132kV Connection
A First for N.S.W Coal Mining
Introduction
• Where is Boggabri – Situated between Gunnedah and Narrabri in north west
N.S.W approx. 115km West from Tamworth.
• Boggabri Coal Operations commenced mining in 2006
• A significant expansion of site infrastructure was undertaken in 2014/2015
• The 132kV connection was a joint project by Transgrid and Boggabri Coal
Operations.
• Included was 15kM of single structure, double circuit, 132kV transmission line,
132kV switching station and the 132kv/11kV substation.
Overview
• Boggabri Coal Operations were an LV customer (HV was
managed by the utility) at inception.
• Site demand was below 2MVA
• An 11kV rural feeder from Boggabri Substation was the
only mine supply source. The service extended over 25kM
(voltage regulation was required).
• Expansion of site infrastructure required power system
demand exceeding the 11kV capability.
• Overall site demand increased to 8MVA (design capacity)
• Local services could not meet the demand – Transmission
was the only option.
Why 132kV Connection
?
A first for Mining and Transgrid
Network Layout
Network Connection
Boggabri Coal
Substation
Network Connection
Protection Schemes
Inter tripping
• 132kV trip signals are duplicated through protection relays from
Boggabri Coal to Transgrid
– Zone Protection (overcurrent, short circuit etc)
– TX Differential
– Emergency stops
– Fire system
– Back up Earth Leakage
– Neutral Earth Resistor failure via NER monitor.
– Transformer Protection (Oil temp, explosion, winding temp, over pressure)
– Arc Fault Detection (11kv Bus)
• Protection devices, Circuit breakers, are in Transgrids Switching Station.
• Faults are cleared by transgrid for all 132kV primary protection or
Intertrip faults
Logic Diagram Example
Load shed Arrangements
• Transmission systems demand stability
• Transgrid Load shed scheme means exactly what is
sounds like
• 4 Tiers are implemented which shed different load
blocks
• Bus voltage is monitored at the switching station for
trip signal initiations
EARTHING
• Common earthing system between Transgrid and Boggabri Coal
• Design requirements - Allowable touch and step voltages were
derived from different standards
• Transgrid – AS2067 ( Calculated)
• Boggabri Coal – AS3007 (step/touch potentials v’s clearance times)
• Transfer voltage levels required separation between
“mine infrastructure area” and the 132kV facility. A
164M exclusion zone has been established for earthed
services entering this zone.
EARTHING
Challenges
• Design was completed by Transmission orientated Engineers with a different approach to mining
“Risk management base”
• Design review was undertaken by a QLD based engineering company
• Disconnect between project team and the end user of the facility
• System operation – original design philosophy was to run 2 x 10MVA TX’s in parallel which allowed
for a 65kA fault level on the 415V system (terminals of the 3MVA TX supply)
• Fundamental protection schemes, secondary systems, required further development prior to
energistaion.
• HV and LV services crossing operational boundaries. Boggabri Coal and Transgrid share HV and LV
services originating on both sides of the installation.
• Differences in isolation procedures, including hardware between both Transgrid and Boggabri Coal
• Transgrid having a major facility “next door” to the mine substation.
• Unrestricted earth fault levels on the 132kV connection (max 15kA) – transfer voltages
• Reliance of primary protection clearing faults is by the utility – No 132kV protective devices are
owned or operated by Boggabri Coal Operations.
Advantages
• Transgrid monitoring
• Transgrid system control monitor the status of Transgrid equipment, including the 132kV circuit breakers,
24/7
• Remote operation of 132kV circuit breakers from Transgrid system control
• Stability of Supply
• The 132kV connection is part of the overall, north west area “Ring Main”. This means the system is very
stable and subject to minimal outages or faults.
• Reduced Arc Flash Categories
• Increased equipment clearances (above 3M) and protection schemes allow for arc
flash categories to be reduced
Key Outcomes
• Transgrid and Boggabri Coal Operating agreement implemented
This document identifies
– Equipment isolation instructions, each piece of equipment has an agreed isolation procedure
– Communication protocol’s
– Key contacts for events
– Use and transaction of “High Voltage Equipment Outage” permits.
• Connection Agreement
– Highlights the obligations of each party
– Deals with access and safety scenarios .
– Modifications to the agreed installation and protection settings are dealt with here
• Operational and Maintenance, hazard identification and risk analysis via
consultation with designer, supplier, installer, operator and utility (Transgrid).
– This process expedited the risk mitigation process due to designer information being supplied by key engineers
• Designer based training for operational staff
– Maintenance, Isolation and Operational documents were developed and used as training material
for electrical staff by the designer. Training was delivered onsite.
Recommendations
• Where plant and installations are being
constructed, for the purpose of mining
operations, statutory functions should be
involved in the key decisions.
• Collaboration with mining and transmission
industries requires further development.
Mindsets are differing around system
operations and protection functions.
Thank You!

Más contenido relacionado

La actualidad más candente

La actualidad más candente (20)

Presentation on Dehar power house(DPH), slapper
Presentation on Dehar power house(DPH), slapperPresentation on Dehar power house(DPH), slapper
Presentation on Dehar power house(DPH), slapper
 
My report vfd
My  report vfdMy  report vfd
My report vfd
 
Gagan
GaganGagan
Gagan
 
Kulekhani I hydropower ,Nepal
Kulekhani I hydropower ,NepalKulekhani I hydropower ,Nepal
Kulekhani I hydropower ,Nepal
 
Critical Power: Generators and Generator System Design
Critical Power: Generators and Generator System DesignCritical Power: Generators and Generator System Design
Critical Power: Generators and Generator System Design
 
ppt
pptppt
ppt
 
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)
 
Wind farm planning and commissioning
Wind farm planning and commissioningWind farm planning and commissioning
Wind farm planning and commissioning
 
Construction of PCC Parapet
Construction of PCC Parapet Construction of PCC Parapet
Construction of PCC Parapet
 
lift ppt
lift pptlift ppt
lift ppt
 
Paralleling Switchgear
Paralleling SwitchgearParalleling Switchgear
Paralleling Switchgear
 
PM Ahmed Abdelhady CV
PM Ahmed Abdelhady CVPM Ahmed Abdelhady CV
PM Ahmed Abdelhady CV
 
Modern substation design
Modern substation designModern substation design
Modern substation design
 
Ppt
PptPpt
Ppt
 
Bangladesh Power Stations & Power Plants Overview
Bangladesh Power Stations & Power Plants OverviewBangladesh Power Stations & Power Plants Overview
Bangladesh Power Stations & Power Plants Overview
 
Automotive Driver Requirements Topologies & Applications
Automotive Driver Requirements Topologies & ApplicationsAutomotive Driver Requirements Topologies & Applications
Automotive Driver Requirements Topologies & Applications
 
Transformer Failure Due to Circuit Breaker Induced Switching Transients
Transformer Failure Due to Circuit Breaker Induced Switching TransientsTransformer Failure Due to Circuit Breaker Induced Switching Transients
Transformer Failure Due to Circuit Breaker Induced Switching Transients
 
Critical power: Transfer switches and switchgear
Critical power: Transfer switches and switchgearCritical power: Transfer switches and switchgear
Critical power: Transfer switches and switchgear
 
Ward leonard method & Characteristics of series motor
Ward leonard method & Characteristics of series motorWard leonard method & Characteristics of series motor
Ward leonard method & Characteristics of series motor
 
Switch yard pp 2 kanti thermal power station
Switch yard pp 2 kanti thermal power stationSwitch yard pp 2 kanti thermal power station
Switch yard pp 2 kanti thermal power station
 

Destacado

CFU Kitchens - International Menus
CFU Kitchens - International MenusCFU Kitchens - International Menus
CFU Kitchens - International Menus
Tony Joseph
 
2.Israel Tourism Brand Guidelines
2.Israel Tourism Brand Guidelines2.Israel Tourism Brand Guidelines
2.Israel Tourism Brand Guidelines
Ruochen CHENG
 
2014 Regulatory Team Work
2014 Regulatory Team Work2014 Regulatory Team Work
2014 Regulatory Team Work
Michael Youth
 

Destacado (20)

What is agile marketing?
What is agile marketing? What is agile marketing?
What is agile marketing?
 
Presentation english2
Presentation english2Presentation english2
Presentation english2
 
Deveco
DevecoDeveco
Deveco
 
Blake aden ppp_slides
Blake aden ppp_slidesBlake aden ppp_slides
Blake aden ppp_slides
 
Sistema operativo
Sistema operativoSistema operativo
Sistema operativo
 
to Edit
to Editto Edit
to Edit
 
FERMÁQUINAS
FERMÁQUINASFERMÁQUINAS
FERMÁQUINAS
 
CFU Kitchens - International Menus
CFU Kitchens - International MenusCFU Kitchens - International Menus
CFU Kitchens - International Menus
 
LC Intro 7/8
LC Intro 7/8LC Intro 7/8
LC Intro 7/8
 
portfolio
portfolioportfolio
portfolio
 
Cooperative Drilling
Cooperative DrillingCooperative Drilling
Cooperative Drilling
 
Qalam w maidan final
Qalam w maidan final Qalam w maidan final
Qalam w maidan final
 
P.Timmins Resume 2015
P.Timmins Resume 2015P.Timmins Resume 2015
P.Timmins Resume 2015
 
2.Israel Tourism Brand Guidelines
2.Israel Tourism Brand Guidelines2.Israel Tourism Brand Guidelines
2.Israel Tourism Brand Guidelines
 
Clean Energy Finance Corporation
Clean Energy Finance CorporationClean Energy Finance Corporation
Clean Energy Finance Corporation
 
2014 Regulatory Team Work
2014 Regulatory Team Work2014 Regulatory Team Work
2014 Regulatory Team Work
 
Limbajultrupului(cOp)
Limbajultrupului(cOp)Limbajultrupului(cOp)
Limbajultrupului(cOp)
 
Nmdl final project express-kate schild
Nmdl final project express-kate schildNmdl final project express-kate schild
Nmdl final project express-kate schild
 
Prevention of vehicle interaction collisions
Prevention of vehicle interaction collisionsPrevention of vehicle interaction collisions
Prevention of vehicle interaction collisions
 
Rojas cárdenas juan_manuel_colaborativa_i
Rojas cárdenas juan_manuel_colaborativa_iRojas cárdenas juan_manuel_colaborativa_i
Rojas cárdenas juan_manuel_colaborativa_i
 

Similar a Complex connections Rick Chorley

Resume -Abdul Alim Dewan -2017
Resume -Abdul Alim Dewan -2017Resume -Abdul Alim Dewan -2017
Resume -Abdul Alim Dewan -2017
Abdul Alim Dewan
 
Rourkela Steel Pant Power System
Rourkela Steel Pant Power System Rourkela Steel Pant Power System
Rourkela Steel Pant Power System
Sarthak Panigrahi
 
MES Case Study - Carlton Park Substation
MES Case Study - Carlton Park SubstationMES Case Study - Carlton Park Substation
MES Case Study - Carlton Park Substation
Steve Sadler
 
Power Factor correction of Toitskraal 11kV feeder
Power Factor correction of Toitskraal 11kV feederPower Factor correction of Toitskraal 11kV feeder
Power Factor correction of Toitskraal 11kV feeder
Kruger Greyvenstein
 
resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986
sheik syedali
 

Similar a Complex connections Rick Chorley (20)

Zinfra Renewables Capability Statement
Zinfra Renewables Capability StatementZinfra Renewables Capability Statement
Zinfra Renewables Capability Statement
 
Resume -Abdul Alim Dewan -2017
Resume -Abdul Alim Dewan -2017Resume -Abdul Alim Dewan -2017
Resume -Abdul Alim Dewan -2017
 
Final Presentation Talha (1).pptx
Final Presentation Talha (1).pptxFinal Presentation Talha (1).pptx
Final Presentation Talha (1).pptx
 
Zinfra Group Australia: Power Brochure
Zinfra Group Australia: Power BrochureZinfra Group Australia: Power Brochure
Zinfra Group Australia: Power Brochure
 
Rourkela Steel Pant Power System
Rourkela Steel Pant Power System Rourkela Steel Pant Power System
Rourkela Steel Pant Power System
 
CESC LTD. TRAINING REPORT
CESC LTD. TRAINING REPORTCESC LTD. TRAINING REPORT
CESC LTD. TRAINING REPORT
 
Wind Power EPCM
Wind Power EPCMWind Power EPCM
Wind Power EPCM
 
1.3. MCAGCC 29 Palms Microgrid_Morrissett_EPRI/SNL Microgrid
1.3. MCAGCC 29 Palms Microgrid_Morrissett_EPRI/SNL Microgrid1.3. MCAGCC 29 Palms Microgrid_Morrissett_EPRI/SNL Microgrid
1.3. MCAGCC 29 Palms Microgrid_Morrissett_EPRI/SNL Microgrid
 
Ultra High Voltage AC Transmission UHVAC
Ultra High Voltage AC Transmission UHVACUltra High Voltage AC Transmission UHVAC
Ultra High Voltage AC Transmission UHVAC
 
Operational ANM Schmes in the UK and America
Operational ANM Schmes in the UK and AmericaOperational ANM Schmes in the UK and America
Operational ANM Schmes in the UK and America
 
10.6_Utility Microgrids_Reid_EPRI/SNL Microgrid Symposium
10.6_Utility Microgrids_Reid_EPRI/SNL Microgrid Symposium10.6_Utility Microgrids_Reid_EPRI/SNL Microgrid Symposium
10.6_Utility Microgrids_Reid_EPRI/SNL Microgrid Symposium
 
Planning a successful microgrid
Planning a successful microgridPlanning a successful microgrid
Planning a successful microgrid
 
Wind Power Plant Planning And Commisioning
Wind Power Plant  Planning  And CommisioningWind Power Plant  Planning  And Commisioning
Wind Power Plant Planning And Commisioning
 
20170727 angledc project, mvdc
20170727 angledc project, mvdc20170727 angledc project, mvdc
20170727 angledc project, mvdc
 
Engage with...Network Rail
Engage with...Network RailEngage with...Network Rail
Engage with...Network Rail
 
MES Case Study - Carlton Park Substation
MES Case Study - Carlton Park SubstationMES Case Study - Carlton Park Substation
MES Case Study - Carlton Park Substation
 
Industrial Training at Howrah 220 kV Substation.
Industrial Training at Howrah 220 kV Substation.Industrial Training at Howrah 220 kV Substation.
Industrial Training at Howrah 220 kV Substation.
 
Power Factor correction of Toitskraal 11kV feeder
Power Factor correction of Toitskraal 11kV feederPower Factor correction of Toitskraal 11kV feeder
Power Factor correction of Toitskraal 11kV feeder
 
Power conversion in wind turbine.ppt
Power conversion in wind turbine.pptPower conversion in wind turbine.ppt
Power conversion in wind turbine.ppt
 
resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986
 

Más de NSW Environment and Planning

Where do I stand for fire protection on mobile and transportable equipment an...
Where do I stand for fire protection on mobile and transportable equipment an...Where do I stand for fire protection on mobile and transportable equipment an...
Where do I stand for fire protection on mobile and transportable equipment an...
NSW Environment and Planning
 

Más de NSW Environment and Planning (20)

12 Small mines report card 2020
12 Small mines report card 202012 Small mines report card 2020
12 Small mines report card 2020
 
11 occupational hygiene monitoring of dust
11 occupational hygiene monitoring of dust11 occupational hygiene monitoring of dust
11 occupational hygiene monitoring of dust
 
09 learning from disasters
09 learning from disasters09 learning from disasters
09 learning from disasters
 
13 explosives awareness
13 explosives awareness13 explosives awareness
13 explosives awareness
 
10 incident reporting to the regulator 2020
10 incident reporting to the regulator 202010 incident reporting to the regulator 2020
10 incident reporting to the regulator 2020
 
08 dust safety and health surveillance
08 dust safety and health surveillance08 dust safety and health surveillance
08 dust safety and health surveillance
 
07 feedback and consultation
07 feedback and consultation07 feedback and consultation
07 feedback and consultation
 
06. how the regulator communicates with the industry
06. how the regulator communicates with the industry06. how the regulator communicates with the industry
06. how the regulator communicates with the industry
 
05 reviewing your SMS
05 reviewing your SMS05 reviewing your SMS
05 reviewing your SMS
 
04. slinging and lifting equipment
04. slinging and lifting equipment04. slinging and lifting equipment
04. slinging and lifting equipment
 
Control focused inspection tools (Mark Smith)
Control focused inspection tools (Mark Smith)Control focused inspection tools (Mark Smith)
Control focused inspection tools (Mark Smith)
 
Central assessment unit CAU(Steve Bentham)
Central assessment unit CAU(Steve Bentham)Central assessment unit CAU(Steve Bentham)
Central assessment unit CAU(Steve Bentham)
 
Autonomous mining equipment (Owen Barry)
Autonomous mining equipment (Owen Barry)Autonomous mining equipment (Owen Barry)
Autonomous mining equipment (Owen Barry)
 
Fires on mobile plant refuelling (Ross Stutchbury)
Fires on mobile plant refuelling (Ross Stutchbury)Fires on mobile plant refuelling (Ross Stutchbury)
Fires on mobile plant refuelling (Ross Stutchbury)
 
Mobile plant rollovers and collisions (Bill McGlynn)
Mobile plant rollovers and collisions (Bill McGlynn)Mobile plant rollovers and collisions (Bill McGlynn)
Mobile plant rollovers and collisions (Bill McGlynn)
 
Metropolitan colliery gas (Dave Gordon)
Metropolitan colliery gas (Dave Gordon)Metropolitan colliery gas (Dave Gordon)
Metropolitan colliery gas (Dave Gordon)
 
Airborne dust update (Mark Shepherd)
Airborne dust update (Mark Shepherd)Airborne dust update (Mark Shepherd)
Airborne dust update (Mark Shepherd)
 
Emergency planning (Matt U'Brien)
Emergency planning (Matt U'Brien)Emergency planning (Matt U'Brien)
Emergency planning (Matt U'Brien)
 
Electrical performance presentation (Craig Harris)
Electrical performance presentation (Craig Harris)Electrical performance presentation (Craig Harris)
Electrical performance presentation (Craig Harris)
 
Where do I stand for fire protection on mobile and transportable equipment an...
Where do I stand for fire protection on mobile and transportable equipment an...Where do I stand for fire protection on mobile and transportable equipment an...
Where do I stand for fire protection on mobile and transportable equipment an...
 

Último

VIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Call Girls In datia Escorts ☎️7427069034 🔝 💃 Enjoy 24/7 Escort Service Enjoy...
Call Girls In datia Escorts ☎️7427069034  🔝 💃 Enjoy 24/7 Escort Service Enjoy...Call Girls In datia Escorts ☎️7427069034  🔝 💃 Enjoy 24/7 Escort Service Enjoy...
Call Girls In datia Escorts ☎️7427069034 🔝 💃 Enjoy 24/7 Escort Service Enjoy...
nehasharma67844
 
Call Girls in Chandni Chowk (delhi) call me [9953056974] escort service 24X7
Call Girls in Chandni Chowk (delhi) call me [9953056974] escort service 24X7Call Girls in Chandni Chowk (delhi) call me [9953056974] escort service 24X7
Call Girls in Chandni Chowk (delhi) call me [9953056974] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Último (20)

VIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 Booking
 
Akurdi ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Akurdi ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Akurdi ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Akurdi ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
 
celebrity 💋 Patna Escorts Just Dail 8250092165 service available anytime 24 hour
celebrity 💋 Patna Escorts Just Dail 8250092165 service available anytime 24 hourcelebrity 💋 Patna Escorts Just Dail 8250092165 service available anytime 24 hour
celebrity 💋 Patna Escorts Just Dail 8250092165 service available anytime 24 hour
 
VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...
 
celebrity 💋 Agra Escorts Just Dail 8250092165 service available anytime 24 hour
celebrity 💋 Agra Escorts Just Dail 8250092165 service available anytime 24 hourcelebrity 💋 Agra Escorts Just Dail 8250092165 service available anytime 24 hour
celebrity 💋 Agra Escorts Just Dail 8250092165 service available anytime 24 hour
 
Pimple Gurav ) Call Girls Service Pune | 8005736733 Independent Escorts & Dat...
Pimple Gurav ) Call Girls Service Pune | 8005736733 Independent Escorts & Dat...Pimple Gurav ) Call Girls Service Pune | 8005736733 Independent Escorts & Dat...
Pimple Gurav ) Call Girls Service Pune | 8005736733 Independent Escorts & Dat...
 
Finance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCCFinance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCC
 
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
 
Chakan ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Chakan ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Chakan ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Chakan ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
 
Nanded City ? Russian Call Girls Pune - 450+ Call Girl Cash Payment 800573673...
Nanded City ? Russian Call Girls Pune - 450+ Call Girl Cash Payment 800573673...Nanded City ? Russian Call Girls Pune - 450+ Call Girl Cash Payment 800573673...
Nanded City ? Russian Call Girls Pune - 450+ Call Girl Cash Payment 800573673...
 
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'IsraëlAntisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
 
A Press for the Planet: Journalism in the face of the Environmental Crisis
A Press for the Planet: Journalism in the face of the Environmental CrisisA Press for the Planet: Journalism in the face of the Environmental Crisis
A Press for the Planet: Journalism in the face of the Environmental Crisis
 
Call Girls In datia Escorts ☎️7427069034 🔝 💃 Enjoy 24/7 Escort Service Enjoy...
Call Girls In datia Escorts ☎️7427069034  🔝 💃 Enjoy 24/7 Escort Service Enjoy...Call Girls In datia Escorts ☎️7427069034  🔝 💃 Enjoy 24/7 Escort Service Enjoy...
Call Girls In datia Escorts ☎️7427069034 🔝 💃 Enjoy 24/7 Escort Service Enjoy...
 
Sustainability by Design: Assessment Tool for Just Energy Transition Plans
Sustainability by Design: Assessment Tool for Just Energy Transition PlansSustainability by Design: Assessment Tool for Just Energy Transition Plans
Sustainability by Design: Assessment Tool for Just Energy Transition Plans
 
Call Girls in Chandni Chowk (delhi) call me [9953056974] escort service 24X7
Call Girls in Chandni Chowk (delhi) call me [9953056974] escort service 24X7Call Girls in Chandni Chowk (delhi) call me [9953056974] escort service 24X7
Call Girls in Chandni Chowk (delhi) call me [9953056974] escort service 24X7
 
Hinjewadi * VIP Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service ...
Hinjewadi * VIP Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service ...Hinjewadi * VIP Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service ...
Hinjewadi * VIP Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service ...
 
World Press Freedom Day 2024; May 3rd - Poster
World Press Freedom Day 2024; May 3rd - PosterWorld Press Freedom Day 2024; May 3rd - Poster
World Press Freedom Day 2024; May 3rd - Poster
 
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
 
Scaling up coastal adaptation in Maldives through the NAP process
Scaling up coastal adaptation in Maldives through the NAP processScaling up coastal adaptation in Maldives through the NAP process
Scaling up coastal adaptation in Maldives through the NAP process
 
Call On 6297143586 Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...
Call On 6297143586  Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...Call On 6297143586  Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...
Call On 6297143586 Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...
 

Complex connections Rick Chorley

  • 1. 132kV Connection A First for N.S.W Coal Mining
  • 2. Introduction • Where is Boggabri – Situated between Gunnedah and Narrabri in north west N.S.W approx. 115km West from Tamworth. • Boggabri Coal Operations commenced mining in 2006 • A significant expansion of site infrastructure was undertaken in 2014/2015 • The 132kV connection was a joint project by Transgrid and Boggabri Coal Operations. • Included was 15kM of single structure, double circuit, 132kV transmission line, 132kV switching station and the 132kv/11kV substation.
  • 3. Overview • Boggabri Coal Operations were an LV customer (HV was managed by the utility) at inception. • Site demand was below 2MVA • An 11kV rural feeder from Boggabri Substation was the only mine supply source. The service extended over 25kM (voltage regulation was required). • Expansion of site infrastructure required power system demand exceeding the 11kV capability. • Overall site demand increased to 8MVA (design capacity) • Local services could not meet the demand – Transmission was the only option.
  • 4. Why 132kV Connection ? A first for Mining and Transgrid
  • 8.
  • 10. Inter tripping • 132kV trip signals are duplicated through protection relays from Boggabri Coal to Transgrid – Zone Protection (overcurrent, short circuit etc) – TX Differential – Emergency stops – Fire system – Back up Earth Leakage – Neutral Earth Resistor failure via NER monitor. – Transformer Protection (Oil temp, explosion, winding temp, over pressure) – Arc Fault Detection (11kv Bus) • Protection devices, Circuit breakers, are in Transgrids Switching Station. • Faults are cleared by transgrid for all 132kV primary protection or Intertrip faults
  • 12. Load shed Arrangements • Transmission systems demand stability • Transgrid Load shed scheme means exactly what is sounds like • 4 Tiers are implemented which shed different load blocks • Bus voltage is monitored at the switching station for trip signal initiations
  • 13. EARTHING • Common earthing system between Transgrid and Boggabri Coal • Design requirements - Allowable touch and step voltages were derived from different standards • Transgrid – AS2067 ( Calculated) • Boggabri Coal – AS3007 (step/touch potentials v’s clearance times) • Transfer voltage levels required separation between “mine infrastructure area” and the 132kV facility. A 164M exclusion zone has been established for earthed services entering this zone.
  • 15. Challenges • Design was completed by Transmission orientated Engineers with a different approach to mining “Risk management base” • Design review was undertaken by a QLD based engineering company • Disconnect between project team and the end user of the facility • System operation – original design philosophy was to run 2 x 10MVA TX’s in parallel which allowed for a 65kA fault level on the 415V system (terminals of the 3MVA TX supply) • Fundamental protection schemes, secondary systems, required further development prior to energistaion. • HV and LV services crossing operational boundaries. Boggabri Coal and Transgrid share HV and LV services originating on both sides of the installation. • Differences in isolation procedures, including hardware between both Transgrid and Boggabri Coal • Transgrid having a major facility “next door” to the mine substation. • Unrestricted earth fault levels on the 132kV connection (max 15kA) – transfer voltages • Reliance of primary protection clearing faults is by the utility – No 132kV protective devices are owned or operated by Boggabri Coal Operations.
  • 16. Advantages • Transgrid monitoring • Transgrid system control monitor the status of Transgrid equipment, including the 132kV circuit breakers, 24/7 • Remote operation of 132kV circuit breakers from Transgrid system control • Stability of Supply • The 132kV connection is part of the overall, north west area “Ring Main”. This means the system is very stable and subject to minimal outages or faults. • Reduced Arc Flash Categories • Increased equipment clearances (above 3M) and protection schemes allow for arc flash categories to be reduced
  • 17. Key Outcomes • Transgrid and Boggabri Coal Operating agreement implemented This document identifies – Equipment isolation instructions, each piece of equipment has an agreed isolation procedure – Communication protocol’s – Key contacts for events – Use and transaction of “High Voltage Equipment Outage” permits. • Connection Agreement – Highlights the obligations of each party – Deals with access and safety scenarios . – Modifications to the agreed installation and protection settings are dealt with here • Operational and Maintenance, hazard identification and risk analysis via consultation with designer, supplier, installer, operator and utility (Transgrid). – This process expedited the risk mitigation process due to designer information being supplied by key engineers • Designer based training for operational staff – Maintenance, Isolation and Operational documents were developed and used as training material for electrical staff by the designer. Training was delivered onsite.
  • 18. Recommendations • Where plant and installations are being constructed, for the purpose of mining operations, statutory functions should be involved in the key decisions. • Collaboration with mining and transmission industries requires further development. Mindsets are differing around system operations and protection functions.