Enviar búsqueda
Cargar
Sample drawings (dpr)
•
2 recomendaciones
•
884 vistas
Nikhil Jaipurkar
Seguir
Drawings
Leer menos
Leer más
Ingeniería
Denunciar
Compartir
Denunciar
Compartir
1 de 19
Recomendados
SLUICE GATE
SLUICE GATE
SLUICE GATE
KOLEKAR AKSHAY VIVEKANAND
Dams and Reservoirs -Hydraulics engineering
Dams and Reservoirs -Hydraulics engineering
Dams and Reservoirs -Hydraulics engineering
Civil Zone
Report of Summer Training at Central Public Works Department by AMAN GUPTA, IIT BHU Varanasi
Central Public Works Department (CPWD) summer training report
Central Public Works Department (CPWD) summer training report
Aman Gupta
presentation slide related to construction of dams
Ppt of design of dams
Ppt of design of dams
sarojkhadka059
Structural Engineering
Approximate Analysis of Statically Indeteminate Structures.pdf
Approximate Analysis of Statically Indeteminate Structures.pdf
AshrafZaman33
Water supply systems, Intakes & Water demand of B.C.Punmia book
WATER SUPPLY ENGINEERING
WATER SUPPLY ENGINEERING
Himangshu Bhuyan
calculation template
Calculation template
Calculation template
Yekian Ian
GCE Kannur
Module3 rajesh sir
Module3 rajesh sir
SHAMJITH KM
Recomendados
SLUICE GATE
SLUICE GATE
SLUICE GATE
KOLEKAR AKSHAY VIVEKANAND
Dams and Reservoirs -Hydraulics engineering
Dams and Reservoirs -Hydraulics engineering
Dams and Reservoirs -Hydraulics engineering
Civil Zone
Report of Summer Training at Central Public Works Department by AMAN GUPTA, IIT BHU Varanasi
Central Public Works Department (CPWD) summer training report
Central Public Works Department (CPWD) summer training report
Aman Gupta
presentation slide related to construction of dams
Ppt of design of dams
Ppt of design of dams
sarojkhadka059
Structural Engineering
Approximate Analysis of Statically Indeteminate Structures.pdf
Approximate Analysis of Statically Indeteminate Structures.pdf
AshrafZaman33
Water supply systems, Intakes & Water demand of B.C.Punmia book
WATER SUPPLY ENGINEERING
WATER SUPPLY ENGINEERING
Himangshu Bhuyan
calculation template
Calculation template
Calculation template
Yekian Ian
GCE Kannur
Module3 rajesh sir
Module3 rajesh sir
SHAMJITH KM
I have completed my summer internship course in sangam which is located in nellore district ,new barrage is proposed due to old one is aged,every year needs to replace sand bags to rise the water level.
Summer internship Project on Sangam barrage working procedure,
Summer internship Project on Sangam barrage working procedure,
PANEM SRINIVASULU
Construction of Police Station Khajuri Khas, Near Sonia Vihar, Delhi (SH: C/o Police Station Building, Electric sub Station & External Development Work i.e. Internal Electrical Installations)
Industrial Summer Training Report at Construction Site of CPWD
Industrial Summer Training Report at Construction Site of CPWD
Alok Mishra
presentation of work on site of the construction of high level bridge over Sutlej river. most of the work is related to sinking of well foundation.
Well Foundation
Well Foundation
akjain_mkt
dfghj
Gravity dams galleries
Gravity dams galleries
saibabu48
S1-S2 BT
Coffer dams types
Coffer dams types
Amynaah Amye
Unit-IV Surveying
Volume
Volume
GAURAV. H .TANDON
Design of Flat bottom Overhead Water tank
Flat bottom Overhead Water tank
Flat bottom Overhead Water tank
Syeda Nusrath Fathima
Layout of distribution networks, methods of water distribution, storage capacity of ESR, and underground service reservoir.
Water distribution system
Water distribution system
Bibhabasu Mohanty
third year diploma in civil engineering SUB- W.R.E
Dams and spillways
Dams and spillways
DKTE'S YASHWANTRAO CHAVAN POLYTECHNIC, ICHALKARANJI
Math
Hydraulic jump
Hydraulic jump
Thim Mengly(ម៉េងលី,孟李)
dams
Dam
Dam
ultraviolet_1267
https://irjet.net/archives/V5/i12/IRJET-V5I12199.pdf
IRJET- Analysis and Design of Bridge Deck using Grillage Method - As Per IRC
IRJET- Analysis and Design of Bridge Deck using Grillage Method - As Per IRC
IRJET Journal
Dam engineering i 4
Dam engineering i 4
Dam engineering i 4
FeteneBefekadu
Cofferdams
Cofferdams
Cofferdams
GAURAV. H .TANDON
California Bearing ratio test is used to measure the bearing capacity of the soil. These values are used in the pavement design.
CBR Test
CBR Test
Priyansh Singh
This presentation is of Penetration Test for Bitumen. Penetration test measures the hardness or softness of bitumen by measuring the depth in tenths of a millimeter to which a standard loaded needle will penetrate vertically in 5 seconds. There are different grades of Bitumen used for the civil (especially for roads works) work. This presentation consists of the aim, significance, about the apparatus used procedure, noting the reading, Bis recommendation values and IRC recommendation values, precautions,
Penetration Test for Bitumen
Penetration Test for Bitumen
Shweta Sagar
Class notes of Geotechnical Engineering course I used to teach at UET Lahore. Feel free to download the slide show. Anyone looking to modify these files and use them for their own teaching purposes can contact me directly to get hold of editable version.
Geotechnical Engineering-I [Lec #21: Consolidation Problems]
Geotechnical Engineering-I [Lec #21: Consolidation Problems]
Muhammad Irfan
Geotechnical engineering paper
Geotechnical aspects of highway construction
Geotechnical aspects of highway construction
Daljeet Sidhu
The basic principle behind any hydraulic system is Pascal's Law. "Pressure applied anywhere to the body of fluid causes a force to be transmitted equally in all directions, with the force acting at right angles to any surface in contact with the fluid."
Minor Project Report on Hydraulic Bridge
Minor Project Report on Hydraulic Bridge
Aamir Rajput Khan
ntake structures are used for collecting water from the surface sources such as river, lake, and reservoir and conveying it further to the water treatment plant. These structures are masonry or concrete structures and provides relatively clean water, free from pollution, sand and objectionable floating material.
Intake structures in wwwe
Intake structures in wwwe
tirath prajapati
Drawing
17 forebay plan
17 forebay plan
Nikhil Jaipurkar
DESIGN OF STEEL STRUCTURE WITH COLUMN BASE PLATES AS FIXED
Base plate heavy steel structure
Base plate heavy steel structure
ANANDA DS
Más contenido relacionado
La actualidad más candente
I have completed my summer internship course in sangam which is located in nellore district ,new barrage is proposed due to old one is aged,every year needs to replace sand bags to rise the water level.
Summer internship Project on Sangam barrage working procedure,
Summer internship Project on Sangam barrage working procedure,
PANEM SRINIVASULU
Construction of Police Station Khajuri Khas, Near Sonia Vihar, Delhi (SH: C/o Police Station Building, Electric sub Station & External Development Work i.e. Internal Electrical Installations)
Industrial Summer Training Report at Construction Site of CPWD
Industrial Summer Training Report at Construction Site of CPWD
Alok Mishra
presentation of work on site of the construction of high level bridge over Sutlej river. most of the work is related to sinking of well foundation.
Well Foundation
Well Foundation
akjain_mkt
dfghj
Gravity dams galleries
Gravity dams galleries
saibabu48
S1-S2 BT
Coffer dams types
Coffer dams types
Amynaah Amye
Unit-IV Surveying
Volume
Volume
GAURAV. H .TANDON
Design of Flat bottom Overhead Water tank
Flat bottom Overhead Water tank
Flat bottom Overhead Water tank
Syeda Nusrath Fathima
Layout of distribution networks, methods of water distribution, storage capacity of ESR, and underground service reservoir.
Water distribution system
Water distribution system
Bibhabasu Mohanty
third year diploma in civil engineering SUB- W.R.E
Dams and spillways
Dams and spillways
DKTE'S YASHWANTRAO CHAVAN POLYTECHNIC, ICHALKARANJI
Math
Hydraulic jump
Hydraulic jump
Thim Mengly(ម៉េងលី,孟李)
dams
Dam
Dam
ultraviolet_1267
https://irjet.net/archives/V5/i12/IRJET-V5I12199.pdf
IRJET- Analysis and Design of Bridge Deck using Grillage Method - As Per IRC
IRJET- Analysis and Design of Bridge Deck using Grillage Method - As Per IRC
IRJET Journal
Dam engineering i 4
Dam engineering i 4
Dam engineering i 4
FeteneBefekadu
Cofferdams
Cofferdams
Cofferdams
GAURAV. H .TANDON
California Bearing ratio test is used to measure the bearing capacity of the soil. These values are used in the pavement design.
CBR Test
CBR Test
Priyansh Singh
This presentation is of Penetration Test for Bitumen. Penetration test measures the hardness or softness of bitumen by measuring the depth in tenths of a millimeter to which a standard loaded needle will penetrate vertically in 5 seconds. There are different grades of Bitumen used for the civil (especially for roads works) work. This presentation consists of the aim, significance, about the apparatus used procedure, noting the reading, Bis recommendation values and IRC recommendation values, precautions,
Penetration Test for Bitumen
Penetration Test for Bitumen
Shweta Sagar
Class notes of Geotechnical Engineering course I used to teach at UET Lahore. Feel free to download the slide show. Anyone looking to modify these files and use them for their own teaching purposes can contact me directly to get hold of editable version.
Geotechnical Engineering-I [Lec #21: Consolidation Problems]
Geotechnical Engineering-I [Lec #21: Consolidation Problems]
Muhammad Irfan
Geotechnical engineering paper
Geotechnical aspects of highway construction
Geotechnical aspects of highway construction
Daljeet Sidhu
The basic principle behind any hydraulic system is Pascal's Law. "Pressure applied anywhere to the body of fluid causes a force to be transmitted equally in all directions, with the force acting at right angles to any surface in contact with the fluid."
Minor Project Report on Hydraulic Bridge
Minor Project Report on Hydraulic Bridge
Aamir Rajput Khan
ntake structures are used for collecting water from the surface sources such as river, lake, and reservoir and conveying it further to the water treatment plant. These structures are masonry or concrete structures and provides relatively clean water, free from pollution, sand and objectionable floating material.
Intake structures in wwwe
Intake structures in wwwe
tirath prajapati
La actualidad más candente
(20)
Summer internship Project on Sangam barrage working procedure,
Summer internship Project on Sangam barrage working procedure,
Industrial Summer Training Report at Construction Site of CPWD
Industrial Summer Training Report at Construction Site of CPWD
Well Foundation
Well Foundation
Gravity dams galleries
Gravity dams galleries
Coffer dams types
Coffer dams types
Volume
Volume
Flat bottom Overhead Water tank
Flat bottom Overhead Water tank
Water distribution system
Water distribution system
Dams and spillways
Dams and spillways
Hydraulic jump
Hydraulic jump
Dam
Dam
IRJET- Analysis and Design of Bridge Deck using Grillage Method - As Per IRC
IRJET- Analysis and Design of Bridge Deck using Grillage Method - As Per IRC
Dam engineering i 4
Dam engineering i 4
Cofferdams
Cofferdams
CBR Test
CBR Test
Penetration Test for Bitumen
Penetration Test for Bitumen
Geotechnical Engineering-I [Lec #21: Consolidation Problems]
Geotechnical Engineering-I [Lec #21: Consolidation Problems]
Geotechnical aspects of highway construction
Geotechnical aspects of highway construction
Minor Project Report on Hydraulic Bridge
Minor Project Report on Hydraulic Bridge
Intake structures in wwwe
Intake structures in wwwe
Destacado
Drawing
17 forebay plan
17 forebay plan
Nikhil Jaipurkar
DESIGN OF STEEL STRUCTURE WITH COLUMN BASE PLATES AS FIXED
Base plate heavy steel structure
Base plate heavy steel structure
ANANDA DS
Drawing
7 plan of trench weir
7 plan of trench weir
Nikhil Jaipurkar
Drawing
14 desilting tank-plan & section details
14 desilting tank-plan & section details
Nikhil Jaipurkar
Visit it and know everything about Modikhola HPP
Modi Khola Hydropower Field Report
Modi Khola Hydropower Field Report
Sagunn Paudyal
2.2 gl for-hydaulic_design_of_shp_project
2.2 gl for-hydaulic_design_of_shp_project
Souhail Zraoura
performance evaluation of desilting devices
performance evaluation of desilting devices
Gurdeep singh Johar
SCG report covering 35+ SHP sites of Himurja (3-5 MW) to be released on October 13, 2014. The report will contain information about project location, catchment area, hydrology, estimated power potential, accessibility, and status of other SHP projects in the same stream (upstream/ downstream). More details about content, projects covered, pricing etc in the attached document. Order your copy before October 10 to get a 20% Early Bird Discount.
SCG Report on Himurja SHP Tender 2014
SCG Report on Himurja SHP Tender 2014
Nikhil Jaipurkar
Destacado
(8)
17 forebay plan
17 forebay plan
Base plate heavy steel structure
Base plate heavy steel structure
7 plan of trench weir
7 plan of trench weir
14 desilting tank-plan & section details
14 desilting tank-plan & section details
Modi Khola Hydropower Field Report
Modi Khola Hydropower Field Report
2.2 gl for-hydaulic_design_of_shp_project
2.2 gl for-hydaulic_design_of_shp_project
performance evaluation of desilting devices
performance evaluation of desilting devices
SCG Report on Himurja SHP Tender 2014
SCG Report on Himurja SHP Tender 2014
Más de Nikhil Jaipurkar
Analysis of rates
Appendix 11 analysis of rates - balsio shp phase ii - 28032014
Appendix 11 analysis of rates - balsio shp phase ii - 28032014
Nikhil Jaipurkar
Drawing
51 switchyard(2 of 2)
51 switchyard(2 of 2)
Nikhil Jaipurkar
Drawing
49 single line diagram
49 single line diagram
Nikhil Jaipurkar
Drawing
50 switchyard (1 of 2)
50 switchyard (1 of 2)
Nikhil Jaipurkar
Drawing
43 penstock gate embedment-1
43 penstock gate embedment-1
Nikhil Jaipurkar
Drawing
39 shingle gate embedment-1
39 shingle gate embedment-1
Nikhil Jaipurkar
Drawing
33 service gate panel-1
33 service gate panel-1
Nikhil Jaipurkar
Drawing
29 stop log panel-1
29 stop log panel-1
Nikhil Jaipurkar
Drawing
23 diversion weir trash-1
23 diversion weir trash-1
Nikhil Jaipurkar
Drawing
20 plan of power house
20 plan of power house
Nikhil Jaipurkar
Drawing
19 plan & section of penstock
19 plan & section of penstock
Nikhil Jaipurkar
Drawing
10 section of tunnel (1 of 4)
10 section of tunnel (1 of 4)
Nikhil Jaipurkar
Drawing
9 power channel - section
9 power channel - section
Nikhil Jaipurkar
Drawing
8 section of trench weir
8 section of trench weir
Nikhil Jaipurkar
Drawing
6 general layout of project (6 of 6)
6 general layout of project (6 of 6)
Nikhil Jaipurkar
Drawing
1 general layout of project (1 of 6)
1 general layout of project (1 of 6)
Nikhil Jaipurkar
This is the Detailed Project Report for a 10 MW project in Kenya. Prepared by SCG in 2012.
Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)
Nikhil Jaipurkar
Typical costs and budget for SHP development and construction.
Indicative budget for SHP development
Indicative budget for SHP development
Nikhil Jaipurkar
A roadmap for Small hydro power project development in India
SHP development in India - A roadmap
SHP development in India - A roadmap
Nikhil Jaipurkar
Más de Nikhil Jaipurkar
(19)
Appendix 11 analysis of rates - balsio shp phase ii - 28032014
Appendix 11 analysis of rates - balsio shp phase ii - 28032014
51 switchyard(2 of 2)
51 switchyard(2 of 2)
49 single line diagram
49 single line diagram
50 switchyard (1 of 2)
50 switchyard (1 of 2)
43 penstock gate embedment-1
43 penstock gate embedment-1
39 shingle gate embedment-1
39 shingle gate embedment-1
33 service gate panel-1
33 service gate panel-1
29 stop log panel-1
29 stop log panel-1
23 diversion weir trash-1
23 diversion weir trash-1
20 plan of power house
20 plan of power house
19 plan & section of penstock
19 plan & section of penstock
10 section of tunnel (1 of 4)
10 section of tunnel (1 of 4)
9 power channel - section
9 power channel - section
8 section of trench weir
8 section of trench weir
6 general layout of project (6 of 6)
6 general layout of project (6 of 6)
1 general layout of project (1 of 6)
1 general layout of project (1 of 6)
Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)
Indicative budget for SHP development
Indicative budget for SHP development
SHP development in India - A roadmap
SHP development in India - A roadmap
Último
Wadi rum in Jordan Luxhotel Analysis as Case Study
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptx
NadaHaitham1
covers projection of planes
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
RAJNEESHKUMAR341697
This introduces to the concept of natural gas properties and applications
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
sarkmank1
The proposed application ONLINE ELECTRICITY BILLING SYSTEM is aimed to develop a web application for the various activities being carried out by the BESCOM. The BESCOM is managed by the BESCOM officers who are supposed to get all the required information which are needed to generate an electricity bill for customers for their usage of electricity.
Online electricity billing project report..pdf
Online electricity billing project report..pdf
Kamal Acharya
EAM
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
AldoGarca30
This report will provide a great deal of data for planning Pabna Municipality. The source are old but might give a better result in analysis for urban planning. We can have a proper idea of how to plan a municipal area in the future, control urban growth, and increase utility services for betterment of the people living in an urban area
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
Morshed Ahmed Rahath
Geophysics
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
Motoring and generation Armature circuit equation for motoring and generation, Types of field excitations - separately excited, shunt and series. Open circuit characteristic of separately excited DC generator, back EMF with armature reaction, voltage build-up in a shunt generator, critical field resistance and critical speed. V-I characteristics and torque-speed characteristics of separately excited shunt and series motors. Speed control through armature voltage. Losses, load testing and back-to-back testing of DC machines
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
BhangaleSonal
Mini project for btech
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
vanyagupta248
Exception Handling and Function Template and Class Templates
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
drmkjayanthikannan
“HOSTEL MANAGEMENT SYSTEM” is a software developed for managing various activities in the hostel. For the past few years the number of educational institutions are increasing rapidly. Thereby the number of hostels are also increasing for the accommodation of the students studying in this institution. And hence there is a lot of strain on the person who are running the hostel and software’s are not usually used in this context. This particular project deals with the problems on managing a hostel and avoids the problems which occur when carried manually.
Hostel management system project report..pdf
Hostel management system project report..pdf
Kamal Acharya
The "Employee Leave Management System" has been developed to override the problems prevailing in the practicing manual system. This software is supported to eliminate and in some cases reduce the hardships faced by this existing system. More over this system is designed for the particular need of the company to carry out operations in a smooth and effective manner.
Employee leave management system project.
Employee leave management system project.
Kamal Acharya
PEMESANAN OBAT ASLI : +6287776558899 Cara Menggugurkan Kandungan usia 1 , 2 , bulan - obat penggugur janin - cara aborsi kandungan - obat penggugur kandungan 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 bulan - bagaimana cara menggugurkan kandungan - tips Cara aborsi kandungan - trik Cara menggugurkan janin - Cara aman bagi ibu menyusui menggugurkan kandungan - klinik apotek jual obat penggugur kandungan - jamu PENGGUGUR KANDUNGAN - WAJIB TAU CARA ABORSI JANIN - GUGURKAN KANDUNGAN AMAN TANPA KURET - CARA Menggugurkan Kandungan tanpa efek samping - rekomendasi dokter obat herbal penggugur kandungan - ABORSI JANIN - aborsi kandungan - jamu herbal Penggugur kandungan - cara Menggugurkan Kandungan yang cacat - tata cara Menggugurkan Kandungan - obat penggugur kandungan di apotik kimia Farma - obat telat datang bulan - obat penggugur kandungan tuntas - obat penggugur kandungan alami - klinik aborsi janin gugurkan kandungan - ©Cytotec ™misoprostol BPOM - OBAT PENGGUGUR KANDUNGAN ®CYTOTEC - aborsi janin dengan pil ©Cytotec - ®Cytotec misoprostol® BPOM 100% - penjual obat penggugur kandungan asli - klinik jual obat aborsi janin - obat penggugur kandungan di klinik k-24 || obat penggugur ™Cytotec di apotek umum || ®CYTOTEC ASLI || obat ©Cytotec yang asli 200mcg || obat penggugur ASLI || pil Cytotec© tablet || cara gugurin kandungan || jual ®Cytotec 200mcg || dokter gugurkan kandungan || cara menggugurkan kandungan dengan cepat selesai dalam 24 jam secara alami buah buahan || usia kandungan 1_2 3_4 5_6 7_8 bulan masih bisa di gugurkan || obat penggugur kandungan ®cytotec dan gastrul || cara gugurkan pembuahan janin secara alami dan cepat || gugurkan kandungan || gugurin janin || cara Menggugurkan janin di luar nikah || contoh aborsi janin yang benar || contoh obat penggugur kandungan asli || contoh cara Menggugurkan Kandungan yang benar || telat haid || obat telat haid || Cara Alami gugurkan kehamilan || obat telat menstruasi || cara Menggugurkan janin anak haram || cara aborsi menggugurkan janin yang tidak berkembang || gugurkan kandungan dengan obat ©Cytotec || obat penggugur kandungan ™Cytotec 100% original || HARGA obat penggugur kandungan || obat telat haid 1 bulan || obat telat menstruasi 1-2 3-4 5-6 7-8 BULAN || obat telat datang bulan || cara Menggugurkan janin 1 bulan || cara Menggugurkan Kandungan yang masih 2 bulan || cara Menggugurkan Kandungan yang masih hitungan Minggu || cara Menggugurkan Kandungan yang masih usia 3 bulan || cara Menggugurkan usia kandungan 4 bulan || cara Menggugurkan janin usia 5 bulan || cara Menggugurkan kehamilan 6 Bulan ________&&&_________&&&_____________&&&_________&&&&____________ Cara Menggugurkan Kandungan Usia Janin 1 | 7 | 8 Bulan Dengan Cepat Dalam Hitungan Jam Secara Alami, Kami Siap Meneriman Pesanan Ke Seluruh Indonesia, Melputi: Ambon, Banda Aceh, Bandung, Banjarbaru, Batam, Bau-Bau, Bengkulu, Binjai, Blitar, Bontang, Cilegon, Cirebon, Depok, Gorontalo, Jakarta, Jayapura, Kendari, Kota Mobagu, Kupang, Lhokseumawe
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert In Azad Kashmir kala jadu Specialist Expert In Azad Kashmir
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
Amil baba
This is my cheat sheet for the course Data Management.
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
JiananWang21
Orlando Arnold's case study solved
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
MuhammadAsimMuhammad6
MG University, B.Arch Semester 1&2, History of Architecture, Module III, Topic: Religious Architecture of Kerala - Temple Architecture of Kerala
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
SCMS School of Architecture
TYPES OF GEAR TRAIN
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
selvakumar948
The purpose of Integrated Test Rig is to assess performance of Fuel Cooled Oil Cooler (FCOC), HP Pump & Oil Pump prior to fitment on Aero Engine. The design of rig is such that it can cater to individual testing of individual LRU or integrated testing of all the LRU’s installed together (in combination). The pumps under test shall be mounted directly on the high-speed electric motor flange through adapter quill shaft assembly. Variable speed drives shall be provided for all the pumps under testing. The rig shall cater for real time monitoring and recording of performance parameters. KEY FEATURES Key features of this Rig are as follows: - 1. It has separate power packs for both the fluids i.e. ATF Power pack for ATF Fluid, OX Power Pack for OX-27 Oil. 2. This Rig is designed for high temperature Application. It works on 200 deg. Celsius. 3. Two Dedicated heating systems have been integrated with this Rig to raise the temperature of OX-27 Oil. 4. In both Power Packs insulated tanks are being used, which is good for safe operation and safety of operator. 5. This rig is designed in such a way, that it’s OX power pack is in its left side, ATF Power pack is in right Side and test bed is in Centre. 6. A big Test bed have been provided for smooth testing of UUT’s. 7. All piping is being insulated for safe operation and maintenance. 8. It comprises with DAQ System. 9. This rig can test several components at a time, together or separately. Application All the UUT’s are mounted on HTFE-25 Engine after successful performance testing of those. Application of this Rig are as follows: - 1. One of its application is to test LP Pump of HTFE-25. It is designed for functional testing of LP Pump. a. Free Flow Test b. Load Test 2. It is used to test HP Pump of HTFE-25. It is designed for functional testing of HP Pump. a. Free Flow Test b. Load Test 3. It is used to test Oil Pump of HTFE-25. It is designed for functional testing of Oil Pump. 4. It is used to test FCOC of HTFE-25.
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
The project Hospital Management system includes registration of patients, storing their details into the system, and also computerized billing in the pharmacy, and labs. The software has the facility to give a unique id for every patient and stores the details of every patient and the staff automatically. It includes a search facility to know the current status of each room. User can search availability of a doctor and the details of a patient using the id. The Hospital Management System can be entered using a username and password. It is accessible either by an administrator or receptionist. Only they can add data into the database. The data can be retrieved easily. The interface is very user-friendly. The data are well protected for personal use and makes the data processing very fast. Hospital Management System is powerful, flexible, and easy to use and is designed and developed to deliver real conceivable benefits to hospitals. Hospital Management System is designed for multispecialty hospitals, to cover a wide range of hospital administration and management processes. It is an integrated end-to-end Hospital Management System that provides relevant information across the hospital to support effective decision making for patient care, hospital administration and critical financial accounting, in a seamless flow. Hospital Management System is a software product suite designed to improve the quality and management of hospital management in the areas of clinical process analysis and activity-based costing. Hospital Management System enables you to develop your organization and improve its effectiveness and quality of work. Managing the key processes efficiently is critical to the success of the hospital helps you manage your processes.
Hospital management system project report.pdf
Hospital management system project report.pdf
Kamal Acharya
Último
(20)
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptx
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
Online electricity billing project report..pdf
Online electricity billing project report..pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Hostel management system project report..pdf
Hostel management system project report..pdf
Employee leave management system project.
Employee leave management system project.
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Hospital management system project report.pdf
Hospital management system project report.pdf
Sample drawings (dpr)
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
27