Nirjhar Chakravorti
Nirjhar Chakravorti has completed Graduation in Mechanical Engineering
in 2000 from Jalpaiguri Government Engineering College, India.
Nirjhar has received & Post Graduate Diploma in Business Management
(PGDBM) certificate from Institute of Management Technology
(IMT), CDL, Ghaziabad.
Nirjhar has experience in design, development and project engineering.
During professional life, Nirjhar has worked on different engineering
activities, like core design, management planning and project
engineering, along with the analysis of life cycle costing for capital
expenditure of a profit making company.
Also, Nirjhar has worked on organizational re-structuring, implementation
of ISO, six sigma and total productive maintenance (TPM).
After erection & commissioning of a new plant,
a company named ABC private limited focuses
on production…
Operation engineers remain busy to produce more and
more product
Maintenance engineers stay busy to oil the machine
Procurement engineers remain busy to keep inventory
And so on…..

The result: Management is happy, as Return on
Investment generates fast
Operators report small adjustment of various machines
for ease of operation
Fitters report accessibility problem of various machines
while lubricating oil, as part of preventive maintenance
Machines start breakdown, despite of preventive
maintenance, due to bolt shearing, shaft breakdown,
bearing failure, etc.
Procurement engineer plans to maintain high inventory
for costly spare parts as getting spare part is a time
consuming affair.
The result: Production hampers.
Effect: Maintenance Engineers try various options, but
can not analyze root cause. So problems remain at its
own place.
A customer asked for big order execution. But the
company can not bag the order as plant has not
capacity to meet the stiff delivery schedule of the
customer. The competitor grasp the order as they plan
for enhancement of the plant capacity. But ABC Private
limited has not any infrastructure to improve
machine’s production capacity.
The only way out is to install a new set of machines for
same sizes of product with enhanced production
rate, which is not an economical and feasible option, in
such a short time.
The result: Loss of order, loss in market share.
Effect: Helplessness.
To handle these situations in future, a probable
solution is to….

Set up an In-house Design & Engineering
centre.
The result: Implementation of comprehensive
Operation & Maintenance (O&M) Management which
can analyze failures, adjust machines for considerable
production improvement, eliminate minor inherent
design errors of the machines, prepare drawings for
major spare parts to reduce inventory cost, etc.
Effect: Profit maximization, maintain market share.
Effective O&M is one of the most cost-effective
methods for ensuring reliability, safety, and efficiency.
Pillars of O&M Management are….
 Operation
 Maintenance
 Engineering
 Training
 Administration
The purpose of O&M Management is to prepare a link
between these pillars, i.e. establishing an OMETA link.
To ensure effective O&M Management, following need
to be done:
 Set up a design & engineering centre
 Link design and engineering centre activities with
operation and maintenance activities.
Benefit:
 Maintenance engineers can concentrate in hardcore
maintenance activities, instead of searching for design
related activities.
 Operation engineers need not to worry when drastic
production increment is required beyond machine’s
design capacity. They can concentrate in production
and operation management only.
Engineering Support :
Engineering Support Administration – To guarantee effective
execution and control of technical support.
Equipment Modifications – To ensure proper
design, review, control, realization, and documentation of
equipment design modifications in a timely manner.
Equipment Performance Monitoring – To perform monitoring
actions that optimize machine reliability and efficiency.
Engineering Support Procedures and Documentation – To
ensure that engineering documents provide appropriate
direction and that they support the efficiency and safe
operations of the machine.
Reliable facility
for
production&
maintenance

Modify series
equipments
when production
needs to e
increased up to
an extent

Failure Analysis
for regular
breakdowns

Small design
changes in
machines to
Minimize spare
Ensure safety
ensure lesser
part inventory
breakdown
Design of new machines if
Training to operation &
required
Maintenance Team
Measure actual
Tracking
Life Cycle Cost
operation compared
energy
Analysis when new
to full utilization
consumption
investment made
operation
Design & Engineering Centre shall drive the
O&M Management system within the
organization.
Design & Engineering centre shall be trained
with machine design, project management,
maintenance engineering, safety regulations
and basic economic analysis.
Design & Engineering Centre need to obtain full
support from their management structure in
order to carry out an effective O&M program.
Alternate
location:
Major metro city
near plant/
factory

Best location:
Within Plant/
Factory Premises
Plant/ Factory Premises:

Advantage:
Easy access to plant
Provide in-hand solution
Better control and implementation



Disadvantage:
Most of the plants/ factories located away from cities.
So retaining design & engineering centre professionals
become an issue, which hamper proper
implementation of O&M program. Company needs
proper people for successful implementation of O&M
program. Also, if people associated with O&M program
leaves company regularly, then it is tough to re-orient
the team.
Major metro city near plant/ factory:
 Disadvantage:
It is tough to control plant activities (especially
operation & maintenance management) from
remote location.



Advantage:
Recruiting and retaining members of the Design &
Engineering Centre. Any company and department
is build by human recourse, so recruiting and
retaining proper people is the key to success for
any organization.
Major metro city near plant/ factory:
To overcome major disadvantages, company need to establish proper planning and control for design &
engineering centre.
Some simple rule:
The members need to be properly trained (w.r.t. design, factory layout, project execution,
economics, energy conservation and EHS point of view).
The members should visit plant at least for 4 days every month (irrespective of their workload and
assignment).
After any new development, design & engineering centre must visit factory along with complete
design plan and discuss with all respective person (including maintenance, operation, safety and
procurement). Designer must discuss the issues with operators.
Management should encourage maintenance and operation people (supervisor, officers including
operators) to propose suggestion for improvement to design & engineering centre. Design &
engineering centre must verify any proposal with proper logic and data and accept/ reject with
proper data based reasoning.
Design & engineering centre has to work on both developmental and execution mode, depending
on demand of situation. The modus of operandi must be situational and flexible.
Cost analysis (including life cycle cost analysis) should be practiced after any design activity.
Design and engineering centre must encourage and train plant & operation personnel regarding
various developmental concepts (like total productive maintenance, six sigma, lean production,
etc).
Design and engineering centre personnel should impart training to plant and operation personnel
(officers, supervisors, operators).
Modus of operandi for remote design & engineering centre
can be designed and planned with more accurately, once the
company decided to implement such function.
Flexibility is the key for design and engineering centre . So,
function and activities of design and engineering centre
should be customized to implement effective and efficient
operation and maintenance management .
Design & Engineering Centre’s effects are mostly intangible
and long run; so to get the short term benefit this concept
can not be effective.
But design & engineering centre’s objective must be SMART
and long term to ensure proper O&M management.
Plant & Maintenance Engineering

Más contenido relacionado

La actualidad más candente

Production planning, routing, scheduling, Activating, Monitoring
Production planning, routing, scheduling, Activating, MonitoringProduction planning, routing, scheduling, Activating, Monitoring
Production planning, routing, scheduling, Activating, MonitoringDarshan Shah
 
Maintenance Management
Maintenance ManagementMaintenance Management
Maintenance ManagementBisina Keshara
 
INDUSTRIAL ENGINEERING 1st module
INDUSTRIAL  ENGINEERING  1st moduleINDUSTRIAL  ENGINEERING  1st module
INDUSTRIAL ENGINEERING 1st moduleJim Alex
 
CONDITION MONITORING
CONDITION MONITORINGCONDITION MONITORING
CONDITION MONITORINGlaxtwinsme
 
Design for Assembly (DFA)
Design for Assembly (DFA)Design for Assembly (DFA)
Design for Assembly (DFA)Richard Farr
 
Group Layout (Manufacturing Management)
Group Layout (Manufacturing Management)Group Layout (Manufacturing Management)
Group Layout (Manufacturing Management)Ishan Parekh
 
Automation in manufacturing five unit vtu, mechanical engineering notes pdf d...
Automation in manufacturing five unit vtu, mechanical engineering notes pdf d...Automation in manufacturing five unit vtu, mechanical engineering notes pdf d...
Automation in manufacturing five unit vtu, mechanical engineering notes pdf d...kiran555555
 
17.maintenance and reliability
17.maintenance and reliability17.maintenance and reliability
17.maintenance and reliabilityamibitayes
 
Recording techniques used in method study ppt
Recording techniques used in method study pptRecording techniques used in method study ppt
Recording techniques used in method study pptBeereddy Swapna
 
Plant Maintenance
Plant MaintenancePlant Maintenance
Plant Maintenancevishakeb
 
Group Technology, coding and cell design
Group Technology, coding and cell designGroup Technology, coding and cell design
Group Technology, coding and cell designNauman khan
 
MAINTENANCE POLICIES – PREVENTIVE MAINTENANCE
MAINTENANCE POLICIES – PREVENTIVE MAINTENANCEMAINTENANCE POLICIES – PREVENTIVE MAINTENANCE
MAINTENANCE POLICIES – PREVENTIVE MAINTENANCElaxtwinsme
 
Product design factors
Product design factorsProduct design factors
Product design factorsSupradip Das
 
DFM Design Principles
DFM Design PrinciplesDFM Design Principles
DFM Design PrinciplesNIELITA
 
Plant maintenance basics
Plant maintenance basicsPlant maintenance basics
Plant maintenance basicsSANGRAM PATNAIK
 

La actualidad más candente (20)

Production planning, routing, scheduling, Activating, Monitoring
Production planning, routing, scheduling, Activating, MonitoringProduction planning, routing, scheduling, Activating, Monitoring
Production planning, routing, scheduling, Activating, Monitoring
 
UNIT 4 - PRODUCTION SCHEDULING
UNIT 4 - PRODUCTION SCHEDULINGUNIT 4 - PRODUCTION SCHEDULING
UNIT 4 - PRODUCTION SCHEDULING
 
Group Technology
Group TechnologyGroup Technology
Group Technology
 
MAINTENANCE.ppt
MAINTENANCE.pptMAINTENANCE.ppt
MAINTENANCE.ppt
 
Maintenance Management
Maintenance ManagementMaintenance Management
Maintenance Management
 
INDUSTRIAL ENGINEERING 1st module
INDUSTRIAL  ENGINEERING  1st moduleINDUSTRIAL  ENGINEERING  1st module
INDUSTRIAL ENGINEERING 1st module
 
CONDITION MONITORING
CONDITION MONITORINGCONDITION MONITORING
CONDITION MONITORING
 
Design for Assembly (DFA)
Design for Assembly (DFA)Design for Assembly (DFA)
Design for Assembly (DFA)
 
Group Layout (Manufacturing Management)
Group Layout (Manufacturing Management)Group Layout (Manufacturing Management)
Group Layout (Manufacturing Management)
 
Automation in manufacturing five unit vtu, mechanical engineering notes pdf d...
Automation in manufacturing five unit vtu, mechanical engineering notes pdf d...Automation in manufacturing five unit vtu, mechanical engineering notes pdf d...
Automation in manufacturing five unit vtu, mechanical engineering notes pdf d...
 
17.maintenance and reliability
17.maintenance and reliability17.maintenance and reliability
17.maintenance and reliability
 
Recording techniques used in method study ppt
Recording techniques used in method study pptRecording techniques used in method study ppt
Recording techniques used in method study ppt
 
Plant Maintenance
Plant MaintenancePlant Maintenance
Plant Maintenance
 
Group Technology, coding and cell design
Group Technology, coding and cell designGroup Technology, coding and cell design
Group Technology, coding and cell design
 
Cmms
CmmsCmms
Cmms
 
MAINTENANCE POLICIES – PREVENTIVE MAINTENANCE
MAINTENANCE POLICIES – PREVENTIVE MAINTENANCEMAINTENANCE POLICIES – PREVENTIVE MAINTENANCE
MAINTENANCE POLICIES – PREVENTIVE MAINTENANCE
 
Product design factors
Product design factorsProduct design factors
Product design factors
 
Cellular manufacturing
Cellular manufacturingCellular manufacturing
Cellular manufacturing
 
DFM Design Principles
DFM Design PrinciplesDFM Design Principles
DFM Design Principles
 
Plant maintenance basics
Plant maintenance basicsPlant maintenance basics
Plant maintenance basics
 

Destacado

Types of maintenance
Types of maintenanceTypes of maintenance
Types of maintenanceAbhik Rathod
 
Controlled indoor farming on a local basis
Controlled indoor farming on a local basisControlled indoor farming on a local basis
Controlled indoor farming on a local basisLarry Lipman
 
Control Environment Agriculture
Control Environment AgricultureControl Environment Agriculture
Control Environment AgriculturePruthvi7396
 
Types of maintenance
Types of maintenanceTypes of maintenance
Types of maintenancePallavi Yadav
 
SAP BASED PLANT MAINTENANCE
SAP BASED PLANT MAINTENANCESAP BASED PLANT MAINTENANCE
SAP BASED PLANT MAINTENANCEPANKAJ TIKEKAR
 
Maintenance and repair of buildings.
Maintenance and repair of buildings.Maintenance and repair of buildings.
Maintenance and repair of buildings.Satyaki Sikdar
 
A Presentation On Construction & GTA Services – An Overview 29th November...
A Presentation On Construction  & GTA Services – An Overview  29th November...A Presentation On Construction  & GTA Services – An Overview  29th November...
A Presentation On Construction & GTA Services – An Overview 29th November...Agarwal sanjiv & Co
 
(Overall safety of plant)
(Overall safety of plant)(Overall safety of plant)
(Overall safety of plant)Ahmed Palari
 
Fluidization and fluidized bed
Fluidization and fluidized bedFluidization and fluidized bed
Fluidization and fluidized bedRahat Inayat Ali
 
Introduction to Jwala Techno Engineering Pvt. Ltd.
Introduction to Jwala Techno Engineering Pvt. Ltd.Introduction to Jwala Techno Engineering Pvt. Ltd.
Introduction to Jwala Techno Engineering Pvt. Ltd.IndiaMART InterMESH Limited
 
difference between literary and technical writing
difference between literary and technical writingdifference between literary and technical writing
difference between literary and technical writingmuhammad ilyas
 
Introduction to-technical-writing-anuja
Introduction to-technical-writing-anujaIntroduction to-technical-writing-anuja
Introduction to-technical-writing-anujaAnuja Khaire
 

Destacado (20)

Maintenance
MaintenanceMaintenance
Maintenance
 
Plant Maintenance
Plant MaintenancePlant Maintenance
Plant Maintenance
 
Types of maintenance
Types of maintenanceTypes of maintenance
Types of maintenance
 
Controlled indoor farming on a local basis
Controlled indoor farming on a local basisControlled indoor farming on a local basis
Controlled indoor farming on a local basis
 
Control Environment Agriculture
Control Environment AgricultureControl Environment Agriculture
Control Environment Agriculture
 
Types of maintenance
Types of maintenanceTypes of maintenance
Types of maintenance
 
Hydroponics-An Explosive Fact Of Our Times
Hydroponics-An Explosive Fact Of Our TimesHydroponics-An Explosive Fact Of Our Times
Hydroponics-An Explosive Fact Of Our Times
 
SAP BASED PLANT MAINTENANCE
SAP BASED PLANT MAINTENANCESAP BASED PLANT MAINTENANCE
SAP BASED PLANT MAINTENANCE
 
Plant maintenance
Plant maintenancePlant maintenance
Plant maintenance
 
Hydroponics ppt
Hydroponics pptHydroponics ppt
Hydroponics ppt
 
Maintenance and repair of buildings.
Maintenance and repair of buildings.Maintenance and repair of buildings.
Maintenance and repair of buildings.
 
A Presentation On Construction & GTA Services – An Overview 29th November...
A Presentation On Construction  & GTA Services – An Overview  29th November...A Presentation On Construction  & GTA Services – An Overview  29th November...
A Presentation On Construction & GTA Services – An Overview 29th November...
 
(Overall safety of plant)
(Overall safety of plant)(Overall safety of plant)
(Overall safety of plant)
 
Fluidization and fluidized bed
Fluidization and fluidized bedFluidization and fluidized bed
Fluidization and fluidized bed
 
Fuel economy
Fuel economyFuel economy
Fuel economy
 
Introduction to Jwala Techno Engineering Pvt. Ltd.
Introduction to Jwala Techno Engineering Pvt. Ltd.Introduction to Jwala Techno Engineering Pvt. Ltd.
Introduction to Jwala Techno Engineering Pvt. Ltd.
 
difference between literary and technical writing
difference between literary and technical writingdifference between literary and technical writing
difference between literary and technical writing
 
Greenhouse Gas Emissions and Soil Carbon Stocks in the Agricultural Phase of ...
Greenhouse Gas Emissions and Soil Carbon Stocks in the Agricultural Phase of ...Greenhouse Gas Emissions and Soil Carbon Stocks in the Agricultural Phase of ...
Greenhouse Gas Emissions and Soil Carbon Stocks in the Agricultural Phase of ...
 
Containerized Farms
Containerized FarmsContainerized Farms
Containerized Farms
 
Introduction to-technical-writing-anuja
Introduction to-technical-writing-anujaIntroduction to-technical-writing-anuja
Introduction to-technical-writing-anuja
 

Similar a Plant & Maintenance Engineering

Resume_Press Tool Design & Development & Product Engineering.DOCX
Resume_Press Tool Design & Development & Product Engineering.DOCXResume_Press Tool Design & Development & Product Engineering.DOCX
Resume_Press Tool Design & Development & Product Engineering.DOCXRohit Tyagi
 
DM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in projectDM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in projectssuserb6619e
 
Chapter 3. CON CURRENT ENGINEERING
Chapter 3. CON CURRENT ENGINEERINGChapter 3. CON CURRENT ENGINEERING
Chapter 3. CON CURRENT ENGINEERINGProf.Mayur Modi
 
Compressor Master Class
Compressor Master ClassCompressor Master Class
Compressor Master ClassMarcep Inc.
 
Tpm assignment- roll no. 56 to 60
Tpm  assignment- roll no. 56 to 60Tpm  assignment- roll no. 56 to 60
Tpm assignment- roll no. 56 to 60kalpeshvora4
 
IRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET - Implementation of TPM Philosophy on Critical Paint Shop MachineIRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET - Implementation of TPM Philosophy on Critical Paint Shop MachineIRJET Journal
 
April 2016 CV_1
April 2016 CV_1April 2016 CV_1
April 2016 CV_15Asdfghjkl
 

Similar a Plant & Maintenance Engineering (20)

Resume_Press Tool Design & Development & Product Engineering.DOCX
Resume_Press Tool Design & Development & Product Engineering.DOCXResume_Press Tool Design & Development & Product Engineering.DOCX
Resume_Press Tool Design & Development & Product Engineering.DOCX
 
JP Sharma _ CV
JP Sharma _ CVJP Sharma _ CV
JP Sharma _ CV
 
updated Resume
updated Resumeupdated Resume
updated Resume
 
Saurabh Rathore
Saurabh RathoreSaurabh Rathore
Saurabh Rathore
 
Sanchit Dubey CV.
Sanchit Dubey CV.Sanchit Dubey CV.
Sanchit Dubey CV.
 
FINAL PROJECT-MBA
FINAL PROJECT-MBAFINAL PROJECT-MBA
FINAL PROJECT-MBA
 
DM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in projectDM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in project
 
Ketul Resume
Ketul ResumeKetul Resume
Ketul Resume
 
Heath Nijem
Heath NijemHeath Nijem
Heath Nijem
 
Chapter 3. CON CURRENT ENGINEERING
Chapter 3. CON CURRENT ENGINEERINGChapter 3. CON CURRENT ENGINEERING
Chapter 3. CON CURRENT ENGINEERING
 
Yogesh Sharma
Yogesh SharmaYogesh Sharma
Yogesh Sharma
 
Compressor Master Class
Compressor Master ClassCompressor Master Class
Compressor Master Class
 
Ce seminar
Ce seminarCe seminar
Ce seminar
 
Tpm assignment- roll no. 56 to 60
Tpm  assignment- roll no. 56 to 60Tpm  assignment- roll no. 56 to 60
Tpm assignment- roll no. 56 to 60
 
IRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET - Implementation of TPM Philosophy on Critical Paint Shop MachineIRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
 
Rsume
RsumeRsume
Rsume
 
April 2016 CV_1
April 2016 CV_1April 2016 CV_1
April 2016 CV_1
 
Resume_Balachandru
Resume_BalachandruResume_Balachandru
Resume_Balachandru
 
Resumepmlatest
ResumepmlatestResumepmlatest
Resumepmlatest
 
Girish kumar yadav
Girish kumar yadavGirish kumar yadav
Girish kumar yadav
 

Más de Nirjhar Chakravorti

Technological Advancement & Present engineering practices in india
Technological Advancement & Present engineering practices in indiaTechnological Advancement & Present engineering practices in india
Technological Advancement & Present engineering practices in indiaNirjhar Chakravorti
 
Organizational Structure and Human Asset Planning (for Project Based Organiza...
Organizational Structure and Human Asset Planning (for Project Based Organiza...Organizational Structure and Human Asset Planning (for Project Based Organiza...
Organizational Structure and Human Asset Planning (for Project Based Organiza...Nirjhar Chakravorti
 
Destination Kolkata for Engineering Outsourcing
Destination Kolkata for Engineering OutsourcingDestination Kolkata for Engineering Outsourcing
Destination Kolkata for Engineering OutsourcingNirjhar Chakravorti
 

Más de Nirjhar Chakravorti (8)

Know the Leader inside you
Know the Leader inside youKnow the Leader inside you
Know the Leader inside you
 
Technological Advancement & Present engineering practices in india
Technological Advancement & Present engineering practices in indiaTechnological Advancement & Present engineering practices in india
Technological Advancement & Present engineering practices in india
 
Organizational Structure and Human Asset Planning (for Project Based Organiza...
Organizational Structure and Human Asset Planning (for Project Based Organiza...Organizational Structure and Human Asset Planning (for Project Based Organiza...
Organizational Structure and Human Asset Planning (for Project Based Organiza...
 
Destination Kolkata for Engineering Outsourcing
Destination Kolkata for Engineering OutsourcingDestination Kolkata for Engineering Outsourcing
Destination Kolkata for Engineering Outsourcing
 
Product design concept
Product design conceptProduct design concept
Product design concept
 
Raw Material In Iron Making
Raw Material In Iron MakingRaw Material In Iron Making
Raw Material In Iron Making
 
Paper Making Process by Nirjhar
Paper Making Process by NirjharPaper Making Process by Nirjhar
Paper Making Process by Nirjhar
 
Gear Box Nirjhar
Gear Box NirjharGear Box Nirjhar
Gear Box Nirjhar
 

Último

Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizharallensay1
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentationuneakwhite
 
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceMalegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceDamini Dixit
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPanhandleOilandGas
 
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...lizamodels9
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...lizamodels9
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Anamikakaur10
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Adnet Communications
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...rajveerescorts2022
 
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂EscortCall Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escortdlhescort
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...amitlee9823
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...lizamodels9
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableSeo
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 

Último (20)

Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceMalegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Falcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in indiaFalcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in india
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂EscortCall Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 

Plant & Maintenance Engineering

  • 2. Nirjhar Chakravorti has completed Graduation in Mechanical Engineering in 2000 from Jalpaiguri Government Engineering College, India. Nirjhar has received & Post Graduate Diploma in Business Management (PGDBM) certificate from Institute of Management Technology (IMT), CDL, Ghaziabad. Nirjhar has experience in design, development and project engineering. During professional life, Nirjhar has worked on different engineering activities, like core design, management planning and project engineering, along with the analysis of life cycle costing for capital expenditure of a profit making company. Also, Nirjhar has worked on organizational re-structuring, implementation of ISO, six sigma and total productive maintenance (TPM).
  • 3. After erection & commissioning of a new plant, a company named ABC private limited focuses on production… Operation engineers remain busy to produce more and more product Maintenance engineers stay busy to oil the machine Procurement engineers remain busy to keep inventory And so on….. The result: Management is happy, as Return on Investment generates fast
  • 4. Operators report small adjustment of various machines for ease of operation Fitters report accessibility problem of various machines while lubricating oil, as part of preventive maintenance Machines start breakdown, despite of preventive maintenance, due to bolt shearing, shaft breakdown, bearing failure, etc. Procurement engineer plans to maintain high inventory for costly spare parts as getting spare part is a time consuming affair. The result: Production hampers. Effect: Maintenance Engineers try various options, but can not analyze root cause. So problems remain at its own place.
  • 5. A customer asked for big order execution. But the company can not bag the order as plant has not capacity to meet the stiff delivery schedule of the customer. The competitor grasp the order as they plan for enhancement of the plant capacity. But ABC Private limited has not any infrastructure to improve machine’s production capacity. The only way out is to install a new set of machines for same sizes of product with enhanced production rate, which is not an economical and feasible option, in such a short time. The result: Loss of order, loss in market share. Effect: Helplessness.
  • 6. To handle these situations in future, a probable solution is to…. Set up an In-house Design & Engineering centre. The result: Implementation of comprehensive Operation & Maintenance (O&M) Management which can analyze failures, adjust machines for considerable production improvement, eliminate minor inherent design errors of the machines, prepare drawings for major spare parts to reduce inventory cost, etc. Effect: Profit maximization, maintain market share.
  • 7. Effective O&M is one of the most cost-effective methods for ensuring reliability, safety, and efficiency. Pillars of O&M Management are….  Operation  Maintenance  Engineering  Training  Administration The purpose of O&M Management is to prepare a link between these pillars, i.e. establishing an OMETA link.
  • 8. To ensure effective O&M Management, following need to be done:  Set up a design & engineering centre  Link design and engineering centre activities with operation and maintenance activities. Benefit:  Maintenance engineers can concentrate in hardcore maintenance activities, instead of searching for design related activities.  Operation engineers need not to worry when drastic production increment is required beyond machine’s design capacity. They can concentrate in production and operation management only.
  • 9. Engineering Support : Engineering Support Administration – To guarantee effective execution and control of technical support. Equipment Modifications – To ensure proper design, review, control, realization, and documentation of equipment design modifications in a timely manner. Equipment Performance Monitoring – To perform monitoring actions that optimize machine reliability and efficiency. Engineering Support Procedures and Documentation – To ensure that engineering documents provide appropriate direction and that they support the efficiency and safe operations of the machine.
  • 10. Reliable facility for production& maintenance Modify series equipments when production needs to e increased up to an extent Failure Analysis for regular breakdowns Small design changes in machines to Minimize spare Ensure safety ensure lesser part inventory breakdown Design of new machines if Training to operation & required Maintenance Team Measure actual Tracking Life Cycle Cost operation compared energy Analysis when new to full utilization consumption investment made operation
  • 11. Design & Engineering Centre shall drive the O&M Management system within the organization. Design & Engineering centre shall be trained with machine design, project management, maintenance engineering, safety regulations and basic economic analysis. Design & Engineering Centre need to obtain full support from their management structure in order to carry out an effective O&M program.
  • 12. Alternate location: Major metro city near plant/ factory Best location: Within Plant/ Factory Premises
  • 13. Plant/ Factory Premises:  Advantage: Easy access to plant Provide in-hand solution Better control and implementation  Disadvantage: Most of the plants/ factories located away from cities. So retaining design & engineering centre professionals become an issue, which hamper proper implementation of O&M program. Company needs proper people for successful implementation of O&M program. Also, if people associated with O&M program leaves company regularly, then it is tough to re-orient the team.
  • 14. Major metro city near plant/ factory:  Disadvantage: It is tough to control plant activities (especially operation & maintenance management) from remote location.  Advantage: Recruiting and retaining members of the Design & Engineering Centre. Any company and department is build by human recourse, so recruiting and retaining proper people is the key to success for any organization.
  • 15. Major metro city near plant/ factory: To overcome major disadvantages, company need to establish proper planning and control for design & engineering centre. Some simple rule: The members need to be properly trained (w.r.t. design, factory layout, project execution, economics, energy conservation and EHS point of view). The members should visit plant at least for 4 days every month (irrespective of their workload and assignment). After any new development, design & engineering centre must visit factory along with complete design plan and discuss with all respective person (including maintenance, operation, safety and procurement). Designer must discuss the issues with operators. Management should encourage maintenance and operation people (supervisor, officers including operators) to propose suggestion for improvement to design & engineering centre. Design & engineering centre must verify any proposal with proper logic and data and accept/ reject with proper data based reasoning. Design & engineering centre has to work on both developmental and execution mode, depending on demand of situation. The modus of operandi must be situational and flexible. Cost analysis (including life cycle cost analysis) should be practiced after any design activity. Design and engineering centre must encourage and train plant & operation personnel regarding various developmental concepts (like total productive maintenance, six sigma, lean production, etc). Design and engineering centre personnel should impart training to plant and operation personnel (officers, supervisors, operators).
  • 16. Modus of operandi for remote design & engineering centre can be designed and planned with more accurately, once the company decided to implement such function. Flexibility is the key for design and engineering centre . So, function and activities of design and engineering centre should be customized to implement effective and efficient operation and maintenance management . Design & Engineering Centre’s effects are mostly intangible and long run; so to get the short term benefit this concept can not be effective. But design & engineering centre’s objective must be SMART and long term to ensure proper O&M management.