Concerto A 28-story Residential Tower in Downtown Los Angeles The Englekirk Companies
Project Team Developer:		Astani Enterprises Architect:		De Stefano + Partners Engineer of Record:     Englekirk Partners Contractor:		Astani Builders Construction Management:		Webcor Builders
Project Description ,[object Object]
4th floor plaza with pool, landscaping, and 5-story wood building.
858,220 total area.
348 Condo Units
398,295 SF parking area.
 Estimated Construction Cost is $150M.
Located in downtown Los Angeles,[object Object]
Concrete ductile moment frames with 2-way slab construction
Majority of 4-story area and 1st tower in Phase 1. Second tower to be constructed later in Phase 2.,[object Object]
Structural Description Foundation and Underground Levels: ,[object Object]
4-story tall basement wall thickness is 18” and 16”.
Parking structure is supported by isolated pad footings.
Subterranean parking slab is 10 ½” thickness two-way slab.Function: ,[object Object]
Underground DWP Vault.
Underground water tank and fire pump room.,[object Object]
Tower Parking Lower Levels Plans
Structural Description Tower and Podium Structure: ,[object Object]
Main Lobby
Retail and Restaurant
Parking Spaces
2nd Floor :
Parking Spaces
3rd Floor:
Tower – Fitness and Residential Area
Parking Spaces and Residential Loft Area.,[object Object]
Tower Parking 2nd Floor Plan
Tower Retail and Loft 3rd Floor Plan
Structural Description 4th Floor : Podium Structure:  ,[object Object]
Pool and Recreational Area.Loft – Residential Area ,[object Object]
15” thick pool slabTower: ,[object Object],[object Object]
Structural Description Tower: ,[object Object]
Typical floor – 8” Post-tensioned Slab.
Typical floor to floor height – 11 feet.
Perimeter Gravity Columns – 24” and 30” Round.
Floor Plate dimension: 165 feet x 80 feet,[object Object]
Structural Description Structural Highlight Features: ,[object Object]
Allow for a more open and visually appealing exterior façade.
Utilizing High Strength Concrete VS Conventional Concrete  (F’c = 11,000 psi)- Reducing Column sizes to increase selling area. ,[object Object],[object Object]
Six 1-bay Transverse Moment Frames, with 36”x42” beams and a cap beam at the roof
Frame Columns are 36”x58” at the base decreasing to 36”x36” at the upper levels. Concrete strength ranges from 11 ksi to 6 ksi.Plan View
Lateral System ,[object Object]
Cap beam helps provide added stiffness to the building framePlan View Ground Frame Elevation
Loft Bldg Tower Section
Tower Cross Section
Exterior Curtain Wall along the exterior of the building Tower Elevation
Tower Elevation
Performance Based Design Performance Based Design ,[object Object]
 The time history analysis allowed us to waive the code minimum base shear, which has the following benefits:
Less rebar in beams reduces congestion and reduces demands on columns.
 Lower axial forces in columns allow smaller column sizes while still maintaining axial stresses below the ductile limit.
 Followed UBC Section 1631.6:
Sets ground motion scaling and number of earthquake records
 Requires peer review.,[object Object]
 We developed a procedure for their approval prior to starting the analysis
 Method of ground motion scaling
 Which code requirements would be waived (minimum base shear, accidental torsion, and redundancy)
Modeling assumptions (elastic properties, hinge properties, rigid end zones, mass)
Limit states and acceptance criteria
 Submitted analysis results and design package for panel approval
 Normal City plan check process was still required after peer review approval,[object Object]
Construction Bottom of Mat Foundation
Construction Foundation Pad
Construction Shoring
Construction Mat Foundation Rebar Placement – August 22,07
Construction Mat Foundation Rebar Placement – August 22,07
Construction Mat Foundation Rebar Placement – August 22,07

Más contenido relacionado

La actualidad más candente

Item # 5 301 College (Compatibility)
Item # 5   301 College (Compatibility)Item # 5   301 College (Compatibility)
Item # 5 301 College (Compatibility)ahcitycouncil
 
Petronas Twin Towers
Petronas Twin TowersPetronas Twin Towers
Petronas Twin Towersmatsrock
 
Hearst Magazine Building, NY
Hearst Magazine Building, NYHearst Magazine Building, NY
Hearst Magazine Building, NYSneha Nagarajan
 
presentation on petronas twin tower
 presentation on petronas twin tower presentation on petronas twin tower
presentation on petronas twin towerKaish Pasha
 
Marquette Plaza, Minneapolis, Minnesota, United States.
Marquette Plaza, Minneapolis, Minnesota, United States.Marquette Plaza, Minneapolis, Minnesota, United States.
Marquette Plaza, Minneapolis, Minnesota, United States.Mayur Waghulde
 
Item #5 PPT 222 Castano
Item #5   PPT 222 CastanoItem #5   PPT 222 Castano
Item #5 PPT 222 Castanoahcitycouncil
 
Design of earth-retaining structures - Lecture 8
Design of earth-retaining structures - Lecture 8Design of earth-retaining structures - Lecture 8
Design of earth-retaining structures - Lecture 8Chris Bridges
 
Design of earth-retaining structures - Lecture 7
Design of earth-retaining structures - Lecture 7Design of earth-retaining structures - Lecture 7
Design of earth-retaining structures - Lecture 7Chris Bridges
 
Southland colonial pedestrianoverpass_tre0003-g_technicalproposal
Southland colonial pedestrianoverpass_tre0003-g_technicalproposalSouthland colonial pedestrianoverpass_tre0003-g_technicalproposal
Southland colonial pedestrianoverpass_tre0003-g_technicalproposalBrendan O'Connor
 
Inter Active Corp Building, New york.
Inter Active Corp Building, New york.Inter Active Corp Building, New york.
Inter Active Corp Building, New york.Mayur Waghulde
 
213A Bath Rd Cheltenham project sheet_July 15
213A Bath Rd Cheltenham project sheet_July 15213A Bath Rd Cheltenham project sheet_July 15
213A Bath Rd Cheltenham project sheet_July 15Ron O'Connor
 
CT Assignment Written Report
CT Assignment Written ReportCT Assignment Written Report
CT Assignment Written ReportYap Xin
 
Skyscrapers- Petronas Towers
Skyscrapers- Petronas TowersSkyscrapers- Petronas Towers
Skyscrapers- Petronas TowersRanju Ravindran
 

La actualidad más candente (20)

Item # 5 301 College (Compatibility)
Item # 5   301 College (Compatibility)Item # 5   301 College (Compatibility)
Item # 5 301 College (Compatibility)
 
Item #5 PPT Broadway Ellwood
Item #5   PPT Broadway EllwoodItem #5   PPT Broadway Ellwood
Item #5 PPT Broadway Ellwood
 
The Memorial Wall at Ground Zero
The Memorial Wall at Ground ZeroThe Memorial Wall at Ground Zero
The Memorial Wall at Ground Zero
 
Trump Tower Chicago
Trump Tower ChicagoTrump Tower Chicago
Trump Tower Chicago
 
Case Studies
Case StudiesCase Studies
Case Studies
 
Petronas Twin Towers
Petronas Twin TowersPetronas Twin Towers
Petronas Twin Towers
 
Hearst Magazine Building, NY
Hearst Magazine Building, NYHearst Magazine Building, NY
Hearst Magazine Building, NY
 
presentation on petronas twin tower
 presentation on petronas twin tower presentation on petronas twin tower
presentation on petronas twin tower
 
Marquette Plaza, Minneapolis, Minnesota, United States.
Marquette Plaza, Minneapolis, Minnesota, United States.Marquette Plaza, Minneapolis, Minnesota, United States.
Marquette Plaza, Minneapolis, Minnesota, United States.
 
Item #5 PPT 222 Castano
Item #5   PPT 222 CastanoItem #5   PPT 222 Castano
Item #5 PPT 222 Castano
 
Design of earth-retaining structures - Lecture 8
Design of earth-retaining structures - Lecture 8Design of earth-retaining structures - Lecture 8
Design of earth-retaining structures - Lecture 8
 
AR Gunnar Birkerts
AR Gunnar BirkertsAR Gunnar Birkerts
AR Gunnar Birkerts
 
Design of earth-retaining structures - Lecture 7
Design of earth-retaining structures - Lecture 7Design of earth-retaining structures - Lecture 7
Design of earth-retaining structures - Lecture 7
 
Shanghai tower
Shanghai towerShanghai tower
Shanghai tower
 
Southland colonial pedestrianoverpass_tre0003-g_technicalproposal
Southland colonial pedestrianoverpass_tre0003-g_technicalproposalSouthland colonial pedestrianoverpass_tre0003-g_technicalproposal
Southland colonial pedestrianoverpass_tre0003-g_technicalproposal
 
Inter Active Corp Building, New york.
Inter Active Corp Building, New york.Inter Active Corp Building, New york.
Inter Active Corp Building, New york.
 
82 Mercer
82 Mercer82 Mercer
82 Mercer
 
213A Bath Rd Cheltenham project sheet_July 15
213A Bath Rd Cheltenham project sheet_July 15213A Bath Rd Cheltenham project sheet_July 15
213A Bath Rd Cheltenham project sheet_July 15
 
CT Assignment Written Report
CT Assignment Written ReportCT Assignment Written Report
CT Assignment Written Report
 
Skyscrapers- Petronas Towers
Skyscrapers- Petronas TowersSkyscrapers- Petronas Towers
Skyscrapers- Petronas Towers
 

Destacado

Broucher MCIPL.PDF
Broucher MCIPL.PDFBroucher MCIPL.PDF
Broucher MCIPL.PDFMANOJ KUMAR
 
How to Make a Lavamanos-RoundBASE
How to Make a Lavamanos-RoundBASEHow to Make a Lavamanos-RoundBASE
How to Make a Lavamanos-RoundBASELynn Roberts
 
OneEleven Tower - post tensioned transfer deck
OneEleven Tower - post tensioned transfer deckOneEleven Tower - post tensioned transfer deck
OneEleven Tower - post tensioned transfer deckAMSYSCO Inc.
 
Technical data sheet for post-installed rebar according to EC2
Technical data sheet for post-installed rebar according to EC2Technical data sheet for post-installed rebar according to EC2
Technical data sheet for post-installed rebar according to EC2Nguyen The Dzung
 
Sanfer System build process and solutions
Sanfer System build process and solutionsSanfer System build process and solutions
Sanfer System build process and solutionsRichard Carey-Evans
 
Concrete Footing Details
Concrete Footing DetailsConcrete Footing Details
Concrete Footing Detailsmariacadtech
 
Excavation work
Excavation workExcavation work
Excavation workAmit Kumar
 
Bond strength anddevelopmentlength
Bond strength  anddevelopmentlengthBond strength  anddevelopmentlength
Bond strength anddevelopmentlengthRakibul Hassan
 
Advenser CAD services
Advenser CAD servicesAdvenser CAD services
Advenser CAD servicesSarita Shibu
 
Building Construction 7. construction site
Building Construction 7. construction siteBuilding Construction 7. construction site
Building Construction 7. construction siteHamdija Velagic
 
Excavation2014a-Lecture1
Excavation2014a-Lecture1Excavation2014a-Lecture1
Excavation2014a-Lecture1Anne Allan
 
Programme Sync with BOQ from contract, Cost & ResEqp Loaded (Initial Stage)
Programme Sync with BOQ from contract, Cost & ResEqp Loaded (Initial Stage)Programme Sync with BOQ from contract, Cost & ResEqp Loaded (Initial Stage)
Programme Sync with BOQ from contract, Cost & ResEqp Loaded (Initial Stage)Allan Leyte
 
Bridge structural foundations-and_earth_retaining_structures
Bridge structural foundations-and_earth_retaining_structuresBridge structural foundations-and_earth_retaining_structures
Bridge structural foundations-and_earth_retaining_structuresajbredi0
 
Solid Shank Rivet Codes
Solid Shank Rivet CodesSolid Shank Rivet Codes
Solid Shank Rivet Codesaimeeharden
 
Excavation 2014a-Lecture2
Excavation 2014a-Lecture2Excavation 2014a-Lecture2
Excavation 2014a-Lecture2Anne Allan
 
Excavation 2014a-Lecture3
Excavation 2014a-Lecture3Excavation 2014a-Lecture3
Excavation 2014a-Lecture3Anne Allan
 
Seismic Behavior of Beam Column Joint
Seismic Behavior of Beam Column JointSeismic Behavior of Beam Column Joint
Seismic Behavior of Beam Column JointShoaib Wani
 
Challenges of Rebar Testing
Challenges of Rebar TestingChallenges of Rebar Testing
Challenges of Rebar TestingInstron
 

Destacado (20)

Broucher MCIPL.PDF
Broucher MCIPL.PDFBroucher MCIPL.PDF
Broucher MCIPL.PDF
 
How to Make a Lavamanos-RoundBASE
How to Make a Lavamanos-RoundBASEHow to Make a Lavamanos-RoundBASE
How to Make a Lavamanos-RoundBASE
 
Final report
Final reportFinal report
Final report
 
OneEleven Tower - post tensioned transfer deck
OneEleven Tower - post tensioned transfer deckOneEleven Tower - post tensioned transfer deck
OneEleven Tower - post tensioned transfer deck
 
ScheduleRev- 6
ScheduleRev- 6ScheduleRev- 6
ScheduleRev- 6
 
Technical data sheet for post-installed rebar according to EC2
Technical data sheet for post-installed rebar according to EC2Technical data sheet for post-installed rebar according to EC2
Technical data sheet for post-installed rebar according to EC2
 
Sanfer System build process and solutions
Sanfer System build process and solutionsSanfer System build process and solutions
Sanfer System build process and solutions
 
Concrete Footing Details
Concrete Footing DetailsConcrete Footing Details
Concrete Footing Details
 
Excavation work
Excavation workExcavation work
Excavation work
 
Bond strength anddevelopmentlength
Bond strength  anddevelopmentlengthBond strength  anddevelopmentlength
Bond strength anddevelopmentlength
 
Advenser CAD services
Advenser CAD servicesAdvenser CAD services
Advenser CAD services
 
Building Construction 7. construction site
Building Construction 7. construction siteBuilding Construction 7. construction site
Building Construction 7. construction site
 
Excavation2014a-Lecture1
Excavation2014a-Lecture1Excavation2014a-Lecture1
Excavation2014a-Lecture1
 
Programme Sync with BOQ from contract, Cost & ResEqp Loaded (Initial Stage)
Programme Sync with BOQ from contract, Cost & ResEqp Loaded (Initial Stage)Programme Sync with BOQ from contract, Cost & ResEqp Loaded (Initial Stage)
Programme Sync with BOQ from contract, Cost & ResEqp Loaded (Initial Stage)
 
Bridge structural foundations-and_earth_retaining_structures
Bridge structural foundations-and_earth_retaining_structuresBridge structural foundations-and_earth_retaining_structures
Bridge structural foundations-and_earth_retaining_structures
 
Solid Shank Rivet Codes
Solid Shank Rivet CodesSolid Shank Rivet Codes
Solid Shank Rivet Codes
 
Excavation 2014a-Lecture2
Excavation 2014a-Lecture2Excavation 2014a-Lecture2
Excavation 2014a-Lecture2
 
Excavation 2014a-Lecture3
Excavation 2014a-Lecture3Excavation 2014a-Lecture3
Excavation 2014a-Lecture3
 
Seismic Behavior of Beam Column Joint
Seismic Behavior of Beam Column JointSeismic Behavior of Beam Column Joint
Seismic Behavior of Beam Column Joint
 
Challenges of Rebar Testing
Challenges of Rebar TestingChallenges of Rebar Testing
Challenges of Rebar Testing
 

Similar a Concerto

foundation and structural system of the shard building
foundation and structural system  of the shard buildingfoundation and structural system  of the shard building
foundation and structural system of the shard buildingBirukYared3
 
POST SLAB PRESENTATION FOR LEARNING BASIC STRUCTURAL SYSTEM OF A BUILDING.
POST SLAB PRESENTATION FOR LEARNING BASIC STRUCTURAL SYSTEM OF A BUILDING.POST SLAB PRESENTATION FOR LEARNING BASIC STRUCTURAL SYSTEM OF A BUILDING.
POST SLAB PRESENTATION FOR LEARNING BASIC STRUCTURAL SYSTEM OF A BUILDING.MeherajHussain
 
POST SLAB PRESENTATION FOR LEARNING BASIC STRUCTURAL SYSTEM OF A BUILDING.
POST SLAB PRESENTATION FOR LEARNING BASIC STRUCTURAL SYSTEM OF A BUILDING.POST SLAB PRESENTATION FOR LEARNING BASIC STRUCTURAL SYSTEM OF A BUILDING.
POST SLAB PRESENTATION FOR LEARNING BASIC STRUCTURAL SYSTEM OF A BUILDING.MeherajHussain
 
115659118 pre-engineered-buildings (1)
115659118 pre-engineered-buildings (1)115659118 pre-engineered-buildings (1)
115659118 pre-engineered-buildings (1)hlksd
 
115659118 pre-engineered-buildings
115659118 pre-engineered-buildings115659118 pre-engineered-buildings
115659118 pre-engineered-buildingshlksd
 
Design Appraisal report
Design Appraisal reportDesign Appraisal report
Design Appraisal reportConor Meaney
 
One Museum Park West (Post-Tensioning case study)
One Museum Park West (Post-Tensioning case study)One Museum Park West (Post-Tensioning case study)
One Museum Park West (Post-Tensioning case study)AMSYSCO Inc.
 
Examples of Design Guidelines from OPD
Examples of Design Guidelines from OPDExamples of Design Guidelines from OPD
Examples of Design Guidelines from OPDAdam Cohen
 
Heydar Aliyev Center Structural system and materials
Heydar Aliyev Center Structural system and materialsHeydar Aliyev Center Structural system and materials
Heydar Aliyev Center Structural system and materialsSasanSafar
 
Rfp09498 p2 pres_t05
Rfp09498 p2 pres_t05Rfp09498 p2 pres_t05
Rfp09498 p2 pres_t05rplaughl
 
Long Span Building Construction
Long Span Building ConstructionLong Span Building Construction
Long Span Building ConstructionAsz My
 
The capital nomination 31-08-2013
The capital nomination   31-08-2013The capital nomination   31-08-2013
The capital nomination 31-08-2013engineeringwatch
 
High rise buildings for architects by Dr.-Eng. Moaid subh
High rise buildings for architects   by Dr.-Eng. Moaid subhHigh rise buildings for architects   by Dr.-Eng. Moaid subh
High rise buildings for architects by Dr.-Eng. Moaid subhmoaidsubh
 
JohnHancockCenter.pdf_20230809_123220_0000.pdf
JohnHancockCenter.pdf_20230809_123220_0000.pdfJohnHancockCenter.pdf_20230809_123220_0000.pdf
JohnHancockCenter.pdf_20230809_123220_0000.pdfYashawantSastikar
 
Design of 16 storied apartment using TEKLA STRUCTURAL DESIGNER
Design of 16 storied apartment using TEKLA STRUCTURAL DESIGNERDesign of 16 storied apartment using TEKLA STRUCTURAL DESIGNER
Design of 16 storied apartment using TEKLA STRUCTURAL DESIGNERzafrin mohamed
 

Similar a Concerto (20)

Car park 02
Car park 02Car park 02
Car park 02
 
foundation and structural system of the shard building
foundation and structural system  of the shard buildingfoundation and structural system  of the shard building
foundation and structural system of the shard building
 
Type of high rise building
Type of high rise buildingType of high rise building
Type of high rise building
 
POST SLAB PRESENTATION FOR LEARNING BASIC STRUCTURAL SYSTEM OF A BUILDING.
POST SLAB PRESENTATION FOR LEARNING BASIC STRUCTURAL SYSTEM OF A BUILDING.POST SLAB PRESENTATION FOR LEARNING BASIC STRUCTURAL SYSTEM OF A BUILDING.
POST SLAB PRESENTATION FOR LEARNING BASIC STRUCTURAL SYSTEM OF A BUILDING.
 
POST SLAB PRESENTATION FOR LEARNING BASIC STRUCTURAL SYSTEM OF A BUILDING.
POST SLAB PRESENTATION FOR LEARNING BASIC STRUCTURAL SYSTEM OF A BUILDING.POST SLAB PRESENTATION FOR LEARNING BASIC STRUCTURAL SYSTEM OF A BUILDING.
POST SLAB PRESENTATION FOR LEARNING BASIC STRUCTURAL SYSTEM OF A BUILDING.
 
115659118 pre-engineered-buildings (1)
115659118 pre-engineered-buildings (1)115659118 pre-engineered-buildings (1)
115659118 pre-engineered-buildings (1)
 
115659118 pre-engineered-buildings
115659118 pre-engineered-buildings115659118 pre-engineered-buildings
115659118 pre-engineered-buildings
 
Design Appraisal report
Design Appraisal reportDesign Appraisal report
Design Appraisal report
 
Park avenue
Park avenuePark avenue
Park avenue
 
One Museum Park West (Post-Tensioning case study)
One Museum Park West (Post-Tensioning case study)One Museum Park West (Post-Tensioning case study)
One Museum Park West (Post-Tensioning case study)
 
Examples of Design Guidelines from OPD
Examples of Design Guidelines from OPDExamples of Design Guidelines from OPD
Examples of Design Guidelines from OPD
 
Final_Capstone_2016
Final_Capstone_2016Final_Capstone_2016
Final_Capstone_2016
 
Heydar Aliyev Center Structural system and materials
Heydar Aliyev Center Structural system and materialsHeydar Aliyev Center Structural system and materials
Heydar Aliyev Center Structural system and materials
 
Rfp09498 p2 pres_t05
Rfp09498 p2 pres_t05Rfp09498 p2 pres_t05
Rfp09498 p2 pres_t05
 
Long Span Building Construction
Long Span Building ConstructionLong Span Building Construction
Long Span Building Construction
 
The capital nomination 31-08-2013
The capital nomination   31-08-2013The capital nomination   31-08-2013
The capital nomination 31-08-2013
 
High rise buildings for architects by Dr.-Eng. Moaid subh
High rise buildings for architects   by Dr.-Eng. Moaid subhHigh rise buildings for architects   by Dr.-Eng. Moaid subh
High rise buildings for architects by Dr.-Eng. Moaid subh
 
Prefabricated
PrefabricatedPrefabricated
Prefabricated
 
JohnHancockCenter.pdf_20230809_123220_0000.pdf
JohnHancockCenter.pdf_20230809_123220_0000.pdfJohnHancockCenter.pdf_20230809_123220_0000.pdf
JohnHancockCenter.pdf_20230809_123220_0000.pdf
 
Design of 16 storied apartment using TEKLA STRUCTURAL DESIGNER
Design of 16 storied apartment using TEKLA STRUCTURAL DESIGNERDesign of 16 storied apartment using TEKLA STRUCTURAL DESIGNER
Design of 16 storied apartment using TEKLA STRUCTURAL DESIGNER
 

Concerto