Performance Measures in
Project Management
ME751 Chapter 6
• When do we say that the performance of any
project is good or not ?
The performance of a project is good when it
is completed based on time constraints,
specified budget and project specifications.
Otherwise the project ends up with failure.
• Some of the reasons for the poor performance
of a project are:
If it is abandoned at half the way.
If it is not producing a specified quality of a
product.
If it becomes sick soon after going in to the
commercial production.
Performance Indicators
• The investor, project manager and also the
public must be given with some indications
about the management while the project is
still in progress.
• Some of the performance indicators are:
Time over-run
Cost over-run
Project sickness
Productivity
Value
1) TIME OVER-RUN:
 This basically means not sticking to a pre-planned time schedule of the
project. In order to get the job cleared through the approving authorities,
a schedule may be fixed which can be far away from realistic.
 The vendors and contractors may just add to the confusion by promising
deliveries which can make anything possible on paper.
 Besides, some subsequent modifications or changes have to be made to
suit the project requirements which in turn increases time and cost.

2)COST OVER-RUN:
 Anything done to a project including time over-run would be reflected in
the cost.
 Cost estimates in a project are to be revised at various stages to improve
their accuracy.
 Cost over-run is used to represent the variance between the original cost
and the final cost incurred.
3)PROJECT SICKNESS:
 An efficient project manager is the one who makes the best possible use
of resources for achieving the project objectives.
 What ever the project manager does w.r.t the resources will be reflected
in the cost and what the project manager provides in return to justify this
cost is a plan which is to be called successful and must provide a saleable
output.
 The ratio of this output to the cost incurred for putting up the plan could
be an indicator of a project management performance.

4)PRODUCTIVITY:
 A productivity indicator reflects how the resources have been utilized
either for production of goods and services or for creation of facilities for
the same.
 Productivity is mainly measured to ensure the profitability of the plant and
to ward of the sickness.
5)VALUE:
 Value in this context, indicates the quality of the
products or services that are the final outcome of a
project.
 If the product or services do not meet customers
requirement, then the ideas such as time over-run,
cost over-run, high productivity, all become redundant.
 PROGRESS CONTROL:
 It requires a continuous monitoring during the
production phase.
 There must be a right contractual stipulations
regarding warranties and guarantees.
• What are Guarantees and Warranties?

Guarantee is a promise given to the purchaser
that a particular product would work
satisfactorily for a given period of time.
Warranty is a written guarantee given to a
purchaser by a dealer that they would repair
or replace the defective products with out any
charge for a stated period of time.
PERFORMANCE PARAMETERS:

These are the parameters which are required to
be identified in a project.
• Some of the critical performance parameters are;
 Raw materials
 Power consumption per unit of production
 Outcome etc….
How ever the design and specifications must be
made to meet these performance requirements.
Thus the critical performance parameters must
be tracked through all the stages of project
execution till the final performance guarantee
confirms the achievement of the performance.

Más contenido relacionado

La actualidad más candente

13 project control & closing management
13 project control & closing management13 project control & closing management
13 project control & closing managementDhamo daran
 
Project management assignment slides
Project management assignment slidesProject management assignment slides
Project management assignment slidesDoreen Yeo
 
PMP GLOSSARY
PMP GLOSSARYPMP GLOSSARY
PMP GLOSSARYSoumya De
 
Programme management and project evaluation
Programme management and project evaluationProgramme management and project evaluation
Programme management and project evaluationtumetr1
 
7 cost managmenet
7 cost managmenet7 cost managmenet
7 cost managmenetAla Ibrahim
 
2. project initiation
2. project initiation2. project initiation
2. project initiationMad Jutt
 
Project initiation
Project initiationProject initiation
Project initiationukrulz4u
 
Project audit and closure
Project audit and closureProject audit and closure
Project audit and closureVelita Furtado
 
Contractor Management Business Organisation Environment Implementation Perfor...
Contractor Management Business Organisation Environment Implementation Perfor...Contractor Management Business Organisation Environment Implementation Perfor...
Contractor Management Business Organisation Environment Implementation Perfor...SlideTeam
 
Project Initiation Presentation Template
Project Initiation Presentation TemplateProject Initiation Presentation Template
Project Initiation Presentation TemplateRam Srivastava
 
Monitor and control process group part two
Monitor and control process group part twoMonitor and control process group part two
Monitor and control process group part twoHossam Maghrabi
 
Project integration management
Project integration managementProject integration management
Project integration managementEhsan Ullah
 
Program Management Office Services
Program Management Office ServicesProgram Management Office Services
Program Management Office ServicesGlen Alleman
 

La actualidad más candente (20)

13 project control & closing management
13 project control & closing management13 project control & closing management
13 project control & closing management
 
Excel Project Management
Excel Project ManagementExcel Project Management
Excel Project Management
 
Software Project Management
Software Project ManagementSoftware Project Management
Software Project Management
 
Project management assignment slides
Project management assignment slidesProject management assignment slides
Project management assignment slides
 
PMP GLOSSARY
PMP GLOSSARYPMP GLOSSARY
PMP GLOSSARY
 
Programme management and project evaluation
Programme management and project evaluationProgramme management and project evaluation
Programme management and project evaluation
 
7 cost managmenet
7 cost managmenet7 cost managmenet
7 cost managmenet
 
Pep
PepPep
Pep
 
2. project initiation
2. project initiation2. project initiation
2. project initiation
 
Project initiation
Project initiationProject initiation
Project initiation
 
Project audit and closure
Project audit and closureProject audit and closure
Project audit and closure
 
Contractor Management Business Organisation Environment Implementation Perfor...
Contractor Management Business Organisation Environment Implementation Perfor...Contractor Management Business Organisation Environment Implementation Perfor...
Contractor Management Business Organisation Environment Implementation Perfor...
 
Project Initiation Presentation Template
Project Initiation Presentation TemplateProject Initiation Presentation Template
Project Initiation Presentation Template
 
Monitor and control process group part two
Monitor and control process group part twoMonitor and control process group part two
Monitor and control process group part two
 
Develop project management plan
Develop project management planDevelop project management plan
Develop project management plan
 
Project integration management
Project integration managementProject integration management
Project integration management
 
How to close a project
How to close a projectHow to close a project
How to close a project
 
Mg6088 spm unit-4
Mg6088 spm unit-4Mg6088 spm unit-4
Mg6088 spm unit-4
 
Program Management Office Services
Program Management Office ServicesProgram Management Office Services
Program Management Office Services
 
Project control
Project controlProject control
Project control
 

Similar a 10 me667 chap6 performance measures

Quality control inspection reports and outcomes wrt contract management
Quality control inspection reports and outcomes wrt contract managementQuality control inspection reports and outcomes wrt contract management
Quality control inspection reports and outcomes wrt contract managementEdwinJacob5
 
3 scope Management
3 scope Management 3 scope Management
3 scope Management Qussay Karam
 
Industry_Definitions_Construction.pdf
Industry_Definitions_Construction.pdfIndustry_Definitions_Construction.pdf
Industry_Definitions_Construction.pdfPratibha178649
 
3&4. project scope management at project.ppt
3&4. project scope management at project.ppt3&4. project scope management at project.ppt
3&4. project scope management at project.pptGoharSaeed6
 
1.7 project management
1.7 project management1.7 project management
1.7 project managementchaithanya1025
 
Quality metrics in project management
Quality metrics in project managementQuality metrics in project management
Quality metrics in project managementselinasimpson1601
 
1-7Projectmanagement-120312002842-Phpapp01
1-7Projectmanagement-120312002842-Phpapp011-7Projectmanagement-120312002842-Phpapp01
1-7Projectmanagement-120312002842-Phpapp01Amy Roman
 
1.7 project management
1.7 project management1.7 project management
1.7 project managementexemplar2401
 
2.05 scope management 1
2.05 scope management 12.05 scope management 1
2.05 scope management 1reddvise
 
1661351047Unit 8 1060-V1 Quality Control during Construction.pdf
1661351047Unit 8 1060-V1 Quality Control during Construction.pdf1661351047Unit 8 1060-V1 Quality Control during Construction.pdf
1661351047Unit 8 1060-V1 Quality Control during Construction.pdfahsansaeed78
 
Presentation by meghna jadhav
Presentation by meghna jadhavPresentation by meghna jadhav
Presentation by meghna jadhavPMI_IREP_TP
 
The role of time, cost and quality in project management
The role of time, cost and quality in project managementThe role of time, cost and quality in project management
The role of time, cost and quality in project managementIRJET Journal
 
SYSTEM LIFE CYCLE_DurgaPrasad_TA Assignemnt 02
SYSTEM LIFE CYCLE_DurgaPrasad_TA Assignemnt 02SYSTEM LIFE CYCLE_DurgaPrasad_TA Assignemnt 02
SYSTEM LIFE CYCLE_DurgaPrasad_TA Assignemnt 02Durga Prasad Mishra
 
Project Quality Management PPT.pptx
Project Quality Management PPT.pptxProject Quality Management PPT.pptx
Project Quality Management PPT.pptxZiyad Zaidi
 

Similar a 10 me667 chap6 performance measures (20)

Quality control inspection reports and outcomes wrt contract management
Quality control inspection reports and outcomes wrt contract managementQuality control inspection reports and outcomes wrt contract management
Quality control inspection reports and outcomes wrt contract management
 
3 scope Management
3 scope Management 3 scope Management
3 scope Management
 
Session 4 gdas pmp study group presentation
Session 4   gdas pmp study group presentationSession 4   gdas pmp study group presentation
Session 4 gdas pmp study group presentation
 
Industry_Definitions_Construction.pdf
Industry_Definitions_Construction.pdfIndustry_Definitions_Construction.pdf
Industry_Definitions_Construction.pdf
 
Triple constraint
Triple constraintTriple constraint
Triple constraint
 
PME UNIT-3.pptx
PME UNIT-3.pptxPME UNIT-3.pptx
PME UNIT-3.pptx
 
3&4. project scope management at project.ppt
3&4. project scope management at project.ppt3&4. project scope management at project.ppt
3&4. project scope management at project.ppt
 
1.7 project management
1.7 project management1.7 project management
1.7 project management
 
Quality metrics in project management
Quality metrics in project managementQuality metrics in project management
Quality metrics in project management
 
1-7Projectmanagement-120312002842-Phpapp01
1-7Projectmanagement-120312002842-Phpapp011-7Projectmanagement-120312002842-Phpapp01
1-7Projectmanagement-120312002842-Phpapp01
 
1.7 project management
1.7 project management1.7 project management
1.7 project management
 
2.05 scope management 1
2.05 scope management 12.05 scope management 1
2.05 scope management 1
 
1661351047Unit 8 1060-V1 Quality Control during Construction.pdf
1661351047Unit 8 1060-V1 Quality Control during Construction.pdf1661351047Unit 8 1060-V1 Quality Control during Construction.pdf
1661351047Unit 8 1060-V1 Quality Control during Construction.pdf
 
Cost
CostCost
Cost
 
Cost
CostCost
Cost
 
KENA PRE.pptx
KENA PRE.pptxKENA PRE.pptx
KENA PRE.pptx
 
Presentation by meghna jadhav
Presentation by meghna jadhavPresentation by meghna jadhav
Presentation by meghna jadhav
 
The role of time, cost and quality in project management
The role of time, cost and quality in project managementThe role of time, cost and quality in project management
The role of time, cost and quality in project management
 
SYSTEM LIFE CYCLE_DurgaPrasad_TA Assignemnt 02
SYSTEM LIFE CYCLE_DurgaPrasad_TA Assignemnt 02SYSTEM LIFE CYCLE_DurgaPrasad_TA Assignemnt 02
SYSTEM LIFE CYCLE_DurgaPrasad_TA Assignemnt 02
 
Project Quality Management PPT.pptx
Project Quality Management PPT.pptxProject Quality Management PPT.pptx
Project Quality Management PPT.pptx
 

Último

Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptxnandhinijagan9867
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...rajveerescorts2022
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 MonthsIndeedSEO
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...amitlee9823
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876dlhescort
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...lizamodels9
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...amitlee9823
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...allensay1
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableSeo
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwaitdaisycvs
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Anamikakaur10
 

Último (20)

Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
Falcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in indiaFalcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in india
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
 

10 me667 chap6 performance measures

  • 1. Performance Measures in Project Management ME751 Chapter 6
  • 2. • When do we say that the performance of any project is good or not ? The performance of a project is good when it is completed based on time constraints, specified budget and project specifications. Otherwise the project ends up with failure.
  • 3. • Some of the reasons for the poor performance of a project are: If it is abandoned at half the way. If it is not producing a specified quality of a product. If it becomes sick soon after going in to the commercial production.
  • 4. Performance Indicators • The investor, project manager and also the public must be given with some indications about the management while the project is still in progress.
  • 5. • Some of the performance indicators are: Time over-run Cost over-run Project sickness Productivity Value
  • 6. 1) TIME OVER-RUN:  This basically means not sticking to a pre-planned time schedule of the project. In order to get the job cleared through the approving authorities, a schedule may be fixed which can be far away from realistic.  The vendors and contractors may just add to the confusion by promising deliveries which can make anything possible on paper.  Besides, some subsequent modifications or changes have to be made to suit the project requirements which in turn increases time and cost. 2)COST OVER-RUN:  Anything done to a project including time over-run would be reflected in the cost.  Cost estimates in a project are to be revised at various stages to improve their accuracy.  Cost over-run is used to represent the variance between the original cost and the final cost incurred.
  • 7. 3)PROJECT SICKNESS:  An efficient project manager is the one who makes the best possible use of resources for achieving the project objectives.  What ever the project manager does w.r.t the resources will be reflected in the cost and what the project manager provides in return to justify this cost is a plan which is to be called successful and must provide a saleable output.  The ratio of this output to the cost incurred for putting up the plan could be an indicator of a project management performance. 4)PRODUCTIVITY:  A productivity indicator reflects how the resources have been utilized either for production of goods and services or for creation of facilities for the same.  Productivity is mainly measured to ensure the profitability of the plant and to ward of the sickness.
  • 8. 5)VALUE:  Value in this context, indicates the quality of the products or services that are the final outcome of a project.  If the product or services do not meet customers requirement, then the ideas such as time over-run, cost over-run, high productivity, all become redundant.  PROGRESS CONTROL:  It requires a continuous monitoring during the production phase.  There must be a right contractual stipulations regarding warranties and guarantees.
  • 9. • What are Guarantees and Warranties? Guarantee is a promise given to the purchaser that a particular product would work satisfactorily for a given period of time. Warranty is a written guarantee given to a purchaser by a dealer that they would repair or replace the defective products with out any charge for a stated period of time.
  • 10. PERFORMANCE PARAMETERS: These are the parameters which are required to be identified in a project. • Some of the critical performance parameters are;  Raw materials  Power consumption per unit of production  Outcome etc…. How ever the design and specifications must be made to meet these performance requirements. Thus the critical performance parameters must be tracked through all the stages of project execution till the final performance guarantee confirms the achievement of the performance.