SlideShare una empresa de Scribd logo
1 de 8
SCHEDULE LINE CATOGIRY DETERMINATION


 DEPENDING THE SALES DOCUMENT PROCESSING THE
 SYSTEM AUTOMATICALLY DETERMINES A
 CORRESPONDING A SCHEDULE LINE CATOGIRIES FOR
 THE ITEMS.
 FOR THIS THE FOLLOWING SETTINGS MUST BE DONE
ASSIN SCHEDULE LINE CATOGIRIES

          SPRO            SALES DOCUMENT




 SALES AND DISTRIBUTION
                           SCHEDULE LINE




         SALES
                           ASSIN SCHEDULE
                           LINE CATOGIRIES
SCHEDULE LINE CATOGIRY DETERMINATION

   EX
                                    SALES
                                  DOCUMENT
         HEADER                     TPTE

                                     ITEAM
           ITEM                    CATOGIRY

                                   SCHEDULE
    SCHEDULE LINE                  CATOGIRY
                                          GO TO NEW
                                         ENTRIES AND
                                            ASSIN A
SALES       IN      AFN   ITEM          SCHEDULE LINE
DOC TYPE                  CATOGIRY      CATOGIRIES TO
            AFN     AT    SCHEDULE            THE
                          LINE         COMBINATION OF
                          CATOGIRY           ITEM
SCHEDULE LINE CATOGIRY DETERMINATION

   EX
            NORM




                   M-11
     M-10



    TAN            TAN
SCHEDULE LINE CATOGIRY DETERMINATION

      MRP TYPE : PD         MRP TYPE ND




                            REQUIRMENT
  REQUIREMENT /ASSEMBLY
                            AVILABLIYTY
       AVILABILITY
SCHEDULE LINE CATOGIRY DETERMINATION
ITEM CATOGIRY   MRP TYPE       SCHEDULE LINE
                               CATOGIRY
TAN             PD             CP
TAN             ND             CV




                           NOTE
   DURING THE SCHEDULE LINE CATOGIRY DETERMINATION WHAT
 EVER THE SCHEDULE LINE CATOGIRY’S THAT AS MANUL SCHEDULE
    LINE CATOGIRY WITH THAT WE CAN REPLACE THE DEFAULT
      SCHEDULE LINE CATOGIRY’S IN THE SALES DOCUMENT
SCHEDULE LINE CATOGIRY DETERMINATION
SALES      ITEM       USAGE   HIGHER     DEFAULT    MRP    SCHEDUL
DOC TYPE   CATOGIRY           LEVEL      ITEM       PYPE   E LINE
           GROUP              ITEM       CATOGIRY          CATOGIRY
                              CATOGIRY
IN         NORM         -      -         AFN        ND     AT
QT         NORM                          AGN        ND     BN
OR         NORM                          TAN        ND     CP
OR         NORM               TANN       TANN       ND     CP
RE         NORM                          REN        ND     DN
CS         NORM                          BVN        ND     CP

OR         BANS                          TAS        ND     CS
PEDDADA VENKATA SURYA
PEDDADA.BABU @GMAIL.COM


Created by peddada venkata surya
   # 3-3-90/1 flat no 16
     nacharam
     Hyderabad
     CELL : 9949998657
     MAIL : peddada.babu@gmail.com
                venkat_surya1@ yahoo.com

Más contenido relacionado

Más de peddada venkata surya

Origion of data in te sales document
Origion of data in te sales documentOrigion of data in te sales document
Origion of data in te sales document
peddada venkata surya
 
Creating sales documnt with refrence
Creating sales documnt with refrenceCreating sales documnt with refrence
Creating sales documnt with refrence
peddada venkata surya
 
Controlling the data in the sales document
Controlling the data in the sales documentControlling the data in the sales document
Controlling the data in the sales document
peddada venkata surya
 

Más de peddada venkata surya (19)

Origion of data in te sales document
Origion of data in te sales documentOrigion of data in te sales document
Origion of data in te sales document
 
Feature of sales document
Feature of sales documentFeature of sales document
Feature of sales document
 
Creating sales documnt with refrence
Creating sales documnt with refrenceCreating sales documnt with refrence
Creating sales documnt with refrence
 
Controlling the data in the sales document
Controlling the data in the sales documentControlling the data in the sales document
Controlling the data in the sales document
 
Condition master record
Condition master recordCondition master record
Condition master record
 
Customer material information record
Customer material information recordCustomer material information record
Customer material information record
 
Maser data
Maser dataMaser data
Maser data
 
Enterprize structure
Enterprize   structureEnterprize   structure
Enterprize structure
 
Introduction to sap 1
Introduction to sap 1Introduction to sap 1
Introduction to sap 1
 
Creating sales order
Creating sales orderCreating sales order
Creating sales order
 
Presentation1 material master data
Presentation1 material master dataPresentation1 material master data
Presentation1 material master data
 
Presentation introduction to sap
Presentation introduction to sapPresentation introduction to sap
Presentation introduction to sap
 
Peddada update resume 23.08.2012
Peddada update resume 23.08.2012Peddada update resume 23.08.2012
Peddada update resume 23.08.2012
 
Introduction to sap
Introduction to sapIntroduction to sap
Introduction to sap
 
Introduction to sap
Introduction to sapIntroduction to sap
Introduction to sap
 
Fwquestionbankforinterview
FwquestionbankforinterviewFwquestionbankforinterview
Fwquestionbankforinterview
 
Q&a sd
Q&a sdQ&a sd
Q&a sd
 
Fwquestionbankforinterview
FwquestionbankforinterviewFwquestionbankforinterview
Fwquestionbankforinterview
 
Peddada update resume 23.08.2012
Peddada update resume 23.08.2012Peddada update resume 23.08.2012
Peddada update resume 23.08.2012
 

Schedule line catogiry determination

  • 1. SCHEDULE LINE CATOGIRY DETERMINATION DEPENDING THE SALES DOCUMENT PROCESSING THE SYSTEM AUTOMATICALLY DETERMINES A CORRESPONDING A SCHEDULE LINE CATOGIRIES FOR THE ITEMS. FOR THIS THE FOLLOWING SETTINGS MUST BE DONE
  • 2. ASSIN SCHEDULE LINE CATOGIRIES SPRO SALES DOCUMENT SALES AND DISTRIBUTION SCHEDULE LINE SALES ASSIN SCHEDULE LINE CATOGIRIES
  • 3. SCHEDULE LINE CATOGIRY DETERMINATION  EX SALES DOCUMENT HEADER TPTE ITEAM ITEM CATOGIRY SCHEDULE SCHEDULE LINE CATOGIRY GO TO NEW ENTRIES AND ASSIN A SALES IN AFN ITEM SCHEDULE LINE DOC TYPE CATOGIRY CATOGIRIES TO AFN AT SCHEDULE THE LINE COMBINATION OF CATOGIRY ITEM
  • 4. SCHEDULE LINE CATOGIRY DETERMINATION  EX NORM M-11 M-10 TAN TAN
  • 5. SCHEDULE LINE CATOGIRY DETERMINATION MRP TYPE : PD MRP TYPE ND REQUIRMENT REQUIREMENT /ASSEMBLY AVILABLIYTY AVILABILITY
  • 6. SCHEDULE LINE CATOGIRY DETERMINATION ITEM CATOGIRY MRP TYPE SCHEDULE LINE CATOGIRY TAN PD CP TAN ND CV NOTE DURING THE SCHEDULE LINE CATOGIRY DETERMINATION WHAT EVER THE SCHEDULE LINE CATOGIRY’S THAT AS MANUL SCHEDULE LINE CATOGIRY WITH THAT WE CAN REPLACE THE DEFAULT SCHEDULE LINE CATOGIRY’S IN THE SALES DOCUMENT
  • 7. SCHEDULE LINE CATOGIRY DETERMINATION SALES ITEM USAGE HIGHER DEFAULT MRP SCHEDUL DOC TYPE CATOGIRY LEVEL ITEM PYPE E LINE GROUP ITEM CATOGIRY CATOGIRY CATOGIRY IN NORM - - AFN ND AT QT NORM AGN ND BN OR NORM TAN ND CP OR NORM TANN TANN ND CP RE NORM REN ND DN CS NORM BVN ND CP OR BANS TAS ND CS
  • 8. PEDDADA VENKATA SURYA PEDDADA.BABU @GMAIL.COM Created by peddada venkata surya # 3-3-90/1 flat no 16 nacharam Hyderabad CELL : 9949998657 MAIL : peddada.babu@gmail.com venkat_surya1@ yahoo.com