1. Minimum Program Requirements (MPRs)
 “All projects applying for LEED certification must meet a set of minimum
program requirements” according to the USGBC
 The Minimum Program Requirements (MPRs) are the minimum
characteristics or conditions that make a project appropriate to pursue
LEED certification.
 MPRs serve the purpose of giving clear guidance to customers, protecting
the integrity of the LEED program, and reducing challenges that occur
during the LEED process
 All LEED projects (except LEED for Homes and Neighborhood
Development) must meet all MPRs to become certified. MPRs include:
 1. Must be in a permanent location on existing land
 2. Must use reasonable LEED boundaries
 3. Must comply with project size requirements
Reference: LEED v4 BD+C Reference Guide
2. Integrative Project Planning and Design
 Integrated Project planning and design involves people, systems, business
structures and practices. The process utilizes talents of all project
participants to create the best results, reduce waste and ensure
efficiency throughout all phases of the design process.
 It requires:
 Preparation of an Owner’s Project Requirements Document (OPR),
Preliminary Rating Goals, Selection of an Integrated Project Team and Design
Charrette
Reference: LEED v4 BD+C Reference Guide
3. Credit Interpretation Process
 The Credit Interpretation Process supports high-
performance, cost-effective project outcomes through an
analysis of the interrelationships among systems.
 It is used to identify and achieve synergies across disciplines and
building systems.
 CIRs cost $220 each.
4. LEED Boundaries
 In order for a project to become LEED certified, teams must follow
and report specific site boundaries meaning land in and around the
project space that are affected as a result.
 This includes the site area affected by the construction, including
parking and open space.
 The LEED project boundary may not be “gerrymandered” or be
designed to exclude portions of a space simply for the purposes of
seeking LEED certification.
5. Surrounding Density and Diverse Uses
 For the Location and Transportation Credit, LEED requires that buildings
being constructed or renovated must enhance community connectivity in
order to do the following:
 Conserve land and protect farmland and wildlife habitat by encouraging
development in areas with existing infrastructure.
 Promote walkability, and transportation efficiency and reduce vehicle distance
traveled.
 Improve public health by encouraging daily physical activity.
 The are multiple ways to meet this credit. One example is being close to
other services in the community. For example, laundromats, cleaners,
parks, libraries, and/or restaurants.
6. Sustainable Sites (SS)
 Sustainable Sites minimize a project's impact on the surrounding
environment
 The Sustainable Sites category rewards projects with credits that
emphasize the relationships among buildings, ecosystems, and
ecosystem services.
 It focuses on restoring project site elements and preserving the
biodiversity.
 To gain credits, project teams “use low-impact development
methods that minimize construction pollution, reduce heat island
effects and light pollution, and mimic natural water flow patterns
to manage rainwater runoff.”
Reference: BD+C v4 Reference Guide
7. Water Efficiency (WE)
 The Water Efficiency (WE) category aims to promote "efficiency first" by
reducing potable water consumption through effective efficiency strategies
and also by encouraging the use of non-potable "greywater" where possible.
 LEED encourages 40% less water use in green buildings than conventional
buildings.
 There are specific prerequisites and credits in Water Efficiency on the
exam.
 Water Efficiency Terms to Know:
 Potable water
 Process water
 Graywater
 Blackwater
 Tertiary Standards or Tertiary Treatment
8. Flow Rates
 In order for a project to meet LEED indoor water use
requirements, it must include high-efficiency water
fixtures.
 You must know specific flow rates for different fixtures
which you can see in the LEED v4 GA Study Guide.
 There are specific requirements for flow rates when
installing high-efficiency (low-flow) fixtures or fittings.
9. Full Time Equivalent (FTE) Calculations
 Full Time Equivalents are regular building occupants who
spend 40 hours a week in the project building. For the
exam, you should know how to calculate FTEs.
 Full Time Equivalent (FTE) calculations are sometimes
used in LEED to estimate the number of full-time
employees, part-time employees, residents and transient
visitors (optional to include) in the building on an average
day.
 One part-time employee counts as 1/2 a full time
employee .
10. EA Prerequisite Refrigerant Management
 The purpose of the EA Refrigerant Management credit is reduce
stratospheric ozone depletion as well as comply with the
Montreal Protocol.
 The USGBC prohibits use of “chlorofluorocarbon (CFC)-based
refrigerants in new heating, ventilating, air-conditioning, and
refrigeration (HVAC&R) systems.”
 Project teams can do the following: not use refrigerants or use
natural refrigerants, or minimize refrigerant use with low-
impact refrigerants
 When reusing existing HVAC&R equipment, teams should
complete a comprehensive CFC phase-out conversion before
project completion.
11. Renewable Energy
 Uses of on-site renewable energy for a LEED project must comply with
renewable energy standards.
 The purpose of the renewable energy credit is to encourage the use of
renewable energy, such as solar photovoltaics and wind power, as an
on-site alternative to fossil fuel energy.
 The calculation for determining the building’s annual energy costs
should use the following:
12. HVAC Requirements
 HVAC stands for Heating, Ventilation, and Air Conditioning
 HVAC Standards are a component of the Indoor
Environmental Quality Credit for providing optimal comfort
for occupants in the most efficient way possible.
 Project Teams are required to provide thermal comfort for
at least 50% of occupant spaces.
 Teams can either meet ASHRAE Standard 55-2010, ISO, or
CEN Standards for Ergonomics of the Thermal Environment.
13. Low Emitting Materials Standard
 The purpose of this standard is to reduce the concentration of toxic
chemicals or volatile organic compounds (VOCs) to increase air
quality, human health and productivity in the environment.
 Project Teams should use Product Category Rules (PCRs) or VOC
budgets to test for VOC emissions.
 This standard can be met either by complying with thresholds for
interior paints and coatings, interior adhesives and sealants, etc. or
by using the Budget Calculation Method, which is a weighted average
calculation that includes the VOC information for each product.
Reference: BD+C Reference Guide
14. Material Reuse (MR) Recycled Content
 The Material Reuse Recycled Content standard promotes
reducing, reusing and recycling of materials.
 One way to receive an MR credit is to use at least 25% (by cost) of
permanently installed building products that are post-consumer
content + 1/2 pre-consumer content
 Pre-consumer content is material diverted from the waste stream
during the manufacturing process.
 Ex: Shavings, sawdust, walnut shells
 Post-consumer content is material produced by households,
commercial, industrial or institutional facilities which can no longer
be used for its original purpose.
 Ex: Newspapers, plastic bottles, soup cans
15. Biobased materials
 Biobased materials are required to meet the Sustainable
Agriculture Standard
 Biobased materials are defined as commercial or
industrial products (other than food) that are composed
of biological products, renewable agricultural materials or
forestry materials.
 Leather and other animal hides are not considered biobased
material.
16. Rapidly Renewable Materials List
 Rapidly Renewable materials are building materials made from plants that are
typically harvested in a ten year or shorter life cycle.
 Projects that use rapidly renewable materials are awarded one point for at
least 2.5% of all building materials used on the project, based on cost.
 LEED encourages the use of regional materials to reduce the byproducts of
construction materials transportation to a building site. Regional materials are
defined as…
 Bamboo
 Corkstraw
 cotton insulation (recycled jeans?)
 Agrifiber
 natural linoleum (Marmoleum)
 Wool
 Wheatboard
 strawboard
17. Exemplary Performance (EP)
 EPs are points awarded for using innovative design
measure and exemplary performance (going above and
beyond the credit requirements).
 Projects eligible for EPs achieve between 1-2 additional
points “for achieving double the credit requirements or
the next incremental percentage threshold.”
 Some standards do not award Eps
Reference: BD+C Reference Guide
Additional Study Materials…
 Learn more about our Super Study Pack which includes:
 Poplar’s 131 page LEED v4 Green Associate Study Guide (PDF) with 100
question practice test
 400 practice questions with exam simulator
 9 module Online LEED v4 Green Associate training course
 2 hour downloadable MP3 Audio Study Guide
 400 Downloadable/Printable PDF Flashcards
 Bonus LEED Exam Memorization Guide (only available with the Super
Study Pack)

Más contenido relacionado

La actualidad más candente

La actualidad más candente (20)

LEED Certification
LEED CertificationLEED Certification
LEED Certification
 
2016 Well Presentation
2016 Well Presentation2016 Well Presentation
2016 Well Presentation
 
Green Building Rating LEED
Green Building Rating LEEDGreen Building Rating LEED
Green Building Rating LEED
 
LEED
LEEDLEED
LEED
 
Intro to LEED EBOM
Intro to LEED EBOMIntro to LEED EBOM
Intro to LEED EBOM
 
Green building rating system seminar
Green building rating system seminarGreen building rating system seminar
Green building rating system seminar
 
LEED
LEEDLEED
LEED
 
Breeam+vs+leed
Breeam+vs+leedBreeam+vs+leed
Breeam+vs+leed
 
An Introduction to the LEED Rating Systems
An Introduction to the LEED Rating SystemsAn Introduction to the LEED Rating Systems
An Introduction to the LEED Rating Systems
 
Iwbi well presentation-E
Iwbi well presentation-EIwbi well presentation-E
Iwbi well presentation-E
 
Chapter 2 introduction-to_leed_rating_systems
Chapter 2 introduction-to_leed_rating_systemsChapter 2 introduction-to_leed_rating_systems
Chapter 2 introduction-to_leed_rating_systems
 
BREEAM
BREEAMBREEAM
BREEAM
 
LEED v4 GA exam flashcards
LEED v4 GA exam flashcardsLEED v4 GA exam flashcards
LEED v4 GA exam flashcards
 
1. Green Building Concept.pptx
1. Green Building Concept.pptx1. Green Building Concept.pptx
1. Green Building Concept.pptx
 
BREEAM & WELL Buildings Standard, Chris Ward, BREEAM
BREEAM & WELL Buildings Standard, Chris Ward, BREEAMBREEAM & WELL Buildings Standard, Chris Ward, BREEAM
BREEAM & WELL Buildings Standard, Chris Ward, BREEAM
 
Understanding LEED
Understanding LEEDUnderstanding LEED
Understanding LEED
 
LEED and WELL - An Introduction
LEED and WELL - An IntroductionLEED and WELL - An Introduction
LEED and WELL - An Introduction
 
Leed certification
Leed certificationLeed certification
Leed certification
 
LEED GA Exam Prep
LEED GA Exam PrepLEED GA Exam Prep
LEED GA Exam Prep
 
Comparison of BREEAM & LEED
Comparison of BREEAM & LEED Comparison of BREEAM & LEED
Comparison of BREEAM & LEED
 

Similar a 17 concepts you should know to pass the LEED v4 GA Exam

LEED India + Case Study : CII Sohrabji Godrej, ITC Green Center
LEED India + Case Study : CII Sohrabji Godrej, ITC Green CenterLEED India + Case Study : CII Sohrabji Godrej, ITC Green Center
LEED India + Case Study : CII Sohrabji Godrej, ITC Green Centerbaburajiv2007
 
Green Buildings – Climate Change Heroes for a Sustainable Future
Green Buildings – Climate Change Heroes for a Sustainable FutureGreen Buildings – Climate Change Heroes for a Sustainable Future
Green Buildings – Climate Change Heroes for a Sustainable FutureSustainability Knowledge Group
 
BUILDING SERVICES AND SYSTEMS CHAPTER 11
BUILDING SERVICES AND SYSTEMS CHAPTER 11BUILDING SERVICES AND SYSTEMS CHAPTER 11
BUILDING SERVICES AND SYSTEMS CHAPTER 11MairaNoor4
 
Leed green associate pool b - answer
Leed green associate   pool b - answer Leed green associate   pool b - answer
Leed green associate pool b - answer Bilal Mohamed
 
Leed green associate pool f - answer
Leed green associate   pool f - answer Leed green associate   pool f - answer
Leed green associate pool f - answer Bilal Mohamed
 
Leed Plumbing Sanitary Engineering Design
Leed Plumbing Sanitary Engineering DesignLeed Plumbing Sanitary Engineering Design
Leed Plumbing Sanitary Engineering DesignJefreyAbalos
 
Green Buildings. GREEN BUILDING PROCESS AND ASSESSMENT
Green Buildings. GREEN BUILDING PROCESS AND ASSESSMENTGreen Buildings. GREEN BUILDING PROCESS AND ASSESSMENT
Green Buildings. GREEN BUILDING PROCESS AND ASSESSMENTReenaRanaGCET
 
ESC PRESENTATION PPT (2).ppt VDRHFTGHJMXGH
ESC PRESENTATION PPT (2).ppt VDRHFTGHJMXGHESC PRESENTATION PPT (2).ppt VDRHFTGHJMXGH
ESC PRESENTATION PPT (2).ppt VDRHFTGHJMXGHBhimappaLakshappa
 
IRJET- Limitations of Green Building Rating Systems – A Case of LEED and ...
IRJET-  	  Limitations of Green Building Rating Systems – A Case of LEED and ...IRJET-  	  Limitations of Green Building Rating Systems – A Case of LEED and ...
IRJET- Limitations of Green Building Rating Systems – A Case of LEED and ...IRJET Journal
 
LEED U.S. Green Building Council.htm
LEED   U.S. Green Building Council.htmLEED   U.S. Green Building Council.htm
LEED U.S. Green Building Council.htmFathi Nada
 
Leed green associate vi. stakeholder involvement in innovation answer
Leed green associate vi. stakeholder involvement in innovation   answer Leed green associate vi. stakeholder involvement in innovation   answer
Leed green associate vi. stakeholder involvement in innovation answer Bilal Mohamed
 
Opportunities and role of the quantity surveyor in green building project dev...
Opportunities and role of the quantity surveyor in green building project dev...Opportunities and role of the quantity surveyor in green building project dev...
Opportunities and role of the quantity surveyor in green building project dev...oyinleye
 
Leadership in energy and environmental design
Leadership in energy and environmental designLeadership in energy and environmental design
Leadership in energy and environmental designSamSaj3
 
The evolution of green buildings in nigeria
The evolution of green buildings in nigeria The evolution of green buildings in nigeria
The evolution of green buildings in nigeria amfacilities
 

Similar a 17 concepts you should know to pass the LEED v4 GA Exam (20)

LEED India + Case Study : CII Sohrabji Godrej, ITC Green Center
LEED India + Case Study : CII Sohrabji Godrej, ITC Green CenterLEED India + Case Study : CII Sohrabji Godrej, ITC Green Center
LEED India + Case Study : CII Sohrabji Godrej, ITC Green Center
 
Green Building
Green BuildingGreen Building
Green Building
 
Green
GreenGreen
Green
 
Green Buildings – Climate Change Heroes for a Sustainable Future
Green Buildings – Climate Change Heroes for a Sustainable FutureGreen Buildings – Climate Change Heroes for a Sustainable Future
Green Buildings – Climate Change Heroes for a Sustainable Future
 
BUILDING SERVICES AND SYSTEMS CHAPTER 11
BUILDING SERVICES AND SYSTEMS CHAPTER 11BUILDING SERVICES AND SYSTEMS CHAPTER 11
BUILDING SERVICES AND SYSTEMS CHAPTER 11
 
Leed green associate pool b - answer
Leed green associate   pool b - answer Leed green associate   pool b - answer
Leed green associate pool b - answer
 
Leed green associate pool f - answer
Leed green associate   pool f - answer Leed green associate   pool f - answer
Leed green associate pool f - answer
 
Leed Plumbing Sanitary Engineering Design
Leed Plumbing Sanitary Engineering DesignLeed Plumbing Sanitary Engineering Design
Leed Plumbing Sanitary Engineering Design
 
Green Buildings. GREEN BUILDING PROCESS AND ASSESSMENT
Green Buildings. GREEN BUILDING PROCESS AND ASSESSMENTGreen Buildings. GREEN BUILDING PROCESS AND ASSESSMENT
Green Buildings. GREEN BUILDING PROCESS AND ASSESSMENT
 
2.pdf
2.pdf2.pdf
2.pdf
 
Leed
Leed Leed
Leed
 
ESC PRESENTATION PPT (2).ppt VDRHFTGHJMXGH
ESC PRESENTATION PPT (2).ppt VDRHFTGHJMXGHESC PRESENTATION PPT (2).ppt VDRHFTGHJMXGH
ESC PRESENTATION PPT (2).ppt VDRHFTGHJMXGH
 
IRJET- Limitations of Green Building Rating Systems – A Case of LEED and ...
IRJET-  	  Limitations of Green Building Rating Systems – A Case of LEED and ...IRJET-  	  Limitations of Green Building Rating Systems – A Case of LEED and ...
IRJET- Limitations of Green Building Rating Systems – A Case of LEED and ...
 
2.pptx
2.pptx2.pptx
2.pptx
 
LEED U.S. Green Building Council.htm
LEED   U.S. Green Building Council.htmLEED   U.S. Green Building Council.htm
LEED U.S. Green Building Council.htm
 
Leed green associate vi. stakeholder involvement in innovation answer
Leed green associate vi. stakeholder involvement in innovation   answer Leed green associate vi. stakeholder involvement in innovation   answer
Leed green associate vi. stakeholder involvement in innovation answer
 
LEED India
LEED IndiaLEED India
LEED India
 
Opportunities and role of the quantity surveyor in green building project dev...
Opportunities and role of the quantity surveyor in green building project dev...Opportunities and role of the quantity surveyor in green building project dev...
Opportunities and role of the quantity surveyor in green building project dev...
 
Leadership in energy and environmental design
Leadership in energy and environmental designLeadership in energy and environmental design
Leadership in energy and environmental design
 
The evolution of green buildings in nigeria
The evolution of green buildings in nigeria The evolution of green buildings in nigeria
The evolution of green buildings in nigeria
 

Más de Rob Freeman

Poplar LEED Continuing Education Guide 2017
Poplar LEED Continuing Education Guide 2017Poplar LEED Continuing Education Guide 2017
Poplar LEED Continuing Education Guide 2017Rob Freeman
 
CRS Green-e Leed presentation 11 1-12 final
CRS Green-e Leed presentation 11 1-12 finalCRS Green-e Leed presentation 11 1-12 final
CRS Green-e Leed presentation 11 1-12 finalRob Freeman
 
Introduction to Green Roofs
Introduction to Green RoofsIntroduction to Green Roofs
Introduction to Green RoofsRob Freeman
 
LEED v4 Green Building Focuses on Lighting
LEED v4 Green Building Focuses on Lighting LEED v4 Green Building Focuses on Lighting
LEED v4 Green Building Focuses on Lighting Rob Freeman
 
Understanding Net Zero
Understanding Net ZeroUnderstanding Net Zero
Understanding Net ZeroRob Freeman
 
LEED v4: Life Cycle Assessments & Environmental Product Declarations
LEED v4: Life Cycle Assessments & Environmental Product DeclarationsLEED v4: Life Cycle Assessments & Environmental Product Declarations
LEED v4: Life Cycle Assessments & Environmental Product DeclarationsRob Freeman
 
LEED GA Study Tips from the Pros
LEED GA Study Tips from the ProsLEED GA Study Tips from the Pros
LEED GA Study Tips from the ProsRob Freeman
 

Más de Rob Freeman (7)

Poplar LEED Continuing Education Guide 2017
Poplar LEED Continuing Education Guide 2017Poplar LEED Continuing Education Guide 2017
Poplar LEED Continuing Education Guide 2017
 
CRS Green-e Leed presentation 11 1-12 final
CRS Green-e Leed presentation 11 1-12 finalCRS Green-e Leed presentation 11 1-12 final
CRS Green-e Leed presentation 11 1-12 final
 
Introduction to Green Roofs
Introduction to Green RoofsIntroduction to Green Roofs
Introduction to Green Roofs
 
LEED v4 Green Building Focuses on Lighting
LEED v4 Green Building Focuses on Lighting LEED v4 Green Building Focuses on Lighting
LEED v4 Green Building Focuses on Lighting
 
Understanding Net Zero
Understanding Net ZeroUnderstanding Net Zero
Understanding Net Zero
 
LEED v4: Life Cycle Assessments & Environmental Product Declarations
LEED v4: Life Cycle Assessments & Environmental Product DeclarationsLEED v4: Life Cycle Assessments & Environmental Product Declarations
LEED v4: Life Cycle Assessments & Environmental Product Declarations
 
LEED GA Study Tips from the Pros
LEED GA Study Tips from the ProsLEED GA Study Tips from the Pros
LEED GA Study Tips from the Pros
 

Último

Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...tanu pandey
 
VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...
VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...
VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...SUHANI PANDEY
 
Introduction to heat waves and Heatwaves in Bangladesh.pptx
Introduction to heat waves and Heatwaves in Bangladesh.pptxIntroduction to heat waves and Heatwaves in Bangladesh.pptx
Introduction to heat waves and Heatwaves in Bangladesh.pptxNazmusSakibNS
 
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...AICCRA
 
💚😋 Mathura Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋
💚😋 Mathura Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋💚😋 Mathura Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋
💚😋 Mathura Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋nirzagarg
 
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING  SYSTEMS- IGBC, GRIHA, LEED--.pptxRATING  SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptxJIT KUMAR GUPTA
 
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...AICCRA
 
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...SUHANI PANDEY
 
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...Pooja Nehwal
 
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024itadmin50
 
Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...ZAPPAC1
 
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...Anamikakaur10
 
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation AreasProposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas💥Victoria K. Colangelo
 
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 

Último (20)

Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...
 
VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...
VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...
VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...
 
Introduction to heat waves and Heatwaves in Bangladesh.pptx
Introduction to heat waves and Heatwaves in Bangladesh.pptxIntroduction to heat waves and Heatwaves in Bangladesh.pptx
Introduction to heat waves and Heatwaves in Bangladesh.pptx
 
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
 
💚😋 Mathura Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋
💚😋 Mathura Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋💚😋 Mathura Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋
💚😋 Mathura Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋
 
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING  SYSTEMS- IGBC, GRIHA, LEED--.pptxRATING  SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
 
(Anamika) VIP Call Girls Jammu Call Now 8617697112 Jammu Escorts 24x7
(Anamika) VIP Call Girls Jammu Call Now 8617697112 Jammu Escorts 24x7(Anamika) VIP Call Girls Jammu Call Now 8617697112 Jammu Escorts 24x7
(Anamika) VIP Call Girls Jammu Call Now 8617697112 Jammu Escorts 24x7
 
Deforestation
DeforestationDeforestation
Deforestation
 
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
 
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
 
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...
 
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
 
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
 
DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024
 
Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...
 
(INDIRA) Call Girl Katra Call Now 8617697112 Katra Escorts 24x7
(INDIRA) Call Girl Katra Call Now 8617697112 Katra Escorts 24x7(INDIRA) Call Girl Katra Call Now 8617697112 Katra Escorts 24x7
(INDIRA) Call Girl Katra Call Now 8617697112 Katra Escorts 24x7
 
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
 
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation AreasProposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
 
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
 

17 concepts you should know to pass the LEED v4 GA Exam

  • 1. 17 concepts you should know to pass the LEED v4 Green Associate exam
  • 2. 1. Minimum Program Requirements (MPRs)  “All projects applying for LEED certification must meet a set of minimum program requirements” according to the USGBC  The Minimum Program Requirements (MPRs) are the minimum characteristics or conditions that make a project appropriate to pursue LEED certification.  MPRs serve the purpose of giving clear guidance to customers, protecting the integrity of the LEED program, and reducing challenges that occur during the LEED process  All LEED projects (except LEED for Homes and Neighborhood Development) must meet all MPRs to become certified. MPRs include:  1. Must be in a permanent location on existing land  2. Must use reasonable LEED boundaries  3. Must comply with project size requirements Reference: LEED v4 BD+C Reference Guide
  • 3. 2. Integrative Project Planning and Design  Integrated Project planning and design involves people, systems, business structures and practices. The process utilizes talents of all project participants to create the best results, reduce waste and ensure efficiency throughout all phases of the design process.  It requires:  Preparation of an Owner’s Project Requirements Document (OPR), Preliminary Rating Goals, Selection of an Integrated Project Team and Design Charrette Reference: LEED v4 BD+C Reference Guide
  • 4. 3. Credit Interpretation Process  The Credit Interpretation Process supports high- performance, cost-effective project outcomes through an analysis of the interrelationships among systems.  It is used to identify and achieve synergies across disciplines and building systems.  CIRs cost $220 each.
  • 5. 4. LEED Boundaries  In order for a project to become LEED certified, teams must follow and report specific site boundaries meaning land in and around the project space that are affected as a result.  This includes the site area affected by the construction, including parking and open space.  The LEED project boundary may not be “gerrymandered” or be designed to exclude portions of a space simply for the purposes of seeking LEED certification.
  • 6. 5. Surrounding Density and Diverse Uses  For the Location and Transportation Credit, LEED requires that buildings being constructed or renovated must enhance community connectivity in order to do the following:  Conserve land and protect farmland and wildlife habitat by encouraging development in areas with existing infrastructure.  Promote walkability, and transportation efficiency and reduce vehicle distance traveled.  Improve public health by encouraging daily physical activity.  The are multiple ways to meet this credit. One example is being close to other services in the community. For example, laundromats, cleaners, parks, libraries, and/or restaurants.
  • 7. 6. Sustainable Sites (SS)  Sustainable Sites minimize a project's impact on the surrounding environment  The Sustainable Sites category rewards projects with credits that emphasize the relationships among buildings, ecosystems, and ecosystem services.  It focuses on restoring project site elements and preserving the biodiversity.  To gain credits, project teams “use low-impact development methods that minimize construction pollution, reduce heat island effects and light pollution, and mimic natural water flow patterns to manage rainwater runoff.” Reference: BD+C v4 Reference Guide
  • 8. 7. Water Efficiency (WE)  The Water Efficiency (WE) category aims to promote "efficiency first" by reducing potable water consumption through effective efficiency strategies and also by encouraging the use of non-potable "greywater" where possible.  LEED encourages 40% less water use in green buildings than conventional buildings.  There are specific prerequisites and credits in Water Efficiency on the exam.  Water Efficiency Terms to Know:  Potable water  Process water  Graywater  Blackwater  Tertiary Standards or Tertiary Treatment
  • 9. 8. Flow Rates  In order for a project to meet LEED indoor water use requirements, it must include high-efficiency water fixtures.  You must know specific flow rates for different fixtures which you can see in the LEED v4 GA Study Guide.  There are specific requirements for flow rates when installing high-efficiency (low-flow) fixtures or fittings.
  • 10. 9. Full Time Equivalent (FTE) Calculations  Full Time Equivalents are regular building occupants who spend 40 hours a week in the project building. For the exam, you should know how to calculate FTEs.  Full Time Equivalent (FTE) calculations are sometimes used in LEED to estimate the number of full-time employees, part-time employees, residents and transient visitors (optional to include) in the building on an average day.  One part-time employee counts as 1/2 a full time employee .
  • 11. 10. EA Prerequisite Refrigerant Management  The purpose of the EA Refrigerant Management credit is reduce stratospheric ozone depletion as well as comply with the Montreal Protocol.  The USGBC prohibits use of “chlorofluorocarbon (CFC)-based refrigerants in new heating, ventilating, air-conditioning, and refrigeration (HVAC&R) systems.”  Project teams can do the following: not use refrigerants or use natural refrigerants, or minimize refrigerant use with low- impact refrigerants  When reusing existing HVAC&R equipment, teams should complete a comprehensive CFC phase-out conversion before project completion.
  • 12. 11. Renewable Energy  Uses of on-site renewable energy for a LEED project must comply with renewable energy standards.  The purpose of the renewable energy credit is to encourage the use of renewable energy, such as solar photovoltaics and wind power, as an on-site alternative to fossil fuel energy.  The calculation for determining the building’s annual energy costs should use the following:
  • 13. 12. HVAC Requirements  HVAC stands for Heating, Ventilation, and Air Conditioning  HVAC Standards are a component of the Indoor Environmental Quality Credit for providing optimal comfort for occupants in the most efficient way possible.  Project Teams are required to provide thermal comfort for at least 50% of occupant spaces.  Teams can either meet ASHRAE Standard 55-2010, ISO, or CEN Standards for Ergonomics of the Thermal Environment.
  • 14. 13. Low Emitting Materials Standard  The purpose of this standard is to reduce the concentration of toxic chemicals or volatile organic compounds (VOCs) to increase air quality, human health and productivity in the environment.  Project Teams should use Product Category Rules (PCRs) or VOC budgets to test for VOC emissions.  This standard can be met either by complying with thresholds for interior paints and coatings, interior adhesives and sealants, etc. or by using the Budget Calculation Method, which is a weighted average calculation that includes the VOC information for each product. Reference: BD+C Reference Guide
  • 15. 14. Material Reuse (MR) Recycled Content  The Material Reuse Recycled Content standard promotes reducing, reusing and recycling of materials.  One way to receive an MR credit is to use at least 25% (by cost) of permanently installed building products that are post-consumer content + 1/2 pre-consumer content  Pre-consumer content is material diverted from the waste stream during the manufacturing process.  Ex: Shavings, sawdust, walnut shells  Post-consumer content is material produced by households, commercial, industrial or institutional facilities which can no longer be used for its original purpose.  Ex: Newspapers, plastic bottles, soup cans
  • 16. 15. Biobased materials  Biobased materials are required to meet the Sustainable Agriculture Standard  Biobased materials are defined as commercial or industrial products (other than food) that are composed of biological products, renewable agricultural materials or forestry materials.  Leather and other animal hides are not considered biobased material.
  • 17. 16. Rapidly Renewable Materials List  Rapidly Renewable materials are building materials made from plants that are typically harvested in a ten year or shorter life cycle.  Projects that use rapidly renewable materials are awarded one point for at least 2.5% of all building materials used on the project, based on cost.  LEED encourages the use of regional materials to reduce the byproducts of construction materials transportation to a building site. Regional materials are defined as…  Bamboo  Corkstraw  cotton insulation (recycled jeans?)  Agrifiber  natural linoleum (Marmoleum)  Wool  Wheatboard  strawboard
  • 18. 17. Exemplary Performance (EP)  EPs are points awarded for using innovative design measure and exemplary performance (going above and beyond the credit requirements).  Projects eligible for EPs achieve between 1-2 additional points “for achieving double the credit requirements or the next incremental percentage threshold.”  Some standards do not award Eps Reference: BD+C Reference Guide
  • 19. Additional Study Materials…  Learn more about our Super Study Pack which includes:  Poplar’s 131 page LEED v4 Green Associate Study Guide (PDF) with 100 question practice test  400 practice questions with exam simulator  9 module Online LEED v4 Green Associate training course  2 hour downloadable MP3 Audio Study Guide  400 Downloadable/Printable PDF Flashcards  Bonus LEED Exam Memorization Guide (only available with the Super Study Pack)