costs SLA Service Quality Transparency & Communication Risks Penalties / Rewards Benefits Termination Conditions Back to Presentation 27
  • 28. Appendix G – Implementing IT governance Identify External Trigger Classify as Monitor Strategic Governance Board Event Strategic Direction • Criteria ` • Category Evaluate Deliver and Review • Standards • Criteria • Dependencies • Impact Advisory • Risks Services Back to Presentation 28
  • 29. Appendix H– Enhancing security at MM IT Security Ensure customer transactions Ensure sales data on MM’s are secure online CM system is secure Web Security Data Security Secure Socket Layers (SSLs) Sales information should be ensure confidential data stored behind stricter firewalls transfer Digital Signatures provide Network intrusion scanners third-party authentication in detect abnormal traffic transactions patterns to preempt attacks Back to Presentation 29
  • 30. Appendix I – Data Mirroring All resources are on the same network Main Server Mirror Server 1 2 Client Terminal Asynchronous data transfer during non- peak hours In case Server 1 is unavailable, its IP is assigned to Server 2, which then starts serving the client terminal Back to Presentation 30

Notas del editor

  1. ADD IN “TRACKER”
  2. Add in link to fin’cls
  3. Take a moment to assess what we’ve recommended and the costs & time associated with it.
  4. “Speak the same language”btwn IT and business
  5. To ensure continued future success of ourreccomendations, these meetings need to take place freq. The director of IT needs a palce at the corportaet board.As a result of this, IT director need to actively engage board members to get face time to get IT intiaitves carried out to ensure future succsess