SlideShare una empresa de Scribd logo
1 de 51
1
WIRELESS COMMUNICATION’S PROJECT
ANTENNA INSTALLATION ENGINEERING
Giáo viên hướng dẫn:
Hà Hoàng Kha
Học viên thực hiện:
Nguyễn Hồ Bá Hải
Nguyễn Phạm Viết Nhã
HO CHI MINH CITY UNIVERSITY of
TECHNOLOGY
25-Oct-13 WIRELESS 2
EPS Architecture
Radio Network Overview
Core
Network Other
management
systems
TEMS
OSS-RC
Network
Management
Environment
Mun
Mur
Mut
Mub
lu
lur
RNC
Hub RBS
or RXI
RBS
lub
OSS-RC: Operations Support System
Radio & Core
User Equipment
Radio
Access
Network
25-Oct-13 WIRELESS 3
RADIO BASE STATION
25-Oct-13 WIRELESS 4
AN RBS FOR EVERY APPLICATION
RBS 6201 RBS 6101
RBS
6301
RBS
6302
RBS
6601
RBS
6102
RBS
6202
25-Oct-13 WIRELESS 5
Different Cell Structures
RBS with one omni-
directional antenna
covering 360o
RBS with three antennas
each covering one sector,
(120o
) – longer range
120o
Depending on RBS-type we can have up to 6 sectors in a cell
25-Oct-13 WIRELESS 6
ANTENNA SYSTEM DIAGRAM
½ Jumper Cable
`
Existing
GSM Antenna
1800Mhz
Sector
A
½ Jumper Cable
Existing
GSM Antenna
1800Mhz
Existing
GSM Antenna
1800Mhz`
Sector
B
Sector
C
Feeder Cable
7/8 or 1 5/8
RBS6201 (V2)
Feeder Cable
7/8 or 1 5/8
`` ``
Feeder Cable
7/8 or 1 5/8
½ Jumper Cable ½ Jumper Cable
½ Jumper Cable ½ Jumper Cable ½ Jumper Cable
½ Jumper Cable
½ Jumper
Cable
25-Oct-13 WIRELESS 7
ANTENNA SYSTEM DIAGRAM (with EHCU)
`
Existing
GSM Antenna
1800Mhz
Sector
A
Jumper Cable
Feeder Cable
7/8 or 1 5/8
RBS6201 (V2)
Jumper Cable
EHCU
`
Existing
GSM Antenna
1800Mhz
Sector
B
Jumper Cable
Re-used
existing
Feeder Cable
7/8 or 1 5/8
Jumper Cable
EHCU
`
Existing
GSM Antenna
1800Mhz
Sector
C
Jumper Cable
Feeder Cable
7/8 or 1 5/8
Jumper Cable
EHCU
½ Jumper Cable½ Jumper Cable
½ Jumper
Cable
25-Oct-13 WIRELESS 8
RRU 1 RRU 2 RRU 3
MU
FILTER 1 FILTER 2 FILTER 3
OIL 1,2,3
RET Cable RET Cable RET Cable
Jumper Cables Jumper CablesJumper Cables
ANT 1 ANT 2 ANT 3
MU-RRU AND ANTENNA CONNECTIONS
Sector 1 Sector 2 Sector 3
25-Oct-13 WIRELESS 9
GENERAL ANTENNA
 1. Antenna
 2. Down tilt kit
 3. Mounting for F Panel
 4. Clamp for F Panel
11
22
44
33
25-Oct-13 WIRELESS 10
GENERAL ANTENNA
Antenna Dimensions
25-Oct-13 WIRELESS 11
GENERAL ANTENNA
Antennas mounted according to Standard Procedures and Site Specific Documents
M - Tilt : Mechanical Down Tilt.
25-Oct-13 WIRELESS 12
E - Tilt : Electrical Down Tilt.
Electrical tilting angle checked according to Final Site Configuration
GENERAL ANTENNA
25-Oct-13 WIRELESS 13
Remote Electrical Tilt - RET
 RET system is designed to meet the high requirements
for reliability, flexibility and efficiency in remote control
of tower-mounted telecommunication equipment.
 Optimize network in real time, saving time and costly
site visits.
 Respond quickly to changing traffic needs.
 Experience higher tilt possibility compared to
mechanical tilt.
 Reduces human error with accurate mechanical
control.
 No specialized manpower or equipment needed.
 Ideal for isolated or difficult-to-access sites.
25-Oct-13 WIRELESS 14
Single Band RET Connections
RRU 1 RRU 2 RRU 3
MU
FILTER 1 FILTER 2 FILTER 3
OIL 1,2,3
RET Cable RET Cable RET Cable
Jumper Cables Jumper CablesJumper Cables
ANT 1 ANT 2 ANT 3
Sector 1 Sector 2 Sector 3
(I): ALD Control Interface
2 x 8 pin connector according IEC
60130-9, female/male
25-Oct-13 WIRELESS 15
Kathrein’s Remote Electrical Tilt
25-Oct-13 WIRELESS 16
Attaching Single Band RET
25-Oct-13 WIRELESS 17
Attaching Triple Band RET
25-Oct-13 WIRELESS 18
External Hybrid Combiner Unit (ECHU)
 ECHU is designed for high power combining
and distribution.
 When the need for traffic capacity grows, the
EHCU allows a doubling of the number of
carriers without adding antennas or antenna
feeders. Hardware as well as installation and
site fee costs can therefore be kept at a
minimum.
 The EHCU can also be used for in-building
distributed antenna systems.
25-Oct-13 WIRELESS 19
External Hybrid Combiner Unit (ECHU)
25-Oct-13 WIRELESS 20
Tower-Mounted Amplifier (TMA)
 The Tower-Mounted Amplifier (TMA) filters and amplifies
Radio Frequency (RF) signals received by the antenna
before being sent to the RBS.
 Transmission (TX) signals from the RBS are filtered but
not amplified before being sent to the antenna.
25-Oct-13 WIRELESS 21
Tower-Mounted Amplifier (TMA)
25-Oct-13 WIRELESS 22
Tower-Mounted Amplifier (TMA)
25-Oct-13 WIRELESS 23
Repeater Solution
 With the ever increasing focus of cost vs returns in wireless networks,
repeaters (cell extenders) offer a cost effective solution to operators to
provide coverage at a fraction of standard BTS site costs. Repeaters are
ideal in scenarios where coverage is the prime objective.
 These repeaters are ideally suited for use as a Gap-Filler to optimise
network coverage.
25-Oct-13 WIRELESS 24
Repeater Solution
Tapper
Only 1 feed is shown for the example
Donor 1 Link
Main
ant
Repeater
ant
AVITEC
REP
X
X
X
X
X
X
Flexi
BTS
Tower equipment
Floor equipmentTapper connected
directly to surge at
feeder
25-Oct-13 WIRELESS 25
Repeater Solution
RRUS
Tapper
Only 1 feed is shown for the example
Donor 1 Link
Main
ant
Repeater
ant
REP
X
X
X
X
X
X
Tower equipment
Floor equipment
RBS
6601
OIL & DC
25-Oct-13 WIRELESS 26
Repeater Setup
Power – Donor 1 & 2 - Link
Tappers
Repeater
25-Oct-13 WIRELESS 27
Repeater Solution
Repeat
Antenna
A
B
C
25-Oct-13 WIRELESS 28
Repeater Solution
25-Oct-13 WIRELESS 29
90
o
33
o
33
o
Antenna Beam
25-Oct-13 WIRELESS 30
H-Beam = 330
25-Oct-13 WIRELESS 31
H-Beam = 900
25-Oct-13 WIRELESS 32
Smart Radio Concept – SRC
4 Way Receiver Diversity
The SRC solution is to cover large rural areas with low capacity
coverage therefore cutting costs of building new sites to complete
the RF plan.
25-Oct-13 WIRELESS 33
25-Oct-13 WIRELESS 34
RRUS
Tx/Rx Rx
XXXXXXXX
XXXX
RRUS
Tx/Rx Rx
60W 60W
* note: Max output power for a
single RRU trx is currently 60W
2trx 60W - 4 way Rx Div – 2 Ant
Trx #1 Trx #2
25-Oct-13 WIRELESS 35
RRUS
Tx/Rx Rx
XXXXXXXX
XXXX
XXXX
XXXX
RRUS
Tx/Rx Rx
RRUS
Tx/Rx Rx
RRUS
Tx/Rx Rx
60W 60W 60W 60W
Trx #1 Trx #2 Trx #3 Trx #4
4trx 60W - 4 way Rx Div – 4 Ant
25-Oct-13 WIRELESS 36
IN - BUILDING
25-Oct-13 WIRELESS 37
IN - BUILDING
25-Oct-13 WIRELESS 38
IN - BUILDING
25-Oct-13 WIRELESS 39
TM
TM
TM
TM
R
U
S
D
U
G
44 43
R
U
S
R
U
S
R
U
S
R
U
S
D
U
G
R
U
S
R
U
S
43
RBS 6201 12+4+12+7
DAS
B
In-Building Solution
37.8
DAS
C
NSN Ultrasite 3+3+8+3
DAS
A
DAS
B
42 37.5
AA
DAS
C
38.5
37.5
BB
CC
DD
38.2
DAS
D
HC
DASA
DASA
MCM
R
U
S
uLAB
RUS 80W
RUS 80W RUS 80W
25-Oct-13 WIRELESS 40
In-Building Solution
RBS 6201 12+7+4
TM
TM
TM
TM
D
U
G
R
U
S
R
U
S
R
U
S
R
U
S
R
U
S
R
U
S
R
U
S
D
U
G
43
36.8
R
U
S
39.5
36.8
MCM
R
U
S
NSN Configuration 5+4+3
BB
CC
DAS
B
DAS
C
37.537.54
2
DAS
A
AA
MCM
DAS1
DAS1
DAS2
DAS3
DAS1
4343
25-Oct-13 WIRELESS 41
IN - BUILDING
25-Oct-13 WIRELESS 42
Metro SiteMetro Site
25-Oct-13 WIRELESS 43
Metro Site Antenna CS 72454.0Metro Site Antenna CS 72454.0
25-Oct-13 WIRELESS 44
Metro Site Antenna Kathrein 739 489Metro Site Antenna Kathrein 739 489
25-Oct-13 WIRELESS 45
Metro SiteMetro Site
25-Oct-13 WIRELESS 46
Problems of Technology
25-Oct-13 WIRELESS 47
NEW GENERATIONNEW GENERATION
TechnologyTechnology ++ NaturalNatural
25-Oct-13 WIRELESS 48
25-Oct-13 WIRELESS 49
25-Oct-13 WIRELESS 50
Phi Phi Island, Krabi.
25-Oct-13 WIRELESS 51
Thank You & Questions

Más contenido relacionado

La actualidad más candente

83092299 rru3804-overview
83092299 rru3804-overview83092299 rru3804-overview
83092299 rru3804-overview
Serik123
 
Bts3900 Site Maintenance Guide(V200 01)
Bts3900 Site Maintenance Guide(V200 01)Bts3900 Site Maintenance Guide(V200 01)
Bts3900 Site Maintenance Guide(V200 01)
Atif Mahmood
 
240243228 huawei-bts-3900-training-150914113641-lva1-app6892
240243228 huawei-bts-3900-training-150914113641-lva1-app6892240243228 huawei-bts-3900-training-150914113641-lva1-app6892
240243228 huawei-bts-3900-training-150914113641-lva1-app6892
moussaCoulibaly22
 
The Huawei Node B Evolution
The Huawei Node B EvolutionThe Huawei Node B Evolution
The Huawei Node B Evolution
Atif Mahmood
 
01 Bts3900 System Structure
01 Bts3900 System Structure01 Bts3900 System Structure
01 Bts3900 System Structure
Atif Mahmood
 
Base Station Vendors
Base Station VendorsBase Station Vendors
Base Station Vendors
guest1e911f5
 

La actualidad más candente (20)

83092299 rru3804-overview
83092299 rru3804-overview83092299 rru3804-overview
83092299 rru3804-overview
 
3900 series base station
3900 series base station3900 series base station
3900 series base station
 
Rtn
RtnRtn
Rtn
 
5G RAN fundamentals
5G RAN fundamentals5G RAN fundamentals
5G RAN fundamentals
 
Zxmw nr8250 v1.00 commissioning guide ¸±±¾
Zxmw nr8250 v1.00 commissioning guide   ¸±±¾Zxmw nr8250 v1.00 commissioning guide   ¸±±¾
Zxmw nr8250 v1.00 commissioning guide ¸±±¾
 
Bts3900 Site Maintenance Guide(V200 01)
Bts3900 Site Maintenance Guide(V200 01)Bts3900 Site Maintenance Guide(V200 01)
Bts3900 Site Maintenance Guide(V200 01)
 
ZTE BTS Manual
ZTE BTS ManualZTE BTS Manual
ZTE BTS Manual
 
240243228 huawei-bts-3900-training-150914113641-lva1-app6892
240243228 huawei-bts-3900-training-150914113641-lva1-app6892240243228 huawei-bts-3900-training-150914113641-lva1-app6892
240243228 huawei-bts-3900-training-150914113641-lva1-app6892
 
Commissioning flexi multiradio_bts_wcdma
Commissioning flexi multiradio_bts_wcdmaCommissioning flexi multiradio_bts_wcdma
Commissioning flexi multiradio_bts_wcdma
 
Basic 5G.pdf
Basic 5G.pdfBasic 5G.pdf
Basic 5G.pdf
 
The Huawei Node B Evolution
The Huawei Node B EvolutionThe Huawei Node B Evolution
The Huawei Node B Evolution
 
01 Bts3900 System Structure
01 Bts3900 System Structure01 Bts3900 System Structure
01 Bts3900 System Structure
 
Ubbp
UbbpUbbp
Ubbp
 
Ericsson Networks Software 15B
Ericsson Networks Software 15BEricsson Networks Software 15B
Ericsson Networks Software 15B
 
Huawei gsm grfu introduction
Huawei gsm grfu introductionHuawei gsm grfu introduction
Huawei gsm grfu introduction
 
Huawei GSM Principles
Huawei GSM PrinciplesHuawei GSM Principles
Huawei GSM Principles
 
Designing 5G NR (New Radio)
Designing 5G NR (New Radio)Designing 5G NR (New Radio)
Designing 5G NR (New Radio)
 
Base Station Vendors
Base Station VendorsBase Station Vendors
Base Station Vendors
 
LTE RF Planning Tool - Atoll
LTE RF Planning Tool - AtollLTE RF Planning Tool - Atoll
LTE RF Planning Tool - Atoll
 
What is 5G?
What is 5G?What is 5G?
What is 5G?
 

Destacado

Bts-site-installation
 Bts-site-installation Bts-site-installation
Bts-site-installation
Ali Usman
 
Ericsson BTS commisioning
Ericsson BTS commisioningEricsson BTS commisioning
Ericsson BTS commisioning
Shahid Rasool
 
Mobilink 2G3G Swap Guide V1.8 20150406 (1)
Mobilink 2G3G Swap Guide V1.8 20150406 (1)Mobilink 2G3G Swap Guide V1.8 20150406 (1)
Mobilink 2G3G Swap Guide V1.8 20150406 (1)
Abdul Mateen Rahim
 
Bts3900 Product Description (V300 R008 02)
Bts3900 Product Description (V300 R008 02)Bts3900 Product Description (V300 R008 02)
Bts3900 Product Description (V300 R008 02)
Atif Mahmood
 

Destacado (20)

Bts-site-installation
 Bts-site-installation Bts-site-installation
Bts-site-installation
 
Cell tower, BTS & antennas
Cell tower, BTS & antennasCell tower, BTS & antennas
Cell tower, BTS & antennas
 
Antennas smart techniques
Antennas smart techniquesAntennas smart techniques
Antennas smart techniques
 
Ericsson BTS commisioning
Ericsson BTS commisioningEricsson BTS commisioning
Ericsson BTS commisioning
 
Mobilink 2G3G Swap Guide V1.8 20150406 (1)
Mobilink 2G3G Swap Guide V1.8 20150406 (1)Mobilink 2G3G Swap Guide V1.8 20150406 (1)
Mobilink 2G3G Swap Guide V1.8 20150406 (1)
 
telecommunication Towers
telecommunication Towerstelecommunication Towers
telecommunication Towers
 
Construction of telecommunication towers
Construction of telecommunication towersConstruction of telecommunication towers
Construction of telecommunication towers
 
BTS SITE VISIT
BTS SITE VISITBTS SITE VISIT
BTS SITE VISIT
 
Kathreins system
Kathreins systemKathreins system
Kathreins system
 
zte mobilink bts swap
zte mobilink bts swapzte mobilink bts swap
zte mobilink bts swap
 
UMTS
UMTS UMTS
UMTS
 
Antenna system-planning
Antenna system-planningAntenna system-planning
Antenna system-planning
 
Zte cabinets
Zte cabinetsZte cabinets
Zte cabinets
 
Industrial training report
Industrial training report Industrial training report
Industrial training report
 
4G-Fourth Generation Mobile Communication System
4G-Fourth Generation Mobile Communication System4G-Fourth Generation Mobile Communication System
4G-Fourth Generation Mobile Communication System
 
Bts3900 Product Description (V300 R008 02)
Bts3900 Product Description (V300 R008 02)Bts3900 Product Description (V300 R008 02)
Bts3900 Product Description (V300 R008 02)
 
Zte 3g
Zte 3gZte 3g
Zte 3g
 
Presentation of NSN training
Presentation of NSN trainingPresentation of NSN training
Presentation of NSN training
 
Ericsson Radio Dot System: Introduction
Ericsson Radio Dot System: Introduction Ericsson Radio Dot System: Introduction
Ericsson Radio Dot System: Introduction
 
5G: A 2020 Vision
5G: A 2020 Vision5G: A 2020 Vision
5G: A 2020 Vision
 

Similar a Antenna Installation Engineering.

494197038-Baseband-6648-Commercial-Presentation.pdf
494197038-Baseband-6648-Commercial-Presentation.pdf494197038-Baseband-6648-Commercial-Presentation.pdf
494197038-Baseband-6648-Commercial-Presentation.pdf
mehdiberenji
 
98780537 gsm-fundamentals
98780537 gsm-fundamentals98780537 gsm-fundamentals
98780537 gsm-fundamentals
Adzadogo Louis
 

Similar a Antenna Installation Engineering. (20)

Multi-Funtion Phased Array Radar
Multi-Funtion Phased Array RadarMulti-Funtion Phased Array Radar
Multi-Funtion Phased Array Radar
 
EUF-IND-T3931 (1).pdf
EUF-IND-T3931 (1).pdfEUF-IND-T3931 (1).pdf
EUF-IND-T3931 (1).pdf
 
Computer Networking Solutions for Energy Systems
Computer Networking Solutions for Energy SystemsComputer Networking Solutions for Energy Systems
Computer Networking Solutions for Energy Systems
 
494197038-Baseband-6648-Commercial-Presentation.pdf
494197038-Baseband-6648-Commercial-Presentation.pdf494197038-Baseband-6648-Commercial-Presentation.pdf
494197038-Baseband-6648-Commercial-Presentation.pdf
 
2000024
20000242000024
2000024
 
Ausgrid's underground high-voltage cable tunnels - providing P25 GRN coverage...
Ausgrid's underground high-voltage cable tunnels - providing P25 GRN coverage...Ausgrid's underground high-voltage cable tunnels - providing P25 GRN coverage...
Ausgrid's underground high-voltage cable tunnels - providing P25 GRN coverage...
 
Ausgrid's underground high-voltage cable tunnels - providing P25 GRN coverage...
Ausgrid's underground high-voltage cable tunnels - providing P25 GRN coverage...Ausgrid's underground high-voltage cable tunnels - providing P25 GRN coverage...
Ausgrid's underground high-voltage cable tunnels - providing P25 GRN coverage...
 
Catalogo Cables Radiantes, Leaky Radiating Cables
Catalogo Cables Radiantes, Leaky Radiating CablesCatalogo Cables Radiantes, Leaky Radiating Cables
Catalogo Cables Radiantes, Leaky Radiating Cables
 
Rmu710 b 1-autres_fiches_en
Rmu710 b 1-autres_fiches_enRmu710 b 1-autres_fiches_en
Rmu710 b 1-autres_fiches_en
 
IBS/DAS mini training review
IBS/DAS mini training reviewIBS/DAS mini training review
IBS/DAS mini training review
 
Power Line Carrier Communication
Power Line Carrier CommunicationPower Line Carrier Communication
Power Line Carrier Communication
 
Gpon Network
Gpon NetworkGpon Network
Gpon Network
 
Gpon Network
Gpon NetworkGpon Network
Gpon Network
 
WWOR Fox Ch9
WWOR Fox Ch9WWOR Fox Ch9
WWOR Fox Ch9
 
Design and Development of Linearly Polarized Patch Antenna of Circular Shape ...
Design and Development of Linearly Polarized Patch Antenna of Circular Shape ...Design and Development of Linearly Polarized Patch Antenna of Circular Shape ...
Design and Development of Linearly Polarized Patch Antenna of Circular Shape ...
 
98780537 gsm-fundamentals
98780537 gsm-fundamentals98780537 gsm-fundamentals
98780537 gsm-fundamentals
 
Total Turnkey DAS: A Path to Ensure Rapid Business Growth and Career Success
Total Turnkey DAS: A Path to Ensure Rapid Business Growth and Career SuccessTotal Turnkey DAS: A Path to Ensure Rapid Business Growth and Career Success
Total Turnkey DAS: A Path to Ensure Rapid Business Growth and Career Success
 
BICSI DAS Presentation
BICSI DAS PresentationBICSI DAS Presentation
BICSI DAS Presentation
 
Introduction To Antenna Impedance Tuner And Aperture Switch
Introduction To Antenna Impedance Tuner And Aperture SwitchIntroduction To Antenna Impedance Tuner And Aperture Switch
Introduction To Antenna Impedance Tuner And Aperture Switch
 
Deliberant - Apc series-product-overview1
Deliberant - Apc series-product-overview1Deliberant - Apc series-product-overview1
Deliberant - Apc series-product-overview1
 

Más de Hải Nguyễn Hồ Bá (8)

Ngây ngô sheet
Ngây ngô sheetNgây ngô sheet
Ngây ngô sheet
 
Microwave Engineering - Homework
Microwave Engineering - HomeworkMicrowave Engineering - Homework
Microwave Engineering - Homework
 
VANET - Vehicle Heading based Routing Protocol for VANET.
VANET - Vehicle Heading based Routing Protocol for VANET.VANET - Vehicle Heading based Routing Protocol for VANET.
VANET - Vehicle Heading based Routing Protocol for VANET.
 
True emotion of body language
True emotion of body languageTrue emotion of body language
True emotion of body language
 
8 ways to refresh yourself
8 ways to refresh yourself8 ways to refresh yourself
8 ways to refresh yourself
 
THIẾT KẾ MẠCH KHUẾCH TẠI TẦN SỐ 0.9 GHz VỚI ĐỘ LỢI 10dB VÀ CỰC TIỂU HỆ SỐ NHIỄU
THIẾT KẾ MẠCH KHUẾCH TẠI TẦN SỐ 0.9 GHz VỚI ĐỘ LỢI 10dB VÀ CỰC TIỂU HỆ SỐ NHIỄUTHIẾT KẾ MẠCH KHUẾCH TẠI TẦN SỐ 0.9 GHz VỚI ĐỘ LỢI 10dB VÀ CỰC TIỂU HỆ SỐ NHIỄU
THIẾT KẾ MẠCH KHUẾCH TẠI TẦN SỐ 0.9 GHz VỚI ĐỘ LỢI 10dB VÀ CỰC TIỂU HỆ SỐ NHIỄU
 
THIẾT KẾ MẠCH KHUẾCH TẠI TẦN SỐ 0.9 GHz VỚI ĐỘ LỢI 10dB VÀ CỰC TIỂU HỆ SỐ NHIỄU
THIẾT KẾ MẠCH KHUẾCH TẠI TẦN SỐ 0.9 GHz VỚI ĐỘ LỢI 10dB VÀ CỰC TIỂU HỆ SỐ NHIỄUTHIẾT KẾ MẠCH KHUẾCH TẠI TẦN SỐ 0.9 GHz VỚI ĐỘ LỢI 10dB VÀ CỰC TIỂU HỆ SỐ NHIỄU
THIẾT KẾ MẠCH KHUẾCH TẠI TẦN SỐ 0.9 GHz VỚI ĐỘ LỢI 10dB VÀ CỰC TIỂU HỆ SỐ NHIỄU
 
VANET
VANETVANET
VANET
 

Último

Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
panagenda
 

Último (20)

AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
CNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In PakistanCNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In Pakistan
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Spring Boot vs Quarkus the ultimate battle - DevoxxUK
Spring Boot vs Quarkus the ultimate battle - DevoxxUKSpring Boot vs Quarkus the ultimate battle - DevoxxUK
Spring Boot vs Quarkus the ultimate battle - DevoxxUK
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challenges
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 

Antenna Installation Engineering.

Notas del editor

  1. <number> Nhã Nhã
  2. Nhã
  3. This slide shows the versatility of the RBS 6000 family. With the various models of the RBS 6000, every relevant application is supported: RBS 6201 is the high capacity indoor RBS, suitable for deployment at e.g. metropolitan indoor sites. RBS 6102 is the high capacity outdoor RBS, suitable for deployment at e.g. metropolitan rooftop sites, ground level sites and rural outdoor sites. RBS 6202 is the zero footprint indoor RBS which can be installed in any 19 inch rack. RBS 6102 is the high capacity outdoor RBS, suitable for deployment at e.g. metropolitan rooftop sites, ground level sites and rural outdoor sites. RBS 6601 is the zero footprint main-remote RBS, suitable for deployment at e.g. metropolitan indoor sites or for in-building coverage solutions. RBS 6301 is the outdoor main-remote RBS, suitable for deployment at e.g. metropolitan rooftop sites, suburban/rural sites or highway coverage sites. RBS 6302 is the super compact outdoor main-remote RBS, suitable for deployment at e.g. metropolitan rooftop sites, suburban/rural sites, highway coverage sites or for in-building coverage solutions.
  4. <number> Nhã
  5. Nhã
  6. Nhã
  7. Nhã
  8. Nhã
  9. Nhã
  10. Nhã
  11. @ sector 2 use WB 2 stage