Nicholas Vetri                           Quality Management                                   26/6/2012


The following are necessary parts of the electronic system:


-Creation of a search engine

    1.All functions of the system must function 98% of the time or more:

2.All library systems must be by user opinion considered “easy to use” or “fairly easy to use”
by a majority of testees

3.All pages in the Electronic system must load within an average of 5 seconds

4.Search engine should be be rated as “very useful” by majority of testies

Work to meet standard:

    1. We run tests and improve programming until the systems function 98% of the time

    2. We will design the system to work within 3 page changes or less for the initial search and
    have instructions labeled on the search engine

    4. The system must make finding books much easier than before and bring the average time it
    takes to find a book down by at least 100%

To measure if standards are met:

    - We will measure the search time (vs. the old non-electronic search time)and page changes of
the system



-Creation of a library database

    1.All functions of the system must function 98% of the time or more

2.Library data base must have at least 100TB of storage

3.Library data base must store title, author/artist/director, date of release, style, related documents
and cover photo of the document

4.All pages in the Electronic system must load within an average of 5 seconds

Work to meet standard:

    1. We run tests and improve programming until the systems functions 98% of the time

    2. A 100TB hard drive will be purchased and install
To measure if standards are met:

-We will measure the response times

- Manager will sign reports on database characteristics and inspect the system personally to see if
storage requirements are met and functionality is met




- Popularity Sorting

    1.All functions of the system must function 98% of the time or more

2.All library systems must be by user opinion considered “easy to use” or “fairly easy to use”
by a majority of testees

3.All pages in the Electronic system must load within an average of 5 seconds

Work to meet standard:

    1. We run tests and improve programming until the systems functions 98% of the time

    2. We will design the system to work within 3 page changes or less for the initial search and
    have instructions labeled on the search engine

To measure if standards are met:

    - We will measure the time of page loading and conduct surveys on ease of use



-Reminder Function

    1.All functions of the system must function 98% of the time or more

2.All library systems must be by user opinion considered “easy to use” or “fairly easy to use”
by a majority of testees (in this case librarians)

3.All pages in the Electronic system must load within an average of 5 seconds

Work to meet standard:

    1. We run tests and improve programming until the systems functions 98% of the time

    2. We will design the system to work within 3 page changes or less for the initial search and
    have instructions labeled on the search engine

To measure if standards are met:
- We will measure the time of page loading and conduct surveys on ease of use



- Consultation System

    1.All functions of the system must function 98% of the time or more

2.All library systems must be by user opinion considered “easy to use” or “fairly easy to use”
by a majority of testees

3.All pages in the Electronic system must load within an average of 5 seconds

Work to meet standard:

    1. We run tests and improve programming until the systems functions 98% of the time

    2. We will design the system to work within 3 page changes or less for the initial search and
    have instructions labeled on the search engine

To measure if standards are met:

    - We will measure the time of page loading and conduct surveys on ease of use



-Loan System

    1.All functions of the system must function 98% of the time or more

2.All library systems must be by user opinion considered “easy to use” or “fairly easy to use”
by a majority of testees

3.All pages in the Electronic system must load within an average of 5 seconds

Work to meet standard:

    1. We run tests and improve programming until the systems functions 98% of the time

    2. We will design the system to work within 3 page changes or less for the initial search and
    have instructions labeled on the search engine

To measure if standards are met:

    - We will measure the time of page loading and conduct surveys on ease of use



-Member Registry

1.All functions of the system must function 98% of the time or more
2.All library systems must be by user opinion considered “easy to use” or “fairly easy to use”
by a majority of testees

3.All pages in the Electronic system must load within an average of 5 seconds

Other Fuctions

Work to meet standard:

    1. We run tests and improve programming until the systems functions 98% of the time

    2. We will design the system to work within 3 page changes or less for the initial search and
    have instructions labeled on the search engine

To measure if standards are met:

    - We will measure the time of page loading and conduct surveys on ease of use




Quality assurance of electronic systems:

- For all electronic systems, a weekly report will have to be filed containing in detail the quality
standards that need to be met and the progress they have made in meeting those standards (against
the amount of time there is left)

-The project manager will personally sign a form stating that he has inspected the quality, progress,
and method of installation of each electronic function twice a month. The first inspection will be on
the 15th of each month. The second will be unannounced.




Non-electronic system functions:

-Tansferal of data:
    1. The implementation of system should not disrupt the daily operations of the library

    2. Less than 5% of transferred information should have to be reworked later on

    To measure if standards are met:

         -All work will be scheduled off opening hours of the library and the manager will call
    library to make sure no one works during hours

         -We will conduct tests on 2 percent of imput information to see what percent much is
incorrect

Quality Assurance procedures:

-The team working on the transferal of data will file a report every week on the progress of the data
transferal.

-The project manager will inspect and sign a form stating that he has inspected the data transferal
twice a month



-New Card Standards:

    1. New cards must be able to fit into a standard 4x 2.5 in. wallet pocket

    2. Cards must contain a scannable barcode and computer registry number

    3. Cards must cost less than 1 euro to produce

    4. Cards must contain a 2x 3 in. photo of the patron

    To measure if standards are met:

    -We will have conduct checks to see if the cards meet the requirements twice a month during
their production

Quality Assurance:

-The team working on the design and creation of the cards will file a report every week on its
progress.

-The project manager will inspect and sign a form stating that he has inspected the card design and
creation process twice a month

-Library Kiosk Standards:

    1. Kiosks must all be maid of heavy weight aluminum

    2. The screen of all kiosks must be made of a non-cracking/splintering material

    3. Kiosks must all be painted the same shade of black

    4. Kiosks must not block the access to books or areas of the library

    5. Kiosks must be made with material than poses no tangible health risks to the public

Work to meet standard:

    1. We will order only heavy weight aluminum
2. We will avoid using glass and plastics and try to use a touch material or safety glass

    4. We will mark the areas where kiosks will be blocking aisles

    To measure if standards are met:
    -We will have conduct checks to see if the kiosks meet the requirements once a week during
their production

Quality Assurance:

-The team working on the kiosks will file a report every week for the project manager to sign on the
progress kiosk design and fabrication
-The project manager will inspect and sign a form stating that he has inspected the kiosks personally
twice a month

-Other project standards:

- The no. of librarians to be involved in the project at any one time should not compromise the
required number of librarians needed at any one time for the operations of the library

Work to meet standard: We will make sure at least 3 librarians are working at the library at all times
before asking for their assistance



- Implementation of self service kiosks can not be done during the opening hours of library



-3 self service kiosks will be installed in the library



- Sufficient training needs to be provided to librarians

Work to meet standard: We will give three 45 minute courses to the librarians

Quality assurance:

-Project manager will call library after supposed 45 minute courses are finished to make sure they
have been conducted.



-Overtime must be limited within 20% of the normal operating cost

To measure if standards are met:
- we will stop giving overtime hours to employees if the 20% mark is hit
-All library internet connection and wifi must be “secure” and not open to outside parties

Work to meet standard: we will make sure that all connections are protected and inacessable for
outside parties

To measure if standards are met: we will test the security and inscription of the system
Quality Assurance:
-The project manager will inspect and sign a form stating that he has inspected the connection
progress twice a month



-All diagrams are to be made with Argo Uml



-All programming is to be done with C++



-For every 1000 lines of programming script there should be no more than 4 errors/bugs

Work to meet standard: we will rewrite programming repeatedly to get as close to the mark as
possible

To measure if standards are met:
    - We will have weekly tests to see how many errors in script there are.



-New user cards must cost less than one euro in production cost for the library

Work to meet standard: We will use only highly rated low cost materials, and take all card photos in
the library.

To measure if standards are met:
    -We will perform cost checks on the orders twice a month during the production of the cards.



Quality Control:

1. The Project Manager will sign 3 quality reports at each quarter of the projects progress (ex. 25%
done 50% done etc.) stating that the quality of all functions are competitive with industry standards

2. The Project Manager will hold a meeting at least once a month with a representative from each
function of the system to discuss possible ideas and implementation strategies for improvement (ex.
order steel for kiosks in whole sale vs. as needed for more quality and lower costs)
3. Once a month the Project Manager will weigh which projects need extra resources for improved
quality based on reports received.

Más contenido relacionado

Similar a Quality management 2

Project Management (Practical Qustion Paper) [CBSGS - 75:25 Pattern] {2013-20...
Project Management (Practical Qustion Paper) [CBSGS - 75:25 Pattern] {2013-20...Project Management (Practical Qustion Paper) [CBSGS - 75:25 Pattern] {2013-20...
Project Management (Practical Qustion Paper) [CBSGS - 75:25 Pattern] {2013-20...Mumbai B.Sc.IT Study
 
Product and sevices management system
Product and sevices management systemProduct and sevices management system
Product and sevices management systemVinod Gurram
 
Quality Assurance in Modern Software Development
Quality Assurance in Modern Software DevelopmentQuality Assurance in Modern Software Development
Quality Assurance in Modern Software DevelopmentZahra Sadeghi
 
Software Development
Software DevelopmentSoftware Development
Software DevelopmentBasil Bibi
 
Heuristic Test Strategy Model For "Soda Co"
Heuristic Test Strategy Model For "Soda Co"Heuristic Test Strategy Model For "Soda Co"
Heuristic Test Strategy Model For "Soda Co"eaqa
 
Library Management system requirements
Library Management system requirementsLibrary Management system requirements
Library Management system requirementsAhsan Riaz
 
Online-Voting-System.doc
Online-Voting-System.docOnline-Voting-System.doc
Online-Voting-System.docShangaviS2
 
CAPP, MRP, CRP, CAQC (model 2)
CAPP, MRP, CRP, CAQC (model 2) CAPP, MRP, CRP, CAQC (model 2)
CAPP, MRP, CRP, CAQC (model 2) Deepika V S
 
Christian Bk Hansen - Agile on Huge Banking Mainframe Legacy Systems - EuroST...
Christian Bk Hansen - Agile on Huge Banking Mainframe Legacy Systems - EuroST...Christian Bk Hansen - Agile on Huge Banking Mainframe Legacy Systems - EuroST...
Christian Bk Hansen - Agile on Huge Banking Mainframe Legacy Systems - EuroST...TEST Huddle
 
Goal driven performance optimization (Пётр Зайцев)
Goal driven performance optimization (Пётр Зайцев)Goal driven performance optimization (Пётр Зайцев)
Goal driven performance optimization (Пётр Зайцев)Ontico
 
UNIT 1C CHARACTERISTICS _ QUALITY ATT OF ES.pptx
UNIT 1C CHARACTERISTICS _ QUALITY ATT OF ES.pptxUNIT 1C CHARACTERISTICS _ QUALITY ATT OF ES.pptx
UNIT 1C CHARACTERISTICS _ QUALITY ATT OF ES.pptxSKILL2021
 
University roll (Sub code).pptx
University roll (Sub code).pptxUniversity roll (Sub code).pptx
University roll (Sub code).pptxSKILL2021
 
Inventory Management System
Inventory Management SystemInventory Management System
Inventory Management SystemEmmanuel college
 
2015-HNDIT1212 Lecture 3.pptx
2015-HNDIT1212  Lecture 3.pptx2015-HNDIT1212  Lecture 3.pptx
2015-HNDIT1212 Lecture 3.pptxusama537223
 

Similar a Quality management 2 (20)

Project Management (Practical Qustion Paper) [CBSGS - 75:25 Pattern] {2013-20...
Project Management (Practical Qustion Paper) [CBSGS - 75:25 Pattern] {2013-20...Project Management (Practical Qustion Paper) [CBSGS - 75:25 Pattern] {2013-20...
Project Management (Practical Qustion Paper) [CBSGS - 75:25 Pattern] {2013-20...
 
Product and sevices management system
Product and sevices management systemProduct and sevices management system
Product and sevices management system
 
Quality Assurance in Modern Software Development
Quality Assurance in Modern Software DevelopmentQuality Assurance in Modern Software Development
Quality Assurance in Modern Software Development
 
3. quality.ppt
3. quality.ppt3. quality.ppt
3. quality.ppt
 
Software Development
Software DevelopmentSoftware Development
Software Development
 
Heuristic Test Strategy Model For "Soda Co"
Heuristic Test Strategy Model For "Soda Co"Heuristic Test Strategy Model For "Soda Co"
Heuristic Test Strategy Model For "Soda Co"
 
Library Management system requirements
Library Management system requirementsLibrary Management system requirements
Library Management system requirements
 
Online-Voting-System.doc
Online-Voting-System.docOnline-Voting-System.doc
Online-Voting-System.doc
 
OCSP.pptx
OCSP.pptxOCSP.pptx
OCSP.pptx
 
Standard
StandardStandard
Standard
 
Hms project report
Hms project reportHms project report
Hms project report
 
CAPP, MRP, CRP, CAQC (model 2)
CAPP, MRP, CRP, CAQC (model 2) CAPP, MRP, CRP, CAQC (model 2)
CAPP, MRP, CRP, CAQC (model 2)
 
Christian Bk Hansen - Agile on Huge Banking Mainframe Legacy Systems - EuroST...
Christian Bk Hansen - Agile on Huge Banking Mainframe Legacy Systems - EuroST...Christian Bk Hansen - Agile on Huge Banking Mainframe Legacy Systems - EuroST...
Christian Bk Hansen - Agile on Huge Banking Mainframe Legacy Systems - EuroST...
 
Software automation
Software automationSoftware automation
Software automation
 
Goal driven performance optimization (Пётр Зайцев)
Goal driven performance optimization (Пётр Зайцев)Goal driven performance optimization (Пётр Зайцев)
Goal driven performance optimization (Пётр Зайцев)
 
UNIT 1C CHARACTERISTICS _ QUALITY ATT OF ES.pptx
UNIT 1C CHARACTERISTICS _ QUALITY ATT OF ES.pptxUNIT 1C CHARACTERISTICS _ QUALITY ATT OF ES.pptx
UNIT 1C CHARACTERISTICS _ QUALITY ATT OF ES.pptx
 
University roll (Sub code).pptx
University roll (Sub code).pptxUniversity roll (Sub code).pptx
University roll (Sub code).pptx
 
Chapter6
Chapter6Chapter6
Chapter6
 
Inventory Management System
Inventory Management SystemInventory Management System
Inventory Management System
 
2015-HNDIT1212 Lecture 3.pptx
2015-HNDIT1212  Lecture 3.pptx2015-HNDIT1212  Lecture 3.pptx
2015-HNDIT1212 Lecture 3.pptx
 

Último

MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756dollysharma2066
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...amitlee9823
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...lizamodels9
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...Any kyc Account
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 

Último (20)

MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 

Quality management 2

  • 1. Nicholas Vetri Quality Management 26/6/2012 The following are necessary parts of the electronic system: -Creation of a search engine 1.All functions of the system must function 98% of the time or more: 2.All library systems must be by user opinion considered “easy to use” or “fairly easy to use” by a majority of testees 3.All pages in the Electronic system must load within an average of 5 seconds 4.Search engine should be be rated as “very useful” by majority of testies Work to meet standard: 1. We run tests and improve programming until the systems function 98% of the time 2. We will design the system to work within 3 page changes or less for the initial search and have instructions labeled on the search engine 4. The system must make finding books much easier than before and bring the average time it takes to find a book down by at least 100% To measure if standards are met: - We will measure the search time (vs. the old non-electronic search time)and page changes of the system -Creation of a library database 1.All functions of the system must function 98% of the time or more 2.Library data base must have at least 100TB of storage 3.Library data base must store title, author/artist/director, date of release, style, related documents and cover photo of the document 4.All pages in the Electronic system must load within an average of 5 seconds Work to meet standard: 1. We run tests and improve programming until the systems functions 98% of the time 2. A 100TB hard drive will be purchased and install
  • 2. To measure if standards are met: -We will measure the response times - Manager will sign reports on database characteristics and inspect the system personally to see if storage requirements are met and functionality is met - Popularity Sorting 1.All functions of the system must function 98% of the time or more 2.All library systems must be by user opinion considered “easy to use” or “fairly easy to use” by a majority of testees 3.All pages in the Electronic system must load within an average of 5 seconds Work to meet standard: 1. We run tests and improve programming until the systems functions 98% of the time 2. We will design the system to work within 3 page changes or less for the initial search and have instructions labeled on the search engine To measure if standards are met: - We will measure the time of page loading and conduct surveys on ease of use -Reminder Function 1.All functions of the system must function 98% of the time or more 2.All library systems must be by user opinion considered “easy to use” or “fairly easy to use” by a majority of testees (in this case librarians) 3.All pages in the Electronic system must load within an average of 5 seconds Work to meet standard: 1. We run tests and improve programming until the systems functions 98% of the time 2. We will design the system to work within 3 page changes or less for the initial search and have instructions labeled on the search engine To measure if standards are met:
  • 3. - We will measure the time of page loading and conduct surveys on ease of use - Consultation System 1.All functions of the system must function 98% of the time or more 2.All library systems must be by user opinion considered “easy to use” or “fairly easy to use” by a majority of testees 3.All pages in the Electronic system must load within an average of 5 seconds Work to meet standard: 1. We run tests and improve programming until the systems functions 98% of the time 2. We will design the system to work within 3 page changes or less for the initial search and have instructions labeled on the search engine To measure if standards are met: - We will measure the time of page loading and conduct surveys on ease of use -Loan System 1.All functions of the system must function 98% of the time or more 2.All library systems must be by user opinion considered “easy to use” or “fairly easy to use” by a majority of testees 3.All pages in the Electronic system must load within an average of 5 seconds Work to meet standard: 1. We run tests and improve programming until the systems functions 98% of the time 2. We will design the system to work within 3 page changes or less for the initial search and have instructions labeled on the search engine To measure if standards are met: - We will measure the time of page loading and conduct surveys on ease of use -Member Registry 1.All functions of the system must function 98% of the time or more
  • 4. 2.All library systems must be by user opinion considered “easy to use” or “fairly easy to use” by a majority of testees 3.All pages in the Electronic system must load within an average of 5 seconds Other Fuctions Work to meet standard: 1. We run tests and improve programming until the systems functions 98% of the time 2. We will design the system to work within 3 page changes or less for the initial search and have instructions labeled on the search engine To measure if standards are met: - We will measure the time of page loading and conduct surveys on ease of use Quality assurance of electronic systems: - For all electronic systems, a weekly report will have to be filed containing in detail the quality standards that need to be met and the progress they have made in meeting those standards (against the amount of time there is left) -The project manager will personally sign a form stating that he has inspected the quality, progress, and method of installation of each electronic function twice a month. The first inspection will be on the 15th of each month. The second will be unannounced. Non-electronic system functions: -Tansferal of data: 1. The implementation of system should not disrupt the daily operations of the library 2. Less than 5% of transferred information should have to be reworked later on To measure if standards are met: -All work will be scheduled off opening hours of the library and the manager will call library to make sure no one works during hours -We will conduct tests on 2 percent of imput information to see what percent much is
  • 5. incorrect Quality Assurance procedures: -The team working on the transferal of data will file a report every week on the progress of the data transferal. -The project manager will inspect and sign a form stating that he has inspected the data transferal twice a month -New Card Standards: 1. New cards must be able to fit into a standard 4x 2.5 in. wallet pocket 2. Cards must contain a scannable barcode and computer registry number 3. Cards must cost less than 1 euro to produce 4. Cards must contain a 2x 3 in. photo of the patron To measure if standards are met: -We will have conduct checks to see if the cards meet the requirements twice a month during their production Quality Assurance: -The team working on the design and creation of the cards will file a report every week on its progress. -The project manager will inspect and sign a form stating that he has inspected the card design and creation process twice a month -Library Kiosk Standards: 1. Kiosks must all be maid of heavy weight aluminum 2. The screen of all kiosks must be made of a non-cracking/splintering material 3. Kiosks must all be painted the same shade of black 4. Kiosks must not block the access to books or areas of the library 5. Kiosks must be made with material than poses no tangible health risks to the public Work to meet standard: 1. We will order only heavy weight aluminum
  • 6. 2. We will avoid using glass and plastics and try to use a touch material or safety glass 4. We will mark the areas where kiosks will be blocking aisles To measure if standards are met: -We will have conduct checks to see if the kiosks meet the requirements once a week during their production Quality Assurance: -The team working on the kiosks will file a report every week for the project manager to sign on the progress kiosk design and fabrication -The project manager will inspect and sign a form stating that he has inspected the kiosks personally twice a month -Other project standards: - The no. of librarians to be involved in the project at any one time should not compromise the required number of librarians needed at any one time for the operations of the library Work to meet standard: We will make sure at least 3 librarians are working at the library at all times before asking for their assistance - Implementation of self service kiosks can not be done during the opening hours of library -3 self service kiosks will be installed in the library - Sufficient training needs to be provided to librarians Work to meet standard: We will give three 45 minute courses to the librarians Quality assurance: -Project manager will call library after supposed 45 minute courses are finished to make sure they have been conducted. -Overtime must be limited within 20% of the normal operating cost To measure if standards are met: - we will stop giving overtime hours to employees if the 20% mark is hit
  • 7. -All library internet connection and wifi must be “secure” and not open to outside parties Work to meet standard: we will make sure that all connections are protected and inacessable for outside parties To measure if standards are met: we will test the security and inscription of the system Quality Assurance: -The project manager will inspect and sign a form stating that he has inspected the connection progress twice a month -All diagrams are to be made with Argo Uml -All programming is to be done with C++ -For every 1000 lines of programming script there should be no more than 4 errors/bugs Work to meet standard: we will rewrite programming repeatedly to get as close to the mark as possible To measure if standards are met: - We will have weekly tests to see how many errors in script there are. -New user cards must cost less than one euro in production cost for the library Work to meet standard: We will use only highly rated low cost materials, and take all card photos in the library. To measure if standards are met: -We will perform cost checks on the orders twice a month during the production of the cards. Quality Control: 1. The Project Manager will sign 3 quality reports at each quarter of the projects progress (ex. 25% done 50% done etc.) stating that the quality of all functions are competitive with industry standards 2. The Project Manager will hold a meeting at least once a month with a representative from each function of the system to discuss possible ideas and implementation strategies for improvement (ex. order steel for kiosks in whole sale vs. as needed for more quality and lower costs)
  • 8. 3. Once a month the Project Manager will weigh which projects need extra resources for improved quality based on reports received.