Facilities provided at each department of seberang perai
1.
2. • The report has been written as a requirement to
complete a mini project survey for course
Communication English 3 (AE501). The title of this
survey is to find out how many PSP students who
agree with our suggestion about facilities provided at
each department of Polytecnic Seberang Perai. The
questionnaires were distributed to a total of students,
consisting of 16 Commerce Department students, 14
Information and Communication Technology
Department students, 15 Electrical Engineering and 15
Mechanical Engineering students.
3. • To determine whether the students are satisfied with
the condition of classroom.
• To investigate whether the students feel comfortable
and concentrated with their learning in the classroom.
• To find out new suggestions for the improvements of
classroom at Seberang Perai Polytechnic for each
departments.
4. • All student in Polytecnic Seberang Perai
Commerce Department
Mechanical Department
Electrical Engineering Department
Information, Communication, and Technology
Department
15. 0 2 4 6 8 10 12 14
Number of respondents
Department
Respondents opinion about the flip
chairs in the classroom
Uncomfortable
Comfortable
16. • The respondents admitted that the facilities provided at
Seberang Perai Polytechnic is not satisfied at each department.
The result of the survey showed that 72% of students from all
department thinks that the size of classes is standard, whereas
only 6 % from student of PSP thinks that the size of classes is
large. From the survey, it was found that about 10 student from
Commerce Department agreed that classroom equipted have
enough chairs and tables for the students. Meanwhile, there are
57% respondents thinks the projected provided in classroom
was unavailable. At the same time, that an outstandingly high
percentage respondents agreed that facilities at PSP is not
enough and must make some improvement or always update
some service that provided in Seberang Perai Polytechnic.
17. PSP need to add more equited in classes
with enough chairs and tables
Add more classroom
Always update and service the projected
Provided more projected