FALL PROTECTION
Contract Name and Number: Contractor/Subcontractor:
Government QA Person: Location:
Contractor Inspector: Date:
Yes No N/A
1. Is each employee who might be exposed to fall hazards trained by a competent
person qualified in the following areas, in the safe use of accessways and fall
protection systems and the recognition of hazards related to their use? (21.A.16a)
a. The nature of access and fall hazards in the work area
b. The correct procedures for constructing, erecting, maintaining, using, and
dismantling accessways and fall protection systems
c. The maximum intended load-carrying capacities of accessways and fall
protection systems
d. All applicable requirements from EM-385 Section 16
e. The limitations on the use of mechanical equipment during the performance
of roofing work on low-sloped roofs
2. Has retraining been provided as necessary for employees to maintain an
understanding of these subjects?
3. Is rescue equipment available and procedures known?
4. Has employer verified employees training by a written certification record that
identifies the employee trained, the dates of the training, and the signature of the
trainer?
2. Are the manufacturer's recommendations followed in the fitting, adjustment, use,
inspection, testing, and care of personal fall protection equipment? (21.C.06)
3. Is personal fall protection equipment inspected by the worker before use each
day to determine that it is in safe working condition? (21.C.07)
4. Are body belts prohibited from use (except in positioning and restraint systems)?
(05.F.01b)
5. Are ropes and straps (webbing) used in lanyards, lifelines, and strength
components of body belts and body harnesses made from synthetic fibers?
(05.F.03d)
6. When vertical lifelines are used, is each employee attached to a separate
lifeline? (21.C.09a)
7. Are anchorages used for attachment of personal fall arrest equipment independ-
ent of any anchorage used to support or suspend platforms and are they capable of
supporting at least 2,270 kg (5,000 lb) per employee attached? (21.C.10a)
8. Are safety nets in place and tested before operations requiring safety net
protection are undertaken? (21.C.11c)
9. Prior to commencing any activity which requires work in elevated areas, have all
provisions for access and fall protection been delineated in the AHA and accepted
by the designated authority? (22.A.03)
10. Is each person supported by a suspended scaffold protected by a Type I body
belt or body harness system? (22.E.15a)
11. Are workers provided fall protection whenever they are exposed to falls of 1.8 m
(6 ft) or more? (21.A.02b)
Comments:
This checklist is based on EM 385-1-1, dated 3 November 2003. Use of this checklist is optional.

Más contenido relacionado

La actualidad más candente

17 traffic operations working on live roads risk assessment templates
17 traffic operations   working on live roads risk assessment templates17 traffic operations   working on live roads risk assessment templates
17 traffic operations working on live roads risk assessment templatesDwarika Bhushan Sharma
 
Human Factors as Driver for Safety Management, Engineering, and Risk Governance
Human Factors as Driver for Safety Management, Engineering, and Risk GovernanceHuman Factors as Driver for Safety Management, Engineering, and Risk Governance
Human Factors as Driver for Safety Management, Engineering, and Risk GovernanceThe Windsdor Consulting Group, Inc.
 
Confined Space Horizontal Entry And Rescue
Confined Space Horizontal Entry And RescueConfined Space Horizontal Entry And Rescue
Confined Space Horizontal Entry And RescueAbfad Limited
 
23 casting of concrete slabs risk assessment templates
23 casting of concrete slabs risk assessment templates23 casting of concrete slabs risk assessment templates
23 casting of concrete slabs risk assessment templatesDwarika Bhushan Sharma
 
MONTAGEM E DESMONTAGEM DE ANDAIME NA TORRE DE REFRIGERAÇÃO.doc
MONTAGEM E DESMONTAGEM DE ANDAIME NA TORRE DE REFRIGERAÇÃO.docMONTAGEM E DESMONTAGEM DE ANDAIME NA TORRE DE REFRIGERAÇÃO.doc
MONTAGEM E DESMONTAGEM DE ANDAIME NA TORRE DE REFRIGERAÇÃO.docGeninhoFarias
 
EXCAVATION PERMIT Form # HSEQ - EP Rev 3.docx
EXCAVATION PERMIT Form # HSEQ - EP Rev 3.docxEXCAVATION PERMIT Form # HSEQ - EP Rev 3.docx
EXCAVATION PERMIT Form # HSEQ - EP Rev 3.docxDwarika Bhushan Sharma
 
CV (Ahmed Saeed) HSE Engineer
CV (Ahmed Saeed) HSE EngineerCV (Ahmed Saeed) HSE Engineer
CV (Ahmed Saeed) HSE EngineerAhmed Saeed
 
Toolbox Talk | Portable electricial equipment
Toolbox Talk | Portable electricial equipmentToolbox Talk | Portable electricial equipment
Toolbox Talk | Portable electricial equipmentAlan Bassett
 
22 casting of concrete columns risk assessment templates
22 casting of concrete columns risk assessment templates22 casting of concrete columns risk assessment templates
22 casting of concrete columns risk assessment templatesDwarika Bhushan Sharma
 
Training confined space entry holewatch man [compatibility mode]
Training confined space entry holewatch man [compatibility mode]Training confined space entry holewatch man [compatibility mode]
Training confined space entry holewatch man [compatibility mode]Azmeel Contracting Company
 
252113184 method-statement-for-office-container-and-equipment-mobilization (1)
252113184 method-statement-for-office-container-and-equipment-mobilization (1)252113184 method-statement-for-office-container-and-equipment-mobilization (1)
252113184 method-statement-for-office-container-and-equipment-mobilization (1)DusanJankovic8
 
Contractor camp inspection check list rev 9 12 16.00hr
Contractor camp inspection check list rev 9 12 16.00hrContractor camp inspection check list rev 9 12 16.00hr
Contractor camp inspection check list rev 9 12 16.00hranshse2
 
Daily mobile crane inspection checklist
Daily mobile crane inspection checklist  Daily mobile crane inspection checklist
Daily mobile crane inspection checklist Rahmat Mohamed
 
TOOLBOX TALK | lifting & rigging operations
TOOLBOX TALK | lifting & rigging operationsTOOLBOX TALK | lifting & rigging operations
TOOLBOX TALK | lifting & rigging operationsAlan Bassett
 
PRE-START BRIEFING Form # HSEQ - PSB Rev 2 -.docx
PRE-START BRIEFING Form # HSEQ - PSB  Rev 2 -.docxPRE-START BRIEFING Form # HSEQ - PSB  Rev 2 -.docx
PRE-START BRIEFING Form # HSEQ - PSB Rev 2 -.docxDwarika Bhushan Sharma
 
MAST CLIMBER & CRADLE PERMIT Form # HSEQ - Rev 2.docx
MAST CLIMBER & CRADLE PERMIT Form # HSEQ -  Rev 2.docxMAST CLIMBER & CRADLE PERMIT Form # HSEQ -  Rev 2.docx
MAST CLIMBER & CRADLE PERMIT Form # HSEQ - Rev 2.docxDwarika Bhushan Sharma
 
25 demolition of existing concrete structures risk assessment templates
25 demolition of existing concrete structures risk assessment templates25 demolition of existing concrete structures risk assessment templates
25 demolition of existing concrete structures risk assessment templatesDwarika Bhushan Sharma
 

La actualidad más candente (20)

17 traffic operations working on live roads risk assessment templates
17 traffic operations   working on live roads risk assessment templates17 traffic operations   working on live roads risk assessment templates
17 traffic operations working on live roads risk assessment templates
 
Human Factors as Driver for Safety Management, Engineering, and Risk Governance
Human Factors as Driver for Safety Management, Engineering, and Risk GovernanceHuman Factors as Driver for Safety Management, Engineering, and Risk Governance
Human Factors as Driver for Safety Management, Engineering, and Risk Governance
 
Confined Space Horizontal Entry And Rescue
Confined Space Horizontal Entry And RescueConfined Space Horizontal Entry And Rescue
Confined Space Horizontal Entry And Rescue
 
23 casting of concrete slabs risk assessment templates
23 casting of concrete slabs risk assessment templates23 casting of concrete slabs risk assessment templates
23 casting of concrete slabs risk assessment templates
 
MONTAGEM E DESMONTAGEM DE ANDAIME NA TORRE DE REFRIGERAÇÃO.doc
MONTAGEM E DESMONTAGEM DE ANDAIME NA TORRE DE REFRIGERAÇÃO.docMONTAGEM E DESMONTAGEM DE ANDAIME NA TORRE DE REFRIGERAÇÃO.doc
MONTAGEM E DESMONTAGEM DE ANDAIME NA TORRE DE REFRIGERAÇÃO.doc
 
EXCAVATION PERMIT Form # HSEQ - EP Rev 3.docx
EXCAVATION PERMIT Form # HSEQ - EP Rev 3.docxEXCAVATION PERMIT Form # HSEQ - EP Rev 3.docx
EXCAVATION PERMIT Form # HSEQ - EP Rev 3.docx
 
CV (Ahmed Saeed) HSE Engineer
CV (Ahmed Saeed) HSE EngineerCV (Ahmed Saeed) HSE Engineer
CV (Ahmed Saeed) HSE Engineer
 
Warehouse Safety & OSHA Regulations
Warehouse Safety & OSHA RegulationsWarehouse Safety & OSHA Regulations
Warehouse Safety & OSHA Regulations
 
MEWP TRAINING.pptx
MEWP TRAINING.pptxMEWP TRAINING.pptx
MEWP TRAINING.pptx
 
Medical emergency mock drill
Medical emergency mock drillMedical emergency mock drill
Medical emergency mock drill
 
Toolbox Talk | Portable electricial equipment
Toolbox Talk | Portable electricial equipmentToolbox Talk | Portable electricial equipment
Toolbox Talk | Portable electricial equipment
 
22 casting of concrete columns risk assessment templates
22 casting of concrete columns risk assessment templates22 casting of concrete columns risk assessment templates
22 casting of concrete columns risk assessment templates
 
Training confined space entry holewatch man [compatibility mode]
Training confined space entry holewatch man [compatibility mode]Training confined space entry holewatch man [compatibility mode]
Training confined space entry holewatch man [compatibility mode]
 
252113184 method-statement-for-office-container-and-equipment-mobilization (1)
252113184 method-statement-for-office-container-and-equipment-mobilization (1)252113184 method-statement-for-office-container-and-equipment-mobilization (1)
252113184 method-statement-for-office-container-and-equipment-mobilization (1)
 
Contractor camp inspection check list rev 9 12 16.00hr
Contractor camp inspection check list rev 9 12 16.00hrContractor camp inspection check list rev 9 12 16.00hr
Contractor camp inspection check list rev 9 12 16.00hr
 
Daily mobile crane inspection checklist
Daily mobile crane inspection checklist  Daily mobile crane inspection checklist
Daily mobile crane inspection checklist
 
TOOLBOX TALK | lifting & rigging operations
TOOLBOX TALK | lifting & rigging operationsTOOLBOX TALK | lifting & rigging operations
TOOLBOX TALK | lifting & rigging operations
 
PRE-START BRIEFING Form # HSEQ - PSB Rev 2 -.docx
PRE-START BRIEFING Form # HSEQ - PSB  Rev 2 -.docxPRE-START BRIEFING Form # HSEQ - PSB  Rev 2 -.docx
PRE-START BRIEFING Form # HSEQ - PSB Rev 2 -.docx
 
MAST CLIMBER & CRADLE PERMIT Form # HSEQ - Rev 2.docx
MAST CLIMBER & CRADLE PERMIT Form # HSEQ -  Rev 2.docxMAST CLIMBER & CRADLE PERMIT Form # HSEQ -  Rev 2.docx
MAST CLIMBER & CRADLE PERMIT Form # HSEQ - Rev 2.docx
 
25 demolition of existing concrete structures risk assessment templates
25 demolition of existing concrete structures risk assessment templates25 demolition of existing concrete structures risk assessment templates
25 demolition of existing concrete structures risk assessment templates
 

Similar a Fall protection checklist usace

Abu Dhabi Occupational Safety And Health System Framework (OSHAD-SF) Code Of ...
Abu Dhabi Occupational Safety And Health System Framework (OSHAD-SF) Code Of ...Abu Dhabi Occupational Safety And Health System Framework (OSHAD-SF) Code Of ...
Abu Dhabi Occupational Safety And Health System Framework (OSHAD-SF) Code Of ...Kayla Smith
 
16 Scaffolding (Temporary Works) Risk Assessment Templates.docx
16 Scaffolding (Temporary Works) Risk Assessment Templates.docx16 Scaffolding (Temporary Works) Risk Assessment Templates.docx
16 Scaffolding (Temporary Works) Risk Assessment Templates.docxDwarika Bhushan Sharma
 
13 Initial Project Site Office Set-up Risk Assessment Templates.docx
13 Initial Project Site Office Set-up Risk Assessment Templates.docx13 Initial Project Site Office Set-up Risk Assessment Templates.docx
13 Initial Project Site Office Set-up Risk Assessment Templates.docxDwarika Bhushan Sharma
 
Bucket elevator-o&m-5-21-13
Bucket elevator-o&m-5-21-13Bucket elevator-o&m-5-21-13
Bucket elevator-o&m-5-21-13Edisson Valencia
 
16 scaffolding (temporary works) risk assessment templates
16 scaffolding (temporary works) risk assessment templates16 scaffolding (temporary works) risk assessment templates
16 scaffolding (temporary works) risk assessment templatesDwarika Bhushan Sharma
 
13 initial project site office set up risk assessment templates
13 initial project site office set up risk assessment templates13 initial project site office set up risk assessment templates
13 initial project site office set up risk assessment templatesDwarika Bhushan Sharma
 
32 use of aluminium mobile scaffolding risk assessment templates
32 use of aluminium mobile scaffolding risk assessment templates32 use of aluminium mobile scaffolding risk assessment templates
32 use of aluminium mobile scaffolding risk assessment templatesDwarika Bhushan Sharma
 
32 Use of Aluminium mobile Scaffolding Risk Assessment Templates.docx
32 Use of Aluminium mobile Scaffolding Risk Assessment Templates.docx32 Use of Aluminium mobile Scaffolding Risk Assessment Templates.docx
32 Use of Aluminium mobile Scaffolding Risk Assessment Templates.docxDwarika Bhushan Sharma
 
0-GG010-MZ711-00020 Scaffolding Procedure rev.1 .docx
0-GG010-MZ711-00020 Scaffolding Procedure rev.1 .docx0-GG010-MZ711-00020 Scaffolding Procedure rev.1 .docx
0-GG010-MZ711-00020 Scaffolding Procedure rev.1 .docxKaty A. Beitia G.
 
2000 08 safe use of mobile cranes in construction sites
2000 08 safe use of mobile cranes in construction sites2000 08 safe use of mobile cranes in construction sites
2000 08 safe use of mobile cranes in construction sitesPrastowo Priyatmoko
 
7 Falsework (Temporary Works) Risk Assessment Templates.docx
7 Falsework (Temporary Works) Risk Assessment Templates.docx7 Falsework (Temporary Works) Risk Assessment Templates.docx
7 Falsework (Temporary Works) Risk Assessment Templates.docxDwarika Bhushan Sharma
 
28 Edge protection to open edges, shafts and risers Risk Assessment Templates...
28 Edge protection to open edges, shafts and risers Risk Assessment Templates...28 Edge protection to open edges, shafts and risers Risk Assessment Templates...
28 Edge protection to open edges, shafts and risers Risk Assessment Templates...Dwarika Bhushan Sharma
 
22 Casting of concrete columns Risk Assessment Templates.docx
22 Casting of concrete columns Risk Assessment Templates.docx22 Casting of concrete columns Risk Assessment Templates.docx
22 Casting of concrete columns Risk Assessment Templates.docxDwarika Bhushan Sharma
 
15 formwork (temporary works) risk assessment templates
15 formwork (temporary works) risk assessment templates15 formwork (temporary works) risk assessment templates
15 formwork (temporary works) risk assessment templatesDwarika Bhushan Sharma
 
23 Casting of concrete slabs Risk Assessment Templates.docx
23 Casting of concrete slabs Risk Assessment Templates.docx23 Casting of concrete slabs Risk Assessment Templates.docx
23 Casting of concrete slabs Risk Assessment Templates.docxDwarika Bhushan Sharma
 
11. JSA MECH. ROTATING AND STATIC BV-TPE-MSD-JSA 011 Rev. 00.docx
11. JSA MECH. ROTATING AND STATIC BV-TPE-MSD-JSA 011 Rev. 00.docx11. JSA MECH. ROTATING AND STATIC BV-TPE-MSD-JSA 011 Rev. 00.docx
11. JSA MECH. ROTATING AND STATIC BV-TPE-MSD-JSA 011 Rev. 00.docxssusered2ed4
 
7 falsework (temporary works) risk assessment templates
7 falsework (temporary works) risk assessment templates7 falsework (temporary works) risk assessment templates
7 falsework (temporary works) risk assessment templatesDwarika Bhushan Sharma
 
Working_At_Height_01.ppt
Working_At_Height_01.pptWorking_At_Height_01.ppt
Working_At_Height_01.ppthossam74752
 
JHA LIFTING ERECTION OF VESSEL EQUIPMENT.pdf
JHA LIFTING ERECTION OF VESSEL EQUIPMENT.pdfJHA LIFTING ERECTION OF VESSEL EQUIPMENT.pdf
JHA LIFTING ERECTION OF VESSEL EQUIPMENT.pdfHaroon AbdulRahim
 

Similar a Fall protection checklist usace (20)

Abu Dhabi Occupational Safety And Health System Framework (OSHAD-SF) Code Of ...
Abu Dhabi Occupational Safety And Health System Framework (OSHAD-SF) Code Of ...Abu Dhabi Occupational Safety And Health System Framework (OSHAD-SF) Code Of ...
Abu Dhabi Occupational Safety And Health System Framework (OSHAD-SF) Code Of ...
 
16 Scaffolding (Temporary Works) Risk Assessment Templates.docx
16 Scaffolding (Temporary Works) Risk Assessment Templates.docx16 Scaffolding (Temporary Works) Risk Assessment Templates.docx
16 Scaffolding (Temporary Works) Risk Assessment Templates.docx
 
13 Initial Project Site Office Set-up Risk Assessment Templates.docx
13 Initial Project Site Office Set-up Risk Assessment Templates.docx13 Initial Project Site Office Set-up Risk Assessment Templates.docx
13 Initial Project Site Office Set-up Risk Assessment Templates.docx
 
Bucket elevator-o&m-5-21-13
Bucket elevator-o&m-5-21-13Bucket elevator-o&m-5-21-13
Bucket elevator-o&m-5-21-13
 
16 scaffolding (temporary works) risk assessment templates
16 scaffolding (temporary works) risk assessment templates16 scaffolding (temporary works) risk assessment templates
16 scaffolding (temporary works) risk assessment templates
 
13 initial project site office set up risk assessment templates
13 initial project site office set up risk assessment templates13 initial project site office set up risk assessment templates
13 initial project site office set up risk assessment templates
 
32 use of aluminium mobile scaffolding risk assessment templates
32 use of aluminium mobile scaffolding risk assessment templates32 use of aluminium mobile scaffolding risk assessment templates
32 use of aluminium mobile scaffolding risk assessment templates
 
2015 CRW - New Crane Rules = New Compliance Directives
 2015 CRW - New Crane Rules = New Compliance Directives 2015 CRW - New Crane Rules = New Compliance Directives
2015 CRW - New Crane Rules = New Compliance Directives
 
32 Use of Aluminium mobile Scaffolding Risk Assessment Templates.docx
32 Use of Aluminium mobile Scaffolding Risk Assessment Templates.docx32 Use of Aluminium mobile Scaffolding Risk Assessment Templates.docx
32 Use of Aluminium mobile Scaffolding Risk Assessment Templates.docx
 
0-GG010-MZ711-00020 Scaffolding Procedure rev.1 .docx
0-GG010-MZ711-00020 Scaffolding Procedure rev.1 .docx0-GG010-MZ711-00020 Scaffolding Procedure rev.1 .docx
0-GG010-MZ711-00020 Scaffolding Procedure rev.1 .docx
 
2000 08 safe use of mobile cranes in construction sites
2000 08 safe use of mobile cranes in construction sites2000 08 safe use of mobile cranes in construction sites
2000 08 safe use of mobile cranes in construction sites
 
7 Falsework (Temporary Works) Risk Assessment Templates.docx
7 Falsework (Temporary Works) Risk Assessment Templates.docx7 Falsework (Temporary Works) Risk Assessment Templates.docx
7 Falsework (Temporary Works) Risk Assessment Templates.docx
 
28 Edge protection to open edges, shafts and risers Risk Assessment Templates...
28 Edge protection to open edges, shafts and risers Risk Assessment Templates...28 Edge protection to open edges, shafts and risers Risk Assessment Templates...
28 Edge protection to open edges, shafts and risers Risk Assessment Templates...
 
22 Casting of concrete columns Risk Assessment Templates.docx
22 Casting of concrete columns Risk Assessment Templates.docx22 Casting of concrete columns Risk Assessment Templates.docx
22 Casting of concrete columns Risk Assessment Templates.docx
 
15 formwork (temporary works) risk assessment templates
15 formwork (temporary works) risk assessment templates15 formwork (temporary works) risk assessment templates
15 formwork (temporary works) risk assessment templates
 
23 Casting of concrete slabs Risk Assessment Templates.docx
23 Casting of concrete slabs Risk Assessment Templates.docx23 Casting of concrete slabs Risk Assessment Templates.docx
23 Casting of concrete slabs Risk Assessment Templates.docx
 
11. JSA MECH. ROTATING AND STATIC BV-TPE-MSD-JSA 011 Rev. 00.docx
11. JSA MECH. ROTATING AND STATIC BV-TPE-MSD-JSA 011 Rev. 00.docx11. JSA MECH. ROTATING AND STATIC BV-TPE-MSD-JSA 011 Rev. 00.docx
11. JSA MECH. ROTATING AND STATIC BV-TPE-MSD-JSA 011 Rev. 00.docx
 
7 falsework (temporary works) risk assessment templates
7 falsework (temporary works) risk assessment templates7 falsework (temporary works) risk assessment templates
7 falsework (temporary works) risk assessment templates
 
Working_At_Height_01.ppt
Working_At_Height_01.pptWorking_At_Height_01.ppt
Working_At_Height_01.ppt
 
JHA LIFTING ERECTION OF VESSEL EQUIPMENT.pdf
JHA LIFTING ERECTION OF VESSEL EQUIPMENT.pdfJHA LIFTING ERECTION OF VESSEL EQUIPMENT.pdf
JHA LIFTING ERECTION OF VESSEL EQUIPMENT.pdf
 

Último

BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 

Último (20)

BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 

Fall protection checklist usace

  • 1. FALL PROTECTION Contract Name and Number: Contractor/Subcontractor: Government QA Person: Location: Contractor Inspector: Date: Yes No N/A 1. Is each employee who might be exposed to fall hazards trained by a competent person qualified in the following areas, in the safe use of accessways and fall protection systems and the recognition of hazards related to their use? (21.A.16a) a. The nature of access and fall hazards in the work area b. The correct procedures for constructing, erecting, maintaining, using, and dismantling accessways and fall protection systems c. The maximum intended load-carrying capacities of accessways and fall protection systems d. All applicable requirements from EM-385 Section 16 e. The limitations on the use of mechanical equipment during the performance of roofing work on low-sloped roofs 2. Has retraining been provided as necessary for employees to maintain an understanding of these subjects? 3. Is rescue equipment available and procedures known? 4. Has employer verified employees training by a written certification record that identifies the employee trained, the dates of the training, and the signature of the trainer? 2. Are the manufacturer's recommendations followed in the fitting, adjustment, use, inspection, testing, and care of personal fall protection equipment? (21.C.06) 3. Is personal fall protection equipment inspected by the worker before use each day to determine that it is in safe working condition? (21.C.07) 4. Are body belts prohibited from use (except in positioning and restraint systems)? (05.F.01b) 5. Are ropes and straps (webbing) used in lanyards, lifelines, and strength components of body belts and body harnesses made from synthetic fibers? (05.F.03d) 6. When vertical lifelines are used, is each employee attached to a separate lifeline? (21.C.09a) 7. Are anchorages used for attachment of personal fall arrest equipment independ- ent of any anchorage used to support or suspend platforms and are they capable of supporting at least 2,270 kg (5,000 lb) per employee attached? (21.C.10a) 8. Are safety nets in place and tested before operations requiring safety net protection are undertaken? (21.C.11c) 9. Prior to commencing any activity which requires work in elevated areas, have all provisions for access and fall protection been delineated in the AHA and accepted by the designated authority? (22.A.03) 10. Is each person supported by a suspended scaffold protected by a Type I body belt or body harness system? (22.E.15a) 11. Are workers provided fall protection whenever they are exposed to falls of 1.8 m (6 ft) or more? (21.A.02b) Comments: This checklist is based on EM 385-1-1, dated 3 November 2003. Use of this checklist is optional.