Why is
Incheon Airport
THE WORLD’S BEST AIRPORT
for 6 years?
*Current condition*
Introduction:
Airport and Airway System
・Incheon Airport celebrated the tenth anniversary of its opening in 2011
・The first ever airport to be nominated as the World Best Airport
for the six consecutive years
Customer-centered service 
Innovation activities
→ Incheon airport has now become a World’s favorite airport!
*Current condition*
*Airport Setting*
・Incheon International Airport (ICN) is around 32 miles from Seoul city
*Terminal Area*
・The main passenger terminal (0.2 sq mile) is the ninth
largest passenger terminal in the world
・Construction cost : 121million
*Utilities*
Energy Self-Reliance:
・Has carried out viability analysis to introduce renewable energy resources
・Has established a mid-long term renewable energy introduction plan
・5 units of solar (100 KW) and wind (10 KW) generation facilities
Water:
・Is secured from the Incheon public water supply’s official water treatment
plant
・Is stored in a water supply reservoir of approximately 100 thousand ton
capacity
Eco-friendly Airport:
・Has established an eco-friendly green management strategy
*Government Structure*
Incheon Airport is governed by Incheon International Airport Corporation,
but its shares are wholly owned by the Korean government
*Airport Development History*
・After the Seoul Olympics of 1998, international air traffic to Korea increased
・Construction of the Incheon airport began in November 1992
・Officially opened in March 2001
・Airbus A380 landed at the airport as part of first leg of its certification trip on
15 November, 2006
・Yeongjong Medical Center has been constructed this year
*Current Issues in the Media for
the airport and the community*
・Speedy and accurate service at the customs and quarantine
・The shortest transition between aircrafts’ landing point
・Technical support for safe take-off and landing of aircrafts
Aviation Demand Forecast
*National trends*
- Energy management
: In spite of the significant increase airport
operation,
the energy increased only by 1.6%
- Electricity Consumption
: 0.04% decrease in electricity use
: using 5 units of solar and wind generation
facilities
*Selection of Forecasts*
• Passenger Forecast System
– Account the total number of passengers
according to departure lounge and by the hour
*Commercial service Forecasts*
• Airport Expansion as Northeast Asian Hub
• Increase Passenger Capacity
From 44 million to 62 million
• Increase Cargo Handling
From 4.8 million tons to 5.8 million tons
*Aircraft Utilization*
- the full range of commercial aircraft types including A380
*Runway Information*
- three parallel paved asphalt runways
4,000m x 1 / 3,750 x 2
- Runway lighting system
Facility Requirements
*Airfield Capacity*
Facility Requirements
*Landing Aids*
- the 22 story Control tower
100.4 meters tall
*Worldwide Network*
Facility Requirements
*Landside Facilities*
- 6 Cargo Terminals, 5 separate warehouses
1.7 million tons of cargo per year
3.8 million tons of cargo per year
Facility Requirements
Development Alternatives
*Airside Development Alternatives*
- Phase 3
: second passenger terminal
: 62 million passengers and 5.8 million tons
of cargo per year
- Phase 4
: five parallel runways
: 100 million passengers and 7 million tons of
cargo annually
*Landside Development Alternatives*
- “ Green Airport”
Development Alternatives
*“Airport City”*
・World-class mega hub airport
・A leader of
the world aviation industry
Development Alternatives
Airport Plans
*Airport Layout Plan*
– Airport City
1. IBC-I Second Phase Development Area
2. IBC-II Development Area
3. South Water Basin Development Area
*Terminal Area Plan*
– New design
*Airport Property*
– 15,000 acres
Phase 1. Creating Airport Support Community
Phase 2. Expanding the Airport Support
Community
Phase 3. Creating Commercial Area
Airport Plans
Financial Plan
*Development and Capital Improvement Plan*
– Reduction of Airport Service Charges
through Diversification of Profits
– Government Support Program
– Win-win cooperation Program
– Creating Jobs
*Funding Sources*
– The workplace for 5,933 partners from 43
companies
– Resident of the Yeongjong and Yongyu areas
*Building and Land Leases*
– Economic Effects of Concession Projects
– Support for Stabilization of Airport Tenant Company Sales
Financial Plan
Conclusion
・Incheon International Airport is one of the
largest airports in Asia and, the world
・Incheon Airport mainly focuses on “Airport City”. Its massive land area has
been planned and parceled out for complementary aeronautical and non-
aeronautical uses.
In 2015:
Incheon Airport’s annual passenger capacity will be increase to 62 million and its
annual cargo capacity to 5.8 million tons.
Non-aeronautical use is two major commercial zones that are International Business
Center I and International Business Center II, and a sports and recreation water park.
There are hotels, office buildings, a global medical center, and retail facilities in the
near future. IBC-II area has been planned for entertainment and leisure complexes
for tourists.
→ “Airport City” provides outstanding level
of airport service to everyone!
Thank you so much for listening 

Más contenido relacionado

La actualidad más candente

08-Airport Configuration-1 ( Highway and Airport Engineering Dr. Sherif El-Ba...
08-Airport Configuration-1 ( Highway and Airport Engineering Dr. Sherif El-Ba...08-Airport Configuration-1 ( Highway and Airport Engineering Dr. Sherif El-Ba...
08-Airport Configuration-1 ( Highway and Airport Engineering Dr. Sherif El-Ba...Hossam Shafiq I
 
Design and planning of airport
Design and planning of airportDesign and planning of airport
Design and planning of airportHarshit P Jain
 
AIRPORT PLANNING AND DESIGN
AIRPORT PLANNING AND DESIGNAIRPORT PLANNING AND DESIGN
AIRPORT PLANNING AND DESIGNNiranjan Varma
 
Planning OF AIRPORT REQUIREMENTS OF AIR PORT TERMINAL AREA RUNWAY LENGTH
Planning OF AIRPORT REQUIREMENTS OF AIR PORT TERMINAL AREA RUNWAY LENGTH Planning OF AIRPORT REQUIREMENTS OF AIR PORT TERMINAL AREA RUNWAY LENGTH
Planning OF AIRPORT REQUIREMENTS OF AIR PORT TERMINAL AREA RUNWAY LENGTH RAMPRASAD KUMAWAT
 
Public Private Partnership In Indian Airports
Public Private Partnership In Indian AirportsPublic Private Partnership In Indian Airports
Public Private Partnership In Indian AirportsJetline Marvel
 
overview on airport operation
overview on airport operationoverview on airport operation
overview on airport operationAiDY
 
Layout of Airport Planning
Layout of Airport PlanningLayout of Airport Planning
Layout of Airport PlanningManoharanM12
 
Airport Planning & Terminal Building Design
Airport Planning & Terminal Building DesignAirport Planning & Terminal Building Design
Airport Planning & Terminal Building DesignSiniša Prvanov
 
Terminal Design
Terminal DesignTerminal Design
Terminal DesignMal Mai
 
Presentation on Airport Engineering
Presentation on Airport EngineeringPresentation on Airport Engineering
Presentation on Airport EngineeringAbhishekChavan63
 
10-Runway Design ( Highway and Airport Engineering Dr. Sherif El-Badawy )
10-Runway Design ( Highway and Airport Engineering Dr. Sherif El-Badawy )10-Runway Design ( Highway and Airport Engineering Dr. Sherif El-Badawy )
10-Runway Design ( Highway and Airport Engineering Dr. Sherif El-Badawy )Hossam Shafiq I
 
airside operation 3
airside operation 3airside operation 3
airside operation 3AiDY
 
1.introduction
1.introduction1.introduction
1.introductionMani Vel
 
Airport planning
Airport planning Airport planning
Airport planning Sonali99999
 
Design elements of airport taxiway
Design elements of airport taxiwayDesign elements of airport taxiway
Design elements of airport taxiwayAsok999
 
Airport capacity and airport marking
Airport capacity and airport markingAirport capacity and airport marking
Airport capacity and airport markingIsmailQubaisMotiya
 

La actualidad más candente (20)

08-Airport Configuration-1 ( Highway and Airport Engineering Dr. Sherif El-Ba...
08-Airport Configuration-1 ( Highway and Airport Engineering Dr. Sherif El-Ba...08-Airport Configuration-1 ( Highway and Airport Engineering Dr. Sherif El-Ba...
08-Airport Configuration-1 ( Highway and Airport Engineering Dr. Sherif El-Ba...
 
Design and planning of airport
Design and planning of airportDesign and planning of airport
Design and planning of airport
 
AIRPORT PLANNING AND DESIGN
AIRPORT PLANNING AND DESIGNAIRPORT PLANNING AND DESIGN
AIRPORT PLANNING AND DESIGN
 
Airport Layout
Airport LayoutAirport Layout
Airport Layout
 
Planning OF AIRPORT REQUIREMENTS OF AIR PORT TERMINAL AREA RUNWAY LENGTH
Planning OF AIRPORT REQUIREMENTS OF AIR PORT TERMINAL AREA RUNWAY LENGTH Planning OF AIRPORT REQUIREMENTS OF AIR PORT TERMINAL AREA RUNWAY LENGTH
Planning OF AIRPORT REQUIREMENTS OF AIR PORT TERMINAL AREA RUNWAY LENGTH
 
Public Private Partnership In Indian Airports
Public Private Partnership In Indian AirportsPublic Private Partnership In Indian Airports
Public Private Partnership In Indian Airports
 
overview on airport operation
overview on airport operationoverview on airport operation
overview on airport operation
 
Layout of Airport Planning
Layout of Airport PlanningLayout of Airport Planning
Layout of Airport Planning
 
Airport layout
Airport layoutAirport layout
Airport layout
 
Airport Management 11
Airport Management  11Airport Management  11
Airport Management 11
 
Airport Planning & Terminal Building Design
Airport Planning & Terminal Building DesignAirport Planning & Terminal Building Design
Airport Planning & Terminal Building Design
 
Terminal Design
Terminal DesignTerminal Design
Terminal Design
 
Presentation on Airport Engineering
Presentation on Airport EngineeringPresentation on Airport Engineering
Presentation on Airport Engineering
 
10-Runway Design ( Highway and Airport Engineering Dr. Sherif El-Badawy )
10-Runway Design ( Highway and Airport Engineering Dr. Sherif El-Badawy )10-Runway Design ( Highway and Airport Engineering Dr. Sherif El-Badawy )
10-Runway Design ( Highway and Airport Engineering Dr. Sherif El-Badawy )
 
CHANGI AIRPORT
CHANGI AIRPORTCHANGI AIRPORT
CHANGI AIRPORT
 
airside operation 3
airside operation 3airside operation 3
airside operation 3
 
1.introduction
1.introduction1.introduction
1.introduction
 
Airport planning
Airport planning Airport planning
Airport planning
 
Design elements of airport taxiway
Design elements of airport taxiwayDesign elements of airport taxiway
Design elements of airport taxiway
 
Airport capacity and airport marking
Airport capacity and airport markingAirport capacity and airport marking
Airport capacity and airport marking
 

Destacado

INCHEON INTERNATIONAL AIRPORT - SEOUL
INCHEON INTERNATIONAL AIRPORT - SEOULINCHEON INTERNATIONAL AIRPORT - SEOUL
INCHEON INTERNATIONAL AIRPORT - SEOULsylhadisaputri
 
Incheon airport presentation 이것이 완전 최종본이다.
Incheon airport presentation 이것이 완전 최종본이다.Incheon airport presentation 이것이 완전 최종본이다.
Incheon airport presentation 이것이 완전 최종본이다.Sonam Dhendup
 
Daniel Link - Promoting Port Resiliency - IDRC Davos Presentation
Daniel Link - Promoting Port Resiliency - IDRC Davos PresentationDaniel Link - Promoting Port Resiliency - IDRC Davos Presentation
Daniel Link - Promoting Port Resiliency - IDRC Davos PresentationGlobal Risk Forum GRFDavos
 
REGENASS-Insurability of high impact low probability events-ID1456-IDRC2014_b
REGENASS-Insurability of high impact low probability events-ID1456-IDRC2014_bREGENASS-Insurability of high impact low probability events-ID1456-IDRC2014_b
REGENASS-Insurability of high impact low probability events-ID1456-IDRC2014_bGlobal Risk Forum GRFDavos
 
India Aviation ICT Forum 2013 - Adonis Succar, SITA
India Aviation ICT Forum 2013 - Adonis Succar, SITAIndia Aviation ICT Forum 2013 - Adonis Succar, SITA
India Aviation ICT Forum 2013 - Adonis Succar, SITASITA
 
Wasso Hospital - Short analysis of a District Hospital in Tanzania
Wasso Hospital - Short analysis of a District Hospital in TanzaniaWasso Hospital - Short analysis of a District Hospital in Tanzania
Wasso Hospital - Short analysis of a District Hospital in TanzaniaChristian van Rij
 
Migration plan for District Trishuli Hospital Nuwakot 2016
Migration plan for District Trishuli Hospital Nuwakot 2016Migration plan for District Trishuli Hospital Nuwakot 2016
Migration plan for District Trishuli Hospital Nuwakot 2016Deepak TIMSINA
 
Hospital sector 39
Hospital sector 39Hospital sector 39
Hospital sector 39Shyam Singh
 
Landfill
LandfillLandfill
LandfillVanessa
 
Solid waste management model
Solid waste management modelSolid waste management model
Solid waste management modelEshwari P
 
Non-Profit Marketing Communications Strategy
Non-Profit Marketing Communications StrategyNon-Profit Marketing Communications Strategy
Non-Profit Marketing Communications StrategyFlint Group
 
Making introductions in presentation
Making introductions in presentationMaking introductions in presentation
Making introductions in presentationLinh Bear
 
Design & construction of secure waste landfill
Design & construction of secure waste landfillDesign & construction of secure waste landfill
Design & construction of secure waste landfillKezar Ali. Shah
 
SOLID WASTE MANAGEMENT PROJECT
SOLID WASTE MANAGEMENT PROJECTSOLID WASTE MANAGEMENT PROJECT
SOLID WASTE MANAGEMENT PROJECTTrishan Perera
 
Annex 14 ppt cheng
Annex 14 ppt chengAnnex 14 ppt cheng
Annex 14 ppt chengguestb793fe2
 
Halifax International Airport Authority presentation
Halifax International Airport Authority presentationHalifax International Airport Authority presentation
Halifax International Airport Authority presentationHalifax_Gateway
 

Destacado (20)

INCHEON INTERNATIONAL AIRPORT - SEOUL
INCHEON INTERNATIONAL AIRPORT - SEOULINCHEON INTERNATIONAL AIRPORT - SEOUL
INCHEON INTERNATIONAL AIRPORT - SEOUL
 
Incheon airport presentation 이것이 완전 최종본이다.
Incheon airport presentation 이것이 완전 최종본이다.Incheon airport presentation 이것이 완전 최종본이다.
Incheon airport presentation 이것이 완전 최종본이다.
 
Daniel Link - Promoting Port Resiliency - IDRC Davos Presentation
Daniel Link - Promoting Port Resiliency - IDRC Davos PresentationDaniel Link - Promoting Port Resiliency - IDRC Davos Presentation
Daniel Link - Promoting Port Resiliency - IDRC Davos Presentation
 
REGENASS-Insurability of high impact low probability events-ID1456-IDRC2014_b
REGENASS-Insurability of high impact low probability events-ID1456-IDRC2014_bREGENASS-Insurability of high impact low probability events-ID1456-IDRC2014_b
REGENASS-Insurability of high impact low probability events-ID1456-IDRC2014_b
 
India Aviation ICT Forum 2013 - Adonis Succar, SITA
India Aviation ICT Forum 2013 - Adonis Succar, SITAIndia Aviation ICT Forum 2013 - Adonis Succar, SITA
India Aviation ICT Forum 2013 - Adonis Succar, SITA
 
Wasso Hospital - Short analysis of a District Hospital in Tanzania
Wasso Hospital - Short analysis of a District Hospital in TanzaniaWasso Hospital - Short analysis of a District Hospital in Tanzania
Wasso Hospital - Short analysis of a District Hospital in Tanzania
 
Migration plan for District Trishuli Hospital Nuwakot 2016
Migration plan for District Trishuli Hospital Nuwakot 2016Migration plan for District Trishuli Hospital Nuwakot 2016
Migration plan for District Trishuli Hospital Nuwakot 2016
 
Hospital sector 39
Hospital sector 39Hospital sector 39
Hospital sector 39
 
Landfill revised
Landfill revisedLandfill revised
Landfill revised
 
Landfill
LandfillLandfill
Landfill
 
Solid waste management model
Solid waste management modelSolid waste management model
Solid waste management model
 
Non-Profit Marketing Communications Strategy
Non-Profit Marketing Communications StrategyNon-Profit Marketing Communications Strategy
Non-Profit Marketing Communications Strategy
 
Making introductions in presentation
Making introductions in presentationMaking introductions in presentation
Making introductions in presentation
 
Design & construction of secure waste landfill
Design & construction of secure waste landfillDesign & construction of secure waste landfill
Design & construction of secure waste landfill
 
Landfilling
Landfilling Landfilling
Landfilling
 
Airports presentation
Airports presentationAirports presentation
Airports presentation
 
Proposal on Solid Waste Management
Proposal on Solid Waste ManagementProposal on Solid Waste Management
Proposal on Solid Waste Management
 
SOLID WASTE MANAGEMENT PROJECT
SOLID WASTE MANAGEMENT PROJECTSOLID WASTE MANAGEMENT PROJECT
SOLID WASTE MANAGEMENT PROJECT
 
Annex 14 ppt cheng
Annex 14 ppt chengAnnex 14 ppt cheng
Annex 14 ppt cheng
 
Halifax International Airport Authority presentation
Halifax International Airport Authority presentationHalifax International Airport Authority presentation
Halifax International Airport Authority presentation
 

Similar a Incheon international airport

Report on airport engineering
Report on airport engineeringReport on airport engineering
Report on airport engineeringAbhishekChavan63
 
Cg of sweden 031214
Cg of sweden 031214Cg of sweden 031214
Cg of sweden 031214S Sittarasu
 
Zhytomyr International Airport
Zhytomyr International Airport Zhytomyr International Airport
Zhytomyr International Airport Taras Strygunenko
 
India Aviation ICT Forum 2013 - G. Chandramouli, MD, Kunnur International Air...
India Aviation ICT Forum 2013 - G. Chandramouli, MD, Kunnur International Air...India Aviation ICT Forum 2013 - G. Chandramouli, MD, Kunnur International Air...
India Aviation ICT Forum 2013 - G. Chandramouli, MD, Kunnur International Air...SITA
 
BANDAR UDARA SEBAGAI PENDUKUNG INDUSTRI PENERBANGAN NASIONAL DALAM ERA GLOBAL...
BANDAR UDARA SEBAGAI PENDUKUNG INDUSTRI PENERBANGAN NASIONAL DALAM ERA GLOBAL...BANDAR UDARA SEBAGAI PENDUKUNG INDUSTRI PENERBANGAN NASIONAL DALAM ERA GLOBAL...
BANDAR UDARA SEBAGAI PENDUKUNG INDUSTRI PENERBANGAN NASIONAL DALAM ERA GLOBAL...Indonesia Infrastructure Initiative
 
Istanbul New Airport (İstanbul Yeni Havalimanı)
Istanbul New Airport (İstanbul Yeni Havalimanı)Istanbul New Airport (İstanbul Yeni Havalimanı)
Istanbul New Airport (İstanbul Yeni Havalimanı)BME
 
Airport developments in _india_An_Overview
Airport developments in _india_An_OverviewAirport developments in _india_An_Overview
Airport developments in _india_An_OverviewBharat Bhushan
 
MIHAN SPECIAL ECONOMIC ZONE
MIHAN SPECIAL ECONOMIC ZONEMIHAN SPECIAL ECONOMIC ZONE
MIHAN SPECIAL ECONOMIC ZONES Sittarasu
 
Airport Fees Rates and Charges
Airport Fees Rates and ChargesAirport Fees Rates and Charges
Airport Fees Rates and ChargesJetline Marvel
 
12th Airfield World Congress 2015 Partnership Prospectus with Projects in the...
12th Airfield World Congress 2015 Partnership Prospectus with Projects in the...12th Airfield World Congress 2015 Partnership Prospectus with Projects in the...
12th Airfield World Congress 2015 Partnership Prospectus with Projects in the...Aries Valkin Calonzo
 
IRJET- Construction Planning and management of Airport
IRJET-  	  Construction Planning and management of AirportIRJET-  	  Construction Planning and management of Airport
IRJET- Construction Planning and management of AirportIRJET Journal
 
Desmond Shum - Session 3: Airport Cities – A special focus on how China and I...
Desmond Shum - Session 3: Airport Cities – A special focus on how China and I...Desmond Shum - Session 3: Airport Cities – A special focus on how China and I...
Desmond Shum - Session 3: Airport Cities – A special focus on how China and I...Global Airport Cities
 
Lecture 2 - Airport Finance and Commercial Management_2023.pdf
Lecture 2 - Airport Finance and Commercial Management_2023.pdfLecture 2 - Airport Finance and Commercial Management_2023.pdf
Lecture 2 - Airport Finance and Commercial Management_2023.pdfjasonleung1000g
 
Copy of Jaipur Airport Study.pdf
Copy of Jaipur Airport Study.pdfCopy of Jaipur Airport Study.pdf
Copy of Jaipur Airport Study.pdfThirumeni Madavan
 
Economic reforms aviation industry
Economic reforms aviation industryEconomic reforms aviation industry
Economic reforms aviation industryNajam Rao
 
ISCF Future Flight Networking Event - Use cases
ISCF Future Flight Networking Event - Use casesISCF Future Flight Networking Event - Use cases
ISCF Future Flight Networking Event - Use casesKTN
 

Similar a Incheon international airport (20)

Report on airport engineering
Report on airport engineeringReport on airport engineering
Report on airport engineering
 
Cg of sweden 031214
Cg of sweden 031214Cg of sweden 031214
Cg of sweden 031214
 
Zhytomyr International Airport
Zhytomyr International Airport Zhytomyr International Airport
Zhytomyr International Airport
 
India Aviation ICT Forum 2013 - G. Chandramouli, MD, Kunnur International Air...
India Aviation ICT Forum 2013 - G. Chandramouli, MD, Kunnur International Air...India Aviation ICT Forum 2013 - G. Chandramouli, MD, Kunnur International Air...
India Aviation ICT Forum 2013 - G. Chandramouli, MD, Kunnur International Air...
 
BANDAR UDARA SEBAGAI PENDUKUNG INDUSTRI PENERBANGAN NASIONAL DALAM ERA GLOBAL...
BANDAR UDARA SEBAGAI PENDUKUNG INDUSTRI PENERBANGAN NASIONAL DALAM ERA GLOBAL...BANDAR UDARA SEBAGAI PENDUKUNG INDUSTRI PENERBANGAN NASIONAL DALAM ERA GLOBAL...
BANDAR UDARA SEBAGAI PENDUKUNG INDUSTRI PENERBANGAN NASIONAL DALAM ERA GLOBAL...
 
Istanbul New Airport (İstanbul Yeni Havalimanı)
Istanbul New Airport (İstanbul Yeni Havalimanı)Istanbul New Airport (İstanbul Yeni Havalimanı)
Istanbul New Airport (İstanbul Yeni Havalimanı)
 
Itransporte No 49 - Jan 14 - Q8
Itransporte No 49 - Jan 14 - Q8Itransporte No 49 - Jan 14 - Q8
Itransporte No 49 - Jan 14 - Q8
 
Bangalore kochi airport
Bangalore kochi airportBangalore kochi airport
Bangalore kochi airport
 
Airport developments in _india_An_Overview
Airport developments in _india_An_OverviewAirport developments in _india_An_Overview
Airport developments in _india_An_Overview
 
MIHAN SPECIAL ECONOMIC ZONE
MIHAN SPECIAL ECONOMIC ZONEMIHAN SPECIAL ECONOMIC ZONE
MIHAN SPECIAL ECONOMIC ZONE
 
Airport Fees Rates and Charges
Airport Fees Rates and ChargesAirport Fees Rates and Charges
Airport Fees Rates and Charges
 
12th Airfield World Congress 2015 Partnership Prospectus with Projects in the...
12th Airfield World Congress 2015 Partnership Prospectus with Projects in the...12th Airfield World Congress 2015 Partnership Prospectus with Projects in the...
12th Airfield World Congress 2015 Partnership Prospectus with Projects in the...
 
IRJET- Construction Planning and management of Airport
IRJET-  	  Construction Planning and management of AirportIRJET-  	  Construction Planning and management of Airport
IRJET- Construction Planning and management of Airport
 
Chris whittle aviation sector and open skies june 14 2011
Chris whittle aviation sector and open skies june 14 2011Chris whittle aviation sector and open skies june 14 2011
Chris whittle aviation sector and open skies june 14 2011
 
Desmond Shum - Session 3: Airport Cities – A special focus on how China and I...
Desmond Shum - Session 3: Airport Cities – A special focus on how China and I...Desmond Shum - Session 3: Airport Cities – A special focus on how China and I...
Desmond Shum - Session 3: Airport Cities – A special focus on how China and I...
 
Lecture 2 - Airport Finance and Commercial Management_2023.pdf
Lecture 2 - Airport Finance and Commercial Management_2023.pdfLecture 2 - Airport Finance and Commercial Management_2023.pdf
Lecture 2 - Airport Finance and Commercial Management_2023.pdf
 
EIA repot for Airport
EIA repot for AirportEIA repot for Airport
EIA repot for Airport
 
Copy of Jaipur Airport Study.pdf
Copy of Jaipur Airport Study.pdfCopy of Jaipur Airport Study.pdf
Copy of Jaipur Airport Study.pdf
 
Economic reforms aviation industry
Economic reforms aviation industryEconomic reforms aviation industry
Economic reforms aviation industry
 
ISCF Future Flight Networking Event - Use cases
ISCF Future Flight Networking Event - Use casesISCF Future Flight Networking Event - Use cases
ISCF Future Flight Networking Event - Use cases
 

Último

Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAIGetting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAITim Wilson
 
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...meghakumariji156
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizharallensay1
 
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptxQSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptxDitasDelaCruz
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPanhandleOilandGas
 
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165meghakumariji156
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwaitdaisycvs
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGpr788182
 
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTSJAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTSkajalroy875762
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Adnet Communications
 
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGpr788182
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon investment
 
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableBerhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Availablepr788182
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecZurliaSoop
 
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur DubaiUAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubaijaehdlyzca
 
New 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateNew 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateCannaBusinessPlans
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingNauman Safdar
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel
 

Último (20)

Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAIGetting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
 
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
 
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptxQSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTSJAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableBerhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
 
Buy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail AccountsBuy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail Accounts
 
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur DubaiUAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
 
New 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateNew 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck Template
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 

Incheon international airport

  • 1. - Incheon International Airport - Presented by: Natsuko Iwashita, Kenny Daily, Luke Amundson
  • 2. Why is Incheon Airport THE WORLD’S BEST AIRPORT for 6 years?
  • 3. *Current condition* Introduction: Airport and Airway System ・Incheon Airport celebrated the tenth anniversary of its opening in 2011
  • 4. ・The first ever airport to be nominated as the World Best Airport for the six consecutive years Customer-centered service  Innovation activities → Incheon airport has now become a World’s favorite airport! *Current condition*
  • 5. *Airport Setting* ・Incheon International Airport (ICN) is around 32 miles from Seoul city
  • 6. *Terminal Area* ・The main passenger terminal (0.2 sq mile) is the ninth largest passenger terminal in the world ・Construction cost : 121million
  • 7. *Utilities* Energy Self-Reliance: ・Has carried out viability analysis to introduce renewable energy resources ・Has established a mid-long term renewable energy introduction plan ・5 units of solar (100 KW) and wind (10 KW) generation facilities Water: ・Is secured from the Incheon public water supply’s official water treatment plant ・Is stored in a water supply reservoir of approximately 100 thousand ton capacity Eco-friendly Airport: ・Has established an eco-friendly green management strategy
  • 8. *Government Structure* Incheon Airport is governed by Incheon International Airport Corporation, but its shares are wholly owned by the Korean government
  • 9. *Airport Development History* ・After the Seoul Olympics of 1998, international air traffic to Korea increased ・Construction of the Incheon airport began in November 1992 ・Officially opened in March 2001 ・Airbus A380 landed at the airport as part of first leg of its certification trip on 15 November, 2006 ・Yeongjong Medical Center has been constructed this year
  • 10. *Current Issues in the Media for the airport and the community* ・Speedy and accurate service at the customs and quarantine ・The shortest transition between aircrafts’ landing point ・Technical support for safe take-off and landing of aircrafts
  • 11. Aviation Demand Forecast *National trends* - Energy management : In spite of the significant increase airport operation, the energy increased only by 1.6% - Electricity Consumption : 0.04% decrease in electricity use : using 5 units of solar and wind generation facilities
  • 12. *Selection of Forecasts* • Passenger Forecast System – Account the total number of passengers according to departure lounge and by the hour
  • 13. *Commercial service Forecasts* • Airport Expansion as Northeast Asian Hub • Increase Passenger Capacity From 44 million to 62 million • Increase Cargo Handling From 4.8 million tons to 5.8 million tons
  • 14. *Aircraft Utilization* - the full range of commercial aircraft types including A380 *Runway Information* - three parallel paved asphalt runways 4,000m x 1 / 3,750 x 2 - Runway lighting system Facility Requirements
  • 16. *Landing Aids* - the 22 story Control tower 100.4 meters tall *Worldwide Network* Facility Requirements
  • 17. *Landside Facilities* - 6 Cargo Terminals, 5 separate warehouses 1.7 million tons of cargo per year 3.8 million tons of cargo per year Facility Requirements
  • 18. Development Alternatives *Airside Development Alternatives* - Phase 3 : second passenger terminal : 62 million passengers and 5.8 million tons of cargo per year - Phase 4 : five parallel runways : 100 million passengers and 7 million tons of cargo annually
  • 19. *Landside Development Alternatives* - “ Green Airport” Development Alternatives
  • 20. *“Airport City”* ・World-class mega hub airport ・A leader of the world aviation industry Development Alternatives
  • 21. Airport Plans *Airport Layout Plan* – Airport City 1. IBC-I Second Phase Development Area 2. IBC-II Development Area 3. South Water Basin Development Area *Terminal Area Plan* – New design
  • 22. *Airport Property* – 15,000 acres Phase 1. Creating Airport Support Community Phase 2. Expanding the Airport Support Community Phase 3. Creating Commercial Area Airport Plans
  • 23. Financial Plan *Development and Capital Improvement Plan* – Reduction of Airport Service Charges through Diversification of Profits – Government Support Program – Win-win cooperation Program – Creating Jobs
  • 24. *Funding Sources* – The workplace for 5,933 partners from 43 companies – Resident of the Yeongjong and Yongyu areas *Building and Land Leases* – Economic Effects of Concession Projects – Support for Stabilization of Airport Tenant Company Sales Financial Plan
  • 25. Conclusion ・Incheon International Airport is one of the largest airports in Asia and, the world ・Incheon Airport mainly focuses on “Airport City”. Its massive land area has been planned and parceled out for complementary aeronautical and non- aeronautical uses. In 2015: Incheon Airport’s annual passenger capacity will be increase to 62 million and its annual cargo capacity to 5.8 million tons. Non-aeronautical use is two major commercial zones that are International Business Center I and International Business Center II, and a sports and recreation water park. There are hotels, office buildings, a global medical center, and retail facilities in the near future. IBC-II area has been planned for entertainment and leisure complexes for tourists. → “Airport City” provides outstanding level of airport service to everyone!
  • 26. Thank you so much for listening 

Notas del editor

  1. Incheon Airport was established as a public enterprise in accordance with the Incheon Airport Corporation Act. In accordance with the commercial law and Act on the Management of Public Agencies, Incheon Airport operates within the context of a balanced decision-making system and transparent and responsible management. It is governed by IIAC (Incheon International Airport Corporation) but its shares are wholly owned by the Korean government.
  2. After the Seoul Olympics of 1988, international air traffic to Korea increased. In the 1990s, it became apparent that Gimpo International Airport could not cope with the increase in air traffic. To reduce the load on Gimpo International Airport, construction of the Incheon airport began in November 1992. It was constructed on reclaimed land between Yeongjong Island and Youngyu Island, and took eight years to construct, with an additional six months to test. The airport was officially opened in March 2001. Initially there were numerous problems, mostly involving baggage handling which required the system to be operated semi-automatically. Most of the problems were fixed within a month, and the airport began to operate normally. After the 11 September 2001, attacks in the U.S., and because of regional disease epidemics in Korea and China, the airport’s security and medical inspection equipment were upgraded. On 15 November 2006 the Airbus A380 landed at the airport as part of the first leg of its certification trip. Tests on the runways, taxi-ways and ramps showed that the airport could handle the aircraft.