5. 10 Min. Walk 4 Min. Walk
Neighborhood
Retail / Amenities
Grocery
Store
Daycare and
K-5
Community
Center
Neighborhood
Commons
Community Amenities
6. St. Thomas More
Social Heart
18 Acre Park
Walking Paths
SFSU
Juan Bautista Circle
Meadow
Neighborhood Common
(1 of 7 to be provided)
8900 310K 68 ac
Parkmerced Vision Plan (Adopted 2011)
Street Improvements School
Community Center
with Athletic Fields
9. To Daly City
BART
& Westlake
HIGUERA
GARAGE
355 Serrano
Garces at Grijalva
JBC
Leasing Center
125 CAMBON
100 FONT
55 CHUMASERO
Monday-Friday 6:30AM-10PM
Weekends 9AM-10PM
Frequency every 10 Minutes
Anticipated Launch with Construction Start of Phase 1A & 1B
Gonzalez at Josepha
Phase 1A/1B: Resident Shuttle and Bike Share
10. 1.5 to 1 0.5 to 1
Overall Parking Ratio
up to 1 to 1
Off-Street Parking Strategy
12. Replacement Units
Parkmerced is providing a one-for-one replacement of any existing garden apartment
to be demolished and prior to demolition:
- In brand new construction with at least the same bedroom & bathroom count and of similar
floor & storage areas, which based on average unit sizes
- Upgrades - each Replacement Unit will have a dishwasher, washer and dryer
- New homes will be a more efficient and comfortable, including improved accessibility
- Same lease terms and rent, except for location/address changes
- Same parking rights & parking rent
- Moving expenses covered, including packing
- No capital pass-throughs for new construction
This one-time relocation will be done as a block—so neighbors can stay neighbors.
13. At Time of Relocation -
All Townhome Residents
Long-Term Existing Residents
prior to July 9, 2001
OPTION A
Brand New
Replacement
Apartment
OPTION B
Relocation
Payment
Benefits
OPTION C
Interim
Replacement
Apartment
Relocation Options
14. Juan Bautista
Circle
Leasing
SFSU
Interim Replacement
(E)
37E
(E)
36
(E)
29
LAKE
MERCED
BLVD
BROTHERHOOD WAY
N
I
N
E
T
E
E
N
T
H
A
V
E
N
U
E
J
U
N
I
P
E
R
O
S
E
R
R
A
B
L
V
D
FONT
BLVD
VIDAL DR
ACEVEDO AVE
HIGUERA AVE
ARBALLO
DR
G
O
NZALEZ
DR
SERRANO
DR
PINTO AVE
C
H
U
M
A
S
E
R
O
D
R
C
R
E
S
P
I
D
R
GARCES DR
300 Arballo
199 Vidal V
I
D
A
L
D
R
RIVAS
DR
B
U
C
A
R
E
L
I
D
R
Phases 1A and 1B Relocation Map
99 Higuera
16. Q4 2022 Design Review Approvals for Phases 1C and 1D Buildings
Q1 2023 Final Subdivision Map Approvals Phases 1C and 1D
Q3/Q4 2023 Initial Resident/BART Shuttle and Bike Share Launch
Q3/Q4 2023 Anticipated Construction Start for Street Improvements for Phases 1A and 1B
Q4 2023 Existing Tenant Notices to First 56 To Be Replaced Apartments
Q4 2023 Anticipated Construction Start for Blocks 1 (Replacement Buildings) and Block 6
Q4 2023 Anticipated Construction Start for Block 20
Q2 2024 Anticipated Construction Start for Block 22
Anticipated Look Ahead (dates subject to change)
Look Ahead
17. L
A
K
E
M
E
R
C
E
D
B
L
V
D
BROTHERHOOD WY
NINETEENTH AVE
JUNIPERO SERRA BLVD
SFSU
FONT BLVD
FONT BOULEVARD
CHUMASERO DR
V
I
D
A
L
D
R
HIGUERA AVE
ACEVEDO AVE
A
R
B
A
L
L
O
D
R
SERRANO DR
GONZALEZ DR
B1
B6
B2O
B22
RESIDENT
NEWSLETTER
MARCH 2015
Pulse
Resident Newsletter | Fall 2015
Pulse
Resident Newsletter | Winter 2015/2016
Project Website
e-mail
Resident
Newsletters
Information Boards
Job Site Entry
415.405.4666
info@parkmercedvision.com
parkmercedvision.com
Communication
COMMUNICATION
18. PHASES 1A ,1B, 1C and 1D
Building Designs, Community and Street Improvements
20. PHASE 1A
4 BUILDINGS - 401 HOMES:
- 56 REPLACEMENT HOMES
- 20 BELOW-MARKET HOMES
- 325 NEW HOMES
- AND OVER $13 MILLION COMMITTED TO THE
CONSTRUCTION OF AFFORDABLE HOUSING IN SAN
FRANCISCO
OPEN SPACE – STREETS - INFRASTRUCTURE
300 Arballo
199 Vidal
455 Serrano/850 Gonzalez
BROTHERHOOD WAY
L
A
K
E
M
E
R
C
E
D
B
L
V
D
21. Community
Gardens
Car & Bike Share
Children’s
Play Area
Landmark Tree
Reconfigured
Driveway
199 VIDAL
300 ARBALLO
Landscaping
3
1
0
A
R
B
A
L
L
O
3
5
0
A
R
B
A
L
L
O
New
Intersection
VIDAL
ACEVEDO
ARBALLO
Block 1 Community Open Space and Amenities
Dedicated
Drop Off Zone
Parking
LAKE
MERCED
BLVD
27. PHASE 1B
1208/1218 J. SERRA
95/99 CHUMASERO
BROTHERHOOD WAY
NINETEENTH AVE
J. SERRA/SR-1
4 BUILDINGS - 612 HOMES:
- 28 BELOW-MARKET HOMES
- 584 NEW HOMES
- AND OVER $24 MILLION COMMITTED TO THE
CONSTRUCTION OF AFFORDABLE HOUSING IN SAN
FRANCISCO
OPEN SPACE – STREETS - INFRASTRUCTURE
32. PHASE 1C
99 Higuera
600 Arballo
BROTHERHOOD WAY
L
A
K
E
M
E
R
C
E
D
B
L
V
D
2 BUILDINGS - 425 HOMES:
- 166 REPLACEMENT HOMES
- 259 NEW HOMES
- BMR – TBD in process
OPEN SPACE – STREETS - INFRASTRUCTURE
37. PHASE 1D
1 BUILDING
- 471 NEW HOMES
- BMR – TBD in process
OPEN SPACE – STREETS - INFRASTRUCTURE
101 Font
BROTHERHOOD WAY
NINETEENTH AVE
J. SERRA/SR-1
38. N
Maximus PM Phase 1D Owner LLC
One Maritime Plaza, Suite 1900
San Francisco, California 94111
TEL: 415.584.4832
Client
Key Plan
Project No.
Scale
Issue Date:
Kohn Pedersen Fox Associates PC
Architects & Planning Consultants
11 West 42nd Street
New York, New York 10036
TEL: 212.977.6500 FAX: 212.956.2526
Architect
Magnusson Klemencic Associates
1301 Fifth Avenue, Suite 3200
Seattle, Washington 98101
TEL: 206.292.1200 FAX: 206.292.1201
Structural Engineer
Revision
Drawing Title
Seal & Signature
Interface Engineering
135 Main Street, Suite 400
San Francisco, California 94105
TEL: 415.489.7240
Mechanical, Electrical, Plumbing
Bionic
833 Market Street, Suite 601
San Francisco, California 94103
TEL: 415.206.0648
Landscape Architect
PROGRESS SET
NOT FOR
CONSTRUCTION
odesk
Docs://2015
-
Parkmerced/3066-A-KPF-Parkmerced-TOWER.rvt
VER
SHEET
SAN FRANCISCO
08/31/22 3066
No. Description Date
L.S-0.03 ILLUSTRATIVE
1
SCALE: 1"=20'-0"
ILLUSTRATIVE SITE PLAN
PLAN
Neighborhood
Common
Courtyard
Courtyard
Bike Share
Car Share
Block 21S Community Open Space and Amenities
101 FONT