CONTENT
 Definition of cassion
 Use of caisson
 Material use for caisson
 Type of caisson
 Shape of caisson
 Caisson sickness(disease)
 Precaution against Caisson disease
•Introduction of coffer dam
•Requirement of coffer dam
•Types of Cofferdam
•Design Consideration
•Advantage of cofferdam
DEFINITION OF CASSION
 Caisson is defined as watertight structure round or rectangular ,
which is sunk through ground or water to exclude water and semi
fluid material during the process of excavation of foundation and
become a part of the substructure.
USE OF CASSION
 To reach the hard bearing strata for transferring the load of
superstructure.
 For excavation for foundation of bridges , piers , abutments in
rivers and lakes.
 To provide an access to a deep shaft and tunnel.
MATERIAL USE FOR CASSION
 Steel
 Timber
 Reinforced cement concrete
 Cast iron
TYPE OF CASSION
 Box caisson
 Open caisson(open at top and bottom)
1. Single
2. Multiple
3. Cylinder
 Pneumatic caisson(closed at top and open at bottom)
SHAPE OF CAISSONS
OPEN CAISSON
BOX CAISSON
PNEUMATIC CASSION
 Open at bottom and closed at top.
 It is useful where it is not possible to adopt well.
 Suitable when depth of water more than 12m and maximum
depth of water up to 35m.
 Important feature of a pneumatic caisson is that
compressed air is used to remove water from working
chamber at bottom and foundation work Is carried out in
dry condition.
PNEUMATIC CASSION SICKNESS
 The worker working under compressed air inside the
working chamber , suffer a certain type of disease
when they return to atmospheric pressure . This
disease know as caisson sickness or caisson disease.
 The main symptoms of the disease are
I. Dizziness
II. Double vision
III. Headache
IV. Trouble to speaking
V. Pain in leg etc…
PENUMATIC CASSION
The following precaution should be
taken to avoid the caisson sickness.
 No person should work for more than one shift in a day.
 The duration of shift should not exceed 12 hours.
 The rate of compression and decompression should be properly
control.
 person with strong hearts , relatively low blood pressure and
good circulation should be employed on the work.
 The medical chamber must be provided just near the side work.
 Use of alcoholic drinks should be prohibited.
The following precaution should be
taken to avoid the caisson sickness.
 The worker should be made fully conversant
with use of the bells , signals , telephones etc…
 All the passenger , shafts etc. of the pneumatic
caisson should be maintained clear and kept
properly lighted.
What is Cofferdam?
 Cofferdams are temporary enclosures to keep out water
and soil so as to permit dewatering and construction of the
permanent facility (structure) in the dry.
REQUIREMENT OF COFFER DAM
 It should be a water tight.
 It should be generally constructed at site of work.
 The design and layout of coffer dam should be such a that total cost of construction ,
maintenance and pumping is minimum.
 It should be stable against bursting , overturning , under the flood and wave.
Types of Cofferdam
• The followings are the different types of cofferdam:
 Earth fill embankment
 Rock fill embankment
 Timber sheet pile
 Steel sheet pile
 Plastic sheet pile
 Concrete walled
Earth fill Embankment
 Its is suitable for narrow and sluggish river.
 Suitable for low and moderate head of water.
 Problem of erosion in sand embankment is common, solution can be the provision of the
drainage ditches.
Rock fill Embankment
 Suitable for steeper slope.
 It can be either dumped or hand packed.
 For hand packed rock-fill problem of seepage may occur. It can be removed by dumping
the fly-ash on outer side.
 A fair degree of water tightness is gradually occur.
Timber Sheet Pile
 Timber sheet pile were extensively used for cofferdam work in 19 century.
 It can be gradually replaced with steel pile.
 It can only be used for small depth since no deep piling in gravely strata possible.
Steel Sheet Pile
 Widely used specially for deepest type because of its structural strength.
 Very good in water tightness due to its interlocking section.
 Deep penetration provide resistance to inward movement and also provide sufficient cut-
off to prevent piping in permeable ground.
Plastic Sheet Pile
 A smooth, flat external wall surface improving asthetics through complete elimination of
traditional ridges.
 Less complicated formwork requirements, reducing installation time.
 Stiffer section of uniform configuration maximizing installation speed.
 Double interlocking.
Concrete Walled Cofferdam
 Where high heads and water velocities must be resisted, elaborate forms of cofferdam is
necessary.
 It is very costly so all other opinion must be screened before its selection.
 These can be used in different forms, like circular or semi circular concrete shells.
Cofferdam Design Consideration
 Scouring or undermining by rapidly flowing water.
 Stability against overturning or tilting.
 Upward forces on outside edges due to tilting.
 Stability against vertical shear.
 Effects of forces resulting from: ice, water, wave, active earth, passive earth pressures.
Advantages of Cofferdam
 Allow excavation and construction of structures in otherwise poor environment.
 Provides safe environment to work.
 Sheet piles are easily installed and removed.
 Materials typically can be reused on other projects.
Items Needed for Installation
 Pile driving hammer.
 Vibratory or impact hammer.
 Crane of sufficient size.
 Steel sheet piles are typically used etc….
CASSION AND COFFER DAM.pptx

Más contenido relacionado

La actualidad más candente

PRE STRESSED CONCRETE
PRE STRESSED CONCRETEPRE STRESSED CONCRETE
PRE STRESSED CONCRETE524001
 
PRESTRESSED CONCRETE STRUCTURES
PRESTRESSED CONCRETE STRUCTURESPRESTRESSED CONCRETE STRUCTURES
PRESTRESSED CONCRETE STRUCTURESTarun kumar
 
Advanced concrete technology
Advanced concrete technologyAdvanced concrete technology
Advanced concrete technologySelva Prakash
 
Shear, bond bearing,camber & deflection in prestressed concrete
Shear, bond bearing,camber & deflection in prestressed concreteShear, bond bearing,camber & deflection in prestressed concrete
Shear, bond bearing,camber & deflection in prestressed concreteMAHFUZUR RAHMAN
 
High density concrete, high strength concrete and high performance concrete.
High density concrete, high strength concrete and high performance concrete.High density concrete, high strength concrete and high performance concrete.
High density concrete, high strength concrete and high performance concrete.shebina a
 
Chapter 1 PILE FOUNDATIONS
Chapter 1 PILE FOUNDATIONSChapter 1 PILE FOUNDATIONS
Chapter 1 PILE FOUNDATIONSKHUSHBU SHAH
 
Prefabricated structures
Prefabricated structuresPrefabricated structures
Prefabricated structuresFAIZAL MUHAMMED
 
construction of flexible pavement
construction of flexible pavementconstruction of flexible pavement
construction of flexible pavementRafi Khan
 
Design of short columns using helical reinforcement
Design of short columns using helical reinforcementDesign of short columns using helical reinforcement
Design of short columns using helical reinforcementshivam gautam
 
Limit state, working stress, ultimate load method - Detailed Concept
Limit state, working stress, ultimate load method - Detailed ConceptLimit state, working stress, ultimate load method - Detailed Concept
Limit state, working stress, ultimate load method - Detailed ConceptCivil Insider
 

La actualidad más candente (20)

PRE STRESSED CONCRETE
PRE STRESSED CONCRETEPRE STRESSED CONCRETE
PRE STRESSED CONCRETE
 
PRESTRESSED CONCRETE STRUCTURES
PRESTRESSED CONCRETE STRUCTURESPRESTRESSED CONCRETE STRUCTURES
PRESTRESSED CONCRETE STRUCTURES
 
Advanced concrete technology
Advanced concrete technologyAdvanced concrete technology
Advanced concrete technology
 
Shear, bond bearing,camber & deflection in prestressed concrete
Shear, bond bearing,camber & deflection in prestressed concreteShear, bond bearing,camber & deflection in prestressed concrete
Shear, bond bearing,camber & deflection in prestressed concrete
 
Pile foundations
Pile foundationsPile foundations
Pile foundations
 
Chapter 3 caisson
Chapter 3 caissonChapter 3 caisson
Chapter 3 caisson
 
Water tank design ppt
Water tank design pptWater tank design ppt
Water tank design ppt
 
High density concrete, high strength concrete and high performance concrete.
High density concrete, high strength concrete and high performance concrete.High density concrete, high strength concrete and high performance concrete.
High density concrete, high strength concrete and high performance concrete.
 
Cofferdam
CofferdamCofferdam
Cofferdam
 
Chapter 1 PILE FOUNDATIONS
Chapter 1 PILE FOUNDATIONSChapter 1 PILE FOUNDATIONS
Chapter 1 PILE FOUNDATIONS
 
Prefabricated structures
Prefabricated structuresPrefabricated structures
Prefabricated structures
 
Ferro cement
Ferro cementFerro cement
Ferro cement
 
Water in concrete
Water in concreteWater in concrete
Water in concrete
 
construction of flexible pavement
construction of flexible pavementconstruction of flexible pavement
construction of flexible pavement
 
Retaining wall
Retaining wallRetaining wall
Retaining wall
 
Well foundation
Well foundationWell foundation
Well foundation
 
water tank
water tankwater tank
water tank
 
Design of short columns using helical reinforcement
Design of short columns using helical reinforcementDesign of short columns using helical reinforcement
Design of short columns using helical reinforcement
 
Limit state, working stress, ultimate load method - Detailed Concept
Limit state, working stress, ultimate load method - Detailed ConceptLimit state, working stress, ultimate load method - Detailed Concept
Limit state, working stress, ultimate load method - Detailed Concept
 
One-Way Slab Design
One-Way Slab DesignOne-Way Slab Design
One-Way Slab Design
 

Similar a CASSION AND COFFER DAM.pptx

Chapter 4.2 coffer dam, well foundation-final1
Chapter 4.2   coffer dam, well foundation-final1Chapter 4.2   coffer dam, well foundation-final1
Chapter 4.2 coffer dam, well foundation-final1DYPCET
 
Cofferdam_ppt.pptx
Cofferdam_ppt.pptxCofferdam_ppt.pptx
Cofferdam_ppt.pptxJackRider12
 
caissons and cofferdam in substructure construction
caissons and cofferdam in substructure constructioncaissons and cofferdam in substructure construction
caissons and cofferdam in substructure constructionChinnuNinan
 
DEEP FOUNDATION
DEEP FOUNDATIONDEEP FOUNDATION
DEEP FOUNDATIONaframawal
 
ALL ABOUT DEEP FOUNDATIONS
ALL ABOUT DEEP FOUNDATIONSALL ABOUT DEEP FOUNDATIONS
ALL ABOUT DEEP FOUNDATIONSjagrutib22
 
Soldier Bored and Diaphragm
Soldier Bored and DiaphragmSoldier Bored and Diaphragm
Soldier Bored and DiaphragmYingHongKang
 
underwater consruction VIII sem MMBC.pptx
underwater consruction VIII sem MMBC.pptxunderwater consruction VIII sem MMBC.pptx
underwater consruction VIII sem MMBC.pptxSaffanAhmed1
 
1. SELECTION OF FOUNDATION AND SUBSOIL EXPLORATION/INVESTIGATION (FE) 2180609...
1. SELECTION OF FOUNDATION AND SUBSOIL EXPLORATION/INVESTIGATION (FE) 2180609...1. SELECTION OF FOUNDATION AND SUBSOIL EXPLORATION/INVESTIGATION (FE) 2180609...
1. SELECTION OF FOUNDATION AND SUBSOIL EXPLORATION/INVESTIGATION (FE) 2180609...VATSAL PATEL
 
Notes on introduction and design of caissons
Notes on introduction and design of caissonsNotes on introduction and design of caissons
Notes on introduction and design of caissonsVICTOR A. KIPLAGAT
 
CAPSTONE PROJECT PPT.pptx
CAPSTONE PROJECT PPT.pptxCAPSTONE PROJECT PPT.pptx
CAPSTONE PROJECT PPT.pptxvivekvallakati
 
Chapter 4.3 well foundation-final-ppt
Chapter 4.3   well foundation-final-pptChapter 4.3   well foundation-final-ppt
Chapter 4.3 well foundation-final-pptDYPCET
 
Caisson foundation.ppt
Caisson foundation.pptCaisson foundation.ppt
Caisson foundation.pptTarique048
 

Similar a CASSION AND COFFER DAM.pptx (20)

Chapter 4.2 coffer dam, well foundation-final1
Chapter 4.2   coffer dam, well foundation-final1Chapter 4.2   coffer dam, well foundation-final1
Chapter 4.2 coffer dam, well foundation-final1
 
Caisson Foundation
Caisson Foundation Caisson Foundation
Caisson Foundation
 
Cofferdam_ppt.pptx
Cofferdam_ppt.pptxCofferdam_ppt.pptx
Cofferdam_ppt.pptx
 
Cofferdam
CofferdamCofferdam
Cofferdam
 
caissons and cofferdam in substructure construction
caissons and cofferdam in substructure constructioncaissons and cofferdam in substructure construction
caissons and cofferdam in substructure construction
 
DEEP FOUNDATION
DEEP FOUNDATIONDEEP FOUNDATION
DEEP FOUNDATION
 
ALL ABOUT DEEP FOUNDATIONS
ALL ABOUT DEEP FOUNDATIONSALL ABOUT DEEP FOUNDATIONS
ALL ABOUT DEEP FOUNDATIONS
 
BCT- Module 5 a coffer-dam (Part_2)
BCT- Module 5 a coffer-dam (Part_2)BCT- Module 5 a coffer-dam (Part_2)
BCT- Module 5 a coffer-dam (Part_2)
 
Caisson
CaissonCaisson
Caisson
 
Soldier Bored and Diaphragm
Soldier Bored and DiaphragmSoldier Bored and Diaphragm
Soldier Bored and Diaphragm
 
underwater consruction VIII sem MMBC.pptx
underwater consruction VIII sem MMBC.pptxunderwater consruction VIII sem MMBC.pptx
underwater consruction VIII sem MMBC.pptx
 
Deep foundation
Deep foundationDeep foundation
Deep foundation
 
1. SELECTION OF FOUNDATION AND SUBSOIL EXPLORATION/INVESTIGATION (FE) 2180609...
1. SELECTION OF FOUNDATION AND SUBSOIL EXPLORATION/INVESTIGATION (FE) 2180609...1. SELECTION OF FOUNDATION AND SUBSOIL EXPLORATION/INVESTIGATION (FE) 2180609...
1. SELECTION OF FOUNDATION AND SUBSOIL EXPLORATION/INVESTIGATION (FE) 2180609...
 
Notes on introduction and design of caissons
Notes on introduction and design of caissonsNotes on introduction and design of caissons
Notes on introduction and design of caissons
 
CAPSTONE PROJECT PPT.pptx
CAPSTONE PROJECT PPT.pptxCAPSTONE PROJECT PPT.pptx
CAPSTONE PROJECT PPT.pptx
 
pile wall
pile wallpile wall
pile wall
 
Chapter 4.3 well foundation-final-ppt
Chapter 4.3   well foundation-final-pptChapter 4.3   well foundation-final-ppt
Chapter 4.3 well foundation-final-ppt
 
Lesson4
Lesson4Lesson4
Lesson4
 
Caisson foundation.ppt
Caisson foundation.pptCaisson foundation.ppt
Caisson foundation.ppt
 
Coffer dam and its type
Coffer dam and its typeCoffer dam and its type
Coffer dam and its type
 

Último

chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf203318pmpc
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...tanu pandey
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 

Último (20)

chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 

CASSION AND COFFER DAM.pptx

  • 1. CONTENT  Definition of cassion  Use of caisson  Material use for caisson  Type of caisson  Shape of caisson  Caisson sickness(disease)  Precaution against Caisson disease •Introduction of coffer dam •Requirement of coffer dam •Types of Cofferdam •Design Consideration •Advantage of cofferdam
  • 2. DEFINITION OF CASSION  Caisson is defined as watertight structure round or rectangular , which is sunk through ground or water to exclude water and semi fluid material during the process of excavation of foundation and become a part of the substructure.
  • 3. USE OF CASSION  To reach the hard bearing strata for transferring the load of superstructure.  For excavation for foundation of bridges , piers , abutments in rivers and lakes.  To provide an access to a deep shaft and tunnel.
  • 4. MATERIAL USE FOR CASSION  Steel  Timber  Reinforced cement concrete  Cast iron
  • 5. TYPE OF CASSION  Box caisson  Open caisson(open at top and bottom) 1. Single 2. Multiple 3. Cylinder  Pneumatic caisson(closed at top and open at bottom)
  • 9. PNEUMATIC CASSION  Open at bottom and closed at top.  It is useful where it is not possible to adopt well.  Suitable when depth of water more than 12m and maximum depth of water up to 35m.  Important feature of a pneumatic caisson is that compressed air is used to remove water from working chamber at bottom and foundation work Is carried out in dry condition.
  • 10. PNEUMATIC CASSION SICKNESS  The worker working under compressed air inside the working chamber , suffer a certain type of disease when they return to atmospheric pressure . This disease know as caisson sickness or caisson disease.  The main symptoms of the disease are I. Dizziness II. Double vision III. Headache IV. Trouble to speaking V. Pain in leg etc…
  • 12. The following precaution should be taken to avoid the caisson sickness.  No person should work for more than one shift in a day.  The duration of shift should not exceed 12 hours.  The rate of compression and decompression should be properly control.  person with strong hearts , relatively low blood pressure and good circulation should be employed on the work.  The medical chamber must be provided just near the side work.  Use of alcoholic drinks should be prohibited.
  • 13. The following precaution should be taken to avoid the caisson sickness.  The worker should be made fully conversant with use of the bells , signals , telephones etc…  All the passenger , shafts etc. of the pneumatic caisson should be maintained clear and kept properly lighted.
  • 14. What is Cofferdam?  Cofferdams are temporary enclosures to keep out water and soil so as to permit dewatering and construction of the permanent facility (structure) in the dry.
  • 15. REQUIREMENT OF COFFER DAM  It should be a water tight.  It should be generally constructed at site of work.  The design and layout of coffer dam should be such a that total cost of construction , maintenance and pumping is minimum.  It should be stable against bursting , overturning , under the flood and wave.
  • 16. Types of Cofferdam • The followings are the different types of cofferdam:  Earth fill embankment  Rock fill embankment  Timber sheet pile  Steel sheet pile  Plastic sheet pile  Concrete walled
  • 17. Earth fill Embankment  Its is suitable for narrow and sluggish river.  Suitable for low and moderate head of water.  Problem of erosion in sand embankment is common, solution can be the provision of the drainage ditches.
  • 18. Rock fill Embankment  Suitable for steeper slope.  It can be either dumped or hand packed.  For hand packed rock-fill problem of seepage may occur. It can be removed by dumping the fly-ash on outer side.  A fair degree of water tightness is gradually occur.
  • 19.
  • 20. Timber Sheet Pile  Timber sheet pile were extensively used for cofferdam work in 19 century.  It can be gradually replaced with steel pile.  It can only be used for small depth since no deep piling in gravely strata possible.
  • 21. Steel Sheet Pile  Widely used specially for deepest type because of its structural strength.  Very good in water tightness due to its interlocking section.  Deep penetration provide resistance to inward movement and also provide sufficient cut- off to prevent piping in permeable ground.
  • 22.
  • 23. Plastic Sheet Pile  A smooth, flat external wall surface improving asthetics through complete elimination of traditional ridges.  Less complicated formwork requirements, reducing installation time.  Stiffer section of uniform configuration maximizing installation speed.  Double interlocking.
  • 24.
  • 25. Concrete Walled Cofferdam  Where high heads and water velocities must be resisted, elaborate forms of cofferdam is necessary.  It is very costly so all other opinion must be screened before its selection.  These can be used in different forms, like circular or semi circular concrete shells.
  • 26. Cofferdam Design Consideration  Scouring or undermining by rapidly flowing water.  Stability against overturning or tilting.  Upward forces on outside edges due to tilting.  Stability against vertical shear.  Effects of forces resulting from: ice, water, wave, active earth, passive earth pressures.
  • 27. Advantages of Cofferdam  Allow excavation and construction of structures in otherwise poor environment.  Provides safe environment to work.  Sheet piles are easily installed and removed.  Materials typically can be reused on other projects.
  • 28. Items Needed for Installation  Pile driving hammer.  Vibratory or impact hammer.  Crane of sufficient size.  Steel sheet piles are typically used etc….