Purple Line Extension
Beverly Hills Chamber of Commerce – July 18, 2013
Agenda
• Project Overview & Schedule
• Construction Relations
• La Cienega Station Construction Overview
• Questions & Answers
Meet the Team
• Jim Cohen
Deputy Executive Officer, Project Management
• Jody Litvak
Director, Community Relations
• Dennis Mori
Executive Officer, Project Management
• Yvette Rapose
Director, Construction Relations
Project Overview & Schedule
Jody Litvak
Approved Project
Approved Project - Schedule
Planned Schedule Forecasted Schedule
Section 1 Section 2 Section 3
Length 3.9 Miles 2.6 Miles 2.9 Miles
New Stations
Wilshire/La Brea
Wilshire/Fairfax
Wilshire/La Cienega
Wilshire/Rodeo
Century City
Westwood/UCLA
Westwood/VA
Hospital
Pre-Construction
Activities
Current - 2014 2017 - 2018 2025 - 2027
Construction 2014 - 2023 2019 - 2026 2027 - 2035
Operations 2023 2026 2035
Section 1 – Next Steps
• Now and ongoing: Pre-construction (selecting
Design-Build contractor, utility relocations,
exploratory shaft, real estate acquisitions,
discussions with cities, etc.)
• Early 2014: Full-Funding Grant Agreement
(FFGA) anticipated
• 2014: Construction begins
Construction Relations
Yvette Rapose
Construction Relations - Role
Specialized Unit Matrixed to Construction
• Public Outreach, Stakeholder Communication & Direct
Construction Impact Mitigation
• Project Management Plan
• Mitigation Measures Reporting Plan
Construction Relations - Support
Direct Project & Contractor Support:
• Interdepartmental Management Coordination
• Pre-Construction Coordination
• Business Preparation & Coordination
• Resident Preparation & Coordination
Construction Relations – Tactics & Outreach
Did You Know?
Public Outreach Tactics:
• Door-to-Door Distribution
• E-blasts
• Project Website
• Project Hotline
• 3rd Party Websites/Blogs/Other Media
Construction Notices, Fact Sheets & Educational
Videos
Social Media Outreach:
• Facebook
• Twitter
• YouTube
Construction Relations - Community
Construction Safety Awareness Training, Local
Construction Activities, Schedule Stakeholder
Communications:
• Station Advisory Group (SAG)
• Elected Officials Staff
• Neighborhood Councils, HOAs & Residents
• Chambers of Commerce/BIDs/Business Associations
• Business Owners
• Educational & Cultural Institutions
• Faith-Based Organizations
Business Profiles - Goals
Metro Construction Relations will conduct
business profile surveys along the Purple Line
Extension Section 1
• Visit every business along the alignment
• Conduct thorough interviews
• Coordinate construction activities
• Understand business operations
Pre-Construction Business Support -
Project Area Discount Program
The Project Area Discount program is an opportunity for
businesses directly along the alignment, and within a ½ mile
radius, to advertise—without cost—on the Purple Line
Extension project page and the Metro website in exchange
for providing customers an added value incentive
• Free to businesses
• Metro.net enjoys 1.5 million viewers monthly
• Full marketing program
Construction Overview
Jim Cohen
Section I – Wilshire/Western to
Wilshire/La Cienega
Section I - Wilshire/La Cienega Station
• Entrance at NE Corner
• 2 construction staging
sites:
– NE corner Wilshire/La Cienega
– NW corner Wilshire/Gale
• Crossover tracks extend
box to the east
• Tunnel Boring Machine
(TBM) removal site at
conclusion of tunneling
Utility Design/Station Construction
Third Party Coordination
Relocation and final design of utilities require close third
party coordination between Metro, the utility companies,
the City of Los Angeles, City of Beverly Hills and the
contractors.
Advanced Utility Relocation
Wilshire/La Brea Station
Shoring Piles (Typical)
Relocated Utilities
(Clear of Shoring Piles)
To facilitate the construction of major critical path construction activities, three contracts are being
initiated to relocate water, power and sewer lines in advance of awarding the Design/Build tunnels and
stations contract.
The contract for the Wilshire/La Brea advanced utility relocation work was awarded and will begin
construction in July 2013. Invitation For Bids (IFB) for the remaining two Advance Utility Relocations
Contracts for Wilshire/Fairfax and Wilshire/La Cienega are being solicited in June and July 2013.
Station Box Construction:
Begins with Soldier Pile Installation
Work Zone
Protective
Concrete
Traffic Barrier
Construction
Fence
Installation of Soldier Piles
Soldier pile installation in Hollywood during
Metro Red Line construction (1995)
Station Box Construction:
Then Initial Excavation & Decking Installation
Deck
Beam
Decking
Installation of Deck Beams
Station Box Construction:
Continues Below Concrete Deck
Completed decking at
Hollywood/Highland
Station
Deck installation at
Hollywood/Vine Station
Traffic Control Plans
During Full and Partial Street Closures
Work
Zone
Final Traffic
Control Plans are
done by the
Design-Builder
Traffic Control Plans to be approved by Cities of Los Angeles & Beverly Hills
What Exemptions is Metro Seeking?
Objectives:
• Minimize overall duration of construction impacts
• Begin Advance Utility Relocation in July 2013
• Exemptions in Bid Documents
• Complete project in early 2023
Exemptions:
• Peak Hour: Allows construction to continue in the public right of
way during peak hours (rush hours)
• Extended Work Hours: Allows overnight work within specific
noise limits
• Holiday Moratorium: Allows construction to continue between
Thanksgiving and New Year’s Day
Weekday Work Hour Restrictions
Non-Restricted Work Hours
Optimal Schedule Without Restrictions
Work shifts
Peak Hour
Exemption
Night-time
Noise Variance
Holiday
Moritorium
Weekend
Closures
Utilities, shoring and street decking
Utility Relocations Days / Nights  
Building Demolition - Laydown Areas Days 
Pile Installation Days / Nights   
Street Decking Days / Nights    
Hauling / Materials Deliveries Days / Nights  
Below Street Decking
Tunnel Construction Days / Nights 
Station Construction Days / Nights 
Hauling / Materials Deliveries Days / Nights  
Remove street decking & street restoration
Street Decking Removal Days / Nights    
Street Restoration Days / Nights    
Hauling / Materials Deliveries Days / Nights  
Activity
Activities Requiring Exemptions
Option
Time of
Day
Work Hours
Total Work
Hours per
Week
Duration
1 Nights Sun-Thurs 8pm - 6am 40 hours 12months
2 Days
Sun 9am-6pm
Mon-Thurs 10am - 3pm
28 hours 19months
Work Hours and Provisional Schedule:
Advanced Utility Relocation
• Option 2:
– Greater impacts to traffic, pedestrians,
on-street parking, business access &
deliveries
– 19month schedule will impact
independent utility relocations (SCE,
So Cal Gas, AT&T)
• Option 1:
– Less impacts to traffic, pedestrians,
on-street parking, business access &
deliveries
– Mitigations can be adopted
(e.g. noisier work before 11pm)
– Longer work window shortens overall
duration of this activity
Note: Durations for both options assume Holiday Moratorium Exemption
Work Hours and Provisional Schedule:
Pile Installation
Option 1
Option Time of Day Work hours
Total work
hours /
week
Duration
1
Days &
Nights
Mon - Fri 7am - 12 midnight
(2 shifts)
80
30 weeks
Using 2 rigs
2 Days
Sun 9am - 6pm
Mon-Thurs 10am - 3 pm
28
120 weeks
Using 1 rig
Option 2
• Maintains 2 lanes of traffic each
direction
• Requires peak hour, holiday
moratorium & after hours exemptions
• Maximizes productivity in each 24 hour
period
• Maintains 2 lanes of traffic each
direction
• No peak hour, holiday moratorium or
after hours exemptions
• Reduced productivity in each 24 hour
work period
Work Hours and Provisional Schedule:
Deck Installation
Option Time of Day Work hours
Total work
hours /
week
Duration
1
Weekends:
Days &
Nights
Fri 11:59 pm to
Mon 6:00 am
54 20 weekends
Requires:
• Full street closure
• Peak hour work exemption
• Holiday moratorium exemption
• After Hours permit
Stay in Touch
• metro.net/purplelineext
• purplelineext@metro.net
• Infoline: 213.922.6934
• Twitter.com/purplelineext
• Facebook.com/purplelineext
Questions?

Más contenido relacionado

La actualidad más candente

Crosstown business opportunties and info session presentation
Crosstown business opportunties and info session presentationCrosstown business opportunties and info session presentation
Crosstown business opportunties and info session presentationCrosstown TO
 
Avenue station open house presentation
Avenue station open house presentation Avenue station open house presentation
Avenue station open house presentation Crosstown TO
 
Mount Dennis Station Open House
Mount Dennis Station Open HouseMount Dennis Station Open House
Mount Dennis Station Open HouseCrosstown TO
 
Friendship Recreation Center - ANC Presentation (January 12, 2017)
Friendship Recreation Center - ANC Presentation (January 12, 2017)Friendship Recreation Center - ANC Presentation (January 12, 2017)
Friendship Recreation Center - ANC Presentation (January 12, 2017)DC Department of General Services
 
Public Open House - Finch West LRT
Public Open House - Finch West LRTPublic Open House - Finch West LRT
Public Open House - Finch West LRTCrosstown TO
 
Cedarvale Station Open House - March 2017
Cedarvale Station Open House - March 2017Cedarvale Station Open House - March 2017
Cedarvale Station Open House - March 2017Crosstown TO
 
Eglinton Station Open House - March 2017
Eglinton Station Open House - March 2017Eglinton Station Open House - March 2017
Eglinton Station Open House - March 2017Crosstown TO
 
Central- West Open House - April 2018
Central- West Open House - April 2018Central- West Open House - April 2018
Central- West Open House - April 2018Crosstown TO
 
Chaplin Station Open House - March 2017
Chaplin Station Open House - March 2017Chaplin Station Open House - March 2017
Chaplin Station Open House - March 2017Crosstown TO
 
Forest hill station open house
Forest hill station open house Forest hill station open house
Forest hill station open house Crosstown TO
 
Wlrt com-grand linq-technical-briefing-2015-02-23
Wlrt com-grand linq-technical-briefing-2015-02-23Wlrt com-grand linq-technical-briefing-2015-02-23
Wlrt com-grand linq-technical-briefing-2015-02-23Darren Shaw, SIOR
 
Leaside station open house
Leaside station open house Leaside station open house
Leaside station open house Crosstown TO
 
Fairbank & Oakwood Stations Open House - April 2017
Fairbank & Oakwood Stations Open House - April 2017Fairbank & Oakwood Stations Open House - April 2017
Fairbank & Oakwood Stations Open House - April 2017Crosstown TO
 
Eglinton Station Open House
Eglinton Station Open HouseEglinton Station Open House
Eglinton Station Open HouseCrosstown TO
 
Chaplin station open house
Chaplin station open houseChaplin station open house
Chaplin station open houseCrosstown TO
 
Western Segment Open House Slides
 Western Segment  Open House Slides Western Segment  Open House Slides
Western Segment Open House SlidesCrosstown TO
 
Fairgrounds Roadway Widening Public Hearing (March 17, 2015)
Fairgrounds Roadway Widening Public Hearing (March 17, 2015)Fairgrounds Roadway Widening Public Hearing (March 17, 2015)
Fairgrounds Roadway Widening Public Hearing (March 17, 2015)City of Midland
 
Laird Station Open House
Laird Station Open HouseLaird Station Open House
Laird Station Open HouseCrosstown TO
 
Sound Transit 6/17/09 Noise And Construction Meeting
Sound Transit 6/17/09 Noise And Construction MeetingSound Transit 6/17/09 Noise And Construction Meeting
Sound Transit 6/17/09 Noise And Construction Meetingjseattle
 
Caledonia Station, West Portal and Elevated Guideway Open House
Caledonia Station, West Portal and Elevated Guideway Open HouseCaledonia Station, West Portal and Elevated Guideway Open House
Caledonia Station, West Portal and Elevated Guideway Open HouseCrosstown TO
 

La actualidad más candente (20)

Crosstown business opportunties and info session presentation
Crosstown business opportunties and info session presentationCrosstown business opportunties and info session presentation
Crosstown business opportunties and info session presentation
 
Avenue station open house presentation
Avenue station open house presentation Avenue station open house presentation
Avenue station open house presentation
 
Mount Dennis Station Open House
Mount Dennis Station Open HouseMount Dennis Station Open House
Mount Dennis Station Open House
 
Friendship Recreation Center - ANC Presentation (January 12, 2017)
Friendship Recreation Center - ANC Presentation (January 12, 2017)Friendship Recreation Center - ANC Presentation (January 12, 2017)
Friendship Recreation Center - ANC Presentation (January 12, 2017)
 
Public Open House - Finch West LRT
Public Open House - Finch West LRTPublic Open House - Finch West LRT
Public Open House - Finch West LRT
 
Cedarvale Station Open House - March 2017
Cedarvale Station Open House - March 2017Cedarvale Station Open House - March 2017
Cedarvale Station Open House - March 2017
 
Eglinton Station Open House - March 2017
Eglinton Station Open House - March 2017Eglinton Station Open House - March 2017
Eglinton Station Open House - March 2017
 
Central- West Open House - April 2018
Central- West Open House - April 2018Central- West Open House - April 2018
Central- West Open House - April 2018
 
Chaplin Station Open House - March 2017
Chaplin Station Open House - March 2017Chaplin Station Open House - March 2017
Chaplin Station Open House - March 2017
 
Forest hill station open house
Forest hill station open house Forest hill station open house
Forest hill station open house
 
Wlrt com-grand linq-technical-briefing-2015-02-23
Wlrt com-grand linq-technical-briefing-2015-02-23Wlrt com-grand linq-technical-briefing-2015-02-23
Wlrt com-grand linq-technical-briefing-2015-02-23
 
Leaside station open house
Leaside station open house Leaside station open house
Leaside station open house
 
Fairbank & Oakwood Stations Open House - April 2017
Fairbank & Oakwood Stations Open House - April 2017Fairbank & Oakwood Stations Open House - April 2017
Fairbank & Oakwood Stations Open House - April 2017
 
Eglinton Station Open House
Eglinton Station Open HouseEglinton Station Open House
Eglinton Station Open House
 
Chaplin station open house
Chaplin station open houseChaplin station open house
Chaplin station open house
 
Western Segment Open House Slides
 Western Segment  Open House Slides Western Segment  Open House Slides
Western Segment Open House Slides
 
Fairgrounds Roadway Widening Public Hearing (March 17, 2015)
Fairgrounds Roadway Widening Public Hearing (March 17, 2015)Fairgrounds Roadway Widening Public Hearing (March 17, 2015)
Fairgrounds Roadway Widening Public Hearing (March 17, 2015)
 
Laird Station Open House
Laird Station Open HouseLaird Station Open House
Laird Station Open House
 
Sound Transit 6/17/09 Noise And Construction Meeting
Sound Transit 6/17/09 Noise And Construction MeetingSound Transit 6/17/09 Noise And Construction Meeting
Sound Transit 6/17/09 Noise And Construction Meeting
 
Caledonia Station, West Portal and Elevated Guideway Open House
Caledonia Station, West Portal and Elevated Guideway Open HouseCaledonia Station, West Portal and Elevated Guideway Open House
Caledonia Station, West Portal and Elevated Guideway Open House
 

Destacado

Sr710 tac meeting
Sr710 tac meetingSr710 tac meeting
Sr710 tac meetingpeggydrouet
 
Mike antonovich metro_board_710study_alternatives_analysis_draft_eir_eis
Mike antonovich metro_board_710study_alternatives_analysis_draft_eir_eisMike antonovich metro_board_710study_alternatives_analysis_draft_eir_eis
Mike antonovich metro_board_710study_alternatives_analysis_draft_eir_eispeggydrouet
 
Failing ltr 12 21-12
Failing ltr 12 21-12Failing ltr 12 21-12
Failing ltr 12 21-12peggydrouet
 
Sr710 study update_power_point final final
Sr710 study update_power_point final finalSr710 study update_power_point final final
Sr710 study update_power_point final finalpeggydrouet
 
Scag nop comment letter
Scag nop comment letterScag nop comment letter
Scag nop comment letterpeggydrouet
 
15 4 23_bogaard_togarcetti_vote
15 4 23_bogaard_togarcetti_vote15 4 23_bogaard_togarcetti_vote
15 4 23_bogaard_togarcetti_votepeggydrouet
 

Destacado (7)

Sr710 tac meeting
Sr710 tac meetingSr710 tac meeting
Sr710 tac meeting
 
Mike antonovich metro_board_710study_alternatives_analysis_draft_eir_eis
Mike antonovich metro_board_710study_alternatives_analysis_draft_eir_eisMike antonovich metro_board_710study_alternatives_analysis_draft_eir_eis
Mike antonovich metro_board_710study_alternatives_analysis_draft_eir_eis
 
Failing ltr 12 21-12
Failing ltr 12 21-12Failing ltr 12 21-12
Failing ltr 12 21-12
 
Sr710 study update_power_point final final
Sr710 study update_power_point final finalSr710 study update_power_point final final
Sr710 study update_power_point final final
 
Scag nop comment letter
Scag nop comment letterScag nop comment letter
Scag nop comment letter
 
15 4 23_bogaard_togarcetti_vote
15 4 23_bogaard_togarcetti_vote15 4 23_bogaard_togarcetti_vote
15 4 23_bogaard_togarcetti_vote
 
Pasadena
Pasadena Pasadena
Pasadena
 

Similar a 159197331 presentation-on-work-hour-exemptions

Caledonia Fairbank Oakwood Open House Deck October 2017 final
Caledonia Fairbank Oakwood Open House Deck October 2017 finalCaledonia Fairbank Oakwood Open House Deck October 2017 final
Caledonia Fairbank Oakwood Open House Deck October 2017 finalCrosstown TO
 
Chaplin and Avenue Stations Open House - October 2017
Chaplin and Avenue Stations Open House - October 2017Chaplin and Avenue Stations Open House - October 2017
Chaplin and Avenue Stations Open House - October 2017Crosstown TO
 
Eglinton and Mt Pleasant Stations Open House - October 2017
Eglinton and Mt Pleasant Stations Open House - October 2017Eglinton and Mt Pleasant Stations Open House - October 2017
Eglinton and Mt Pleasant Stations Open House - October 2017Crosstown TO
 
Leaside & Laird Stations Open House - October 2017
Leaside & Laird Stations Open House - October 2017Leaside & Laird Stations Open House - October 2017
Leaside & Laird Stations Open House - October 2017Crosstown TO
 
Kennedy Station and East At-Grade Section Open House - December 2017
Kennedy Station and East At-Grade Section Open House - December 2017Kennedy Station and East At-Grade Section Open House - December 2017
Kennedy Station and East At-Grade Section Open House - December 2017Crosstown TO
 
rup-20151016-part-1-item07-victoria-station-upgrade
rup-20151016-part-1-item07-victoria-station-upgraderup-20151016-part-1-item07-victoria-station-upgrade
rup-20151016-part-1-item07-victoria-station-upgradeRobert Lee - CEng, MICE, PMP
 
Open House Meeting: Mount Dennis Station, Railway Corridor and Eglinton Maint...
Open House Meeting: Mount Dennis Station, Railway Corridor and Eglinton Maint...Open House Meeting: Mount Dennis Station, Railway Corridor and Eglinton Maint...
Open House Meeting: Mount Dennis Station, Railway Corridor and Eglinton Maint...Crosstown TO
 
Cedarvale & Forest Hill Stations Open House - November 2017
Cedarvale & Forest Hill Stations Open House - November 2017Cedarvale & Forest Hill Stations Open House - November 2017
Cedarvale & Forest Hill Stations Open House - November 2017Crosstown TO
 
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinarNorth West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinarAssociation for Project Management
 
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinarNorth West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinarAssociation for Project Management
 
Fairfax County Glade Dr. Walkway Improvements August 2020
Fairfax County Glade Dr. Walkway Improvements August 2020Fairfax County Glade Dr. Walkway Improvements August 2020
Fairfax County Glade Dr. Walkway Improvements August 2020Fairfax County
 
Science Centre Station Open House - June 2017
Science Centre Station Open House - June 2017Science Centre Station Open House - June 2017
Science Centre Station Open House - June 2017Crosstown TO
 
Intersection Sight Distance Improvement: Old Dominion Drive at Bellview Road
Intersection Sight Distance Improvement: Old Dominion Drive at Bellview RoadIntersection Sight Distance Improvement: Old Dominion Drive at Bellview Road
Intersection Sight Distance Improvement: Old Dominion Drive at Bellview RoadFairfax County
 
Group_3_Assignment-2 Seccondary plan.pdf
Group_3_Assignment-2 Seccondary plan.pdfGroup_3_Assignment-2 Seccondary plan.pdf
Group_3_Assignment-2 Seccondary plan.pdfAarthiR54
 
Management Control System- Delhi Metro_10042016
Management Control System- Delhi Metro_10042016Management Control System- Delhi Metro_10042016
Management Control System- Delhi Metro_10042016Anil Kumar Gupta
 

Similar a 159197331 presentation-on-work-hour-exemptions (20)

TO Blvd Outreach City Info Mtg PPT Final
TO Blvd Outreach City Info Mtg PPT FinalTO Blvd Outreach City Info Mtg PPT Final
TO Blvd Outreach City Info Mtg PPT Final
 
Caledonia Fairbank Oakwood Open House Deck October 2017 final
Caledonia Fairbank Oakwood Open House Deck October 2017 finalCaledonia Fairbank Oakwood Open House Deck October 2017 final
Caledonia Fairbank Oakwood Open House Deck October 2017 final
 
Chaplin and Avenue Stations Open House - October 2017
Chaplin and Avenue Stations Open House - October 2017Chaplin and Avenue Stations Open House - October 2017
Chaplin and Avenue Stations Open House - October 2017
 
Eglinton and Mt Pleasant Stations Open House - October 2017
Eglinton and Mt Pleasant Stations Open House - October 2017Eglinton and Mt Pleasant Stations Open House - October 2017
Eglinton and Mt Pleasant Stations Open House - October 2017
 
Leaside & Laird Stations Open House - October 2017
Leaside & Laird Stations Open House - October 2017Leaside & Laird Stations Open House - October 2017
Leaside & Laird Stations Open House - October 2017
 
Waterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display PanelsWaterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display Panels
 
Kennedy Station and East At-Grade Section Open House - December 2017
Kennedy Station and East At-Grade Section Open House - December 2017Kennedy Station and East At-Grade Section Open House - December 2017
Kennedy Station and East At-Grade Section Open House - December 2017
 
rup-20151016-part-1-item07-victoria-station-upgrade
rup-20151016-part-1-item07-victoria-station-upgraderup-20151016-part-1-item07-victoria-station-upgrade
rup-20151016-part-1-item07-victoria-station-upgrade
 
A5 Form Based Codes
A5 Form Based CodesA5 Form Based Codes
A5 Form Based Codes
 
June Relief Line Update
June Relief Line UpdateJune Relief Line Update
June Relief Line Update
 
Open House Meeting: Mount Dennis Station, Railway Corridor and Eglinton Maint...
Open House Meeting: Mount Dennis Station, Railway Corridor and Eglinton Maint...Open House Meeting: Mount Dennis Station, Railway Corridor and Eglinton Maint...
Open House Meeting: Mount Dennis Station, Railway Corridor and Eglinton Maint...
 
Cedarvale & Forest Hill Stations Open House - November 2017
Cedarvale & Forest Hill Stations Open House - November 2017Cedarvale & Forest Hill Stations Open House - November 2017
Cedarvale & Forest Hill Stations Open House - November 2017
 
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinarNorth West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
 
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinarNorth West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
 
Fairfax County Glade Dr. Walkway Improvements August 2020
Fairfax County Glade Dr. Walkway Improvements August 2020Fairfax County Glade Dr. Walkway Improvements August 2020
Fairfax County Glade Dr. Walkway Improvements August 2020
 
Science Centre Station Open House - June 2017
Science Centre Station Open House - June 2017Science Centre Station Open House - June 2017
Science Centre Station Open House - June 2017
 
Intersection Sight Distance Improvement: Old Dominion Drive at Bellview Road
Intersection Sight Distance Improvement: Old Dominion Drive at Bellview RoadIntersection Sight Distance Improvement: Old Dominion Drive at Bellview Road
Intersection Sight Distance Improvement: Old Dominion Drive at Bellview Road
 
Relief Line Project Assessment Phase 1A Consultation Presentation
Relief Line Project Assessment Phase 1A Consultation PresentationRelief Line Project Assessment Phase 1A Consultation Presentation
Relief Line Project Assessment Phase 1A Consultation Presentation
 
Group_3_Assignment-2 Seccondary plan.pdf
Group_3_Assignment-2 Seccondary plan.pdfGroup_3_Assignment-2 Seccondary plan.pdf
Group_3_Assignment-2 Seccondary plan.pdf
 
Management Control System- Delhi Metro_10042016
Management Control System- Delhi Metro_10042016Management Control System- Delhi Metro_10042016
Management Control System- Delhi Metro_10042016
 

Más de peggydrouet

Sr710 cost benefit analysis comments 7 7 15 liu
Sr710 cost benefit analysis comments 7 7 15 liuSr710 cost benefit analysis comments 7 7 15 liu
Sr710 cost benefit analysis comments 7 7 15 liupeggydrouet
 
2015 06 18 governing_bd agendapkt
2015 06 18 governing_bd agendapkt2015 06 18 governing_bd agendapkt
2015 06 18 governing_bd agendapktpeggydrouet
 
2015 06 11 transportation_comm agendapkt
2015 06 11 transportation_comm agendapkt2015 06 11 transportation_comm agendapkt
2015 06 11 transportation_comm agendapktpeggydrouet
 
15 4 23_bogaard_togarcetti_vote
15 4 23_bogaard_togarcetti_vote15 4 23_bogaard_togarcetti_vote
15 4 23_bogaard_togarcetti_votepeggydrouet
 
15 4 23_bogaard_togarcetti_vote(1)
15 4 23_bogaard_togarcetti_vote(1)15 4 23_bogaard_togarcetti_vote(1)
15 4 23_bogaard_togarcetti_vote(1)peggydrouet
 
Sr 710 north eir eis tac mtg #14-draft agenda (feb 2014)
Sr 710 north eir eis tac mtg #14-draft agenda (feb 2014)Sr 710 north eir eis tac mtg #14-draft agenda (feb 2014)
Sr 710 north eir eis tac mtg #14-draft agenda (feb 2014)peggydrouet
 
Tac meeting no.13_111313
Tac meeting no.13_111313Tac meeting no.13_111313
Tac meeting no.13_111313peggydrouet
 
State senate transpo hearings 11 13-13 backgroundpaper
State senate transpo hearings 11 13-13 backgroundpaperState senate transpo hearings 11 13-13 backgroundpaper
State senate transpo hearings 11 13-13 backgroundpaperpeggydrouet
 
Long beachcc agenda100113
Long beachcc agenda100113Long beachcc agenda100113
Long beachcc agenda100113peggydrouet
 
130806 ceqa lead agency_24_jun04
130806 ceqa lead agency_24_jun04130806 ceqa lead agency_24_jun04
130806 ceqa lead agency_24_jun04peggydrouet
 
Senator liu et_all_response_041513_final
Senator liu et_all_response_041513_finalSenator liu et_all_response_041513_final
Senator liu et_all_response_041513_finalpeggydrouet
 
Freeway toll roads
Freeway toll roadsFreeway toll roads
Freeway toll roadspeggydrouet
 
Sr 710 study-proposed-exploration-plan_02-25-13
Sr 710 study-proposed-exploration-plan_02-25-13Sr 710 study-proposed-exploration-plan_02-25-13
Sr 710 study-proposed-exploration-plan_02-25-13peggydrouet
 
Sr 710 study boring schedule draft 022513
Sr 710 study boring schedule draft 022513Sr 710 study boring schedule draft 022513
Sr 710 study boring schedule draft 022513peggydrouet
 
Sr 710 field investigation schedule
Sr 710 field investigation scheduleSr 710 field investigation schedule
Sr 710 field investigation schedulepeggydrouet
 
Sr 710 field investigation schedule
Sr 710 field investigation scheduleSr 710 field investigation schedule
Sr 710 field investigation schedulepeggydrouet
 
Barbara messina0001
Barbara messina0001Barbara messina0001
Barbara messina0001peggydrouet
 

Más de peggydrouet (20)

Sr710 cost benefit analysis comments 7 7 15 liu
Sr710 cost benefit analysis comments 7 7 15 liuSr710 cost benefit analysis comments 7 7 15 liu
Sr710 cost benefit analysis comments 7 7 15 liu
 
2015 06 18 governing_bd agendapkt
2015 06 18 governing_bd agendapkt2015 06 18 governing_bd agendapkt
2015 06 18 governing_bd agendapkt
 
2015 06 11 transportation_comm agendapkt
2015 06 11 transportation_comm agendapkt2015 06 11 transportation_comm agendapkt
2015 06 11 transportation_comm agendapkt
 
15 4 23_bogaard_togarcetti_vote
15 4 23_bogaard_togarcetti_vote15 4 23_bogaard_togarcetti_vote
15 4 23_bogaard_togarcetti_vote
 
15 4 23_bogaard_togarcetti_vote(1)
15 4 23_bogaard_togarcetti_vote(1)15 4 23_bogaard_togarcetti_vote(1)
15 4 23_bogaard_togarcetti_vote(1)
 
100814ctcagenda
100814ctcagenda100814ctcagenda
100814ctcagenda
 
710napkin front
710napkin front710napkin front
710napkin front
 
Sr 710 north eir eis tac mtg #14-draft agenda (feb 2014)
Sr 710 north eir eis tac mtg #14-draft agenda (feb 2014)Sr 710 north eir eis tac mtg #14-draft agenda (feb 2014)
Sr 710 north eir eis tac mtg #14-draft agenda (feb 2014)
 
Tac meeting no.13_111313
Tac meeting no.13_111313Tac meeting no.13_111313
Tac meeting no.13_111313
 
State senate transpo hearings 11 13-13 backgroundpaper
State senate transpo hearings 11 13-13 backgroundpaperState senate transpo hearings 11 13-13 backgroundpaper
State senate transpo hearings 11 13-13 backgroundpaper
 
Long beachcc agenda100113
Long beachcc agenda100113Long beachcc agenda100113
Long beachcc agenda100113
 
130806 ceqa lead agency_24_jun04
130806 ceqa lead agency_24_jun04130806 ceqa lead agency_24_jun04
130806 ceqa lead agency_24_jun04
 
Senator liu et_all_response_041513_final
Senator liu et_all_response_041513_finalSenator liu et_all_response_041513_final
Senator liu et_all_response_041513_final
 
Freeway toll roads
Freeway toll roadsFreeway toll roads
Freeway toll roads
 
Sr 710 study-proposed-exploration-plan_02-25-13
Sr 710 study-proposed-exploration-plan_02-25-13Sr 710 study-proposed-exploration-plan_02-25-13
Sr 710 study-proposed-exploration-plan_02-25-13
 
Sr 710 study boring schedule draft 022513
Sr 710 study boring schedule draft 022513Sr 710 study boring schedule draft 022513
Sr 710 study boring schedule draft 022513
 
Sr 710 field investigation schedule
Sr 710 field investigation scheduleSr 710 field investigation schedule
Sr 710 field investigation schedule
 
Sr 710 field investigation schedule
Sr 710 field investigation scheduleSr 710 field investigation schedule
Sr 710 field investigation schedule
 
Judy chu0001
Judy chu0001Judy chu0001
Judy chu0001
 
Barbara messina0001
Barbara messina0001Barbara messina0001
Barbara messina0001
 

159197331 presentation-on-work-hour-exemptions

  • 1. Purple Line Extension Beverly Hills Chamber of Commerce – July 18, 2013
  • 2. Agenda • Project Overview & Schedule • Construction Relations • La Cienega Station Construction Overview • Questions & Answers
  • 3. Meet the Team • Jim Cohen Deputy Executive Officer, Project Management • Jody Litvak Director, Community Relations • Dennis Mori Executive Officer, Project Management • Yvette Rapose Director, Construction Relations
  • 4. Project Overview & Schedule Jody Litvak
  • 6. Approved Project - Schedule Planned Schedule Forecasted Schedule Section 1 Section 2 Section 3 Length 3.9 Miles 2.6 Miles 2.9 Miles New Stations Wilshire/La Brea Wilshire/Fairfax Wilshire/La Cienega Wilshire/Rodeo Century City Westwood/UCLA Westwood/VA Hospital Pre-Construction Activities Current - 2014 2017 - 2018 2025 - 2027 Construction 2014 - 2023 2019 - 2026 2027 - 2035 Operations 2023 2026 2035
  • 7. Section 1 – Next Steps • Now and ongoing: Pre-construction (selecting Design-Build contractor, utility relocations, exploratory shaft, real estate acquisitions, discussions with cities, etc.) • Early 2014: Full-Funding Grant Agreement (FFGA) anticipated • 2014: Construction begins
  • 9. Construction Relations - Role Specialized Unit Matrixed to Construction • Public Outreach, Stakeholder Communication & Direct Construction Impact Mitigation • Project Management Plan • Mitigation Measures Reporting Plan
  • 10. Construction Relations - Support Direct Project & Contractor Support: • Interdepartmental Management Coordination • Pre-Construction Coordination • Business Preparation & Coordination • Resident Preparation & Coordination
  • 11. Construction Relations – Tactics & Outreach Did You Know? Public Outreach Tactics: • Door-to-Door Distribution • E-blasts • Project Website • Project Hotline • 3rd Party Websites/Blogs/Other Media Construction Notices, Fact Sheets & Educational Videos Social Media Outreach: • Facebook • Twitter • YouTube
  • 12. Construction Relations - Community Construction Safety Awareness Training, Local Construction Activities, Schedule Stakeholder Communications: • Station Advisory Group (SAG) • Elected Officials Staff • Neighborhood Councils, HOAs & Residents • Chambers of Commerce/BIDs/Business Associations • Business Owners • Educational & Cultural Institutions • Faith-Based Organizations
  • 13. Business Profiles - Goals Metro Construction Relations will conduct business profile surveys along the Purple Line Extension Section 1 • Visit every business along the alignment • Conduct thorough interviews • Coordinate construction activities • Understand business operations
  • 14. Pre-Construction Business Support - Project Area Discount Program The Project Area Discount program is an opportunity for businesses directly along the alignment, and within a ½ mile radius, to advertise—without cost—on the Purple Line Extension project page and the Metro website in exchange for providing customers an added value incentive • Free to businesses • Metro.net enjoys 1.5 million viewers monthly • Full marketing program
  • 16. Section I – Wilshire/Western to Wilshire/La Cienega
  • 17. Section I - Wilshire/La Cienega Station • Entrance at NE Corner • 2 construction staging sites: – NE corner Wilshire/La Cienega – NW corner Wilshire/Gale • Crossover tracks extend box to the east • Tunnel Boring Machine (TBM) removal site at conclusion of tunneling
  • 18. Utility Design/Station Construction Third Party Coordination Relocation and final design of utilities require close third party coordination between Metro, the utility companies, the City of Los Angeles, City of Beverly Hills and the contractors.
  • 19. Advanced Utility Relocation Wilshire/La Brea Station Shoring Piles (Typical) Relocated Utilities (Clear of Shoring Piles) To facilitate the construction of major critical path construction activities, three contracts are being initiated to relocate water, power and sewer lines in advance of awarding the Design/Build tunnels and stations contract. The contract for the Wilshire/La Brea advanced utility relocation work was awarded and will begin construction in July 2013. Invitation For Bids (IFB) for the remaining two Advance Utility Relocations Contracts for Wilshire/Fairfax and Wilshire/La Cienega are being solicited in June and July 2013.
  • 20. Station Box Construction: Begins with Soldier Pile Installation Work Zone Protective Concrete Traffic Barrier Construction Fence Installation of Soldier Piles Soldier pile installation in Hollywood during Metro Red Line construction (1995)
  • 21. Station Box Construction: Then Initial Excavation & Decking Installation Deck Beam Decking Installation of Deck Beams
  • 22. Station Box Construction: Continues Below Concrete Deck Completed decking at Hollywood/Highland Station Deck installation at Hollywood/Vine Station
  • 23. Traffic Control Plans During Full and Partial Street Closures Work Zone Final Traffic Control Plans are done by the Design-Builder Traffic Control Plans to be approved by Cities of Los Angeles & Beverly Hills
  • 24. What Exemptions is Metro Seeking? Objectives: • Minimize overall duration of construction impacts • Begin Advance Utility Relocation in July 2013 • Exemptions in Bid Documents • Complete project in early 2023 Exemptions: • Peak Hour: Allows construction to continue in the public right of way during peak hours (rush hours) • Extended Work Hours: Allows overnight work within specific noise limits • Holiday Moratorium: Allows construction to continue between Thanksgiving and New Year’s Day
  • 25. Weekday Work Hour Restrictions Non-Restricted Work Hours
  • 26. Optimal Schedule Without Restrictions
  • 27. Work shifts Peak Hour Exemption Night-time Noise Variance Holiday Moritorium Weekend Closures Utilities, shoring and street decking Utility Relocations Days / Nights   Building Demolition - Laydown Areas Days  Pile Installation Days / Nights    Street Decking Days / Nights     Hauling / Materials Deliveries Days / Nights   Below Street Decking Tunnel Construction Days / Nights  Station Construction Days / Nights  Hauling / Materials Deliveries Days / Nights   Remove street decking & street restoration Street Decking Removal Days / Nights     Street Restoration Days / Nights     Hauling / Materials Deliveries Days / Nights   Activity Activities Requiring Exemptions
  • 28. Option Time of Day Work Hours Total Work Hours per Week Duration 1 Nights Sun-Thurs 8pm - 6am 40 hours 12months 2 Days Sun 9am-6pm Mon-Thurs 10am - 3pm 28 hours 19months Work Hours and Provisional Schedule: Advanced Utility Relocation • Option 2: – Greater impacts to traffic, pedestrians, on-street parking, business access & deliveries – 19month schedule will impact independent utility relocations (SCE, So Cal Gas, AT&T) • Option 1: – Less impacts to traffic, pedestrians, on-street parking, business access & deliveries – Mitigations can be adopted (e.g. noisier work before 11pm) – Longer work window shortens overall duration of this activity Note: Durations for both options assume Holiday Moratorium Exemption
  • 29. Work Hours and Provisional Schedule: Pile Installation Option 1 Option Time of Day Work hours Total work hours / week Duration 1 Days & Nights Mon - Fri 7am - 12 midnight (2 shifts) 80 30 weeks Using 2 rigs 2 Days Sun 9am - 6pm Mon-Thurs 10am - 3 pm 28 120 weeks Using 1 rig Option 2 • Maintains 2 lanes of traffic each direction • Requires peak hour, holiday moratorium & after hours exemptions • Maximizes productivity in each 24 hour period • Maintains 2 lanes of traffic each direction • No peak hour, holiday moratorium or after hours exemptions • Reduced productivity in each 24 hour work period
  • 30. Work Hours and Provisional Schedule: Deck Installation Option Time of Day Work hours Total work hours / week Duration 1 Weekends: Days & Nights Fri 11:59 pm to Mon 6:00 am 54 20 weekends Requires: • Full street closure • Peak hour work exemption • Holiday moratorium exemption • After Hours permit
  • 31. Stay in Touch • metro.net/purplelineext • purplelineext@metro.net • Infoline: 213.922.6934 • Twitter.com/purplelineext • Facebook.com/purplelineext