SlideShare una empresa de Scribd logo
1 de 22
Descargar para leer sin conexión
5 MWp Solar PV Power Project
Rajasthan Solar Policy 2011 & Exergy’s Offerings


 Proposal for Project Conceptualization Services
  (Special Reference on Brief Analysis on Rajasthan Policy)




                   (Private and Confidential)

                          3rd May 2011



                         Proposed By:-




  Solar Division Office: D-32, Sector 7, Noida, India. ZIP: 201301
           Tel: +91-9999676750 Fax: +91-11-2271 9366
            Web: www.exergy.in Email: info@exergy.in
Contents

Aim of this Document ................................................................................................................ 3
EXERGY: Partners for Solar Energy .............................................................................................................. 4
   Our Expertise ............................................................................................................................................ 5
   Our Clientele ............................................................................................................................................. 8
DETAILED SCOPE OF WORK .................................................................................................. 9
Appendix 1: POLICY REGIMES UNDER RAJASTHAN SOLAR POLICY 2011 .......................18
Setting up of Solar Power Plants in Rajasthan for direct sale to Discoms of Rajasthan.......18
and CSP based power plants. .................................................................................................18
Phase-1 (up to 2013): 200MW .................................................................................................18
Phase-2 (2013-2017): 400MW (additional) ..............................................................................18
The minimum allocation is 5MW and maximum 10MW for Solar PV. ..................................18
The minimum allocation is 5MW and maximum 50MW for Solar Thermal..........................18
Setting up of Rooftop PV and other Small Solar Power Plants connected to LT/11kV Grid:
.................................................................................................................................................19
Utility Grid Power Projects for sale through RE (Solar) Certificate Mechanism: .................19
Setting up of Solar Power Plant for promotion of manufacturing facilities in the State. .....20
Off-Grid and Decentralized Solar Plants ................................................................................20
Solar Parks ..............................................................................................................................21
Land .........................................................................................................................................21
Time Schedule .........................................................................................................................22
2. Approvals facilitation & Project Registration .....................................................................22
4. EPC services .........................................................................................................................22
Aim of this Document



This document has been prepared by Pan Exergy Pvt Ltd (hereinafter together
referred to as “Exergy”) to provide a comprehensive proposal which includes:

   (a) Solar Site Identification and Selection Services;

   (b) Preparation of Detailed Project Report

   (c) Project Registration Services

for 5 MWp Solar PV Power Project in Rajasthan, proposed by “the Client”.
EXERGY: Partners for Solar Energy
EXERGY SOLAR, the Solar vertical of LSquare
Solutions, is a technology agnostic and knowledge         Head Quartered in New Delhi,
intensive consulting house, lead by a powerful team        India
                                                          Branches in Vadodara, Hyderabad
offering innovative services & technology solutions in     & R&D Centre at IIT Kharagpur.
the field of Solar Photovoltaics & Solar Thermal.         Leading Solar Infrastructure
                                                           Service Provider with a clientele of
Exergy was founded with the strong vision of               650MW SPV & CSP.
adopting a leadership role in solving today‟s key         Only company offering PINCH
                                                           technology services (Process
issues of energy crisis and climate change.                Optimization)
                                                          Partners with of the largest CDM
                                                           development company in the world
Exergy Inc has been a defining force for Solar Power      Extensive network of partnership.
in India. It has grown as India's largest Solar           Formally Accredited with Ministry
                                                           of New & Renewable Energy, GoI.
Consulting Group, having offered services to over         JV Association with Engineers
650MW Solar plants which are at various levels of          India Ltd (EIL) for Solar EPC
                                                           Contracts.
execution. Its consulting team consists of top Solar
Consultants of India having a sound knowledge in
solar technologies, latest trends, regulations and
finance. They have strong academic qualifications
having graduated from IITs & IIMs. Some of our
esteemed clients include TATA Power, GAIL, EIL,
JK Cement, ACC, CCCL, Gammon Infra, Airtel.

We are engaged in projects of 100MW capacity specifically under Rajasthan Solar Policy
2011 under PPA & REC regimes.


Further, Exergy boasts of successfully executing several Solar PV Rooftop & Ground
mounted turnkey EPC execution (largest being 150 kW Rooftop Plant). Our strategic focus
has remained on efficient execution of Solar PV Plants specifically in the range 5kW ~
150kW. Our emphasis has been on engineering improvisations, on-site optimizations, web
based efficiency models. We have direct collaboration with IIT Kharagpur for Solar based
R&D.


We provide a complete range of Solar Services including Lumpsum Turn Key EPC Services
for Solar Farm development, Project Conceptualization & Documentation including
Bankable Detailed Project Reports, Application Support for JNNSM Projects, Technology &
Site Assessments, Solar Land Banks, Construction upto Commissioning & Plant Start-up
Assistance and O&M services.



Our Expertise
We leverage our industry knowledge and technology strength to provide „concept-to-
completion‟ solutions for your energy requirements using Solar Photo Voltaic (SPV) &
Concentrated Solar Power (CSP) technology. We offer solutions in the following categories:

       Grid-connect MW sized Solar Farms
       Stand-alone Battery backup System
       Roof-top solar solution
       Off-Grid Solar Solutions
       Grid/ DG/Wind Hybrid System (in any combination)
These systems come with different mounting options frames.
Our Clientele
DETAILED SCOPE OF WORK

The whole scope of work is divided into following major 4 Phases of activities. The
project is conceived starting from the activities of Phase 1. The remaining phases
are subject to signing PPA with the government or adopting Renewable Energy
Certificate (REC) route for project development.



Phase 1: Project Conceptualization Services

            Scope of Work                                Deliverables

   1. Solar     Site    Selection     &      a. Demonstrating 3 viable Govt. or
      Identification                            private land of around 25 acres.

      a. Solar Land Bank Assessment          b. Site    Evaluation        &      Technical
                                                Feasibility Services.
      b. Solar Resource     Assessment
         Studies                             c. Jamabandi Maps for the chosen
                                                location.
      c. Energy Yield Studies
                                             d. Clearances on the land selected.
      d. Comparative      Analysis    of
         chosen sites                        e. Identifying suitable land brokers,
                                                patwaris for land acquisition process.

   2. Preparation of Detailed Project     Exergy Shall prepare a DPR comprising
      Report                          following

                                             a. Project justification
                                             b. Site       Study,       Energy      Yield
                                                Calculations
                                             c. Technology,         Assessment          &
                                                Recommendation
                                             d. Technology selection and probable
                                                provider
                                             e. Technical design description
f.   Power evacuation scheme and power
                                                             conditioning units
                                                        g. Implementation schedule
                                                        h. Cost    Estimates,     BOM     ,     Layout
                                                             Drawing and Schematics, Financing
                                                             Pattern and Financial Analysis,
                                                        i. Organization           chart/Manpower
                                                             requirements
                                                        j.   Environmental aspects
                                                        k. List of Statutory requirements
   3. Project Registration Services                     a. Project Registration at RREC.

       a. Assistance           for         filing       b. Necessary follow ups with each govt.
          application          with        Govt.           offices involved.
          authorities.
                                                        c. Power Evacuation Clearance.
       b. Preparation of Preliminary
          DPR for Govt. clearances.                     d. DPR Approval

       c. Power Evacuation Scheme &                     e. Project Recommendation Certificate
          Grid Interfacing Clearances.                     from RREC.

       d. Project Recommendation               &
          Clearance.

Note: The actual land acquisition will be undertaken by the client itself and Exergy shall facilitate
the process. Any incidental or liaisoning expenses shall be payable separately by the client.




       Exergy shall support the client during the acquisition process of the site. It
will be part of initial deliberations with the brokers and the govt. officials
responsible. In case of the failure of negotiations Exergy shall suggest another site
in lieu of the previous one or another land broker as the case may be. For this
purpose Exergy shall conduct a maximum of 3 site visits with the client.
We also recommend that one representative is appointed by the client to oversee the work
and choose the land among various land patches we propose after our initial technical
screening.
Phase 2: Detailed Engineering, Design & Analysis


This phase will cover detailed engineering of the project & preparation of drawings
documents by specialist civil, structural, mechanical, and electrical & instrumentation
engineers. Computer aided design techniques are extensively used as design aids to help
develop optimum layout & design to assure maximum construction, operational &
maintenance convenience. Scope of this activity shall be,

              Technology Selection & Necessary Collaborations, MoUs.

              SWOT analysis

              Site Study and Solar Resource Assessment Studies and Energy Yield
              Calculations for selected location and expected CUF

              Technology/Site specific feasibility

              Mode of project implementation

              Implementation schedule

   1. Mechanical Design

          o   Plot Plan and Equipment Layouts for various buildings and area

          o   Selection of technology and Array Design

   2. Electrical Design

          a. Design of power evacuation system

          b. Design of inverter system & their paralleling System

          c. Design of wiring system, cabling details and cable layouts

          d. Estimation of auxiliary power (Normal and Emergency)
e. Design / Sizing and specification of Electrical equipments like Transformers,
               Switchgear (H. T. & L. T.), Cables, Lighting fittings etc

          f. Electrical system study including Relay Co-ordination

          g. Design and specification of Variable Speed Drives for special applications

          h. Design       and   specifications   of   various   service    systems   like   Plant
               Communication, Fire Alarm and Detection etc.

          i. Detailed design of AC junction boxes & Diodes.

          j.   Design of Lightening Arrestor system

          k. Design of 66kV Substation, yard layout and layout for power evacuation
               system.

   3. Instrumentation

          a. Design and specifications of Instrumentation and Control Systems including
               PLC etc.

   4. Architectural, Civil & Structural

          a. Architectural, Civil and Structural design including estimation of quantities
               for tender document, plot development, drawings for statutory approvals and
               construction drawings for all buildings / areas,

          b. Detailed foundation design

All relevant designs/drawings shall be provided to the client.
Phase 3: Technical Support during Project Setup

During this phase, we shall act as an owner‟s engineer and perform following activities.

Project Design Verification

                  Detailed engineering drawings and documents submitted to the EPC
                  Contractor shall be verified by specialist civil, structural, mechanical,
                  electrical & instrumentation engineers whether the precise design details
                  are practically implemented.

                  Detailed drawings and Bill of Materials will be checked for ensuring
                  highest degree of accuracy and quality control.

                  Monitoring of specifications of equipment and material for procurement.

Planning & Schedule Monitoring

                  We shall monitor and report if EPC partner adheres to effective & timely
                  implementation of projects through detailed assessment of work
                  quantum, meticulous planning, and micro level scheduling.

                  In addition, quantitative progress of the various phases of project will be
                  measured and reported back to the client through a well-designed
                  reporting   system    which    enables   complete   evaluation   of   project
                  performance.




Procurement Monitoring

We shall monitor the whole procurement activity to make sure that turnkey contractor is
purchasing quality material and hiring competent vendors as agreed in the MoU. We shall
monitor following comprehensive procurement activities, and report any kind of
discrepancies going against the interests of client.

       Vendor identification, evaluation & enlistment
Entire purchase activity, floating of enquiry to finalization of order.

       Order placement

       Progress monitoring & expediting

       Inspection

       Transportation planning & control

Technical Monitoring

This will include following,

   a. Visual quality check of all the material and equipments delivered at the site.

   b. Comparison between actual quantity delivered with bills of material and delivery
       note

   c. Monitoring of techno-financial sustainability & viability of all the mechanical &
       electrical works.

   d. On-site support on mounting structure installation and solar panel mounting,
       trenching, cable routing, earthing points and connection, Inverter positioning/PCU,
       data monitoring system, power evacuation and substation construction.

Civil Construction Monitoring

We shall monitor the quality and layout of all the civil constructions including foundation
for solar panels, office, security guard cabins, roads etc. and report any kind of discrepancy
going against the client.

Plant Startup Assistance and Quality Check

We shall minutely monitor the final commissioned plant to check,

   a. Delivering the promised amount of electricity

   b. All the equipments are working satisfactorily
c. Civil construction is satisfactory

   d. Properly connected to the grid, as promised in the turnkey contract




Phase 4: Operation & Maintenance

This Phase will include Off-site monitoring of the satisfactory functioning of the Solar PV
power plant and equipment for 3 months post commissioning.
TIMELINE


Zero date:
Placement of a clear and confirmed order/Mandate in favor of M/s Pan Exergy Pvt. Ltd.
alongwith the payment of the agreed advance amount.


Time Line for Completion of Phase 1

             Exergy shall propose three sites within 2 weeks from the Zero date.

             Exergy shall submit land selection-cum-feasibility report within 3 weeks from
             Zero date.

             The necessary project documents shall be submitted at Rajasthan Renewable
             Energy Corp within 4-5 week time from Zero Date. Therefore, your company will
             be registered for Solar Power Project within 6 weeks time.

             Tentative time schedule for RREC Recommendation shall be within 1-2 months
             provided all necessary data sought is provided in time.
Appendix 1:
         SUMMARY OF POLICY REGIMES UNDER
            RAJASTHAN SOLAR POLICY 2011

Setting up of Solar Power Plants in Rajasthan for direct sale to Discoms of
Rajasthan.


The State will promote setting up of solar power projects for direct sale to Discoms
of Rajasthan. The total capacity under this category will be distributed equally
between SPV and CSP based power plants.


The total maximum capacity under this category for


Phase-1 (up to 2013): 200MW


Phase-2 (2013-2017): 400MW (additional)


Selection of these Solar Power Projects shall be through tariff based competitive
bidding process.


The minimum allocation is 5MW and maximum 10MW for Solar PV.


The minimum allocation is 5MW and maximum 50MW for Solar Thermal.


(With Gujarat State expecting only 25%-35% of its allocated projects to be completed
on time; we will see a similar trend in Rajasthan. But since many will have already
gone through the learning phase the success % could be higher than 40% but will be
less than 75%).
(NVVN’s reverse bidding has failed to excite the global solar community. Hopefully
the industry and the government will learn the lessons and we may see a much better
tariff rate in Rajasthan bidding process).


Utility Grid Power Projects for Captive use /Direct sale to 3 rd Party/States other
than Rajasthan through Open Access for promotion of investment in Rajasthan


Solar Power Producers are allowed to set up Solar Power Plants of unlimited
capacity for captive use or sale of power to 3 rd party/States other than Rajasthan.


(Will these solar developers be able to sell RECs in the open market? If not; how
many 3rd party sales are we expecting in solar with a per unit price of above
Rs.10~Rs. 12)


Setting up of Rooftop PV and other Small Solar Power Plants connected to LT/11kV
Grid:


(i) The Rajasthan State will promote deployment of Roof Top and Other Small Solar
Power Plants as per guidelines of MNRE.


(ii) The State will promote setting up of small solar power plants connected at 11kV
grid of 1 MW capacity each for direct sale to State Discoms of Rajasthan. The total
capacity under this category will be 50 MW. The selection of the projects will be
through tariff based competitive bidding process.


Utility Grid Power Projects for sale through RE (Solar) Certificate Mechanism:


The State will promote Solar Power Producers to set up Solar Power Plants of
unlimited capacity for sale through RE (Solar) Certificate mechanism. The Power
generated from these power projects shall be purchased by Discoms of Rajasthan at
Pooled Cost of Power Purchase as determined by the appropriate Commission from
time to time. The Solar Power Producers will sell RE (Solar) Certificates as per the
regulations/orders of appropriate Commission.
Setting up of Solar Power Plant for promotion of manufacturing facilities in the
State.


The State will promote Solar Power Producers to set up Solar Power Plants along
with Solar PV manufacturing plants in Rajasthan. The target under this category
will be 200 MW up to 2013.


Those Solar Power Producers who establish SPV manufacturing plants (thin film
technology modules or crystalline technology modules involving processing from
wafers stage) of minimum 25 MW per annum capacity in Rajasthan will be eligible
for sanction of SPV based Solar Power Plant. The capacity allocation for
manufacturing plant will be as follows:-


For more than 25 MW but less than 50 MW; capacity power plant allocation is 10
MW


50 MW and above 20 MW; capacity power plant allocation is 20MW


(In a new industry like solar; we have seen companies starting with a manufacturing
capacity of 10MW -12MW but not 25MW. The equipment cost does go up higher
while moving from 10MW to 25MW. But what hurts the most is the working capital,
the labor and the ability to sell in the market).


Off-Grid and Decentralized Solar Plants


1. The State will also promote decentralized and off-grid solar applications,
including hybrid system as per guidelines issued by MNRE to meet various
electrical and thermal energy requirements.


Some of the major applications of solar thermal technologies include solar water
heaters, solar cooling systems, air drying, steam cooking, power generation,
sterling engine.
The off grid photovoltaic applications include solar PV home lighting, police
stations, communication and lighting, Small powered looms, solar inverter, solar
PV pumps, powering computers in schools, Small milk chilling plants, refrigeration
for medicine in primary health centers and Hybrid systems for Powering telecom
towers etc. The off-grid solar applications shall be promoted for replacement of
diesel based generators sets. Guidelines and incentives issued by MNRE from time
to time shall be followed in State for promotion of decentralized and off-grid solar
applications.


Solar Parks


The Rajasthan State will develop Solar Parks of more than 1000 MW capacity in
 identified areas of Jodhpur, Jaisalmer, Bikaner and Barmer districts in various
stages.


Land


The allotment of land to the Solar Power Projects will be done as per the provisions
of Rajasthan Land Revenue. The Government land required for Solar Power Plant
shall be allotted to Solar Power Producer at concessional rate of 10% of the DLC
rate (agriculture land).


For setting up Solar Power Plant on different technology, maximum allotable land
to the Solar Power Producer shall be as follows:


a. SPV on thin film: 3.5 hectares per MW


b. SPV on crystalline technology: 2.5 hectares per MW


c. Solar Thermal (CSP)- Parabolic Trough/Tower Technology: 2.5 hectares per MW


d. Solar Thermal (CSP) - Parabolic Trough with Storage Facility /Tower/Other
Technology :
For PLF upto 23%; 2.5 hectares per MW. Then every 1% increase in PLF brings in
0.1 hectare/MW additional land.


Time Schedule


a. Upto 5MW: 15 months from SLEC approval


b. 5-10MW: 24 months from SLEC approval


c. 10-25 MW: 30 months from SLEC approval


“SLEC” means State Level Empowered Committee constituted under the provisions
of this Policy.


Some of the points not covered above include more details on land, technical details
on grid connectivity, the list of approvals needed and the process of application.


For more for details on the policy, please feel free to visit the website of Rajasthan
Renewable Energy Cooperation Limited: www.rrecl.com.


We are assisting our clients with the following services:


1. Govt/Private Solar specific Land assistance and allotment in Rajasthan


2. Approvals facilitation & Project Registration


3. Special Consultancy Services for Renewable Energy Certificates Markets (REC).
This is an upcoming and most attractive route for Solar Power Developers. We have
the rich experience of working on more than 100MW of Solar Projects at IEX (Indian
Energy Exchange for our Developers including Tata Power).


4. EPC services

Más contenido relacionado

La actualidad más candente (20)

50 MW solar-thermal-dpr
50 MW solar-thermal-dpr50 MW solar-thermal-dpr
50 MW solar-thermal-dpr
 
CV-SMZ
CV-SMZCV-SMZ
CV-SMZ
 
Resume_Kailash Kumar Jain
Resume_Kailash Kumar JainResume_Kailash Kumar Jain
Resume_Kailash Kumar Jain
 
AEPL-Profile-SW
AEPL-Profile-SWAEPL-Profile-SW
AEPL-Profile-SW
 
cv (2)
cv (2)cv (2)
cv (2)
 
GOWTHAMAN UPDATED ON 28 OCT 3PM
GOWTHAMAN UPDATED ON 28 OCT 3PM GOWTHAMAN UPDATED ON 28 OCT 3PM
GOWTHAMAN UPDATED ON 28 OCT 3PM
 
G K M Jafar_UAE
G K M Jafar_UAEG K M Jafar_UAE
G K M Jafar_UAE
 
Resume_Ravinder Kumar Raina dtd 080516
Resume_Ravinder Kumar Raina dtd 080516Resume_Ravinder Kumar Raina dtd 080516
Resume_Ravinder Kumar Raina dtd 080516
 
Dayton power-cold storage final
Dayton power-cold storage finalDayton power-cold storage final
Dayton power-cold storage final
 
Hydrolink ppt
Hydrolink pptHydrolink ppt
Hydrolink ppt
 
Resume (1)
Resume (1)Resume (1)
Resume (1)
 
Resume Gupta Ravi
Resume Gupta RaviResume Gupta Ravi
Resume Gupta Ravi
 
CV updated G
CV updated GCV updated G
CV updated G
 
Ambicales Solar
Ambicales SolarAmbicales Solar
Ambicales Solar
 
Updated_CV
Updated_CVUpdated_CV
Updated_CV
 
KJVYAS_SCL
KJVYAS_SCLKJVYAS_SCL
KJVYAS_SCL
 
CV Solar
CV SolarCV Solar
CV Solar
 
Aizaz Ahmad Qatar
Aizaz Ahmad QatarAizaz Ahmad Qatar
Aizaz Ahmad Qatar
 
Rajesh Patel Resume
Rajesh Patel ResumeRajesh Patel Resume
Rajesh Patel Resume
 
Jakson Power Solutions
Jakson Power SolutionsJakson Power Solutions
Jakson Power Solutions
 

Destacado (17)

Steam 1
Steam 1Steam 1
Steam 1
 
Exergy
ExergyExergy
Exergy
 
Heat Engine Cycles
Heat Engine CyclesHeat Engine Cycles
Heat Engine Cycles
 
steam formation
steam formation steam formation
steam formation
 
Exergy
ExergyExergy
Exergy
 
Solutions manual chapter 7 (1)
Solutions manual   chapter 7 (1)Solutions manual   chapter 7 (1)
Solutions manual chapter 7 (1)
 
Steam Formation
Steam FormationSteam Formation
Steam Formation
 
Heat Engine
Heat EngineHeat Engine
Heat Engine
 
B.tech i eme u 3 heat engine
B.tech i eme u 3 heat engineB.tech i eme u 3 heat engine
B.tech i eme u 3 heat engine
 
Steam and its properties
Steam and its propertiesSteam and its properties
Steam and its properties
 
Ppt of properties of steam
Ppt of properties of steamPpt of properties of steam
Ppt of properties of steam
 
Heat engine
Heat engineHeat engine
Heat engine
 
Exergy analysis of Power Plants
Exergy analysis of Power PlantsExergy analysis of Power Plants
Exergy analysis of Power Plants
 
Properties of steam
Properties of steamProperties of steam
Properties of steam
 
Steam generator part 1
Steam generator part 1Steam generator part 1
Steam generator part 1
 
Thermodynamic Chapter 4 Second Law Of Thermodynamics
Thermodynamic Chapter 4 Second Law Of ThermodynamicsThermodynamic Chapter 4 Second Law Of Thermodynamics
Thermodynamic Chapter 4 Second Law Of Thermodynamics
 
Steam Reforming - Common Problems
Steam Reforming - Common ProblemsSteam Reforming - Common Problems
Steam Reforming - Common Problems
 

Similar a Rajasthan Solar Policy PV Services

Rajasthan-Solar-Policy 2011
Rajasthan-Solar-Policy 2011Rajasthan-Solar-Policy 2011
Rajasthan-Solar-Policy 2011Exergy
 
Ambicales Energy Audit
Ambicales Energy AuditAmbicales Energy Audit
Ambicales Energy AuditAmbicales
 
Qp 020 12 Cleanergetic Solar Services Presentation V1
Qp 020 12 Cleanergetic Solar Services Presentation V1Qp 020 12 Cleanergetic Solar Services Presentation V1
Qp 020 12 Cleanergetic Solar Services Presentation V1Antonio Bautista, Ph.D.
 
Suryakiran Engineers - Solar Projects Specialist
Suryakiran Engineers - Solar Projects SpecialistSuryakiran Engineers - Solar Projects Specialist
Suryakiran Engineers - Solar Projects SpecialistRatnakar Sortur
 
Staten solarprofile project development for spv power plants
Staten solarprofile project development for spv power plantsStaten solarprofile project development for spv power plants
Staten solarprofile project development for spv power plantsRakesh Singh
 
Internship Report PPT.pptx
Internship Report PPT.pptxInternship Report PPT.pptx
Internship Report PPT.pptxSAUMYAJITSABUI
 
Gensol Group Profile - Solar Advisory, Solar Rooftop EPC, Solar O&M (13.12.17)
Gensol Group Profile  - Solar Advisory, Solar Rooftop EPC, Solar O&M (13.12.17)Gensol Group Profile  - Solar Advisory, Solar Rooftop EPC, Solar O&M (13.12.17)
Gensol Group Profile - Solar Advisory, Solar Rooftop EPC, Solar O&M (13.12.17)Gensol Engineering Limited
 
Joydip jana resume
Joydip jana resumeJoydip jana resume
Joydip jana resumeJoydip Jana
 
EPC Services Capability Tra International limited
EPC Services Capability  Tra International limitedEPC Services Capability  Tra International limited
EPC Services Capability Tra International limitedHimanshu9974
 
Solar power generation
Solar power generationSolar power generation
Solar power generationAngel Dass
 
Solar power generation
Solar power generationSolar power generation
Solar power generationAngel Dass
 
Solar power generation
Solar power generationSolar power generation
Solar power generationAngel Dass
 
PPT-SPV-Bermaco (2)
PPT-SPV-Bermaco (2)PPT-SPV-Bermaco (2)
PPT-SPV-Bermaco (2)C.P Singh
 

Similar a Rajasthan Solar Policy PV Services (20)

Rajasthan-Solar-Policy 2011
Rajasthan-Solar-Policy 2011Rajasthan-Solar-Policy 2011
Rajasthan-Solar-Policy 2011
 
Cv Ayan Ganguly
Cv Ayan GangulyCv Ayan Ganguly
Cv Ayan Ganguly
 
Imagineering
ImagineeringImagineering
Imagineering
 
Resume#
Resume#Resume#
Resume#
 
Resume
ResumeResume
Resume
 
Ambicales Energy Audit
Ambicales Energy AuditAmbicales Energy Audit
Ambicales Energy Audit
 
Qp 020 12 Cleanergetic Solar Services Presentation V1
Qp 020 12 Cleanergetic Solar Services Presentation V1Qp 020 12 Cleanergetic Solar Services Presentation V1
Qp 020 12 Cleanergetic Solar Services Presentation V1
 
Agneya Clientele
Agneya ClienteleAgneya Clientele
Agneya Clientele
 
Suryakiran Engineers - Solar Projects Specialist
Suryakiran Engineers - Solar Projects SpecialistSuryakiran Engineers - Solar Projects Specialist
Suryakiran Engineers - Solar Projects Specialist
 
Staten solarprofile project development for spv power plants
Staten solarprofile project development for spv power plantsStaten solarprofile project development for spv power plants
Staten solarprofile project development for spv power plants
 
Internship Report PPT.pptx
Internship Report PPT.pptxInternship Report PPT.pptx
Internship Report PPT.pptx
 
Design Group Corporate Profile
Design Group Corporate ProfileDesign Group Corporate Profile
Design Group Corporate Profile
 
Gensol Group Profile - Solar Advisory, Solar Rooftop EPC, Solar O&M (13.12.17)
Gensol Group Profile  - Solar Advisory, Solar Rooftop EPC, Solar O&M (13.12.17)Gensol Group Profile  - Solar Advisory, Solar Rooftop EPC, Solar O&M (13.12.17)
Gensol Group Profile - Solar Advisory, Solar Rooftop EPC, Solar O&M (13.12.17)
 
Solar Brochure
Solar BrochureSolar Brochure
Solar Brochure
 
Joydip jana resume
Joydip jana resumeJoydip jana resume
Joydip jana resume
 
EPC Services Capability Tra International limited
EPC Services Capability  Tra International limitedEPC Services Capability  Tra International limited
EPC Services Capability Tra International limited
 
Solar power generation
Solar power generationSolar power generation
Solar power generation
 
Solar power generation
Solar power generationSolar power generation
Solar power generation
 
Solar power generation
Solar power generationSolar power generation
Solar power generation
 
PPT-SPV-Bermaco (2)
PPT-SPV-Bermaco (2)PPT-SPV-Bermaco (2)
PPT-SPV-Bermaco (2)
 

Último

Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...ShrutiBose4
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 
India Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportIndia Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportMintel Group
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 

Último (20)

Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
 
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
Call Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North GoaCall Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North Goa
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 
India Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportIndia Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample Report
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 

Rajasthan Solar Policy PV Services

  • 1. 5 MWp Solar PV Power Project Rajasthan Solar Policy 2011 & Exergy’s Offerings Proposal for Project Conceptualization Services (Special Reference on Brief Analysis on Rajasthan Policy) (Private and Confidential) 3rd May 2011 Proposed By:- Solar Division Office: D-32, Sector 7, Noida, India. ZIP: 201301 Tel: +91-9999676750 Fax: +91-11-2271 9366 Web: www.exergy.in Email: info@exergy.in
  • 2. Contents Aim of this Document ................................................................................................................ 3 EXERGY: Partners for Solar Energy .............................................................................................................. 4 Our Expertise ............................................................................................................................................ 5 Our Clientele ............................................................................................................................................. 8 DETAILED SCOPE OF WORK .................................................................................................. 9 Appendix 1: POLICY REGIMES UNDER RAJASTHAN SOLAR POLICY 2011 .......................18 Setting up of Solar Power Plants in Rajasthan for direct sale to Discoms of Rajasthan.......18 and CSP based power plants. .................................................................................................18 Phase-1 (up to 2013): 200MW .................................................................................................18 Phase-2 (2013-2017): 400MW (additional) ..............................................................................18 The minimum allocation is 5MW and maximum 10MW for Solar PV. ..................................18 The minimum allocation is 5MW and maximum 50MW for Solar Thermal..........................18 Setting up of Rooftop PV and other Small Solar Power Plants connected to LT/11kV Grid: .................................................................................................................................................19 Utility Grid Power Projects for sale through RE (Solar) Certificate Mechanism: .................19 Setting up of Solar Power Plant for promotion of manufacturing facilities in the State. .....20 Off-Grid and Decentralized Solar Plants ................................................................................20 Solar Parks ..............................................................................................................................21 Land .........................................................................................................................................21 Time Schedule .........................................................................................................................22 2. Approvals facilitation & Project Registration .....................................................................22 4. EPC services .........................................................................................................................22
  • 3. Aim of this Document This document has been prepared by Pan Exergy Pvt Ltd (hereinafter together referred to as “Exergy”) to provide a comprehensive proposal which includes: (a) Solar Site Identification and Selection Services; (b) Preparation of Detailed Project Report (c) Project Registration Services for 5 MWp Solar PV Power Project in Rajasthan, proposed by “the Client”.
  • 4. EXERGY: Partners for Solar Energy EXERGY SOLAR, the Solar vertical of LSquare Solutions, is a technology agnostic and knowledge  Head Quartered in New Delhi, intensive consulting house, lead by a powerful team India  Branches in Vadodara, Hyderabad offering innovative services & technology solutions in & R&D Centre at IIT Kharagpur. the field of Solar Photovoltaics & Solar Thermal.  Leading Solar Infrastructure Service Provider with a clientele of Exergy was founded with the strong vision of 650MW SPV & CSP. adopting a leadership role in solving today‟s key  Only company offering PINCH technology services (Process issues of energy crisis and climate change. Optimization)  Partners with of the largest CDM development company in the world Exergy Inc has been a defining force for Solar Power  Extensive network of partnership. in India. It has grown as India's largest Solar  Formally Accredited with Ministry of New & Renewable Energy, GoI. Consulting Group, having offered services to over  JV Association with Engineers 650MW Solar plants which are at various levels of India Ltd (EIL) for Solar EPC Contracts. execution. Its consulting team consists of top Solar Consultants of India having a sound knowledge in solar technologies, latest trends, regulations and finance. They have strong academic qualifications having graduated from IITs & IIMs. Some of our esteemed clients include TATA Power, GAIL, EIL, JK Cement, ACC, CCCL, Gammon Infra, Airtel. We are engaged in projects of 100MW capacity specifically under Rajasthan Solar Policy 2011 under PPA & REC regimes. Further, Exergy boasts of successfully executing several Solar PV Rooftop & Ground mounted turnkey EPC execution (largest being 150 kW Rooftop Plant). Our strategic focus has remained on efficient execution of Solar PV Plants specifically in the range 5kW ~
  • 5. 150kW. Our emphasis has been on engineering improvisations, on-site optimizations, web based efficiency models. We have direct collaboration with IIT Kharagpur for Solar based R&D. We provide a complete range of Solar Services including Lumpsum Turn Key EPC Services for Solar Farm development, Project Conceptualization & Documentation including Bankable Detailed Project Reports, Application Support for JNNSM Projects, Technology & Site Assessments, Solar Land Banks, Construction upto Commissioning & Plant Start-up Assistance and O&M services. Our Expertise We leverage our industry knowledge and technology strength to provide „concept-to- completion‟ solutions for your energy requirements using Solar Photo Voltaic (SPV) & Concentrated Solar Power (CSP) technology. We offer solutions in the following categories: Grid-connect MW sized Solar Farms Stand-alone Battery backup System Roof-top solar solution Off-Grid Solar Solutions Grid/ DG/Wind Hybrid System (in any combination) These systems come with different mounting options frames.
  • 6.
  • 7.
  • 9. DETAILED SCOPE OF WORK The whole scope of work is divided into following major 4 Phases of activities. The project is conceived starting from the activities of Phase 1. The remaining phases are subject to signing PPA with the government or adopting Renewable Energy Certificate (REC) route for project development. Phase 1: Project Conceptualization Services Scope of Work Deliverables 1. Solar Site Selection & a. Demonstrating 3 viable Govt. or Identification private land of around 25 acres. a. Solar Land Bank Assessment b. Site Evaluation & Technical Feasibility Services. b. Solar Resource Assessment Studies c. Jamabandi Maps for the chosen location. c. Energy Yield Studies d. Clearances on the land selected. d. Comparative Analysis of chosen sites e. Identifying suitable land brokers, patwaris for land acquisition process. 2. Preparation of Detailed Project Exergy Shall prepare a DPR comprising Report following a. Project justification b. Site Study, Energy Yield Calculations c. Technology, Assessment & Recommendation d. Technology selection and probable provider e. Technical design description
  • 10. f. Power evacuation scheme and power conditioning units g. Implementation schedule h. Cost Estimates, BOM , Layout Drawing and Schematics, Financing Pattern and Financial Analysis, i. Organization chart/Manpower requirements j. Environmental aspects k. List of Statutory requirements 3. Project Registration Services a. Project Registration at RREC. a. Assistance for filing b. Necessary follow ups with each govt. application with Govt. offices involved. authorities. c. Power Evacuation Clearance. b. Preparation of Preliminary DPR for Govt. clearances. d. DPR Approval c. Power Evacuation Scheme & e. Project Recommendation Certificate Grid Interfacing Clearances. from RREC. d. Project Recommendation & Clearance. Note: The actual land acquisition will be undertaken by the client itself and Exergy shall facilitate the process. Any incidental or liaisoning expenses shall be payable separately by the client. Exergy shall support the client during the acquisition process of the site. It will be part of initial deliberations with the brokers and the govt. officials responsible. In case of the failure of negotiations Exergy shall suggest another site in lieu of the previous one or another land broker as the case may be. For this purpose Exergy shall conduct a maximum of 3 site visits with the client.
  • 11. We also recommend that one representative is appointed by the client to oversee the work and choose the land among various land patches we propose after our initial technical screening.
  • 12. Phase 2: Detailed Engineering, Design & Analysis This phase will cover detailed engineering of the project & preparation of drawings documents by specialist civil, structural, mechanical, and electrical & instrumentation engineers. Computer aided design techniques are extensively used as design aids to help develop optimum layout & design to assure maximum construction, operational & maintenance convenience. Scope of this activity shall be, Technology Selection & Necessary Collaborations, MoUs. SWOT analysis Site Study and Solar Resource Assessment Studies and Energy Yield Calculations for selected location and expected CUF Technology/Site specific feasibility Mode of project implementation Implementation schedule 1. Mechanical Design o Plot Plan and Equipment Layouts for various buildings and area o Selection of technology and Array Design 2. Electrical Design a. Design of power evacuation system b. Design of inverter system & their paralleling System c. Design of wiring system, cabling details and cable layouts d. Estimation of auxiliary power (Normal and Emergency)
  • 13. e. Design / Sizing and specification of Electrical equipments like Transformers, Switchgear (H. T. & L. T.), Cables, Lighting fittings etc f. Electrical system study including Relay Co-ordination g. Design and specification of Variable Speed Drives for special applications h. Design and specifications of various service systems like Plant Communication, Fire Alarm and Detection etc. i. Detailed design of AC junction boxes & Diodes. j. Design of Lightening Arrestor system k. Design of 66kV Substation, yard layout and layout for power evacuation system. 3. Instrumentation a. Design and specifications of Instrumentation and Control Systems including PLC etc. 4. Architectural, Civil & Structural a. Architectural, Civil and Structural design including estimation of quantities for tender document, plot development, drawings for statutory approvals and construction drawings for all buildings / areas, b. Detailed foundation design All relevant designs/drawings shall be provided to the client.
  • 14. Phase 3: Technical Support during Project Setup During this phase, we shall act as an owner‟s engineer and perform following activities. Project Design Verification Detailed engineering drawings and documents submitted to the EPC Contractor shall be verified by specialist civil, structural, mechanical, electrical & instrumentation engineers whether the precise design details are practically implemented. Detailed drawings and Bill of Materials will be checked for ensuring highest degree of accuracy and quality control. Monitoring of specifications of equipment and material for procurement. Planning & Schedule Monitoring We shall monitor and report if EPC partner adheres to effective & timely implementation of projects through detailed assessment of work quantum, meticulous planning, and micro level scheduling. In addition, quantitative progress of the various phases of project will be measured and reported back to the client through a well-designed reporting system which enables complete evaluation of project performance. Procurement Monitoring We shall monitor the whole procurement activity to make sure that turnkey contractor is purchasing quality material and hiring competent vendors as agreed in the MoU. We shall monitor following comprehensive procurement activities, and report any kind of discrepancies going against the interests of client. Vendor identification, evaluation & enlistment
  • 15. Entire purchase activity, floating of enquiry to finalization of order. Order placement Progress monitoring & expediting Inspection Transportation planning & control Technical Monitoring This will include following, a. Visual quality check of all the material and equipments delivered at the site. b. Comparison between actual quantity delivered with bills of material and delivery note c. Monitoring of techno-financial sustainability & viability of all the mechanical & electrical works. d. On-site support on mounting structure installation and solar panel mounting, trenching, cable routing, earthing points and connection, Inverter positioning/PCU, data monitoring system, power evacuation and substation construction. Civil Construction Monitoring We shall monitor the quality and layout of all the civil constructions including foundation for solar panels, office, security guard cabins, roads etc. and report any kind of discrepancy going against the client. Plant Startup Assistance and Quality Check We shall minutely monitor the final commissioned plant to check, a. Delivering the promised amount of electricity b. All the equipments are working satisfactorily
  • 16. c. Civil construction is satisfactory d. Properly connected to the grid, as promised in the turnkey contract Phase 4: Operation & Maintenance This Phase will include Off-site monitoring of the satisfactory functioning of the Solar PV power plant and equipment for 3 months post commissioning.
  • 17. TIMELINE Zero date: Placement of a clear and confirmed order/Mandate in favor of M/s Pan Exergy Pvt. Ltd. alongwith the payment of the agreed advance amount. Time Line for Completion of Phase 1 Exergy shall propose three sites within 2 weeks from the Zero date. Exergy shall submit land selection-cum-feasibility report within 3 weeks from Zero date. The necessary project documents shall be submitted at Rajasthan Renewable Energy Corp within 4-5 week time from Zero Date. Therefore, your company will be registered for Solar Power Project within 6 weeks time. Tentative time schedule for RREC Recommendation shall be within 1-2 months provided all necessary data sought is provided in time.
  • 18. Appendix 1: SUMMARY OF POLICY REGIMES UNDER RAJASTHAN SOLAR POLICY 2011 Setting up of Solar Power Plants in Rajasthan for direct sale to Discoms of Rajasthan. The State will promote setting up of solar power projects for direct sale to Discoms of Rajasthan. The total capacity under this category will be distributed equally between SPV and CSP based power plants. The total maximum capacity under this category for Phase-1 (up to 2013): 200MW Phase-2 (2013-2017): 400MW (additional) Selection of these Solar Power Projects shall be through tariff based competitive bidding process. The minimum allocation is 5MW and maximum 10MW for Solar PV. The minimum allocation is 5MW and maximum 50MW for Solar Thermal. (With Gujarat State expecting only 25%-35% of its allocated projects to be completed on time; we will see a similar trend in Rajasthan. But since many will have already gone through the learning phase the success % could be higher than 40% but will be less than 75%).
  • 19. (NVVN’s reverse bidding has failed to excite the global solar community. Hopefully the industry and the government will learn the lessons and we may see a much better tariff rate in Rajasthan bidding process). Utility Grid Power Projects for Captive use /Direct sale to 3 rd Party/States other than Rajasthan through Open Access for promotion of investment in Rajasthan Solar Power Producers are allowed to set up Solar Power Plants of unlimited capacity for captive use or sale of power to 3 rd party/States other than Rajasthan. (Will these solar developers be able to sell RECs in the open market? If not; how many 3rd party sales are we expecting in solar with a per unit price of above Rs.10~Rs. 12) Setting up of Rooftop PV and other Small Solar Power Plants connected to LT/11kV Grid: (i) The Rajasthan State will promote deployment of Roof Top and Other Small Solar Power Plants as per guidelines of MNRE. (ii) The State will promote setting up of small solar power plants connected at 11kV grid of 1 MW capacity each for direct sale to State Discoms of Rajasthan. The total capacity under this category will be 50 MW. The selection of the projects will be through tariff based competitive bidding process. Utility Grid Power Projects for sale through RE (Solar) Certificate Mechanism: The State will promote Solar Power Producers to set up Solar Power Plants of unlimited capacity for sale through RE (Solar) Certificate mechanism. The Power generated from these power projects shall be purchased by Discoms of Rajasthan at Pooled Cost of Power Purchase as determined by the appropriate Commission from time to time. The Solar Power Producers will sell RE (Solar) Certificates as per the regulations/orders of appropriate Commission.
  • 20. Setting up of Solar Power Plant for promotion of manufacturing facilities in the State. The State will promote Solar Power Producers to set up Solar Power Plants along with Solar PV manufacturing plants in Rajasthan. The target under this category will be 200 MW up to 2013. Those Solar Power Producers who establish SPV manufacturing plants (thin film technology modules or crystalline technology modules involving processing from wafers stage) of minimum 25 MW per annum capacity in Rajasthan will be eligible for sanction of SPV based Solar Power Plant. The capacity allocation for manufacturing plant will be as follows:- For more than 25 MW but less than 50 MW; capacity power plant allocation is 10 MW 50 MW and above 20 MW; capacity power plant allocation is 20MW (In a new industry like solar; we have seen companies starting with a manufacturing capacity of 10MW -12MW but not 25MW. The equipment cost does go up higher while moving from 10MW to 25MW. But what hurts the most is the working capital, the labor and the ability to sell in the market). Off-Grid and Decentralized Solar Plants 1. The State will also promote decentralized and off-grid solar applications, including hybrid system as per guidelines issued by MNRE to meet various electrical and thermal energy requirements. Some of the major applications of solar thermal technologies include solar water heaters, solar cooling systems, air drying, steam cooking, power generation, sterling engine.
  • 21. The off grid photovoltaic applications include solar PV home lighting, police stations, communication and lighting, Small powered looms, solar inverter, solar PV pumps, powering computers in schools, Small milk chilling plants, refrigeration for medicine in primary health centers and Hybrid systems for Powering telecom towers etc. The off-grid solar applications shall be promoted for replacement of diesel based generators sets. Guidelines and incentives issued by MNRE from time to time shall be followed in State for promotion of decentralized and off-grid solar applications. Solar Parks The Rajasthan State will develop Solar Parks of more than 1000 MW capacity in identified areas of Jodhpur, Jaisalmer, Bikaner and Barmer districts in various stages. Land The allotment of land to the Solar Power Projects will be done as per the provisions of Rajasthan Land Revenue. The Government land required for Solar Power Plant shall be allotted to Solar Power Producer at concessional rate of 10% of the DLC rate (agriculture land). For setting up Solar Power Plant on different technology, maximum allotable land to the Solar Power Producer shall be as follows: a. SPV on thin film: 3.5 hectares per MW b. SPV on crystalline technology: 2.5 hectares per MW c. Solar Thermal (CSP)- Parabolic Trough/Tower Technology: 2.5 hectares per MW d. Solar Thermal (CSP) - Parabolic Trough with Storage Facility /Tower/Other Technology :
  • 22. For PLF upto 23%; 2.5 hectares per MW. Then every 1% increase in PLF brings in 0.1 hectare/MW additional land. Time Schedule a. Upto 5MW: 15 months from SLEC approval b. 5-10MW: 24 months from SLEC approval c. 10-25 MW: 30 months from SLEC approval “SLEC” means State Level Empowered Committee constituted under the provisions of this Policy. Some of the points not covered above include more details on land, technical details on grid connectivity, the list of approvals needed and the process of application. For more for details on the policy, please feel free to visit the website of Rajasthan Renewable Energy Cooperation Limited: www.rrecl.com. We are assisting our clients with the following services: 1. Govt/Private Solar specific Land assistance and allotment in Rajasthan 2. Approvals facilitation & Project Registration 3. Special Consultancy Services for Renewable Energy Certificates Markets (REC). This is an upcoming and most attractive route for Solar Power Developers. We have the rich experience of working on more than 100MW of Solar Projects at IEX (Indian Energy Exchange for our Developers including Tata Power). 4. EPC services